You are on page 1of 56

PHES SG EIRL

OBRA: FACHADA DE IEPC DIEGO THOMSON BURNET

RESUMEN METRADO
CONCRETO

Item Descripcin Und. Metrado Precio Parcial Diferencia de


Presupuesto Metrado Real HV Unitario Presupuesto Parcial Real HV Costos

1.1 OBRAS PRELIMINARES


1.1.1 TRAZO Y REPLANTEO DE OBRA glb 1 1.00 11,005.20 11,005.20 11,005.20 0.00
1.1.2 CAMPAMENTO DE OBRA glb 1 1.00 23,204.51 23,204.51 23,204.51 0.00
01.03 CERCO PERIMETRICO ml 550 220.00 32.07 17,636.74 7,054.70 -10,582.04
01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS glb 1 1.00 17,531.84 17,531.84 17,531.84 0.00
01.05 EQUIPOS glb 1 1.00 75,604.84 75,604.84 75,604.84 0.00
1.2 MOVIMIENTO DE TIERRAS
1.2.1 EXCAVACIN MANUAL DE ZANJAS m3 705 110.00 9.33 6,577.69 1,026.15 -5,551.54
1.2.2 Excavacion localizada de cisterna m3 457 465.06 8.66 3,963.22 4,029.42 66.19
1.2.4 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 250 23.00 6.55 1,637.00 150.60 -1,486.40
1.2.5 ELIMINACION DE MATERIAL EXCEDENTE m3 1,369 717.68 7.98 10,918.76 5,725.92 -5,192.84
1.2.6 ESCARIFICADO DE SUELO NATURAL Y COMPACTADO m2 11,900 5.60 66,606.68 0.00 -66,606.68
1.2.7 AFIRMADO COMPACTADO AL 100% DE SU M.S.D. e=0.15 m m2 3,225 2.47 7,958.01 0.00 -7,958.01
1.2.8 AFIRMADO COMPACTADO AL 100% DE SU M.S.D. e=0.20 m m2 3,777 921.67 3.29 12,426.18 3,032.39 -9,393.79
1.2.9 BASE DE AFIRMADO COMPACTADO PARA PISO RIPIO m2 485 178.23 2.47 1,197.40 439.80 -757.60
1.2.10 PISO RIPIO m2 485 178.23 3.61 1,751.80 643.43 -1,108.37
1.3 CONCRETO SIMPLE
1.3.1 SOLADO PARA CIMIENTOS Y ZAPATAS DE 2" 1:12 C:H m2 344 19.00 4.57 1,573.97 86.89 -1,487.08
1.3.2 CONCRETO 1:10 +30% P.G. PARA CIMIENTO CORRIDO m3 213 69.00 72.50 15,442.16 5,002.39 -10,439.77
1.3.3 FALSO PISO DE 4" DE CONCRETO 1:10 m2 108 168.26 14.78 1,592.16 2,487.20 895.04
1.3.4 CONTRAPISO DE 50 MM. m2 924 3,219.92 6.29 5,813.70 20,261.99 14,448.29
1.4 CONCRETO ARMADO
1.4.1 SOBRECIMIENTOS
1.4.1.1 CONCRETO PREMEZCLADO F'C=175 KG/CM2 PARA SOBRECIMIENTOS m3 20 29.00 117.94 2,404.02 3,420.38 1,016.35
1.4.1.2 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS m2 272 342.00 14.29 3,882.42 4,885.71 1,003.28
1.4.1.3 ACERO Fy=4200 KG/CM2 PARA SOBRECIMIENTOS kg 1,228 1,883.00 1.30 1,597.45 2,448.65 851.20
1.4.2 ZAPATAS
1.4.2.1 CONCRETO PREMEZCLADO F'C=210 KG/CM2 PARA ZAPATAS m3 289 10.00 123.74 35,731.57 1,237.38 -34,494.19
1.4.2.2 ENCOFRADO Y DESENCOFRADO EN ZAPATAS m2 662 0.00 14.29 9,455.99 0.00 -9,455.99
1.4.2.3 ACERO Fy=4200 KG/CM2 PARA ZAPATAS kg 4,592 185.00 1.30 5,971.35 240.57 -5,730.77
1.4.3 COLUMNAS
1.4.3.1 CONCRETO PREMEZCLADO F'C=210 KG/CM2 PARA COLUMNAS m3 31 36.29 134.11 4,176.16 4,867.18 691.02
1.4.3.2 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 372 489.34 21.85 8,127.86 10,694.25 2,566.40
1.4.3.3 ACERO Fy=4200 KG/CM2 PARA COLUMNAS kg 3,439 6,395.00 1.30 4,472.10 8,316.06 3,843.96
1.4.4 PLACAS
1.4.4.1 CONCRETO PREMEZCLADO F'C=210 KG/CM2 PARA PLACAS m3 18 18.00 132.81 2,352.95 2,390.62 37.67
1.4.4.2 ENCOFRADO Y DESENCOFRADO EN PLACAS m2 246 248.00 19.00 4,676.69 4,711.31 34.61
1.4.4.3 ACERO Fy=4200 KG/CM2 PARA PLACAS kg 1,717 1,823.00 1.30 2,232.27 2,370.63 138.36
1.4.5 VIGAS
1.4.5.1 CONCRETO PREMEZCLADO F'C=210 KG/CM2 PARA VIGAS m3 27 38.95 145.53 4,001.28 5,669.05 1,667.77
1.4.5.2 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 324 393.55 29.33 9,496.79 11,541.14 2,044.34
1.4.5.3 ACERO Fy=4200 KG/CM2 PARA VIGAS kg 2,861 3,797.00 1.30 3,720.77 4,937.62 1,216.85
1.4.6 LOSAS ALIGERADAS
1.4.6.1 CONCRETO PREMEZCLADO F'C=210 KG/CM2 PARA LOSAS ALIGERADAS m3 59 40.00 145.53 8,579.60 5,821.25 -2,758.35
1.4.6.2 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS m2 561 409.00 28.49 15,973.99 11,652.94 -4,321.05
1.4.6.3 ACERO Fy=4200 KG/CM2 PARA LOSAS ALIGERADAS kg 4,069 2,581.00 1.30 5,291.78 3,356.33 -1,935.44
1.4.6.4 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 1,975 1,779.00 1.22 2,411.07 2,171.45 -239.62
1.4.6.5 LADRILLO HUECO DE ARCILLA 20X30X30 CM PARA TECHO ALIGERADO und 1,961 1,708.00 1.72 3,377.44 2,942.20 -435.24
1.4.8 CISTERNA
1.4.8.1 CONCRETO PREMEZCLADO F'C=210 KG/CM2 PARA TANQUE CISTERNA m3 104 127.20 154.99 16,169.65 19,713.73 3,544.08
1.4.8.2 ENCOFRADO Y DESENCOFRADO EN TANQUE CISTERNA m2 464 654.74 25.54 11,853.80 16,722.19 4,868.39
1.4.8.3 ACERO Fy=4200 KG/CM2 PARA TANQUE CISTERNA kg 4,680 6,343.00 1.30 6,086.12 8,248.44 2,162.32
1.4.8.4 TAPA DE FIERRO FUNDIDO PARA INSPECCIN und 3 3.00 120.00 360.00 360.00 0.00
1.4.8.5 ESCALONES DE FIERRO GALVANIZADO D=3/4" PARA INSPECCIN und 15 15.00 360.00 5,400.00 5,400.00 0.00
1.5 SUMINISTRO E INSTALACION DE PERNOS DE ANCLAJE
1.5.1 PERNOS INC. TUERCAS Y ARANDELAS A325 1/2" (PARA COLUMNA TIPO C-M2) und 26 26.00 100.00 2,600.00 2,600.00 0.00
1.5.2 PERNOS INC. TUERCAS Y ARANDELAS A325 5/8" (PARA COLUMNA TIPO C-M1) und 52 50.00 125.00 6,500.00 6,250.00 -250.00
1.5.3 PERNOS INC. TUERCAS Y ARANDELAS A325 3/4" (PARA COLUMNA TIPO C-M3) und 4 4.00 150.00 600.00 600.00 0.00
1.6 NUEVAS PARTIDAS
1.6.1 FALZA ZAPATA
1.6.1.1 EXCAVACIN MANUAL DE ZANJA m3 15.38 8.66 133.20 133.20
1.6.1.2 CONCRETO CICLOPEO F'C= 100 KG/CM2 PARA FALSA ZAPATA m3 15.38 72.50 1,115.08 1,115.08
1.6.1.4 PERFILADO PARA FALZA ZAPATA Y PEDESTAL m2 18.26 #REF! #REF! #REF!

HV S.A. CONTRATISTAS resumen Pgina 1 de 56


Metrado Precio Parcial Diferencia de
Item Descripcin Und. Presupuesto Metrado Real HV Unitario Presupuesto Parcial Real HV Costos

1.6.2 APOYO DE CONTENEDORES 0.00


1.6.2.1 CONCRETO PREMEZCLADO F'C= 210 KG/CM2 PARA CONTENEDORES m3 14.40 123.74 1,781.83 1,781.83
1.6.2.2 ENCOFRADO PARA PEDESTAL m2 48.00 21.85 1,049.02 1,049.02
1.6.2.3 ACERO Fy=4200 KG/CM2 PARA PEDESTALES kg 677.00 1.30 880.37 880.37
1.6.3 CISTERNA
1.6.3.1 SOBRE EXCAVACIN MASIVA CON EXCAVADORA 330L m3 327.60 8.66 2,836.97 2,836.97
1.6.3.2 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 327.60 6.55 2,145.09 2,145.09
1.6.3.3 PERFILADO DE TALUD CISTERNA m2 211.89 #REF! #REF! #REF!
1.6.3.4 TRASLADO INTERNO DE MATERIAL D MENOR 1KM m3 327.60 #REF! #REF! #REF!
1.6.3.5 SOLADO PARA CISTERNA m2 164.00 4.57 749.99 749.99
1.6.4 PEDESTALES - OFICINAS ADMINISTRATIVAS
1.6.4.1 ENCOFRADO DE PEDESTAL CM-1 und 50.00 #REF! #REF! #REF!
1.6.4.2 ENCOFRADO DE PEDESTAL CM-2 und 26.00 #REF! #REF! #REF!
1.6.4.3 ENCOFRADO DE PEDESTAL CM-3 und 4.00 #REF! #REF! #REF!
1.6.5 PLATAFORMA ADMINISTRATIVA
1.6.5.1 Corte y relleno compensado m2 6,833.81 #REF! #REF! #REF!
1.6.6 ESTACIONAMIENTO
1.6.6.1 Conformacion de sub base con material propio m2 1,958.00 #REF! #REF! #REF!
1.6.7 MATERIAL FALTANTE
1.6.7.1 Grout 1"/ Grout cementicio sikagrout 212 o similar m2 23.83 #REF! #REF! #REF!
1.6.8 CIMENTACIONES PARA TORRE DE COMUNICACIONES
1.6.8.1 ESTRUCTURAS
1.1 OBRAS PRELIMINARES
1.1.1 TRAZO Y REPLANTEO m2 43.56 1.50 65.34 65.34
1.2 MOVIMIENTO DE TIERRAS
1.2.1 EXCAVACION MANUAL PARA CIMENTACION m3 29.00 9.33 270.57 270.57
1.2.2 PERFILADOS DE ZANJAS m2 85.00 5.60 476.00 476.00
1.2.3 RELLENO CON MATERIAL PROPIO SELECCIONADO m2 19.00 6.55 124.45 124.45
1.2.4 ELIMINACION DE MATERIAL EXCEDENTE m3 95.00 7.98 758.10 758.10
1.2.5 BASE E=0.20 PARA LOSA PISO m2 42.92 3.29 141.21 141.21
1.3 CONCRETO SIMPLE
1.3.1 SOLADO PARA CIMENTACION m2 14.00 4.57 64.04 64.04
1.3.2 CONCRETO PARA LOSA E=0.10 m3 43.00 14.78 635.63 635.63
1.4 CONCRETO ARMADO
1.4.1 ZAPATAS
1.4.1.1 CONCRETO F=280 PARA ZAPATAS m3 6.00 159.99 959.95 959.95
1.4.1.3 ACERO PARA ZAPATAS kg 429.00 1.30 557.70 557.70
1.4.2 COLUMNAS
1.4.2.1 CONCRETO F'C=280 PARA COLUMNAS m3 1.00 170.31 170.31 170.31
1.4.2.2 ENCOFRADO PARA COLUMNAS m2 7.70 21.86 168.32 168.32
1.4.2.3 ACERO PARA COLUMNAS kg 161.00 1.30 209.30 209.30
1.4.3 VIGAS DE CIMENTACION
1.4.3.1 CONCRETO F'C=280 PARA VIGAS DE CIMENTACION m3 3.00 159.99 479.98 479.98
1.4.3.2 ENCOFRADO PARA VIGAS DE CIMENTACION m2 21.00 14.29 300.09 300.09
1.4.3.3 ACERO PARA VIGAS DE CIMENTACION kg 441.00 1.30 573.30 573.30
1.4.4 VARIOS
1.4.4.1 Sealizacin ml 34.40 1.50 51.60 51.60
469,944.99 #REF! #REF!
#REF! #REF!
#REF!

HV S.A. CONTRATISTAS resumen Pgina 2 de 56


METRADO DE ZAPATAS

Partida : Zapatas de Columnas


Tota ml por Tota ml por
Tipo Peso ml
Diametro Diametro

1 8 mm 0.40 - -
2 1/4" - - - Talud 0%
3 3/8" 0.56 - -
4 1/2" 0.99 185.95 ml 185.00 kg
5 5/8" 1.55 - -
6 3/4" 2.25 - -
8 1" 3.97 - - 185.00 kg Total Acero

Datos Metrados Acero


PLANO Id Cant.
Largo Ancho hConc h exc V excav. V relleno Asolado Vconc # L Tipo Total ml

INGDT01-002-B-001 ZAPATAS - - - - -
INGDT01-002-B-002 Z2 1.70 X 1.50 4 1.70 1.50 0.50 1.35 13.77 8.67 10.20 5.10 -
INGDT01-002-B-002 Acero long. 4 - - - - 8 1.60 4 51.20
INGDT01-002-B-002 Cruceta 4 - 9 1.40 4 50.40
INGDT01-002-B-002 Z7 1.20 X 1.20 2 1.20 1.20 0.50 1.35 3.89 2.45 2.88 1.44 -
INGDT01-002-B-002 Acero long. 2 - - - - 7 1.10 4 14.30
INGDT01-002-B-002 Cruceta 2 - - - - 7 1.10 4 14.30
INGDT01-002-B-002 Z14 2.00 X 1.50 1 2.00 1.50 0.50 1.35 4.05 2.55 3.00 1.50 -
INGDT01-002-B-002 Acero long. 1 - - - - 8 1.90 4 15.20
INGDT01-002-B-002 Cruceta 1 - - - - 11 1.40 4 14.70
INGDT01-002-B-002 Z16 3.90 X 1.00 2 1.00 0.75 0.50 1.35 2.03 1.28 1.50 0.75 -
1 2.40 0.75 0.50 1.35 2.43 1.53 1.80 0.90 -
INGDT01-002-B-002 Acero long. 1 2 - - - - 4 0.90 4 7.65
INGDT01-002-B-002 Acero long. 2 1 - - - - 1 0.15 4 0.15
INGDT01-002-B-002 Acero long. 3 1 - - - - 5 3.80 4 18.05
- - - -

26.00 16.00 19.00 10.00 185.95


m3 m3 m2 m3 ml

HV S.A. CONTRATISTAS 361485466.xls - Zapatas Pgina3 de 56


Datos Metrados Acero
PLANO Id Cant.
Largo Ancho hConc h exc V excav. V relleno Asolado Vconc # L Tipo Total ml

HV S.A. CONTRATISTAS 361485466.xls - Zapatas Pgina4 de 56


HV S.A. CONTRATISTAS 23-Aug-11

METRADO CIMIENTO CORRIDO


Obra : PROYECTO CONGA
Partida : CIMIENTO CORRIDO Talud 0%

Datos Metrados

PLANO SECTOR EJE Id Cant. Largo Ancho hConc h exc V excav. V relleno Vconc Perfilado
ITEM

1 INGDT01-002-B-001 Escalera A'-A' VCIM-01 1 2.09 0.25 0.50 0.50 0.26 - 0.26 2.22
2 INGDT01-002-B-002 Escalera A''-A'' 1 2.32 0.60 1.00 1.10 1.53 0.14 1.39 5.76
3 INGDT01-002-B-002 1 1.50 0.60 1.00 1.10 0.99 0.09 0.90 3.96
4 1 1.10 0.60 1.00 1.10 0.73 0.07 0.66 3.08
5 1 4.10 0.60 1.00 1.10 2.71 0.25 2.46 9.68
6 1 1.85 0.60 1.00 1.10 1.22 0.11 1.11 4.73
7 1 1.75 0.60 1.00 1.10 1.16 0.11 1.05 4.51
8 1 2.65 0.60 1.00 1.10 1.75 0.16 1.59 6.49
9 1 1.50 0.60 1.00 1.10 0.99 0.09 0.90 3.96
10 1 4.75 0.60 1.00 1.10 3.14 0.29 2.85 11.11
11 1 4.60 0.60 1.00 1.10 3.04 0.28 2.76 10.78
12 1 1.05 0.60 1.00 1.10 0.69 0.06 0.63 2.97
13 1 2.70 0.60 1.00 1.10 1.78 0.16 1.62 6.60
14 1 2.95 0.60 1.00 1.10 1.95 0.18 1.77 7.15
15 1 4.70 0.60 1.00 1.10 3.10 0.28 2.82 11.00
16 Batera de baos 2 B-B 1 2.70 0.60 1.00 1.10 1.78 0.16 1.62 6.60
17 Batera de baos 2 B'-B' CC - 2 1 1.55 0.60 1.00 1.10 1.02 0.09 0.93 4.07
18 Batera de baos 2 C'-C' CC - 2 1 2.01 0.60 1.00 1.10 1.33 0.12 1.21 5.08
19 Batera de baos 2 C''-C'' CC - 2 1 2.01 0.60 1.00 1.10 1.33 0.12 1.21 5.08
20 Batera de baos 2 C'''-C''' CC - 2 1 3.21 0.60 1.00 1.10 2.12 0.19 1.93 7.72
21 Batera de baos 2 11'-11' CC - 2 1 11.18 0.60 1.00 1.10 7.38 0.67 6.71 25.26
22 Batera de baos 2 11''-11'' CC - 2 1 6.20 0.60 1.00 1.10 4.09 0.37 3.72 14.30
23 Batera de baos 2 11'''-11''' CC - 2 1 2.29 0.60 1.00 1.10 1.51 0.14 1.37 5.70
24 Batera de baos 2 12-12 CC - 2 1 6.10 0.60 1.00 1.10 4.03 0.37 3.66 14.08
25 Batera de baos 3 G'-G' CC - 2 1 2.66 0.60 1.00 1.10 1.76 0.16 1.60 6.51

