Annexure#1

FLOW CHART IMS PROCESS (SAPL-IMSP-iPAC-01)

Identify New Product Identify properties to be modified Cost reduction w.r.to


Development (SAPL-iPAC-F-01) (SAPL-iPAC-F-01) 5.1 Properties/input (SAPL-iPAC-F-01)
5.1 5.1

Feedback
Document grade code, Plan of action, resources If not given to
& inputs time schedule, 5.2 feasible HOD-sales

person.
Analysis and testing of Standard sample (SAPL-iPAC-F-02) 5.3

Develop experimental formulation by iPAC (SAPL-iPAC-F-03) 5.4

Procuring from Purchase

Checking the raw material availability in the Plant If does not


exist

Weighing, specimen preparation, properties evaluation of the experimental sample in comparison to STD & its recording in
development history format (SAPL-iPAC-F-03) 5.5 & 5.6

If found ok then Production of pilot sample. 5.7 If not OK


5555.7sample.

Preparation of specimens by injection or compression molding (whichever is required).

If not Give NCM


if properties evaluation found ok in
comparison with standard sample. 5.8 OK disposal
Plan

Create BOM & freeze specifications in SAP. 5.9

Sample Production for customer trial (SAPL-QA-F-10) 5.10

Trial at customer end. 5.11

Generation of customer visit/trial report (SAPL-MKTG-F-06) 5.12


pr
Performance evaluation of trial sample at customer end. 5.13

If trial sample found ok If not


OK

Plan for scale up trial. 5.14

Feedback from customer/sales. 5.15

Commercial trial run 1/2/3. (SAPL-iPAC-F-04) 5.16

Technology transfer to Production. 5.17