HV S.A. CONTRATISTAS 361485466.xls - Cimiento corrido Pgina 5 de 56


Datos Metrados

PLANO SECTOR EJE Id Cant. Largo Ancho hConc h exc V excav. V relleno Vconc Perfilado
ITEM

26 Batera de baos 3 H-H CC - 2 1 3.03 0.60 1.00 1.10 2.00 0.18 1.82 7.33
27 Batera de baos 3 H'-H' CC - 2 1 1.28 0.60 1.00 1.10 0.84 0.08 0.77 3.48
28 Batera de baos 3 I-I- CC - 2 1 3.06 0.60 1.00 1.10 2.02 0.18 1.84 7.39
29 Batera de baos 3 10'-10' CC - 2 1 4.16 0.60 1.00 1.10 2.75 0.25 2.50 9.81
30 Batera de baos 3 10''-10'' CC - 2 1 2.23 0.60 1.00 1.10 1.47 0.13 1.34 5.57
31 Batera de baos 3 11-11 CC - 2 1 2.65 0.60 1.00 1.10 1.75 0.16 1.59 6.49
32 Edificio administrativo D'-D' CC - 2 1 2.61 0.60 1.00 1.10 1.72 0.16 1.57 6.40
33 Wire room 1 E-E CC - 2 1 2.61 0.60 1.00 1.10 1.72 0.16 1.57 6.40
34 Wire room 1 E'-E' CC - 2 1 2.61 0.60 1.00 1.10 1.72 0.16 1.57 6.40
35 Wire room 1 11'-11' CC - 2 1 1.38 0.60 1.00 1.10 0.91 0.08 0.83 3.70
36 Wire room 1 12-12 CC - 2 1 1.38 0.60 1.00 1.10 0.91 0.08 0.83 3.70
37 Cuarto de tableros 1 F'-F' CC - 2 1 2.10 0.60 1.00 1.10 1.39 0.13 1.26 5.28
38 Cuarto de tableros 1 G'-G' CC - 2 1 3.15 0.60 1.00 1.10 2.08 0.19 1.89 7.59
39 Cuarto de tableros 1 12-12 CC - 2 1 0.43 0.60 1.00 1.10 0.28 0.03 0.26 1.61
40 Cuarto de tableros 1 12'-12' CC - 2 1 3.04 0.60 1.00 1.10 2.01 0.18 1.82 7.35

75.00 7.00 69.00 277.00


m3 m3 m3 m2

El metrado de falsa zapata de pedestales y contenedores se incluy en el metrado de cimiento


corrido de acuerdo a la reunin del 23 de agosto.

Ampliacin de cuarto tcnico

HV S.A. CONTRATISTAS 361485466.xls - Cimiento corrido Pgina 6 de 56


HV S.A. CONTRATISTAS 23-Aug-11

METRADO DE SOBRECIMIENTOS
OBRA: PROYECTO CONGA

Partida : Sobrecimientos
Tota ml por Tota ml por
Tipo Peso ml
Diametro Diametro

1 8 mm 0.40 1,647.48 ml 659.00 kg


2 1/4" - 121.38 ml -
3 3/8" 0.56 2,112.43 ml 1,183.00 kg
4 1/2" 0.99 40.96 ml 41.00 kg
5 5/8" 1.55 - -
6 3/4" 2.25 - -
8 1" 3.97 - - 1,883.00 kg Total Acero

Datos Metrados Acero


ITEM PLANO SECTOR EJE Id Cant. Largo Ancho hConc Vconc Encof # L Tipo Total ml

1 INGDT01-002-B-001 Escalera A'-A' VCIM-01 1 2.09 0.25 0.50 0.26 2.09 -


2 1 - - 8 5.12 4 40.96
3 1 - - 14 8.40 2 121.38
4 1 2.04 0.15 0.50 0.15 2.04 -
5 1 - - 4 3.14 3 12.56
6 1 - - 9 1.27 1 11.43
7 1 0.70 0.15 0.50 0.05 0.70 -
8 1 - - 4 1.75 3 7.00
9 1 - - 4 1.27 1 5.08
10 1 0.98 0.15 0.50 0.07 0.98 -
11 1 - - 4 2.03 3 8.12
12 1 - - 5 1.27 1 6.35
13 1 4.80 0.15 0.50 0.36 4.80 -
14 1 - - 4 7.00 3 28.00
15 1 - - 20 1.27 1 25.40
16 1 1.20 0.15 0.50 0.09 1.20 -
17 1 - - 4 2.25 3 9.00
18 1 - - 6 1.27 1 7.62
19 1 2.00 0.15 0.50 0.15 2.00 -
20 1 - - 4 3.20 3 12.80
21 1 - - 9 1.27 1 11.43

HV S.A CONTRATISTAS 361485466.xls - Sobrecimiento Pgina7 de 56


Datos Metrados Acero
ITEM PLANO SECTOR EJE Id Cant. Largo Ancho hConc Vconc Encof # L Tipo Total ml
22 1 3.05 0.15 0.50 0.23 3.05 -
23 1 - - 4 4.10 3 16.40
24 1 - - 13 1.27 1 16.51
25 1 2.74 0.15 0.50 0.21 2.74 -
26 1 - - 4 4.79 3 19.16
27 1 - - 12 1.27 1 15.24
28 1 4.70 0.15 0.50 0.35 4.70 -
29 1 - - 4 5.90 3 23.60
30 1 - - 20 1.27 1 25.40
31 1 3.60 0.15 0.50 0.27 3.60 -
32 1 - - 4 4.85 3 19.40
33 1 - - 15 1.27 1 19.05
34 1 0.90 0.15 0.50 0.07 0.90 -
35 1 - - 4 1.90 3 7.60
36 1 - - 4 1.27 1 5.08
37 1 1.90 0.15 0.50 0.14 1.90 -
38 1 - - 4 2.95 3 11.80
39 1 - - 8 1.27 1 10.16
40 1 2.50 0.15 0.50 0.19 2.50 -
41 1 - - 4 3.80 3 15.20
42 1 - - 11 1.27 1 13.97
43 1 3.97 0.15 0.50 0.30 3.97 -
44 1 - - 4 5.57 3 22.28
45 1 - - 18 1.27 1 22.86
46 1 2.98 0.15 0.50 0.22 2.98 -
47 1 - - 4 4.23 3 16.92
48 1 - - 13 1.27 1 16.51
49 1 1.93 0.15 0.50 0.14 1.93 -
50 1 - - 4 3.03 3 12.12
51 1 - - 8 1.27 1 10.16
52 1 2.43 0.15 0.50 0.18 2.43 -
53 1 - - 4 3.48 3 13.92
54 1 - - 10 1.27 1 12.70
55 1 2.36 0.15 0.50 0.18 2.36 -
56 1 - - 4 3.48 3 13.92
57 1 - - 14 1.27 1 17.78
58 1 3.48 0.15 0.50 0.26 3.48 -

HV S.A CONTRATISTAS 361485466.xls - Sobrecimiento Pgina8 de 56


Datos Metrados Acero
ITEM PLANO SECTOR EJE Id Cant. Largo Ancho hConc Vconc Encof # L Tipo Total ml
59 1 - - 4 4.68 3 18.72
60 1 - - 16 1.27 1 20.32
61 1 8.54 0.15 0.50 0.64 8.54 -
62 1 - - 4 10.93 3 43.72
63 1 - - 35 1.27 1 44.45
64 1 2.78 0.15 0.50 0.21 2.78 -
65 1 - - 4 5.95 3 23.80
66 1 - - 12 1.27 1 15.24
67 1 4.84 0.15 0.50 0.36 4.84 -
68 1 - - 4 6.89 3 27.56
69 1 - - 21 1.27 1 26.67
70 1 5.38 0.15 0.50 0.40 5.38 -
71 1 - - 4 6.73 3 26.92
72 1 - - 23 1.27 1 29.21
73 1 2.81 0.15 0.50 0.21 2.81 -
74 1 - - 4 4.11 3 16.44
75 1 - - 12 1.27 1 15.24
76 1 2.80 0.15 0.50 0.21 2.80 -
77 1 - - 4 4.11 3 16.44
78 1 - - 13 1.27 1 16.51
79 1 1.15 0.15 0.50 0.09 1.15 -
80 1 - - 4 2.20 3 8.80
81 1 - - 5 1.27 1 6.35
82 1 2.32 0.15 0.50 0.17 2.32 -
83 1 - - 4 4.02 3 16.08
84 1 - - 11 1.27 1 13.97
85 1 2.91 0.15 0.50 0.22 2.91 -
86 1 - - 4 5.06 3 20.24
87 1 - - 12 1.27 1 15.24
88 1 2.34 0.15 0.50 0.18 2.34 -
89 1 - - 4 3.55 3 14.20
90 1 - - 10 1.27 1 12.70
91 1 2.19 0.15 0.50 0.16 2.19 -
92 1 - - 4 3.29 3 13.16
93 1 - - 9 1.27 1 11.43
94 1 3.48 0.15 0.50 0.26 3.48 -

HV S.A CONTRATISTAS 361485466.xls - Sobrecimiento Pgina9 de 56


Datos Metrados Acero
ITEM PLANO SECTOR EJE Id Cant. Largo Ancho hConc Vconc Encof # L Tipo Total ml
95 1 - - 4 4.68 3 18.72
96 1 - - 14 1.27 1 17.78
97 1 3.48 0.15 0.50 0.26 3.48 -
98 1 - - 4 4.68 3 18.72
99 1 - - 14 1.27 1 17.78
100 1 3.48 0.15 0.50 0.26 3.48 -
101 1 - - 4 4.68 3 18.72
102 1 - - 14 1.27 1 17.78
103 1 1.83 0.15 0.50 0.14 1.83 -
104 1 - - 4 2.93 3 11.72
105 1 - - 8 1.27 1 10.16
106 1 2.98 0.15 0.50 0.22 2.98 -
107 1 - - 4 3.98 3 15.92
108 1 - - 12 1.27 1 15.24
109 1 2.20 0.15 0.50 0.17 2.20 -
110 1 - - 4 3.30 3 13.20
111 1 - - 9 1.27 1 11.43
112 1 2.25 0.15 0.50 0.17 2.25 -
113 1 - - 4 2.60 3 10.40
114 1 - - 10 1.27 1 12.70
115 1 1.13 0.15 0.50 0.08 1.13 -
116 1 - - 4 2.33 3 9.32
117 1 - - 6 1.27 1 7.62
118 1 2.23 0.15 0.50 0.17 2.23 -
119 1 - - 4 3.53 3 14.12
120 1 - - 10 1.27 1 12.70
121 1 3.10 0.15 0.50 0.23 3.10 -
122 1 - - 4 4.20 3 16.80
123 1 - - 13 1.27 1 16.51
124 1 3.10 0.15 0.50 0.23 3.10 -
125 1 - - 4 4.20 3 16.80
126 1 - - 13 1.27 1 16.51
127 1 1.05 0.15 0.50 0.08 1.05 -
128 1 - - 4 2.15 3 8.60
129 1 - - 5 1.27 1 6.35

HV S.A CONTRATISTAS 361485466.xls - Sobrecimiento Pgina10 de 56


Datos Metrados Acero
ITEM PLANO SECTOR EJE Id Cant. Largo Ancho hConc Vconc Encof # L Tipo Total ml
130 1 2.37 0.15 0.50 0.18 2.37 -
131 1 - - 4 4.07 3 16.28
132 1 - - 11 1.27 1 13.97
133 1 2.19 0.15 0.50 0.16 2.19 -
134 1 - - 4 3.29 3 13.16
135 1 - - 9 1.27 1 11.43
136 1 2.55 0.15 0.50 0.19 2.55 -
137 1 - - 4 3.55 3 14.20
138 1 - - 11 1.27 1 13.97
139 1 2.96 0.15 0.50 0.22 2.96 -
140 1 - - 4 5.06 3 20.24
141 1 - - 13 1.27 1 16.51
142 1 1.70 0.15 0.50 0.13 1.70 -
143 1 - - 4 2.80 3 11.20
144 1 - - 7 1.27 1 8.89
145 1 2.85 0.15 0.50 0.21 2.85 -
146 1 - - 4 3.85 3 15.40
147 1 - - 12 1.27 1 15.24
148 1 2.25 0.15 0.50 0.17 2.25 -
149 1 - - 4 3.30 3 13.20
150 1 - - 11 1.27 1 13.97
151 1 2.20 0.15 0.50 0.17 2.20 -
152 1 - - 4 3.30 3 13.20
153 1 - - 9 1.27 1 11.43
154 1 3.52 0.15 0.50 0.26 3.52 -
155 1 - - 4 4.72 3 18.88
156 1 - - 15 1.27 1 19.05
157 1 3.52 0.15 0.50 0.26 3.52 -
158 1 - - 4 4.72 3 18.88
159 1 - - 15 1.27 1 19.05
160 1 3.00 0.15 0.50 0.23 3.00 -
161 1 - - 4 4.35 3 17.40
162 1 - - 13 1.27 1 16.51
163 1 2.10 0.15 0.50 0.16 2.10 -
164 1 - - 4 3.45 3 13.80

HV S.A CONTRATISTAS 361485466.xls - Sobrecimiento Pgina11 de 56


Datos Metrados Acero
ITEM PLANO SECTOR EJE Id Cant. Largo Ancho hConc Vconc Encof # L Tipo Total ml
165 1 - - 9 1.27 1 11.43
166 1 2.93 0.15 0.50 0.22 2.93 -
167 1 - - 4 4.23 3 16.92
168 1 - - 13 1.27 1 16.51
169 1 2.08 0.15 0.50 0.16 2.08 -
170 1 - - 4 3.18 3 12.72
171 1 - - 9 1.27 1 11.43
172 1 0.64 0.15 0.50 0.05 0.64 -
173 1 - - 4 1.34 3 5.36
174 1 - - 2 1.27 1 2.54
175 1 2.47 0.15 0.50 0.19 2.47 -
176 1 - - 4 3.52 3 14.08
177 1 - - 11 1.27 1 13.97
178 1 3.62 0.15 0.50 0.27 3.62 -
179 1 - - 4 4.72 3 18.88
180 1 - - 15 1.27 1 19.05
181 1 2.54 0.15 0.50 0.19 2.54 -
182 1 - - 4 3.69 3 14.76
183 1 - - 11 1.27 1 13.97
184 1 3.94 0.15 0.50 0.30 3.94 -
185 1 - - 4 5.09 3 20.36
186 1 - - 17 1.27 1 21.59
187 1 1.00 0.15 0.50 0.08 1.00 -
188 1 - - 4 2.05 3 8.20
189 1 - - 5 1.27 1 6.35
190 1 5.33 0.15 0.50 0.40 5.33 -
191 1 - - 4 7.43 3 29.72
192 1 - - 22 1.27 1 27.94
193 1 4.85 0.15 0.50 0.36 4.85 -
194 1 - - 4 7.00 3 28.00
195 1 - - 21 1.27 1 26.67
196 1 2.10 0.15 0.50 0.16 2.10 -
197 1 - - 4 3.30 3 13.20
198 1 - - 9 1.27 1 11.43
199 1 1.95 0.15 0.50 0.15 1.95 -

HV S.A CONTRATISTAS 361485466.xls - Sobrecimiento Pgina12 de 56


Datos Metrados Acero
ITEM PLANO SECTOR EJE Id Cant. Largo Ancho hConc Vconc Encof # L Tipo Total ml
200 1 - - 4 3.20 3 12.80
201 1 - - 9 1.27 1 11.43
202 1 3.05 0.15 0.50 0.23 3.05 -
203 1 - - 4 4.10 3 16.40
204 1 - - 13 1.27 1 16.51
205 1 1.85 0.15 0.50 0.14 1.85 -
206 1 - - 4 2.90 3 11.60
207 1 - - 8 1.27 1 10.16
208 1 0.50 0.15 0.50 0.04 0.50 -
209 1 - - 4 1.35 3 5.40
210 1 - - 3 1.27 1 3.81
211 1 4.92 0.15 0.50 0.37 4.92 -
212 1 - - 4 6.27 3 25.08
213 1 - - 21 1.27 1 26.67
214 1 2.50 0.15 0.50 0.19 2.50 -
215 1 - - 4 3.80 3 15.20
216 1 - - 11 1.27 1 13.97
217 1 0.85 0.15 0.50 0.06 0.85 -
218 1 - - 4 1.90 3 7.60
219 1 - - 4 1.27 1 5.08
220 1 3.60 0.15 0.50 0.27 3.60 -
221 1 - - 4 4.85 3 19.40
222 1 - - 15 1.27 1 19.05
223 1 4.65 0.15 0.50 0.35 4.65 -
224 1 - - 4 5.90 3 23.60
225 1 - - 20 1.27 1 25.40
226 1 3.75 0.15 0.50 0.28 3.75 -
227 1 - - 4 5.05 3 20.20
228 1 - - 16 1.27 1 20.32
229 1 0.50 0.15 0.50 0.04 0.50 -
230 1 - - 4 1.34 3 5.36
231 1 - - 2 1.27 1 2.54
232 1 3.87 0.15 0.50 0.29 3.87 -
233 1 - - 4 5.17 3 20.68
234 1 - - 16 1.27 1 20.32

HV S.A CONTRATISTAS 361485466.xls - Sobrecimiento Pgina13 de 56


Datos Metrados Acero
ITEM PLANO SECTOR EJE Id Cant. Largo Ancho hConc Vconc Encof # L Tipo Total ml
235 1 0.98 0.15 0.50 0.07 0.98 -
236 1 - - 4 2.03 3 8.12
237 1 - - 5 1.27 1 6.35
238 1 0.62 0.15 0.50 0.05 0.62 -
239 1 - - 4 1.65 3 6.60
240 1 - - 3 1.27 1 3.81
241 1 0.70 0.15 0.50 0.05 0.70 -
242 1 - - 4 1.75 3 7.00
243 1 - - 3 1.27 1 3.81
244 1 2.50 0.15 0.50 0.19 2.50 -
245 1 - - 4 6.90 3 27.60
246 1 - - 7 1.27 1 8.89
247 1 1.80 0.15 0.50 0.14 1.80 -
248 1 - - 6 1.67 1 10.02
249 1 2.30 0.15 0.50 0.17 2.30 -
250 1 - - 4 3.20 3 12.80
251 1 - - 8 1.27 1 10.16
252 1 6.40 0.15 0.50 0.48 6.40 -
253 1 - - 4 7.40 3 29.60
254 1 - - 21 1.27 1 26.67
255 1 3.15 0.15 0.50 0.24 3.15 -
256 1 - - 4 4.70 3 18.80
257 1 - - 10 1.27 1 12.70
258 1 0.60 0.15 0.50 0.05 0.60 -
259 1 - - 2 1.67 1 3.34
260 1 0.40 0.15 0.50 0.03 0.40 -
261 1 - - 4 1.05 3 4.20
262 1 - - 1 1.27 1 1.27
263 1 2.65 0.15 0.50 0.20 2.65 -
264 1 - - 4 4.20 3 16.80
265 1 - - 9 1.27 1 11.43
266 1 3.54 0.15 0.50 0.27 3.54 -
267 1 - - 4 4.70 3 18.80
268 1 - - 12 1.27 1 15.24
269 1 3.35 0.15 0.50 0.25 3.35 -

HV S.A CONTRATISTAS 361485466.xls - Sobrecimiento Pgina14 de 56


Datos Metrados Acero
ITEM PLANO SECTOR EJE Id Cant. Largo Ancho hConc Vconc Encof # L Tipo Total ml
270 1 - - 4 13.00 3 52.00
271 1 - - 12 1.27 1 15.24
272 1 8.75 0.15 0.50 0.66 8.75 -
273 1 - - 34 1.67 1 56.78
274 1 2.95 0.15 0.50 0.22 2.95 -
275 1 - - 4 3.85 3 15.40
276 1 - - 10 1.27 1 12.70
277 1 1.60 0.15 0.50 0.12 1.60 -
278 1 - - 4 2.50 3 10.00
279 1 - - 5 1.27 1 6.35
280 1 4.05 0.15 0.50 0.30 4.05 -
281 1 - - 4 6.10 3 24.40
282 1 - - 13 1.27 1 16.51
283 1 7.05 0.15 0.50 0.53 7.05 -
284 1 - - 4 8.30 3 33.20
285 1 - - 22 1.27 1 27.94
286 1 3.50 0.15 0.50 0.26 3.50 -
287 1 - - 4 4.20 3 16.80
288 1 - - 13 1.27 1 16.51
289 1 1.65 0.15 0.50 0.12 1.65 -
290 1 - - 4 2.75 3 11.00
291 1 - - 5 1.27 1 6.35
292 1 5.05 0.15 0.50 0.38 5.05 -
293 1 - - 4 6.90 3 27.60
294 1 - - 16 1.27 1 20.32
295 1 3.48 0.15 0.50 0.26 3.48 -
296 1 - - 4 6.65 3 26.60
297 1 - - 10 1.27 1 12.70
298 1 1.26 0.15 0.50 0.09 1.26 -
299 1 - - 4 1.27 1 5.08
300 1 1.65 0.15 0.50 0.12 1.65 -
301 1 - - 4 2.75 3 11.00
302 1 - - 5 1.27 1 6.35
303 1 2.21 0.15 0.50 0.17 2.21 -
304 1 - - 4 4.20 3 16.80

HV S.A CONTRATISTAS 361485466.xls - Sobrecimiento Pgina15 de 56


Datos Metrados Acero
ITEM PLANO SECTOR EJE Id Cant. Largo Ancho hConc Vconc Encof # L Tipo Total ml
305 1 - - 6 1.27 1 7.62
306 1 1.04 0.15 0.50 0.08 1.04 -
307 1 - - 3 1.27 1 3.81
308 1 4.80 0.25 0.50 0.60 4.80 -
309 1 - - 4 5.90 3 23.60
310 1 - - 16 1.27 1 20.32
311 1 4.80 0.25 0.50 0.60 4.80 -
312 1 - - 4 5.90 3 23.60
313 1 - - 16 1.27 1 20.32
314 1 4.80 0.25 0.50 0.60 4.80 -
315 1 - - 4 5.90 3 23.60
316 1 - - 16 1.27 1 20.32
317 1 5.59 0.25 0.50 0.70 5.59 -
318 1 - - 4 9.25 3 37.00
319 1 - - 16 1.27 1 20.32
320 1 11.24 0.25 0.50 1.41 11.24 -
321 1 - - 4 12.64 3 50.56
322 1 - - 41 1.27 1 52.07
323 1 5.52 0.25 0.30 0.41 3.31 -
324 1 - - 4 6.62 3 26.48
325 1 - - 15 1.45 3 21.75
326 1 5.77 0.25 0.30 0.43 3.46 -
327 1 - - 4 9.42 3 37.68
328 1 - - 16 1.45 3 23.20
329 1 5.52 0.25 0.30 0.41 3.31 -
330 1 - - 4 6.62 3 26.48
331 1 - - 15 1.45 3 21.75
332 1 4.80 0.25 0.30 0.36 2.88 -
333 1 - - 4 5.90 3 23.60
334 1 - - 14 1.45 3 20.30
335 1 3.02 0.25 0.30 0.23 1.81 -
336 1 - - 4 4.11 3 16.44
337 1 - - 8 1.45 3 11.60
338 1 7.81 0.25 0.30 0.59 4.69 -
339 1 - - 4 10.41 3 41.64
340 1 - - 15 1.45 3 21.75

HV S.A CONTRATISTAS 361485466.xls - Sobrecimiento Pgina16 de 56


Datos Metrados Acero
ITEM PLANO SECTOR EJE Id Cant. Largo Ancho hConc Vconc Encof # L Tipo Total ml
341 1 2.45 0.25 0.50 0.31 2.45 -
342 1 - - 4 3.25 3 13.00
343 1 - - 10 1.27 1 12.70
344 1 2.45 0.25 0.50 0.31 2.45 -
345 1 - - 4 3.25 3 13.00
346 1 - - 10 1.27 1 12.70
- - -

Total Concreto 29.00 342.00 Total Encofrado 3,922.25


Ampliacin de cuarto tcnico m3 m2 ml

HV S.A CONTRATISTAS 361485466.xls - Sobrecimiento Pgina17 de 56


HV S.A. CONTRATISTAS 23-Aug-11
METRADO DE COLUMNAS
Obra : PROYECTO CONGA
Partida : COLUMNAS
Tota ml por Total Kg por
Tipo Peso ml
Diametro Diametro

1 8 mm 0.40 2,413.74 ml 965.00 kg


2 1/4" - - -
3 3/8" 0.56 4,852.14 ml 2,717.00 kg
4 1/2" 0.99 1,918.61 ml 1,899.00 kg
5 5/8" 1.55 405.60 ml 629.00 kg
6 3/4" 2.25 - -
8 1" 3.97 - - 6,210.00 kg Total Acero
DATOS METRADO Dimensiones
Item Plano Ambiente Id Cant. Largo Ancho hConc. hEncof. Vconc Encof # L Tipo Total ml

1 005IM0118A-740-01-101_1 Batera de baos 1 CA-01 19 0.20 0.15 2.90 2.90 1.65 30.31 -
2 005IM0118A-740-01-101_1 Batera de baos 1 Acero Long 19 - - 4 4.06 3 308.56
3 005IM0118A-740-01-101_1 Batera de baos 1 Estribos 19 - - 16 0.67 1 203.68
4 005IM0118A-740-01-101_1 Kitchenet 1/cto de limp. CA-01 6 0.20 0.15 2.90 2.90 0.52 9.57 -
5 005IM0118A-740-01-101_1 Kitchenet 1/cto de limp. Acero Long 6 - - 4 4.06 3 97.44
6 005IM0118A-740-01-101_1 Kitchenet 1/cto de limp. Estribos 6 - - 16 0.67 1 64.32
7 005IM0118A-740-01-101_1 Batera de baos 2 CA-01 17 0.20 0.15 3.20 3.20 1.63 29.92 -
8 005IM0118A-740-01-101_1 Batera de baos 2 Acero Long 17 - - 4 4.36 3 296.48
9 005IM0118A-740-01-101_1 Batera de baos 2 Estribos 17 - - 17 0.67 1 193.63
10 005IM0118A-740-01-101_1 Batera de baos 2 CA-02 1 0.52 0.15 3.20 3.20 0.25 3.81 -
11 005IM0118A-740-01-101_1 Batera de baos 2 Acero Long 1 - - 7 4.36 4 30.52
12 005IM0118A-740-01-101_1 Batera de baos 2 Estribo 1 1 - - 17 1.01 1 17.17
13 005IM0118A-740-01-101_1 Batera de baos 2 Estribo 2 1 - - 17 0.87 1 14.79
14 005IM0118A-740-01-101_1 Batera de baos 3 CA-01 15 0.20 0.15 3.40 3.40 1.53 28.05 -
15 005IM0118A-740-01-101_1 Batera de baos 3 Acero Long 15 - - 4 4.56 3 273.60
16 005IM0118A-740-01-101_1 Batera de baos 3 Estribos 15 - - 18 0.67 1 180.90
17 005IM0118A-740-01-101_1 Batera de baos 3 CA-03 1 0.67 0.15 3.40 3.40 0.34 5.07 -
18 005IM0118A-740-01-101_1 Batera de baos 3 Acero Long 1 - - 8 4.56 4 36.48
19 005IM0118A-740-01-101_1 Batera de baos 3 Estribo 1 1 - - 18 1.61 1 28.98
20 005IM0118A-740-01-101_1 Batera de baos 3 Estribo 2 1 - - 18 0.85 1 15.30
21 005IM0118A-740-01-101_1 PP-1 CA-01 5 0.20 0.15 3.30 3.30 0.50 9.08 -
22 005IM0118A-740-01-101_1 PP-1 Acero Long 5 - - 4 4.46 3 89.20
23 005IM0118A-740-01-101_1 PP-1 Estribos 5 - - 17 0.67 1 56.95

HV S.A. CONTRATISTAS 361485466.xls - Columnas Pgina 18 de 56


DATOS METRADO Dimensiones
Item Plano Ambiente Id Cant. Largo Ancho hConc. hEncof. Vconc Encof # L Tipo Total ml
24 005IM0118A-740-01-101_1 Batera de baos 4 CA-01 12 0.20 0.15 2.90 2.90 1.04 19.14 -
25 005IM0118A-740-01-101_1 Batera de baos 4 Acero Long 12 - - 4 4.26 3 204.48
26 005IM0118A-740-01-101_1 Batera de baos 4 Estribos 12 - - 16 0.55 1 105.60
27 005IM0118A-740-01-101_1 Batera de baos 4 CA-03 1 0.67 0.15 2.90 2.90 0.29 4.32 -
28 005IM0118A-740-01-101_1 Batera de baos 4 Acero Long 1 - - 8 4.26 4 34.08
29 005IM0118A-740-01-101_1 Batera de baos 4 Estribo 1 1 - - 16 1.61 1 25.76
30 005IM0118A-740-01-101_1 Batera de baos 4 Estribo 2 1 - - 16 0.85 1 13.60
31 005IM0118A-740-01-101_1 PP - 2 CA-01 5 0.20 0.15 2.90 2.90 0.44 7.98 -
32 005IM0118A-740-01-101_1 PP - 2 Acero Long 5 - - 4 4.26 3 85.20
33 005IM0118A-740-01-101_1 PP - 2 Estribos 5 - - 16 0.67 1 53.60
34 005IM0118A-740-01-101_1 Batera de baos 5 CA-01 14 0.20 0.15 2.70 2.70 1.13 20.79 -
35 005IM0118A-740-01-101_1 Batera de baos 5 Acero Long 14 - - 4 4.26 3 238.56
36 005IM0118A-740-01-101_1 Batera de baos 5 Estribos 14 - - 16 0.67 1 150.08
37 005IM0118A-740-01-101_1 Batera de baos 6 CA-01 17 0.20 0.15 2.70 2.70 1.38 25.25 -
38 005IM0118A-740-01-101_1 Batera de baos 6 Acero Long 17 - - 4 4.26 3 289.68
39 005IM0118A-740-01-101_1 Batera de baos 6 Estribos 17 - - 16 0.67 1 182.24
40 005IM0118A-740-01-101_1 Kitchenet 2 CA-01 9 0.20 0.15 2.70 2.70 0.73 13.37 -
41 005IM0118A-740-01-101_1 Kitchenet 2 Acero Long 9 - - 4 4.26 3 153.36
42 005IM0118A-740-01-101_1 Kitchenet 2 Estribos 9 - - 16 0.67 1 96.48
43 005IM0118A-740-01-106_0 Cuarto de Vigilancia CA-01 16 0.25 0.15 3.13 3.13 1.88 32.55 -
44 005IM0118A-740-01-106_0 Cuarto de Vigilancia Acero Long 16 - - 4 4.50 3 288.00
45 005IM0118A-740-01-106_0 Cuarto de Vigilancia Estribos 16 - - 17 0.77 1 209.44
46 005IM0118A-740-01-107_0 Caseta de Ingreso CA-01 18 0.25 0.15 4.10 4.10 2.77 47.97 -
47 005IM0118A-740-01-107_0 Caseta de Ingreso Acero Long 18 - - 4 5.42 4 390.24
48 005IM0118A-740-01-107_0 Caseta de Ingreso Estribos 18 - - 22 0.77 1 304.92
49 005IM0118A-740-01-107_0 Caseta de Ingreso CA-02 1 0.25 0.25 4.26 4.26 0.27 3.20 -
50 005IM0118A-740-01-107_0 Caseta de Ingreso Acero Long 1 - - 11 5.64 4 62.04
51 005IM0118A-740-01-107_0 Caseta de Ingreso Estribo 1 1 - - 22 1.77 1 38.94
52 005IM0118A-740-01-107_0 Caseta de Ingreso Estribo 2 1 - - 22 0.85 1 18.70
53 005IM0118A-740-01-107_0 Caseta de Ingreso Estribo 3 1 - - 22 0.89 1 19.58
54 005IM0118A-740-01-107_0 Caseta de Ingreso CA-03 2 0.55 0.15 3.82 3.82 0.63 9.55 -
55 005IM0118A-740-01-107_0 Caseta de Ingreso Acero Long 2 - - 8 5.20 4 83.20
56 005IM0118A-740-01-107_0 Caseta de Ingreso Estribo 1 2 - - 20 1.37 1 54.80
57 005IM0118A-740-01-107_0 Caseta de Ingreso Estribo 2 2 - - 20 0.85 1 34.00
58 005IM0118A-740-01-107_0 Caseta de Ingreso CA-04 1 0.90 0.15 4.03 4.03 0.54 7.86 -

HV S.A. CONTRATISTAS 361485466.xls - Columnas Pgina 19 de 56


DATOS METRADO Dimensiones
Item Plano Ambiente Id Cant. Largo Ancho hConc. hEncof. Vconc Encof # L Tipo Total ml
59 005IM0118A-740-01-107_0 Caseta de Ingreso Acero Long 1 - - 11 5.41 4 59.51
60 005IM0118A-740-01-107_0 Caseta de Ingreso Estribo 1 1 - - 21 1.37 1 28.77
61 005IM0118A-740-01-107_0 Caseta de Ingreso Estribo 2 1 - - 21 1.27 1 26.67
62 005IM0118A-740-01-107_0 Caseta de Ingreso Gancho 1 - - 42 0.24 1 10.08
63 005IM0118A-740-01-107_0 Caseta de Ingreso CA-05 2 0.85 0.15 4.11 4.11 1.05 15.21 -
64 005IM0118A-740-01-107_0 Caseta de Ingreso Acero Long 2 - - 11 5.49 4 120.78
65 005IM0118A-740-01-107_0 Caseta de Ingreso Estribo 1 2 - - 22 1.17 1 51.48
66 005IM0118A-740-01-107_0 Caseta de Ingreso Estribo 2 2 - - 22 1.37 1 60.28
67 005IM0118A-740-01-107_0 Caseta de Ingreso Gancho 2 - - 44 0.24 1 21.12
68 005IM0118A-740-01-107_0 Caseta de Ingreso CA-06 2 0.30 0.20 4.72 4.72 0.57 7.55 -
69 005IM0118A-740-01-107_0 Caseta de Ingreso Acero Long 2 - - 4 6.64 4 53.12
70 005IM0118A-740-01-107_0 Caseta de Ingreso Estribos 2 - - 24 1.04 3 49.92
71 005IM0118A-740-01-110_0 Cuarto Tcnico C-01 6 0.25 0.20 4.00 4.00 1.20 16.80 -
72 005IM0118A-740-01-110_0 Cuarto Tcnico Acero Long 6 - - 4 5.71 4 137.04
73 005IM0118A-740-01-110_0 Cuarto Tcnico Estribos 6 - - 19 0.94 3 107.16
74 005IM0118A-740-01-110_0 Cuarto Tcnico C-02 9 0.25 0.25 4.00 4.00 2.25 27.00 -
75 005IM0118A-740-01-110_0 Cuarto Tcnico Acero Long 9 - - 4 5.71 4 205.56
76 005IM0118A-740-01-110_0 Cuarto Tcnico Acero Long 9 - - 2 5.71 3 102.78
77 005IM0118A-740-01-110_0 Cuarto Tcnico Estribos 9 - - 19 1.04 3 177.84
78 005IM0118A-740-01-110_0 Cuarto Tcnico C-01 5 0.25 0.20 4.20 4.20 1.05 14.70 -
79 005IM0118A-740-01-110_0 Cuarto Tcnico Acero Long 5 - - 4 6.11 4 122.20
80 005IM0118A-740-01-110_0 Cuarto Tcnico Estribos 5 - - 20 0.94 3 94.00
81 005IM0118A-740-01-110_0 Cuarto Tcnico C-02 8 0.25 0.25 4.20 4.20 2.10 25.20 -
82 005IM0118A-740-01-110_0 Cuarto Tcnico Acero Long 8 - - 4 6.11 4 195.52
83 005IM0118A-740-01-110_0 Cuarto Tcnico Acero Long 8 - - 2 6.11 3 97.76
84 005IM0118A-740-01-110_0 Cuarto Tcnico Estribos 8 - - 20 1.04 3 166.40
85 005IM0118A-740-01-110_0 Cuarto Tcnico C-02 2 0.25 0.25 4.40 4.40 0.55 6.60 -
86 005IM0118A-740-01-110_0 Cuarto Tcnico Acero Long 2 - - 4 6.31 4 50.48
87 005IM0118A-740-01-110_0 Cuarto Tcnico Acero Long 2 - - 2 6.31 3 25.24
88 005IM0118A-740-01-110_0 Cuarto Tcnico Estribos 2 - - 21 1.04 3 43.68
89 005IM0118A-740-01-101_1 Escape/ ingreso personal/ wire room C-01 6 0.25 0.25 4.30 4.30 1.61 19.35 -
90 005IM0118A-740-01-101_1 Escape/ ingreso personal/ wire room Acero Long 6 - - 4 5.06 4 121.44
91 005IM0118A-740-01-101_1 Escape/ ingreso personal/ wire room Acero Long 6 - - 2 5.06 3 60.72
92 005IM0118A-740-01-101_1 Escape/ ingreso personal/ wire room Estribos 6 - - 16 0.75 3 72.00
93 005IM0118A-740-01-101_1 Escape/ ingreso personal/ wire room C-01 4 0.25 0.25 4.20 4.20 1.05 12.60 -

HV S.A. CONTRATISTAS 361485466.xls - Columnas Pgina 20 de 56


DATOS METRADO Dimensiones
Item Plano Ambiente Id Cant. Largo Ancho hConc. hEncof. Vconc Encof # L Tipo Total ml
94 005IM0118A-740-01-101_1 Escape/ ingreso personal/ wire room Acero Long 4 - - 4 4.96 4 216.40
95 005IM0118A-740-01-101_1 Escape/ ingreso personal/ wire room Acero Long 4 - - 2 4.96 3 108.20
96 005IM0118A-740-01-101_1 Escape/ ingreso personal/ wire room Estribos 4 - - 15 0.75 3 97.50
97 RFI 120 WIRE ROOM EJES 11-12 CA-01 1 0.20 0.15 3.40 3.40 0.10 1.87 -
98 RFI 120 WIRE ROOM EJES 11-12 Acero Long 1 - - 4 4.56 3 18.24
99 RFI 120 WIRE ROOM EJES 11-12 Estribos 1 - - 18 0.67 1 12.06
100 RFI por consultar WIRE ROOM EJES 1-2 CA-01 2 0.20 0.15 3.30 3.30 0.20 3.63 -
101 RFI por consultar WIRE ROOM EJES 1-2 Acero Long 2 - - 4 4.46 3 35.68
102 RFI por consultar WIRE ROOM EJES 1-2 Estribos 2 - - 17 0.67 1 22.78
103 005IM0118A-740-01-101 Oficinas Administrativas CM -1 Estribos 50 0.59 0.59 0.23 0.23 4.00 -
104 005IM0118A-740-01-101 Oficinas Administrativas Estribos 50 - - 5 1.98 3 495.00
105 Ac. Ad. Proceso construc. Oficinas Administrativas Sujecion 50 - - 6 1.94 3 582.00
106 Ac. Ad. Proceso construc. Oficinas Administrativas Estabilidad 50 - - 4 1.50 5 300.00
107 005IM0118A-740-01-101 Oficinas Administrativas CM -2 Estribos 26 0.38 0.43 0.23 0.23 0.98 -
108 005IM0118A-740-01-101 Oficinas Administrativas Estribos 26 - - 5 1.13 3 146.90
109 Ac. Ad. Proceso construc. Oficinas Administrativas Sujecion 26 - - 4 0.80 5 83.20
110 Ac. Ad. Proceso construc. Oficinas Administrativas Estabilidad 26 - - 4 0.77 1 80.08
111 005IM0118A-740-01-101 Oficinas Administrativas CM -3 Estribos 4 0.59 0.59 0.23 0.23 0.32 -
112 005IM0118A-740-01-101 Oficinas Administrativas Estribos 4 - - 6 1.94 3 46.56
113 Ac. Ad. Proceso construc. Oficinas Administrativas Sujecion 4 - - 4 1.40 5 22.40
114 Ac. Ad. Proceso construc. Oficinas Administrativas Estabilidad 4 - - 4 1.06 1 16.96

Total Concreto 34.60 458.30 Total Encofrado


m3 m2
PERNOS INC. TUERCAS Y ARANDELAS A325
COLUMNAS CANT. COLUM TIPO TOTAL MET.
CM-1 50.00 5/8" 50.00
CM-2 26.00 1/2" 26.00
CM-3 4.00 3/4" 4.00

Ampliacin de cuarto tcnico

HV S.A. CONTRATISTAS 361485466.xls - Columnas Pgina 21 de 56


HV S.A. CONTRATISTAS 23-Aug-11

METRADO DE PLACAS
Obra : PROYECTO CONGA
Partida : PLACAS
Tota ml por Tota ml por
Tipo Peso ml
Diametro Diametro

1 8 mm 0.40 - -
2 1/4" - - -
3 3/8" 0.56 2,134.12 ml 1,195.00 kg
4 1/2" 0.99 634.00 ml 628.00 kg
5 5/8" 1.55 - -
6 3/4" 2.25 - -
8 1" 3.97 - - 1,823.00 kg Total Acero
Datos Metrados Dimensiones

Item Plano Id Cant. Largo Ancho hConc. h encof Vconc Encof # L Tipo Total ml

1 005IM0118A-740-01-103_1 PL -01 a 2 4.43 0.15 2.63 2.63 3.50 48.18 -


2 005IM0118A-740-01-103_1 Ac. Vertical 2 - - 20 3.98 3 159.20
3 005IM0118A-740-01-103_1 Ac. Horizontal 2 - - 22 4.61 3 202.84
4 005IM0118A-740-01-103_1 Columna 2 - - 12 3.98 4 95.52
5 005IM0118A-740-01-103_1 Estribo 2 - - 38 0.94 3 71.44
6 005IM0118A-740-01-103_1 PL -01 b 2 4.43 0.15 1.60 1.60 2.13 29.31 -
7 005IM0118A-740-01-103_1 Ac. Vertical 2 - - 20 1.73 3 69.20
8 005IM0118A-740-01-103_1 Ac. Horizontal 2 - - 8 4.61 3 73.76
9 005IM0118A-740-01-103_1 Columna 2 - - 8 1.73 4 27.68
10 005IM0118A-740-01-103_1 Estribo 2 - - 16 0.94 3 30.08
11 005IM0118A-740-01-103_1 PL -02 a 4 4.00 0.15 2.63 2.63 6.31 87.32 -
12 005IM0118A-740-01-103_1 Ac. Vertical 4 - - 18 3.98 3 286.56
13 005IM0118A-740-01-103_1 Ac. Horizontal 4 - - 22 4.18 3 367.84
14 005IM0118A-740-01-103_1 Columna 4 - - 16 3.98 4 254.72
15 005IM0118A-740-01-103_1 Estribo 1 4 - - 38 0.99 3 150.48
16 005IM0118A-740-01-103_1 Estribo 2 4 - - 19 0.89 3 67.64
17 005IM0118A-740-01-103_1 PL -02 b 4 ### 0.15 1.60 1.60 3.60 49.92 -

HV S.A. CONTRATISTAS 361485466.xls - Placas Pgina 22 de 56


Datos Metrados Dimensiones

Item Plano Id Cant. Largo Ancho hConc. h encof Vconc Encof # L Tipo Total ml
18 005IM0118A-740-01-103_1 Ac. Vertical 4 - - 18 1.73 3 124.56
19 005IM0118A-740-01-103_1 Ac. Horizontal 4 - - 8 4.18 3 133.76
20 005IM0118A-740-01-103_1 Columna 4 - - 8 1.73 4 55.36
21 005IM0118A-740-01-103_1 Estribo 4 - - 16 0.74 3 47.36
22 005IM0118A-740-01-103_1 PL -03 a 2 1.80 0.15 2.63 2.63 1.42 20.51 -
23 005IM0118A-740-01-103_1 Ac. Vertical 2 - - 6 3.98 3 47.76
24 005IM0118A-740-01-103_1 Ac. Horizontal 2 - - 22 1.98 3 87.12
25 005IM0118A-740-01-103_1 Columna 2 - - 20 3.98 4 159.20
26 005IM0118A-740-01-103_1 Estribo 1 2 - - 38 1.34 3 101.84
27 005IM0118A-740-01-103_1 Estribo 2 2 - - 19 0.84 3 31.92
28 005IM0118A-740-01-103_1 PL -03 b 2 1.80 0.15 1.60 1.60 0.86 12.48 -
29 005IM0118A-740-01-103_1 Ac. Vertical 2 - - 6 1.73 3 20.76
30 005IM0118A-740-01-103_1 Ac. Horizontal 2 - - 8 1.87 3 29.92
31 005IM0118A-740-01-103_1 Columna 2 - - 12 1.73 4 41.52
32 005IM0118A-740-01-103_1 Estribo 2 - - 16 0.94 3 30.08

Total Concreto 18.00 248.00 Total Encofrado


m3 m2

HV S.A. CONTRATISTAS 361485466.xls - Placas Pgina 23 de 56


HV S.A. CONTRATISTAS 23-Aug-11
METRADO DE VIGAS
Obra : PROYECTO CONGA

Partida : VIGAS
Tota ml por Total Kg por
Tipo Peso ml
Diametro Diametro
1 8 mm 0.40 1,623.76 ml 650.00 kg
2 1/4" - - -
3 3/8" 0.56 3,976.34 ml 2,227.00 kg
4 1/2" 0.99 426.96 ml 423.00 kg
5 5/8" 1.55 320.72 ml 497.00 kg
6 3/4" 2.25 - -
8 1" 3.97 - -
11 1"3/8 8.31 - - 3,797.00 kg

DATOS Metrados Dimensiones


Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

1 005IM0118A-740-01-106 Cuarto de Vigilancia A-A VT 5-5 VT 3-3 1 7.90 0.53 0.33 0.15 0.63 6.40 -
2 005IM0118A-740-01-106 Cuarto de Vigilancia A-A Ac. Long sup. 1 - - 2 8.50 4 17.00
3 005IM0118A-740-01-106 Cuarto de Vigilancia A-A Ac. Long inf. 1 1 - - 2 5.84 4 11.68
4 005IM0118A-740-01-106 Cuarto de Vigilancia A-A Ac. Long inf. 2 1 - - 2 4.72 4 9.44
5 005IM0118A-740-01-106 Cuarto de Vigilancia A-A Estribos 1 - - 46 1.34 3 61.64
6 005IM0118A-740-01-106 Cuarto de Vigilancia A-A VT 5-5 1 5.10 0.20 0.20 0.15 0.15 2.04 -
7 005IM0118A-740-01-106 Cuarto de Vigilancia A-A Ac. Long 1 - - 4 5.34 3 21.36
8 005IM0118A-740-01-106 Cuarto de Vigilancia A-A Estribos 1 - - 14 0.51 1 7.14
9 005IM0118A-740-01-106 Cuarto de Vigilancia B-B VS - 01 VT 2-2 1 4.52 0.20 0.05 0.15 0.14 1.13 -
10 005IM0118A-740-01-106 Cuarto de Vigilancia B-B Ac. Long 1 - - 4 4.67 3 18.68
11 005IM0118A-740-01-106 Cuarto de Vigilancia B-B Estribos 1 - - 18 0.51 1 9.18
12 005IM0118A-740-01-106 Cuarto de Vigilancia B-B VS - 01 VT 2-2 1 4.40 0.20 0.20 0.15 0.13 1.76 -
13 005IM0118A-740-01-106 Cuarto de Vigilancia B-B Ac. Long 1 - - 4 3.26 3 13.04
14 005IM0118A-740-01-106 Cuarto de Vigilancia B-B Estribos 1 - - 23 0.51 1 11.73
15 005IM0118A-740-01-106 Cuarto de Vigilancia C-C VT 5-5 1 7.90 0.50 0.30 0.15 0.59 5.93 -
16 005IM0118A-740-01-106 Cuarto de Vigilancia C-C Ac. Long sup. 1 - - 2 8.50 4 17.00
17 005IM0118A-740-01-106 Cuarto de Vigilancia C-C Ac. Long inf. 1 1 - - 2 5.84 4 11.68
18 005IM0118A-740-01-106 Cuarto de Vigilancia C-C Ac. Long inf. 2 1 - - 2 4.72 4 9.44
19 005IM0118A-740-01-106 Cuarto de Vigilancia C-C Estribos 1 - - 46 1.34 3 61.64
20 005IM0118A-740-01-106 Cuarto de Vigilancia 1-1 VT 2-2 1 4.80 0.20 - 0.15 0.14 0.72 -
21 005IM0118A-740-01-106 Cuarto de Vigilancia 1-1 Ac. Long 1 - - 4 5.06 3 20.24
22 005IM0118A-740-01-106 Cuarto de Vigilancia 1-1 Estribos 1 - - 46 0.51 1 23.46
23 005IM0118A-740-01-106 Cuarto de Vigilancia 1-1 VT 2-2 1 4.80 0.20 0.20 0.15 0.14 1.92 -

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 24 de 56


DATOS Metrados Dimensiones
Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

24 005IM0118A-740-01-106 Cuarto de Vigilancia 1-1 Ac. Long 1 - - 4 5.06 3 20.24


25 005IM0118A-740-01-106 Cuarto de Vigilancia 1-1 Estribos 1 - - 46 0.51 1 23.46
26 005IM0118A-740-01-106 Cuarto de Vigilancia 2-2 VT 2-2 1 1.85 0.20 - 0.15 0.06 0.28 -
27 005IM0118A-740-01-106 Cuarto de Vigilancia 2-2 Ac. Long 1 - - 4 2.06 3 8.24
28 005IM0118A-740-01-106 Cuarto de Vigilancia 2-2 Estribos 1 - - 17 0.51 1 8.67
29 005IM0118A-740-01-106 Cuarto de Vigilancia 2-2 VT 2-2 1 1.85 0.20 0.20 0.15 0.06 0.74 -
30 005IM0118A-740-01-106 Cuarto de Vigilancia 2-2 Ac. Long 1 - - 4 2.06 3 8.24
31 005IM0118A-740-01-106 Cuarto de Vigilancia 2-2 Estribos 1 - - 17 0.51 1 8.67
32 005IM0118A-740-01-106 Cuarto de Vigilancia 3-3 VT 4-4 1 3.30 0.50 0.30 0.15 0.25 2.48 -
33 005IM0118A-740-01-106 Cuarto de Vigilancia 3-3 Ac. Long 1 - - 4 3.82 4 15.28
34 005IM0118A-740-01-106 Cuarto de Vigilancia 3-3 Estribos 1 - - 25 1.22 3 30.50
35 005IM0118A-740-01-106 Cuarto de Vigilancia 3-3 VT 4-4 1 3.30 0.20 0.20 0.15 0.10 1.32 -
36 005IM0118A-740-01-106 Cuarto de Vigilancia 3-3 Ac. Long 1 - - 4 3.82 3 15.28
37 005IM0118A-740-01-106 Cuarto de Vigilancia 3-3 Estribos 1 - - 25 0.51 1 12.75
38 005IM0118A-740-01-106 Cuarto de Vigilancia 3-3 VT 6-6 1 1.75 0.50 0.30 0.15 0.13 1.31 -
39 005IM0118A-740-01-106 Cuarto de Vigilancia 3-3 Ac. Long 1 - - 4 1.96 4 7.84
40 005IM0118A-740-01-106 Cuarto de Vigilancia 3-3 Estribos 1 - - 13 1.22 3 15.86
41 005IM0118A-740-01-106 Cuarto de Vigilancia 4-4 VT 2-2 1 4.80 0.20 0.05 0.15 0.14 1.20 -
42 005IM0118A-740-01-106 Cuarto de Vigilancia 4-4 Ac. Long 1 - - 4 4.36 3 17.44
43 005IM0118A-740-01-106 Cuarto de Vigilancia 4-4 Estribos 1 - - 26 0.51 1 13.26
44 005IM0118A-740-01-106 Cuarto de Vigilancia 4-4 VT 2-2 1 4.80 0.20 0.20 0.15 0.14 1.92 -
45 005IM0118A-740-01-106 Cuarto de Vigilancia 4-4 Ac. Long 1 - - 4 4.36 3 17.44
46 005IM0118A-740-01-106 Cuarto de Vigilancia 4-4 Estribos 1 - - 26 0.51 1 13.26
47 005IM0118A-740-01-106 Cuarto de Vigilancia A-A Dintel 1/ ventana 1 0.90 0.25 0.25 0.15 0.03 0.59 -
48 005IM0118A-740-01-106 Cuarto de Vigilancia A-A Ac. Long 1 - - 4 1.66 3 6.64
49 005IM0118A-740-01-106 Cuarto de Vigilancia A-A Estribos 1 - - 4 0.51 1 2.04
50 005IM0118A-740-01-106 Cuarto de Vigilancia A-A Dintel 2/ puerta 1 0.90 0.25 0.25 0.15 0.03 0.59 -
51 005IM0118A-740-01-106 Cuarto de Vigilancia A-A Ac. Long 1 - - 4 1.56 3 6.24
52 005IM0118A-740-01-106 Cuarto de Vigilancia A-A Estribos 1 - - 4 0.51 1 2.04
53 005IM0118A-740-01-106 Cuarto de Vigilancia A-A Dintel 3/ ventana 1 0.90 0.25 0.25 0.15 0.03 0.59 -
54 005IM0118A-740-01-106 Cuarto de Vigilancia A-A Ac. Long 1 - - 4 1.66 3 6.64
55 005IM0118A-740-01-106 Cuarto de Vigilancia A-A Estribos 1 - - 4 0.51 1 2.04
56 005IM0118A-740-01-106 Cuarto de Vigilancia 1-1 Dintel 4/ ventana 1 1.20 0.25 0.25 0.15 0.05 0.78 -
57 005IM0118A-740-01-106 Cuarto de Vigilancia 1-1 Ac. Long 1 - - 4 1.86 3 7.44
58 005IM0118A-740-01-106 Cuarto de Vigilancia 1-1 Estribos 1 - - 5 0.51 1 2.55
59 005IM0118A-740-01-106 Cuarto de Vigilancia 2-2 Dintel 5/ puerta 1 1.20 0.25 0.25 0.15 0.05 0.78 -
60 005IM0118A-740-01-106 Cuarto de Vigilancia 2-2 Ac. Long 1 - - 4 1.86 3 7.44

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 25 de 56


DATOS Metrados Dimensiones
Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

61 005IM0118A-740-01-106 Cuarto de Vigilancia 2-2 Estribos 1 - - 5 0.51 1 2.55


62 005IM0118A-740-01-106 Cuarto de Vigilancia 3-3 Dintel 6/ puerta 1 1.40 0.25 0.25 0.15 0.05 0.91 -
63 005IM0118A-740-01-106 Cuarto de Vigilancia 3-3 Ac. Long 1 - - 4 2.16 3 8.64
64 005IM0118A-740-01-106 Cuarto de Vigilancia 3-3 Estribos 1 - - 6 0.51 1 3.06
65 005IM0118A-740-01-107 Caseta de ingreso A-A VT 5-5 1 13.40 0.50 0.30 0.15 1.01 10.05 -
66 005IM0118A-740-01-107 Caseta de ingreso A-A Ac. Long sup. 1 - - 2 13.74 4 27.48
67 005IM0118A-740-01-107 Caseta de ingreso A-A Ac. Long inf 1 - - 4 7.85 4 31.40
68 005IM0118A-740-01-107 Caseta de ingreso A-A Estribos 1 - - 74 1.18 3 87.32
69 005IM0118A-740-01-107 Caseta de ingreso A-A VT 5-5 1 3.50 0.20 0.20 0.15 0.11 1.40 -
70 005IM0118A-740-01-107 Caseta de ingreso A-A Ac. Long 1 - - 4 4.11 3 16.44
71 005IM0118A-740-01-107 Caseta de ingreso A-A Estribos 1 - - 18 0.51 1 9.18
72 No especificado en plano Caseta de ingreso A-A Dintel 1/ ventana 1 3.85 0.25 0.25 0.15 0.14 2.50 -
73 No especificado en plano Caseta de ingreso A-A Ac. Long 1 - - 4 4.11 3 16.44
74 No especificado en plano Caseta de ingreso A-A Estribos 1 - - 15 0.51 1 7.65
75 No especificado en plano Caseta de ingreso B-B Dintel 2/ puerta 1 1.00 0.25 0.25 0.15 0.04 0.65 -
76 No especificado en plano Caseta de ingreso B-B Ac. Long 1 - - 4 2.26 3 9.04
77 No especificado en plano Caseta de ingreso B-B Estribos 1 - - 5 0.51 1 2.55
78 No especificado en plano Caseta de ingreso D-D Dintel 3/ puerta 1 0.90 0.25 0.25 0.15 0.03 0.59 -
79 No especificado en plano Caseta de ingreso D-D Ac. Long 1 - - 4 2.21 3 8.84
80 No especificado en plano Caseta de ingreso D-D Estribos 1 - - 4 0.51 1 2.04
81 No especificado en plano Caseta de ingreso D-D Dintel 4/ventana 1 1.65 0.25 0.25 0.15 0.06 1.07 -
82 No especificado en plano Caseta de ingreso D-D Ac. Long 1 - - 4 2.66 3 10.64
83 No especificado en plano Caseta de ingreso D-D Estribos 1 - - 7 0.51 1 3.57
84 No especificado en plano Caseta de ingreso D'-D' Dintel 5/ puerta 1 0.80 0.25 0.25 0.15 0.03 0.52 -
85 No especificado en plano Caseta de ingreso D'-D' Ac. Long 1 - - 4 1.76 3 7.04
86 No especificado en plano Caseta de ingreso D'-D' Estribos 1 - - 4 0.51 1 2.04
87 No especificado en plano Caseta de ingreso D'-D' Dintel 6/ puerta 1 0.80 0.25 0.25 0.15 0.03 0.52 -
88 No especificado en plano Caseta de ingreso D'-D' Ac. Long 1 - - 4 1.76 3 7.04
89 No especificado en plano Caseta de ingreso D'-D' Estribos 1 - - 4 0.51 1 2.04
90 No especificado en plano Caseta de ingreso E-E Dintel 7/ventana 1 3.52 0.25 0.25 0.15 0.13 2.29 -
91 No especificado en plano Caseta de ingreso E-E Ac. Long 1 - - 4 4.34 3 17.36
92 No especificado en plano Caseta de ingreso E-E Estribos 1 - - 15 0.51 1 7.65
93 No especificado en plano Caseta de ingreso E-E Dintel 8/ventana 1 3.53 0.25 0.25 0.15 0.13 2.29 -
94 No especificado en plano Caseta de ingreso E-E Ac. Long 1 - - 4 4.34 3 17.36
95 No especificado en plano Caseta de ingreso E-E Estribos 1 - - 15 0.51 1 7.65
96 No especificado en plano Caseta de ingreso 1-1 Dintel 9/ventana 1 3.30 0.25 0.25 0.15 0.12 2.15 -
97 No especificado en plano Caseta de ingreso 1-1 Ac. Long 1 - - 4 4.06 3 16.24

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 26 de 56


DATOS Metrados Dimensiones
Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

98 No especificado en plano Caseta de ingreso 1-1 Estribos 1 - - 14 0.51 1 7.14


99 No especificado en plano Caseta de ingreso 2-2 Dintel 10/ventana 1 0.90 0.25 0.25 0.15 0.03 0.59 -
100 No especificado en plano Caseta de ingreso 2-2 Ac. Long 1 - - 4 1.76 3 7.04
101 No especificado en plano Caseta de ingreso 2-2 Estribos 1 - - 4 0.51 1 2.04
102 No especificado en plano Caseta de ingreso 4-4 Dintel 11/ventana 1 1.84 0.25 0.25 0.15 0.07 1.20 -
103 No especificado en plano Caseta de ingreso 4-4 Ac. Long 1 - - 4 2.71 3 10.84
104 No especificado en plano Caseta de ingreso 4-4 Estribos 1 - - 8 0.51 1 4.08
105 No especificado en plano Caseta de ingreso 5-5 Dintel 12/puerta 1 0.90 0.25 0.25 0.15 0.03 0.59 -
106 No especificado en plano Caseta de ingreso 5-5 Ac. Long 1 - - 4 1.76 3 7.04
107 No especificado en plano Caseta de ingreso 5-5 Estribos 1 - - 4 0.51 1 2.04
108 No especificado en plano Caseta de ingreso 5'-5' Dintel 13/puerta 1 0.80 0.25 0.25 0.15 0.03 0.52 -
109 No especificado en plano Caseta de ingreso 5'-5' Ac. Long 1 - - 4 1.76 3 7.04
110 No especificado en plano Caseta de ingreso 5'-5' Estribos 1 - - 4 0.51 1 2.04
111 No especificado en plano Caseta de ingreso 4-4 Dintel 14/ventana 1 0.89 0.25 0.25 0.15 0.03 0.58 -
112 No especificado en plano Caseta de ingreso 4-4 Ac. Long 1 - - 4 1.55 3 6.20
113 No especificado en plano Caseta de ingreso 4-4 Estribos 1 - - 6 0.51 1 3.06
114 005IM0118A-740-01-107 Caseta de ingreso B-B VT 3-3 1 4.82 0.20 - 0.15 0.14 0.72 -
115 005IM0118A-740-01-107 Caseta de ingreso B-B Ac. Long 1 - - 4 5.33 3 21.32
116 005IM0118A-740-01-107 Caseta de ingreso B-B Estribos 1 - - 20 0.51 1 10.20
117 005IM0118A-740-01-107 Caseta de ingreso B-B VT 3-3 1 4.82 0.20 0.20 0.15 0.14 0.55 -
118 005IM0118A-740-01-107 Caseta de ingreso B-B Ac. Long 1 - - 4 5.32 3 21.28
119 005IM0118A-740-01-107 Caseta de ingreso B-B Estribos 1 - - 22 0.51 1 11.22
120 005IM0118A-740-01-107 Caseta de ingreso C-C VS - 01 1 1.65 0.20 - 0.15 0.05 0.25 -
121 005IM0118A-740-01-107 Caseta de ingreso C-C Ac. Long 1 - - 4 2.20 3 8.80
122 005IM0118A-740-01-107 Caseta de ingreso C-C Estribos 1 - - 10 0.51 1 5.10
123 005IM0118A-740-01-107 Caseta de ingreso C-C VS - 01 1 1.60 0.20 0.20 0.15 0.05 0.55 -
124 005IM0118A-740-01-107 Caseta de ingreso C-C Ac. Long 1 - - 4 2.20 3 8.80
125 005IM0118A-740-01-107 Caseta de ingreso C-C Estribos 1 - - 10 0.51 1 5.10
126 005IM0118A-740-01-107 Caseta de ingreso D-D VT 5-5 1 13.40 0.50 0.30 0.15 1.01 10.05 -
127 005IM0118A-740-01-107 Caseta de ingreso D-D Ac. Long sup. 1 - - 2 13.74 4 27.48
128 005IM0118A-740-01-107 Caseta de ingreso D-D Ac. Long inf 1 - - 4 7.85 4 31.40
129 005IM0118A-740-01-107 Caseta de ingreso D-D Estribos 1 - - 74 1.18 3 87.32
130 005IM0118A-740-01-107 Caseta de ingreso E-E VT 5-5 1 13.40 0.50 0.30 0.15 1.01 10.05 -
131 005IM0118A-740-01-107 Caseta de ingreso E-E Ac. Long sup. 1 - - 2 13.74 4 27.48
132 005IM0118A-740-01-107 Caseta de ingreso E-E Ac. Long inf 1 - - 4 7.85 4 31.40
133 005IM0118A-740-01-107 Caseta de ingreso E-E Estribos 1 - - 74 1.18 3 87.32
134 005IM0118A-740-01-107 Caseta de ingreso E-E VT 5-5 1 13.40 0.20 0.20 0.15 0.40 5.36 -

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 27 de 56


DATOS Metrados Dimensiones
Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

135 005IM0118A-740-01-107 Caseta de ingreso E-E Ac. Long 1 - - 4 13.96 3 55.84


136 005IM0118A-740-01-107 Caseta de ingreso E-E Estribos 1 - - 88 0.51 1 44.88
137 005IM0118A-740-01-107 Caseta de ingreso 1-1 VS - 01 1 3.70 0.20 - 0.15 0.11 0.56 -
138 005IM0118A-740-01-107 Caseta de ingreso 1-1 Ac. Long 1 - - 4 4.36 3 17.44
139 005IM0118A-740-01-107 Caseta de ingreso 1-1 Estribos 1 - - 14 0.51 1 7.14
140 005IM0118A-740-01-107 Caseta de ingreso 1-1 VS - 01 1 3.70 0.20 0.20 0.15 0.11 1.48 -
141 005IM0118A-740-01-107 Caseta de ingreso 1-1 Ac. Long 1 - - 4 4.36 3 17.44
142 005IM0118A-740-01-107 Caseta de ingreso 1-1 Estribos 1 - - 14 1.48 1 20.72
143 005IM0118A-740-01-107 Caseta de ingreso 1-1 VT 2-2 1 3.35 0.50 0.40 0.25 0.42 3.52 -
144 005IM0118A-740-01-107 Caseta de ingreso 1-1 Ac. Long 1 - - 4 4.12 4 16.48
145 005IM0118A-740-01-107 Caseta de ingreso 1-1 Estribos 1 - - 26 1.38 3 35.88
146 005IM0118A-740-01-107 Caseta de ingreso 2-2 VS -01 1 2.05 0.20 - 0.15 0.06 0.31 -
147 005IM0118A-740-01-107 Caseta de ingreso 2-2 Ac. Long 1 - - 4 2.91 3 11.64
148 005IM0118A-740-01-107 Caseta de ingreso 2-2 Estribos 1 - - 8 0.51 1 4.08
149 005IM0118A-740-01-107 Caseta de ingreso 2-2 VS - 01 1 2.05 0.20 0.20 0.15 0.06 0.82 -
150 005IM0118A-740-01-107 Caseta de ingreso 2-2 Ac. Long 1 - - 4 2.91 3 11.64
151 005IM0118A-740-01-107 Caseta de ingreso 2-2 Estribos 1 - - 9 0.51 1 4.59
152 005IM0118A-740-01-107 Caseta de ingreso 3-3 VS -01 1 7.55 0.20 - 0.15 0.23 1.13 -
153 005IM0118A-740-01-107 Caseta de ingreso 3-3 Ac. Long 1 - - 4 7.67 3 30.68
154 005IM0118A-740-01-107 Caseta de ingreso 3-3 Estribos 1 - - 26 0.51 1 13.26
155 005IM0118A-740-01-107 Caseta de ingreso 3-3 VS - 01 1 7.05 0.20 0.20 0.15 0.21 2.82 -
156 005IM0118A-740-01-107 Caseta de ingreso 3-3 Ac. Long 1 - - 4 7.52 3 30.08
157 005IM0118A-740-01-107 Caseta de ingreso 3-3 Estribos 1 - - 38 0.51 1 19.38
158 005IM0118A-740-01-107 Caseta de ingreso 3'-3' VT 6-6 1 7.55 0.50 0.30 0.25 0.94 6.42 -
159 005IM0118A-740-01-107 Caseta de ingreso 3'-3' Ac. Long 1 - - 4 8.01 4 32.04
160 005IM0118A-740-01-107 Caseta de ingreso 3'-3' Estribos 1 - - 58 1.38 3 80.04
161 005IM0118A-740-01-107 Caseta de ingreso 4-4 VS-01/ VT 3-3 1 4.60 0.20 - 0.15 0.14 0.69 -
162 005IM0118A-740-01-107 Caseta de ingreso 4-4 Ac. Long 1 - - 4 5.31 3 21.24
163 005IM0118A-740-01-107 Caseta de ingreso 4-4 Estribos 1 - - 18 0.51 1 9.18
164 005IM0118A-740-01-107 Caseta de ingreso 4-4 VS-01/ VT 3-3 1 4.60 0.20 0.20 0.15 0.14 1.84 -
165 005IM0118A-740-01-107 Caseta de ingreso 4-4 Ac. Long 1 - - 4 5.31 3 21.24
166 005IM0118A-740-01-107 Caseta de ingreso 4-4 Estribos 1 - - 26 0.51 1 13.26
167 005IM0118A-740-01-107 Caseta de ingreso 5-5 VS-01 1 2.05 0.20 - 0.15 0.06 0.31 -
168 005IM0118A-740-01-107 Caseta de ingreso 5-5 Ac. Long 1 - - 4 2.91 3 11.64
169 005IM0118A-740-01-107 Caseta de ingreso 5-5 Estribos 1 - - 21 0.51 1 10.71
170 005IM0118A-740-01-107 Caseta de ingreso 5-5 VS-01 1 2.05 0.20 0.20 0.15 0.06 0.82 -
171 005IM0118A-740-01-107 Caseta de ingreso 5-5 Ac. Long 1 - - 4 2.91 3 11.64

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 28 de 56


DATOS Metrados Dimensiones
Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

172 005IM0118A-740-01-107 Caseta de ingreso 5-5 Estribos 1 - - 21 0.51 1 10.71


173 005IM0118A-740-01-107 Caseta de ingreso 6-6 VS-01 1 1.20 0.20 - 0.15 0.04 0.18 -
174 005IM0118A-740-01-107 Caseta de ingreso 6-6 Ac. Long 1 - - 4 1.66 3 6.64
175 005IM0118A-740-01-107 Caseta de ingreso 6-6 Estribos 1 - - 5 0.51 1 2.55
176 005IM0118A-740-01-107 Caseta de ingreso 6-6 VS-01 1 1.20 0.20 0.20 0.15 0.04 0.48 -
177 005IM0118A-740-01-107 Caseta de ingreso 6-6 Ac. Long 1 - - 4 1.66 3 6.64
178 005IM0118A-740-01-107 Caseta de ingreso 6-6 Estribos 1 - - 5 0.51 1 2.55
179 005IM0118A-740-01-107 Caseta de ingreso 6-6 VT 2-2 1 2.95 0.50 0.40 0.25 0.37 2.36 -
180 005IM0118A-740-01-107 Caseta de ingreso 6-6 Ac. Long 1 - - 4 3.62 4 14.48
181 005IM0118A-740-01-107 Caseta de ingreso 6-6 Estribos 1 - - 21 0.51 3 10.71
182 005IM0118A-740-01-107 Caseta de ingreso eje 6-6 6-6 VT 4-4 1 2.39 1.53 1.53 0.15 0.55 7.67 -
183 005IM0118A-740-01-107 Caseta de ingreso eje 6-6 6-6 Ac. Long 1 - - 22 3.00 4 66.00
184 005IM0118A-740-01-107 Caseta de ingreso eje 6-6 6-6 Estribos 1 - - 11 4.35 3 47.85
185 005IM0118A-740-01-107 Caseta de ingreso eje 4-4 4-4 VT 8-8 1 3.50 0.88 0.88 0.15 0.46 6.69 -
186 005IM0118A-740-01-107 Caseta de ingreso eje 4-4 4-4 Ac. Long 1 1 - - 4 2.61 4 10.44
187 005IM0118A-740-01-107 Caseta de ingreso eje 4-4 4-4 Ac. Long 2 1 - - 10 2.61 3 26.10
188 005IM0118A-740-01-107 Caseta de ingreso eje 4-4 4-4 Estribos 1 - - 9 2.84 3 25.56
189 005IM0118A-740-01-107 Caseta de ingreso eje A-A A-A MALLA 1 3.55 1.20 1.20 0.15 0.64 9.05 -
190 005IM0118A-740-01-107 Caseta de ingreso eje A-A A-A Ac. Long 1 - - 12 3.84 3 46.08
191 005IM0118A-740-01-107 Caseta de ingreso eje A-A A-A Estribos 1 - - 36 1.82 3 65.52
192 005IM0118A-740-01-111 Cuarto Tcnico A-A VS - 01 1 6.22 0.25 - 0.25 0.39 1.56 -
193 005IM0118A-740-01-111 Cuarto Tcnico A-A Ac. Long 1 - - 4 6.48 3 25.92
194 005IM0118A-740-01-111 Cuarto Tcnico A-A Estribos 1 - - 22 0.81 1 17.82
195 005IM0118A-740-01-111 Cuarto Tcnico B-B VS - 01 1 6.22 0.25 - 0.25 0.39 1.56 -
196 005IM0118A-740-01-111 Cuarto Tcnico B-B Ac. Long 1 - - 4 6.48 3 25.92
197 005IM0118A-740-01-111 Cuarto Tcnico B-B Estribos 1 - - 22 0.81 1 17.82
198 005IM0118A-740-01-111 Cuarto Tcnico C-C VS - 01 1 6.22 0.25 - 0.25 0.39 1.56 -
199 005IM0118A-740-01-111 Cuarto Tcnico C-C Ac. Long 1 - - 4 6.48 3 25.92
200 005IM0118A-740-01-111 Cuarto Tcnico C-C Estribos 1 - - 22 0.81 1 17.82
201 005IM0118A-740-01-111 Cuarto Tcnico D-D VS - 01 1 5.50 0.25 - 0.25 0.34 1.38 -
202 005IM0118A-740-01-111 Cuarto Tcnico D-D Ac. Long 1 - - 4 5.76 3 23.04
203 005IM0118A-740-01-111 Cuarto Tcnico D-D Estribos 1 - - 18 0.81 1 14.58
204 005IM0118A-740-01-111 Cuarto Tcnico E-E VS - 01 1 5.50 0.25 - 0.25 0.34 1.38 -
205 005IM0118A-740-01-111 Cuarto Tcnico E-E Ac. Long 1 - - 4 5.76 3 23.04
206 005IM0118A-740-01-111 Cuarto Tcnico E-E Estribos 1 - - 18 0.81 1 14.58
207 005IM0118A-740-01-111 Cuarto Tcnico F-F VS - 01 1 5.50 0.25 - 0.25 0.34 1.38 -
208 005IM0118A-740-01-111 Cuarto Tcnico F-F Ac. Long 1 - - 4 5.76 3 23.04

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 29 de 56


DATOS Metrados Dimensiones
Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

209 005IM0118A-740-01-111 Cuarto Tcnico F-F Estribos 1 - - 18 0.81 1 14.58


210 005IM0118A-740-01-111 Cuarto Tcnico G-G VS - 01 1 5.50 0.25 - 0.25 0.34 1.38 -
211 005IM0118A-740-01-111 Cuarto Tcnico G-G Ac. Long 1 - - 4 5.76 3 23.04
212 005IM0118A-740-01-111 Cuarto Tcnico G-G Estribos 1 - - 18 0.81 1 14.58
213 005IM0118A-740-01-111 Cuarto Tcnico 0-0 VS - 01 1 3.46 0.25 - 0.25 0.22 0.87 -
214 005IM0118A-740-01-111 Cuarto Tcnico 0-0 Ac. Long 1 - - 4 3.97 3 15.88
215 005IM0118A-740-01-111 Cuarto Tcnico 0-0 Estribos 1 - - 12 0.81 1 9.72
216 005IM0118A-740-01-111 Cuarto Tcnico 0-0 VT 2-2 1 4.80 0.55 0.30 0.25 0.66 4.08 -
217 005IM0118A-740-01-111 Cuarto Tcnico 0-0 Ac. Long 1 - - 4 5.56 5 22.24
218 005IM0118A-740-01-111 Cuarto Tcnico 0-0 Estribos 1 - - 35 1.48 3 51.80
219 005IM0118A-740-01-111 Cuarto Tcnico 1-1 VS - 01 1 9.41 0.25 - 0.25 0.59 2.35 -
220 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Ac. Long 1 - - 4 10.95 3 43.80
221 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Estribos 1 - - 28 0.81 1 22.68
222 005IM0118A-740-01-111 Cuarto Tcnico 1-1 VT 2-2 1 4.80 0.55 0.30 0.25 0.66 4.08 -
223 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Ac. Long 1 - - 4 6.82 5 27.28
224 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Estribos 1 - - 41 1.48 3 60.68
225 005IM0118A-740-01-111 Cuarto Tcnico 2-2 VS - 01 1 21.35 0.25 - 0.25 1.33 5.34 -
226 005IM0118A-740-01-111 Cuarto Tcnico 2-2 Ac. Long 1 - - 4 25.46 5 101.84
227 005IM0118A-740-01-111 Cuarto Tcnico 2-2 Estribos 1 - - 83 0.81 1 67.23
228 005IM0118A-740-01-111 Cuarto Tcnico 0-0 Dintel 1/ puerta CB 1 4.55 0.30 0.30 0.25 0.34 3.87 -
229 005IM0118A-740-01-111 Cuarto Tcnico 0-0 Ac. Long 1 - - 4 5.66 3 22.64
230 005IM0118A-740-01-111 Cuarto Tcnico 0-0 Estribos 1 - - 20 0.91 1 18.20
231 005IM0118A-740-01-111 Cuarto Tcnico 0-0 Dintel 2/ ventana CB 1 7.56 0.30 0.30 0.25 0.57 6.43 -
232 005IM0118A-740-01-111 Cuarto Tcnico 0-0 Ac. Long 1 - - 4 9.73 3 38.92
233 005IM0118A-740-01-111 Cuarto Tcnico 0-0 Estribos 1 - - 33 0.91 1 30.03
234 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Dintel 3/ puerta SE 1 1.50 0.30 0.30 0.25 0.11 1.28 -
235 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Ac. Long 1 - - 4 2.36 3 9.44
236 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Estribos 1 - - 7 0.91 1 6.37
237 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Dintel 4/ puerta CT 1 1.50 0.30 0.30 0.25 0.11 1.28 -
238 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Ac. Long 1 - - 4 2.36 3 9.44
239 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Estribos 1 - - 7 0.91 1 6.37
240 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Dintel 5/ puerta GE 1 1.80 0.30 0.30 0.25 0.14 1.53 -
241 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Ac. Long 1 - - 4 2.56 3 10.24
242 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Estribos 1 - - 9 0.91 1 8.19
243 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Dintel 6/ ventana GE 1 1.15 0.30 0.30 0.25 0.09 0.98 -
244 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Ac. Long 1 - - 4 1.96 3 7.84
245 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Estribos 1 - - 5 0.91 1 4.55

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 30 de 56


DATOS Metrados Dimensiones
Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

246 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Dintel 7/ ventana GE 1 1.15 0.30 0.30 0.25 0.09 0.98 -
247 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Ac. Long 1 - - 4 1.96 3 7.84
248 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Estribos 1 - - 5 0.91 1 4.55
249 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Dintel 8/ ventana CT 1 1.45 0.30 0.30 0.25 0.11 1.23 -
250 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Ac. Long 1 - - 4 2.31 3 9.24
251 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Estribos 1 - - 8 0.91 1 7.28
252 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Dintel 9/ ventana SE 1 2.74 0.30 0.30 0.25 0.21 2.33 -
253 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Ac. Long 1 - - 4 3.85 3 15.40
254 005IM0118A-740-01-111 Cuarto Tcnico 1-1 Estribos 1 - - 13 0.91 1 11.83
255 005IM0118A-740-01-111 Cuarto Tcnico 2-2 Dintel 10/ ventana GE 1 4.50 0.30 0.30 0.25 0.34 3.83 -
256 005IM0118A-740-01-111 Cuarto Tcnico 2-2 Ac. Long 1 - - 4 5.36 3 21.44
257 005IM0118A-740-01-111 Cuarto Tcnico 2-2 Estribos 1 - - 19 0.91 1 17.29
258 005IM0118A-740-01-111 Cuarto Tcnico 2-2 Dintel 11/ ventana CT 1 3.50 0.30 0.30 0.25 0.26 2.98 -
259 005IM0118A-740-01-111 Cuarto Tcnico 2-2 Ac. Long 1 - - 4 4.36 3 17.44
260 005IM0118A-740-01-111 Cuarto Tcnico 2-2 Estribos 1 - - 15 0.91 1 13.65
261 005IM0118A-740-01-111 Cuarto Tcnico 2-2 Dintel 12/ ventana SE 1 3.24 0.30 0.30 0.25 0.24 2.75 -
262 005IM0118A-740-01-111 Cuarto Tcnico 2-2 Ac. Long 1 - - 4 3.99 3 15.96
263 005IM0118A-740-01-111 Cuarto Tcnico 2-2 Estribos 1 - - 14 0.91 1 12.74
264 005IM0118A-740-01-111 Cuarto Tcnico 2-2 Dintel 13/ ventana CB 1 2.05 0.30 0.30 0.25 0.15 1.74 -
265 005IM0118A-740-01-111 Cuarto Tcnico 2-2 Ac. Long 1 - - 4 2.91 3 11.64
266 005IM0118A-740-01-111 Cuarto Tcnico 2-2 Estribos 1 - - 9 0.91 1 8.19
267 005IM0118A-740-01-111 Cuarto Tcnico 2-2 Dintel 14/ ventana CB 1 5.76 0.30 0.30 0.25 0.43 4.90 -
268 005IM0118A-740-01-111 Cuarto Tcnico 2-2 Ac. Long 1 - - 4 6.82 3 27.28
269 005IM0118A-740-01-111 Cuarto Tcnico 2-2 Estribos 1 - - 24 0.91 1 21.84
270 005IM0118A-740-01-111 Cuarto Tcnico F-F VS - 01 1 2.45 0.25 - 0.25 0.15 0.61 -
271 005IM0118A-740-01-111 Cuarto Tcnico F-F Ac. Long 1 - - 4 2.71 3 10.84
272 005IM0118A-740-01-111 Cuarto Tcnico F-F Estribos 1 - - 8 0.81 1 6.48
273 005IM0118A-740-01-111 Cuarto Tcnico G-G VS - 01 1 2.45 0.25 - 0.25 0.15 0.61 -
274 005IM0118A-740-01-111 Cuarto Tcnico G-G Ac. Long 1 - - 4 2.71 3 10.84
275 005IM0118A-740-01-111 Cuarto Tcnico G-G Estribos 1 - - 8 0.81 1 6.48
276 005IM0118A-740-01-101 Kitchenet 1 A'-A' SC - 2 1 2.04 0.25 0.25 0.15 0.08 1.02 -
277 005IM0118A-740-01-101 Kitchenet 1 A'-A' Acero Long. 1 - - 4 2.70 3 10.80
278 005IM0118A-740-01-101 Kitchenet 1 A'-A' Acero transv. 1 - - 9 0.61 1 5.49
279 005IM0118A-740-01-101 Kitchenet 1 A''-A'' SC - 2 1 2.04 0.25 0.25 0.15 0.08 1.02 -
280 005IM0118A-740-01-101 Kitchenet 1 A''-A'' Acero Long. 1 - - 4 2.70 3 10.80
281 005IM0118A-740-01-101 Kitchenet 1 A''-A'' Acero transv. 1 - - 9 0.61 1 5.49
282 005IM0118A-740-01-101 Kitchenet 1 8'-8' SC - 2 1 1.60 0.25 0.25 0.15 0.06 0.80 -

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 31 de 56


DATOS Metrados Dimensiones
Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

283 005IM0118A-740-01-101 Kitchenet 1 8'-8' Acero Long. 1 - - 4 2.36 3 9.44


284 005IM0118A-740-01-101 Kitchenet 1 8'-8' Acero transv. 1 - - 7 0.61 1 4.27
285 005IM0118A-740-01-101 Kitchenet 1 9'-9' SC - 2 1 0.98 0.25 0.25 0.15 0.04 0.49 -
286 005IM0118A-740-01-101 Kitchenet 1 9'-9' Acero Long. 1 - - 4 1.59 3 6.36
287 005IM0118A-740-01-101 Kitchenet 1 9'-9' Acero transv. 1 - - 5 0.61 1 3.05
288 No especificado en planos Kitchenet 1 8'-8' Dintel 1/ puerta 1 0.90 0.45 0.45 0.15 0.06 0.95 -
289 No especificado en planos Kitchenet 1 8'-8' Acero Long. 1 - - 4 1.91 3 7.64
290 No especificado en planos Kitchenet 1 8'-8' Acero transv. 1 - - 4 1.01 1 4.04
291 No especificado en planos Kitchenet 1 8'-8' Dintel 2/ ventana 1 0.98 0.45 0.45 0.15 0.07 1.03 -
292 No especificado en planos Kitchenet 1 8'-8' Acero Long. 1 - - 4 1.59 3 6.36
293 No especificado en planos Kitchenet 1 8'-8' Acero transv. 1 - - 5 0.61 1 3.05
294 005IM0118A-740-01-101 Batera de baos 1 A'-A' SC - 2 1 4.80 0.25 0.25 0.15 0.18 2.40 -
295 005IM0118A-740-01-101 Batera de baos 1 A'-A' Acero Long. 1 - - 4 6.12 3 24.48
296 005IM0118A-740-01-101 Batera de baos 1 A'-A' Acero transv. 1 - - 20 0.61 1 12.20
297 005IM0118A-740-01-101 Batera de baos 1 B-B SC - 2 1 2.10 0.25 0.25 0.15 0.08 1.05 -
298 005IM0118A-740-01-101 Batera de baos 1 B-B Acero Long. 1 - - 4 2.86 3 11.44
299 005IM0118A-740-01-101 Batera de baos 1 B-B Acero transv. 1 - - 10 0.61 1 6.10
300 005IM0118A-740-01-101 Batera de baos 1 B'-B' SC - 2 1 2.00 0.25 0.25 0.15 0.08 1.00 -
301 005IM0118A-740-01-101 Batera de baos 1 B'-B' Acero Long. 1 - - 4 2.76 3 11.04
302 005IM0118A-740-01-101 Batera de baos 1 B'-B' Acero transv. 1 - - 9 0.61 1 5.49
303 005IM0118A-740-01-101 Batera de baos 1 B''-B'' SC - 2 1 3.05 0.25 0.25 0.15 0.11 1.53 -
304 005IM0118A-740-01-101 Batera de baos 1 B''-B'' Acero Long. 1 - - 4 3.66 3 14.64
305 005IM0118A-740-01-101 Batera de baos 1 B''-B'' Acero transv. 1 - - 13 0.61 1 7.93
306 005IM0118A-740-01-101 Batera de baos 1 C-C SC - 2 1 2.74 0.25 0.25 0.15 0.10 1.37 -
307 005IM0118A-740-01-101 Batera de baos 1 C-C Acero Long. 1 - - 4 3.91 3 15.64
308 005IM0118A-740-01-101 Batera de baos 1 C-C Acero transv. 1 - - 12 0.61 1 7.32
309 005IM0118A-740-01-101 Batera de baos 1 7'-7' SC - 2 1 4.65 0.25 0.25 0.15 0.17 2.33 -
310 005IM0118A-740-01-101 Batera de baos 1 7'-7' Acero Long. 1 - - 4 5.46 3 21.84
311 005IM0118A-740-01-101 Batera de baos 1 7'-7' Acero transv. 1 - - 20 0.61 1 12.20
312 005IM0118A-740-01-101 Batera de baos 1 8-8 SC - 2 1 3.60 0.25 0.25 0.15 0.14 1.80 -
313 005IM0118A-740-01-101 Batera de baos 1 8-8 Acero Long. 1 - - 4 4.41 3 17.64
314 005IM0118A-740-01-101 Batera de baos 1 8-8 Acero transv. 1 - - 15 0.61 1 9.15
315 005IM0118A-740-01-101 Batera de baos 1 8'-8' SC - 2 1 0.90 0.25 0.25 0.15 0.03 0.45 -
316 005IM0118A-740-01-101 Batera de baos 1 8'-8' Acero Long. 1 - - 4 1.46 3 5.84
317 005IM0118A-740-01-101 Batera de baos 1 8'-8' Acero transv. 1 - - 4 0.61 1 2.44
318 005IM0118A-740-01-101 Batera de baos 1 8''-8'' SC - 2 1 1.90 0.25 0.25 0.15 0.07 0.95 -
319 005IM0118A-740-01-101 Batera de baos 1 8''-8'' Acero Long. 1 - - 4 2.51 3 10.04

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 32 de 56


DATOS Metrados Dimensiones
Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

320 005IM0118A-740-01-101 Batera de baos 1 8''-8'' Acero transv. 1 - - 8 0.61 1 4.88


321 005IM0118A-740-01-101 Batera de baos 1 8'''-8''' SC - 2 1 2.50 0.25 0.25 0.15 0.09 1.25 -
322 005IM0118A-740-01-101 Batera de baos 1 8'''-8''' Acero Long. 1 - - 4 3.36 3 13.44
323 005IM0118A-740-01-101 Batera de baos 1 8'''-8''' Acero transv. 1 - - 11 0.61 1 6.71
324 005IM0118A-740-01-101 Batera de baos 1 8''''-8'''' SC - 2 1 3.97 0.25 0.25 0.15 0.15 1.99 -
325 005IM0118A-740-01-101 Batera de baos 1 8''''-8'''' Acero Long. 1 - - 4 5.13 3 20.52
326 005IM0118A-740-01-101 Batera de baos 1 8''''-8'''' Acero transv. 1 - - 18 0.61 1 10.98
327 No especificado en planos Batera de baos 1 B-B Dintel 1/ puerta 1 0.90 0.45 0.45 0.15 0.06 0.95 -
328 No especificado en planos Batera de baos 1 B-B Acero Long. 1 - - 4 1.91 3 7.64
329 No especificado en planos Batera de baos 1 B-B Acero transv. 1 - - 4 1.01 1 4.04
330 No especificado en planos Batera de baos 1 8'-8' Dintel 2/ puerta 1 0.90 0.45 0.45 0.15 0.06 0.95 -
331 No especificado en planos Batera de baos 1 8'-8' Acero Long. 1 - - 4 1.86 3 7.44
332 No especificado en planos Batera de baos 1 8'-8' Acero transv. 1 - - 4 1.01 1 4.04
333 No especificado en planos Batera de baos 1 8'''-8''' Dintel 3/ puerta 1 0.90 0.45 0.45 0.15 0.06 0.95 -
334 No especificado en planos Batera de baos 1 8'''-8''' Acero Long. 1 - - 4 1.91 3 7.64
335 No especificado en planos Batera de baos 1 8'''-8''' Acero transv. 1 - - 4 1.01 1 4.04
336 No especificado en planos Batera de baos 1 8'''-8''' Dintel 4/ puerta 1 0.90 0.45 0.45 0.15 0.06 0.95 -
337 No especificado en planos Batera de baos 1 8'''-8''' Acero Long. 1 - - 4 1.91 3 7.64
338 No especificado en planos Batera de baos 1 8'''-8''' Acero transv. 1 - - 4 1.01 1 4.04
339 005IM0118A-740-01-101 Batera de baos 2 B-B SC - 2 1 2.98 0.25 0.25 0.15 0.11 1.49 -
340 005IM0118A-740-01-101 Batera de baos 2 B-B Acero Long. 1 - - 4 3.79 3 15.16
341 005IM0118A-740-01-101 Batera de baos 2 B-B Acero transv. 1 - - 13 0.61 1 7.93
342 005IM0118A-740-01-101 Batera de baos 2 B'-B' SC - 2 1 1.93 0.25 0.25 0.15 0.07 0.97 -
343 005IM0118A-740-01-101 Batera de baos 2 B'-B' Acero Long. 1 - - 4 2.59 3 10.36
344 005IM0118A-740-01-101 Batera de baos 2 B'-B' Acero transv. 1 - - 8 0.61 1 4.88
345 005IM0118A-740-01-101 Batera de baos 2 C'-C' SC - 2 1 2.43 0.25 0.25 0.15 0.09 1.22 -
346 005IM0118A-740-01-101 Batera de baos 2 C'-C' Acero Long. 1 - - 4 3.04 3 12.16
347 005IM0118A-740-01-101 Batera de baos 2 C'-C' Acero transv. 1 - - 10 0.61 1 6.10
348 005IM0118A-740-01-101 Batera de baos 2 C''-C'' SC - 2 1 2.36 0.25 0.25 0.15 0.09 1.18 -
349 005IM0118A-740-01-101 Batera de baos 2 C''-C'' Acero Long. 1 - - 4 3.04 3 12.16
350 005IM0118A-740-01-101 Batera de baos 2 C''-C'' Acero transv. 1 - - 14 0.61 1 8.54
351 005IM0118A-740-01-101 Batera de baos 2 C'''-C''' SC - 2 1 3.48 0.25 0.25 0.15 0.13 1.74 -
352 005IM0118A-740-01-101 Batera de baos 2 C'''-C''' Acero Long. 1 - - 4 4.24 3 16.96
353 005IM0118A-740-01-101 Batera de baos 2 C'''-C''' Acero transv. 1 - - 16 0.61 1 9.76
354 005IM0118A-740-01-101 Batera de baos 2 11'-11' SC - 2 1 9.74 0.25 0.25 0.15 0.37 4.87 -
355 005IM0118A-740-01-101 Batera de baos 2 11'-11' Acero Long. 1 - - 4 11.45 3 45.80
356 005IM0118A-740-01-101 Batera de baos 2 11'-11' Acero transv. 1 - - 39 0.61 1 23.79

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 33 de 56


DATOS Metrados Dimensiones
Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

357 005IM0118A-740-01-101 Batera de baos 2 11''-11'' SC - 2 1 4.68 0.25 0.25 0.15 0.18 2.34 -
358 005IM0118A-740-01-101 Batera de baos 2 11''-11'' Acero Long. 1 - - 4 6.01 3 24.04
359 005IM0118A-740-01-101 Batera de baos 2 11''-11'' Acero transv. 1 - - 21 0.61 1 12.81
360 005IM0118A-740-01-101 Batera de baos 2 11'''-11''' SC - 2 1 4.84 0.25 0.25 0.15 0.18 2.42 -
361 005IM0118A-740-01-101 Batera de baos 2 11'''-11''' Acero Long. 1 - - 4 6.01 3 24.04
362 005IM0118A-740-01-101 Batera de baos 2 11'''-11''' Acero transv. 1 - - 21 0.61 1 12.81
363 005IM0118A-740-01-101 Batera de baos 2 12-12 SC - 2 1 5.38 0.25 0.25 0.15 0.20 2.69 -
364 005IM0118A-740-01-101 Batera de baos 2 12-12 Acero Long. 1 - - 4 6.29 3 25.16
365 005IM0118A-740-01-101 Batera de baos 2 12-12 Acero transv. 1 - - 23 0.61 1 14.03
366 No especificado en planos Batera de baos 2 B'-B' Dintel 1/ puerta 1 1.05 0.45 0.45 0.15 0.07 1.10 -
367 No especificado en planos Batera de baos 2 B'-B' Acero Long. 1 - - 4 2.06 3 8.24
368 No especificado en planos Batera de baos 2 B'-B' Acero transv. 1 - - 5 1.01 1 5.05
369 No especificado en planos Batera de baos 2 C''-C'' Dintel 2/ puerta 1 0.90 0.45 0.45 0.15 0.06 0.95 -
370 No especificado en planos Batera de baos 2 C''-C'' Acero Long. 1 - - 4 2.01 3 8.04
371 No especificado en planos Batera de baos 2 C''-C'' Acero transv. 1 - - 4 1.01 1 4.04
372 No especificado en planos Batera de baos 2 11'-11' Dintel 3/ puerta 1 2.15 0.45 0.45 0.15 0.15 2.26 -
373 No especificado en planos Batera de baos 2 11'-11' Acero Long. 1 - - 4 3.58 3 14.32
374 No especificado en planos Batera de baos 2 11'-11' Acero transv. 1 - - 9 1.01 1 9.09
375 No especificado en planos Batera de baos 2 C-C Dintel 1/ ventana 1 1.90 0.45 0.45 0.15 0.13 2.00 -
376 No especificado en planos Batera de baos 2 C-C Acero Long. 1 - - 4 2.51 3 10.04
377 No especificado en planos Batera de baos 2 C-C Acero transv. 1 - - 8 0.61 1 4.88
378 No especificado en planos Batera de baos 2 C-C Dintel 2/ ventana 1 5.38 0.45 0.45 0.15 0.36 5.65 -
379 No especificado en planos Batera de baos 2 C-C Acero Long. 1 - - 4 6.28 3 25.12
380 No especificado en planos Batera de baos 2 C-C Acero transv. 1 - - 22 0.61 1 13.42
381 005IM0118A-740-01-106 Cuarto de Tableros 1 F'-F' SC - 2 1 2.73 0.25 0.25 0.15 0.10 1.37 -
382 005IM0118A-740-01-106 Cuarto de Tableros 1 F'-F' Acero Long. 1 - - 4 3.54 3 14.16
383 005IM0118A-740-01-106 Cuarto de Tableros 1 F'-F' Acero transv. 1 - - 12 0.61 1 7.32
384 005IM0118A-740-01-106 Cuarto de Tableros 1 G'-G' SC - 2 1 2.98 0.25 0.25 0.15 0.11 1.49 -
385 005IM0118A-740-01-106 Cuarto de Tableros 1 G'-G' Acero Long. 1 - - 4 3.54 3 14.16
386 005IM0118A-740-01-106 Cuarto de Tableros 1 G'-G' Acero transv. 1 - - 13 0.61 1 7.93
387 005IM0118A-740-01-106 Cuarto de Tableros 1 12-12 SC - 2 1 2.20 0.25 0.25 0.15 0.08 1.10 -
388 005IM0118A-740-01-106 Cuarto de Tableros 1 12-12 Acero Long. 1 - - 4 2.86 3 11.44
389 005IM0118A-740-01-106 Cuarto de Tableros 1 12-12 Acero transv. 1 - - 9 0.61 1 5.49
390 005IM0118A-740-01-106 Cuarto de Tableros 1 12'-12' SC - 2 1 2.25 0.25 0.25 0.15 0.08 1.13 -
391 005IM0118A-740-01-106 Cuarto de Tableros 1 12'-12' Acero Long. 1 - - 4 2.86 3 11.44
392 005IM0118A-740-01-106 Cuarto de Tableros 1 12'-12' Acero transv. 1 - - 10 0.61 1 6.10
393 No especificado en planos Cuarto de Tableros 1 F'-F' Dintel 1/ Puerta 1 0.90 0.30 0.30 0.15 0.04 0.68 -

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 34 de 56


DATOS Metrados Dimensiones
Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

394 No especificado en planos Cuarto de Tableros 1 F'-F' Acero Long. 1 - - 4 2.39 3 9.56
395 No especificado en planos Cuarto de Tableros 1 F'-F' Acero transv. 1 - - 4 0.71 1 2.84
396 005IM0118A-740-01-106 Batera de Baos 3 G'-G' SC - 2 1 2.81 0.25 0.25 0.15 0.11 1.41 -
397 005IM0118A-740-01-106 Batera de Baos 3 G'-G' Acero Long. 1 - - 4 3.67 3 14.68
398 005IM0118A-740-01-106 Batera de Baos 3 G'-G' Acero transv. 1 - - 12 0.61 1 7.32
399 005IM0118A-740-01-106 Batera de Baos 3 H-H SC - 2 1 2.80 0.25 0.25 0.15 0.11 1.40 -
400 005IM0118A-740-01-106 Batera de Baos 3 H-H Acero Long. 1 - - 4 3.67 3 14.68
401 005IM0118A-740-01-106 Batera de Baos 3 H-H Acero transv. 1 - - 13 0.61 1 7.93
402 005IM0118A-740-01-106 Batera de Baos 3 H'-H' SC - 2 1 1.15 0.25 0.25 0.15 0.04 0.58 -
403 005IM0118A-740-01-106 Batera de Baos 3 H'-H' Acero Long. 1 - - 4 1.76 3 7.04
404 005IM0118A-740-01-106 Batera de Baos 3 H'-H' Acero transv. 1 - - 5 0.61 1 3.05
405 005IM0118A-740-01-106 Batera de Baos 3 I-I- SC - 2 1 2.32 0.25 0.25 0.15 0.09 1.16 -
406 005IM0118A-740-01-106 Batera de Baos 3 I-I- Acero Long. 1 - - 4 3.58 3 14.32
407 005IM0118A-740-01-106 Batera de Baos 3 I-I- Acero transv. 1 - - 11 0.61 1 6.71
408 005IM0118A-740-01-106 Batera de Baos 3 10'-10' SC - 2 1 4.71 0.25 0.25 0.15 0.18 2.36 -
409 005IM0118A-740-01-106 Batera de Baos 3 10'-10' Acero Long. 1 - - 4 5.87 3 23.48
410 005IM0118A-740-01-106 Batera de Baos 3 10'-10' Acero transv. 1 - - 12 0.61 1 7.32
411 005IM0118A-740-01-106 Batera de Baos 3 10''-10'' SC - 2 1 2.34 0.25 0.25 0.15 0.09 1.17 -
412 005IM0118A-740-01-106 Batera de Baos 3 10''-10'' Acero Long. 1 - - 4 3.11 3 12.44
413 005IM0118A-740-01-106 Batera de Baos 3 10''-10'' Acero transv. 1 - - 10 0.61 1 6.10
414 005IM0118A-740-01-106 Batera de Baos 3 11-11 SC - 2 1 2.19 0.25 0.25 0.15 0.08 1.10 -
415 005IM0118A-740-01-106 Batera de Baos 3 11-11 Acero Long. 1 - - 4 2.85 3 11.40
416 005IM0118A-740-01-106 Batera de Baos 3 11-11 Acero transv. 1 - - 9 0.61 1 5.49
417 No especificado en planos Batera de Baos 3 I-I Dintel/ ventana 1 2.32 0.25 0.25 0.15 0.09 1.51 -
418 No especificado en planos Batera de Baos 3 I-I Acero Long. 1 - - 4 3.58 3 14.32
419 No especificado en planos Batera de Baos 3 I-I Acero transv. 1 - - 11 0.61 1 6.71
420 No especificado en planos Batera de Baos 3 I-I Dintel/ puerta 1 1.80 0.50 0.50 0.15 0.14 2.07 -
421 No especificado en planos Batera de Baos 3 I-I Acero Long. 1 - - 4 3.11 3 12.44
422 No especificado en planos Batera de Baos 3 I-I Acero transv. 1 - - 8 1.11 1 8.88
423 005IM0118A-740-01-101 Batera de Baos 4 G'-G' SC - 2 1 3.10 0.25 0.25 0.15 0.12 1.55 -
424 005IM0118A-740-01-101 Batera de Baos 4 G'-G' Acero Long. 1 - - 4 3.76 3 15.04
425 005IM0118A-740-01-101 Batera de Baos 4 G'-G' Acero transv. 1 - - 13 0.61 1 7.93
426 005IM0118A-740-01-101 Batera de Baos 4 H-H SC - 2 1 3.10 0.25 0.25 0.15 0.12 1.55 -
427 005IM0118A-740-01-101 Batera de Baos 4 H-H Acero Long. 1 - - 4 3.76 3 15.04
428 005IM0118A-740-01-101 Batera de Baos 4 H-H Acero transv. 1 - - 13 0.61 1 7.93
429 005IM0118A-740-01-101 Batera de Baos 4 H'-H' SC - 2 1 1.05 0.25 0.25 0.15 0.04 0.53 -
430 005IM0118A-740-01-101 Batera de Baos 4 H'-H' Acero Long. 1 - - 4 1.71 3 6.84

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 35 de 56


DATOS Metrados Dimensiones
Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

431 005IM0118A-740-01-101 Batera de Baos 4 H'-H' Acero transv. 1 - - 5 0.61 1 3.05


432 005IM0118A-740-01-101 Batera de Baos 4 I-I- SC - 2 1 2.37 0.25 0.25 0.15 0.09 1.19 -
433 005IM0118A-740-01-101 Batera de Baos 4 I-I- Acero Long. 1 - - 4 3.63 3 14.52
434 005IM0118A-740-01-101 Batera de Baos 4 I-I- Acero transv. 1 - - 11 0.61 1 6.71
435 005IM0118A-740-01-101 Batera de Baos 4 2-2 SC - 2 1 2.19 0.25 0.25 0.15 0.08 1.10 -
436 005IM0118A-740-01-101 Batera de Baos 4 2-2 Acero Long. 1 - - 4 2.85 3 11.40
437 005IM0118A-740-01-101 Batera de Baos 4 2-2 Acero transv. 1 - - 9 0.61 1 5.49
438 005IM0118A-740-01-101 Batera de Baos 4 2'-2' SC - 2 1 2.55 0.25 0.25 0.15 0.10 1.28 -
439 005IM0118A-740-01-101 Batera de Baos 4 2'-2' Acero Long. 1 - - 4 3.11 3 12.44
440 005IM0118A-740-01-101 Batera de Baos 4 2'-2' Acero transv. 1 - - 11 0.61 1 6.71
441 005IM0118A-740-01-101 Batera de Baos 4 2''-2'' SC - 2 1 4.76 0.25 0.25 0.15 0.18 2.38 -
442 005IM0118A-740-01-101 Batera de Baos 4 2''-2'' Acero Long. 1 - - 4 5.87 3 23.48
443 005IM0118A-740-01-101 Batera de Baos 4 2''-2'' Acero transv. 1 - - 21 0.61 1 12.81
444 No especificado en planos Batera de Baos 4 I-I Dintel/ ventana 1 2.37 0.25 0.25 0.15 0.09 1.54 -
445 No especificado en planos Batera de Baos 4 I-I Acero Long. 1 - - 4 3.63 3 14.52
446 No especificado en planos Batera de Baos 4 I-I Acero transv. 1 - - 11 0.61 1 6.71
447 No especificado en planos Batera de Baos 4 I-I Dintel/ puerta 1 1.80 0.50 0.50 0.15 0.14 2.07 -
448 No especificado en planos Batera de Baos 4 I-I Acero Long. 1 - - 4 3.11 3 12.44
449 No especificado en planos Batera de Baos 4 I-I Acero transv. 1 - - 8 1.11 1 8.88
450 005IM0118A-740-01-106 Cuarto de Tableros 1 F'-F' SC - 2 1 2.73 0.25 0.25 0.15 0.10 1.37 -
451 005IM0118A-740-01-106 Cuarto de Tableros 1 F'-F' Acero Long. 1 - - 4 3.54 3 14.16
452 005IM0118A-740-01-106 Cuarto de Tableros 1 F'-F' Acero transv. 1 - - 12 0.61 1 7.32
453 005IM0118A-740-01-106 Cuarto de Tableros 1 G'-G' SC - 2 1 2.98 0.25 0.25 0.15 0.11 1.49 -
454 005IM0118A-740-01-106 Cuarto de Tableros 1 G'-G' Acero Long. 1 - - 4 3.54 3 14.16
455 005IM0118A-740-01-106 Cuarto de Tableros 1 G'-G' Acero transv. 1 - - 13 0.61 1 7.93
456 005IM0118A-740-01-106 Cuarto de Tableros 1 0-0 SC - 2 1 2.20 0.25 0.25 0.15 0.08 1.10 -
457 005IM0118A-740-01-106 Cuarto de Tableros 1 0-0 Acero Long. 1 - - 4 2.86 3 11.44
458 005IM0118A-740-01-106 Cuarto de Tableros 1 0-0 Acero transv. 1 - - 9 0.61 1 5.49
459 005IM0118A-740-01-106 Cuarto de Tableros 1 1-1 SC - 2 1 2.25 0.25 0.25 0.15 0.08 1.13 -
460 005IM0118A-740-01-106 Cuarto de Tableros 1 1-1 Acero Long. 1 - - 4 2.86 3 11.44
461 005IM0118A-740-01-106 Cuarto de Tableros 1 1-1 Acero transv. 1 - - 10 0.61 1 6.10
462 No especificado en planos Cuarto de Tableros 1 F'-F' Dintel 1/ Puerta 1 0.90 0.30 0.30 0.15 0.04 0.68 -
463 No especificado en planos Cuarto de Tableros 1 F'-F' Acero Long. 1 - - 4 2.39 3 9.56
464 No especificado en planos Cuarto de Tableros 1 F'-F' Acero transv. 1 - - 4 0.71 1 2.84
465 005IM0118A-740-01-106 Batera de Baos 5 B-B SC - 2 1 2.93 0.25 0.25 0.15 0.11 1.47 -
466 005IM0118A-740-01-106 Batera de Baos 5 B-B Acero Long. 1 - - 4 3.79 3 15.16
467 005IM0118A-740-01-106 Batera de Baos 5 B-B Acero transv. 1 - - 13 0.61 1 7.93

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 36 de 56


DATOS Metrados Dimensiones
Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

468 005IM0118A-740-01-106 Batera de Baos 5 B'-B' SC - 2 1 2.98 0.25 0.25 0.15 0.11 1.49 -
469 005IM0118A-740-01-106 Batera de Baos 5 B'-B' Acero Long. 1 - - 4 3.79 3 15.16
470 005IM0118A-740-01-106 Batera de Baos 5 B'-B' Acero transv. 1 - - 13 0.61 1 7.93
471 005IM0118A-740-01-106 Batera de Baos 5 C'-C' SC - 2 1 0.64 0.25 0.25 0.15 0.02 0.32 -
472 005IM0118A-740-01-106 Batera de Baos 5 C'-C' Acero Long. 1 - - 4 0.90 3 3.60
473 005IM0118A-740-01-106 Batera de Baos 5 C'-C' Acero transv. 1 - - 2 0.61 1 1.22
474 005IM0118A-740-01-106 Batera de Baos 5 C''-C'' SC - 2 1 3.47 0.25 0.25 0.15 0.13 1.74 -
475 005IM0118A-740-01-106 Batera de Baos 5 C''-C'' Acero Long. 1 - - 4 4.69 3 18.76
476 005IM0118A-740-01-106 Batera de Baos 5 C''-C'' Acero transv. 1 - - 17 0.61 1 10.37
477 005IM0118A-740-01-106 Batera de Baos 5 C'''-C''' SC - 2 1 3.62 0.25 0.25 0.15 0.14 1.81 -
478 005IM0118A-740-01-106 Batera de Baos 5 C'''-C''' Acero Long. 1 - - 4 4.28 3 17.12
479 005IM0118A-740-01-106 Batera de Baos 5 C'''-C''' Acero transv. 1 - - 15 0.61 1 9.15
480 005IM0118A-740-01-106 Batera de Baos 5 1-1 SC - 2 1 2.54 0.25 0.25 0.15 0.10 1.27 -
481 005IM0118A-740-01-106 Batera de Baos 5 1-1 Acero Long. 1 - - 4 3.26 3 13.04
482 005IM0118A-740-01-106 Batera de Baos 5 1-1 Acero transv. 1 - - 11 0.61 1 6.71
483 005IM0118A-740-01-106 Batera de Baos 5 1'-1' SC - 2 1 3.94 0.25 0.25 0.15 0.15 1.97 -
484 005IM0118A-740-01-106 Batera de Baos 5 1'-1' Acero Long. 1 - - 4 4.65 3 18.60
485 005IM0118A-740-01-106 Batera de Baos 5 1'-1' Acero transv. 1 - - 17 0.61 1 10.37
486 005IM0118A-740-01-106 Batera de Baos 5 1''-1'' SC - 2 1 2.00 0.25 0.25 0.15 0.08 1.00 -
487 005IM0118A-740-01-106 Batera de Baos 5 1''-1'' Acero Long. 1 - - 4 2.76 3 11.04
488 005IM0118A-740-01-106 Batera de Baos 5 1''-1'' Acero transv. 1 - - 10 0.61 1 6.10
489 005IM0118A-740-01-106 Batera de Baos 5 1'''-1''' SC - 2 1 6.53 0.25 0.25 0.15 0.24 3.27 -
490 005IM0118A-740-01-106 Batera de Baos 5 1'''-1''' Acero Long. 1 - - 4 7.49 3 29.96
491 005IM0118A-740-01-106 Batera de Baos 5 1'''-1''' Acero transv. 1 - - 27 0.61 1 16.47
492 No especificado en planos Batera de Baos 5 B'-B' Dintel 1/ puerta 1 0.90 0.50 0.50 0.15 0.07 1.04 -
493 No especificado en planos Batera de Baos 5 B'-B' Acero Long. 1 - - 4 1.91 3 7.64
494 No especificado en planos Batera de Baos 5 B'-B' Acero transv. 1 - - 4 1.11 1 4.44
495 No especificado en planos Batera de Baos 5 C'-C' Dintel 2/ puerta 1 1.00 0.50 0.50 0.15 0.08 1.15 -
496 No especificado en planos Batera de Baos 5 C'-C' Acero Long. 1 - - 4 2.01 3 8.04
497 No especificado en planos Batera de Baos 5 C'-C' Acero transv. 1 - - 5 1.11 1 5.55
498 No especificado en planos Batera de Baos 5 1'''-1''' Dintel 1/ puerta 1 1.00 0.50 0.50 0.15 0.08 1.15 -
499 No especificado en planos Batera de Baos 5 1'''-1''' Acero Long. 1 - - 4 1.61 3 6.44
500 No especificado en planos Batera de Baos 5 1'''-1''' Acero transv. 1 - - 5 1.11 1 5.55
501 No especificado en planos Batera de Baos 5 B-B Dintel 1/ ventana 1 1.95 0.25 0.25 0.15 0.07 1.27 -
502 No especificado en planos Batera de Baos 5 B-B Acero Long. 1 - - 4 2.61 3 10.44
503 No especificado en planos Batera de Baos 5 B-B Acero transv. 1 - - 8 0.61 1 4.88
504 No especificado en planos Batera de Baos 5 1-1 Dintel 2/ ventana 1 2.54 0.25 0.25 0.15 0.10 1.65 -

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 37 de 56


DATOS Metrados Dimensiones
Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

505 No especificado en planos Batera de Baos 5 1-1 Acero Long. 1 - - 4 3.25 3 13.00
506 No especificado en planos Batera de Baos 5 1-1 Acero transv. 1 - - 11 0.61 1 6.71
507 005IM0118A-740-01-106 Batera de Baos 6 A'-A' SC - 2 1 4.65 0.25 0.25 0.15 0.17 2.33 -
508 005IM0118A-740-01-106 Batera de Baos 6 A'-A' Acero Long. 1 - - 4 6.12 3 24.48
509 005IM0118A-740-01-106 Batera de Baos 6 A'-A' Acero transv. 1 - - 21 0.61 1 12.81
510 005IM0118A-740-01-106 Batera de Baos 6 B-B SC - 2 1 2.10 0.25 0.25 0.15 0.08 1.05 -
511 005IM0118A-740-01-106 Batera de Baos 6 B-B Acero Long. 1 - - 4 3.20 3 12.80
512 005IM0118A-740-01-106 Batera de Baos 6 B-B Acero transv. 1 - - 9 0.61 1 5.49
513 005IM0118A-740-01-106 Batera de Baos 6 B'-B' SC - 2 1 1.95 0.25 0.25 0.15 0.07 0.98 -
514 005IM0118A-740-01-106 Batera de Baos 6 B'-B' Acero Long. 1 - - 4 2.76 3 11.04
515 005IM0118A-740-01-106 Batera de Baos 6 B'-B' Acero transv. 1 - - 9 0.61 1 5.49
516 005IM0118A-740-01-106 Batera de Baos 6 B''-B'' SC - 2 1 3.05 0.25 0.25 0.15 0.11 1.53 -
517 005IM0118A-740-01-106 Batera de Baos 6 B''-B'' Acero Long. 1 - - 4 3.66 3 14.64
518 005IM0118A-740-01-106 Batera de Baos 6 B''-B'' Acero transv. 1 - - 13 0.61 1 7.93
519 005IM0118A-740-01-106 Batera de Baos 6 C-C SC - 2 1 1.85 0.25 0.25 0.15 0.07 0.93 -
520 005IM0118A-740-01-106 Batera de Baos 6 C-C Acero Long. 1 - - 4 2.46 3 9.84
521 005IM0118A-740-01-106 Batera de Baos 6 C-C Acero transv. 1 - - 8 0.61 1 4.88
522 005IM0118A-740-01-106 Batera de Baos 6 C'-C' SC - 2 1 0.50 0.25 0.25 0.15 0.02 0.25 -
523 005IM0118A-740-01-106 Batera de Baos 6 C'-C' Acero Long. 1 - - 4 0.91 3 3.64
524 005IM0118A-740-01-106 Batera de Baos 6 C'-C' Acero transv. 1 - - 3 0.61 1 1.83
525 005IM0118A-740-01-106 Batera de Baos 6 4'-4' SC - 2 1 4.92 0.25 0.25 0.15 0.18 2.46 -
526 005IM0118A-740-01-106 Batera de Baos 6 4'-4' Acero Long. 1 - - 4 5.83 3 23.32
527 005IM0118A-740-01-106 Batera de Baos 6 4'-4' Acero transv. 1 - - 21 0.61 1 12.81
528 005IM0118A-740-01-106 Batera de Baos 6 4''-4'' SC - 2 1 2.50 0.25 0.25 0.15 0.09 1.25 -
529 005IM0118A-740-01-106 Batera de Baos 6 4''-4'' Acero Long. 1 - - 4 3.36 3 13.44
530 005IM0118A-740-01-106 Batera de Baos 6 4''-4'' Acero transv. 1 - - 11 0.61 1 6.71
531 005IM0118A-740-01-106 Batera de Baos 6 4'''-4''' SC - 2 1 1.75 0.25 0.25 0.15 0.07 0.88 -
532 005IM0118A-740-01-106 Batera de Baos 6 4'''-4''' Acero Long. 1 - - 4 2.51 3 10.04
533 005IM0118A-740-01-106 Batera de Baos 6 4''''-4'''' Acero transv. 1 - - 8 0.61 1 4.88
534 005IM0118A-740-01-106 Batera de Baos 6 4''''-4'''' SC - 2 1 0.90 0.25 0.25 0.15 0.03 0.45 -
535 005IM0118A-740-01-106 Batera de Baos 6 4''''-4'''' Acero Long. 1 - - 4 1.46 3 5.84
536 005IM0118A-740-01-106 Batera de Baos 6 4''''-4'''' Acero transv. 1 - - 4 0.61 1 2.44
537 005IM0118A-740-01-106 Batera de Baos 6 5-5 SC - 2 1 3.60 0.25 0.25 0.15 0.14 1.80 -
538 005IM0118A-740-01-106 Batera de Baos 6 5-5 Acero Long. 1 - - 4 4.41 3 17.64
539 005IM0118A-740-01-106 Batera de Baos 6 5-5 Acero transv. 1 - - 15 0.61 1 9.15
540 005IM0118A-740-01-106 Batera de Baos 6 5''-5'' SC - 2 1 4.65 0.25 0.25 0.15 0.17 2.33 -
541 005IM0118A-740-01-106 Batera de Baos 6 5''-5'' Acero Long. 1 - - 4 5.46 3 21.84

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 38 de 56


DATOS Metrados Dimensiones
Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

542 005IM0118A-740-01-106 Batera de Baos 6 5''-5'' Acero transv. 1 - - 20 0.61 1 12.20


543 No especificado en planos Batera de Baos 6 4''-4'' Dintel 1/ puerta 1 0.90 0.50 0.50 0.15 0.07 1.04 -
544 No especificado en planos Batera de Baos 6 4''-4'' Acero Long. 1 - - 4 1.91 3 7.64
545 No especificado en planos Batera de Baos 6 4''-4'' Acero transv. 1 - - 4 1.11 1 4.44
546 No especificado en planos Batera de Baos 6 4'''-4''' Dintel 2/ puerta 1 0.90 0.50 0.50 0.15 0.07 1.04 -
547 No especificado en planos Batera de Baos 6 4'''-4''' Acero Long. 1 - - 4 1.86 3 7.44
548 No especificado en planos Batera de Baos 6 4'''-4''' Acero transv. 1 - - 4 1.11 1 4.44
549 No especificado en planos Batera de Baos 6 B-B Dintel 3/ puerta 1 0.90 0.50 0.50 0.15 0.07 1.04 -
550 No especificado en planos Batera de Baos 6 B-B Acero Long. 1 - - 4 1.91 3 7.64
551 No especificado en planos Batera de Baos 6 B-B Acero transv. 1 - - 4 1.11 1 4.44
552 005IM0118A-740-01-106 Kitchenet 2 A'-A' SC - 2 1 3.75 0.25 0.25 0.15 0.14 1.88 -
553 005IM0118A-740-01-106 Kitchenet 2 A'-A' Acero Long. 1 - - 4 4.61 3 18.44
554 005IM0118A-740-01-106 Kitchenet 2 A'-A' Acero transv. 1 - - 16 0.61 1 9.76
555 005IM0118A-740-01-106 Kitchenet 2 A''-A'' SC - 2 1 0.50 0.25 0.25 0.15 0.02 0.25 -
556 005IM0118A-740-01-106 Kitchenet 2 A''-A'' Acero Long. 1 - - 4 0.91 3 3.64
557 005IM0118A-740-01-106 Kitchenet 2 A''-A'' Acero transv. 1 - - 2 0.61 1 1.22
558 005IM0118A-740-01-106 Kitchenet 2 A'''-A''' SC - 2 1 3.87 0.25 0.25 0.15 0.15 1.94 -
559 005IM0118A-740-01-106 Kitchenet 2 A'''-A''' Acero Long. 1 - - 4 4.73 3 18.92
560 005IM0118A-740-01-106 Kitchenet 2 A'''-A''' Acero transv. 1 - - 16 0.61 1 9.76
561 005IM0118A-740-01-106 Kitchenet 2 3'-3' SC - 2 1 0.98 0.25 0.25 0.15 0.04 0.49 -
562 005IM0118A-740-01-106 Kitchenet 2 3'-3' Acero Long. 1 - - 4 1.59 3 6.36
563 005IM0118A-740-01-106 Kitchenet 2 3'-3' Acero transv. 1 - - 5 0.61 1 3.05
564 005IM0118A-740-01-106 Kitchenet 2 3''-3'' SC - 2 1 0.62 0.25 0.25 0.15 0.02 0.31 -
565 005IM0118A-740-01-106 Kitchenet 2 3''-3'' Acero Long. 1 - - 4 1.18 3 4.72
566 005IM0118A-740-01-106 Kitchenet 2 3''-3'' Acero transv. 1 - - 3 0.61 1 1.83
567 005IM0118A-740-01-106 Kitchenet 2 4'-4' SC - 2 1 1.60 0.25 0.25 0.15 0.06 0.80 -
568 005IM0118A-740-01-106 Kitchenet 2 4'-4' Acero Long. 1 - - 4 2.36 3 9.44
569 005IM0118A-740-01-106 Kitchenet 2 4'-4' Acero transv. 1 - - 7 0.61 1 4.27
570 No especificado en planos Kitchenet 2 B-B Dintel 1/ puerta 1 0.90 0.50 0.50 0.15 0.07 1.04 -
571 No especificado en planos Kitchenet 2 B-B Acero Long. 1 - - 4 1.91 3 7.64
572 No especificado en planos Kitchenet 2 B-B Acero transv. 1 - - 4 1.11 1 4.44
573 No especificado en planos Kitchenet 2 8'-8' Dintel 1/ ventana 1 0.98 0.45 0.45 0.15 0.07 1.03 -
574 No especificado en planos Kitchenet 2 8'-8' Acero Long. 1 - - 4 1.59 3 6.36
575 No especificado en planos Kitchenet 2 8'-8' Acero transv. 1 - - 5 0.91 1 4.55
576 No especificado en planos Escape 11'-11'/12-12 Dintel / puerta 2 2.10 0.25 0.25 0.15 0.16 2.73 -
577 No especificado en planos Escape 8'-8' Acero Long. 2 - - 4 2.96 3 23.68
578 No especificado en planos Escape 8'-8' Acero transv. 2 - - 9 0.61 1 10.98

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 39 de 56


DATOS Metrados Dimensiones
Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

579 No especificado en planos Ingreso Personal 1-1/1'-1' Dintel / puerta 2 3.60 0.25 0.25 0.15 0.27 4.68 -
580 No especificado en planos Ingreso Personal 1-1/1'-1' Acero Long. 2 - - 4 4.46 3 35.68
581 No especificado en planos Ingreso Personal 1-1/1'-1' Acero transv. 2 - - 15 0.61 1 18.30
582 005IM0118A-740-01-106_0 Cuarto de Vigilancia A-A SC - 2 1 1.80 0.25 0.25 0.15 0.07 0.90 -
583 005IM0118A-740-01-106_0 Cuarto de Vigilancia A-A Acero Long. 1 - - 4 3.12 3 12.48
584 005IM0118A-740-01-106_0 Cuarto de Vigilancia A-A Acero transv. 1 - - 6 1.27 1 7.62
585 005IM0118A-740-01-106_0 Cuarto de Vigilancia 1-1 SC - 2 1 0.60 0.25 0.25 0.15 0.02 0.30 -
586 005IM0118A-740-01-106_0 Cuarto de Vigilancia 1-1 Acero Long. 1 - - 4 1.06 3 4.24
587 005IM0118A-740-01-106_0 Cuarto de Vigilancia 1-1 Acero transv. 1 - - 2 1.27 1 2.54
588 005IM0118A-740-01-107_0 Caseta de ingreso A-A SC - 2 1 8.75 0.25 0.25 0.15 0.33 4.38 -
589 005IM0118A-740-01-107_0 Caseta de ingreso A-A Acero Long. 1 - - 4 5.31 3 21.24
590 005IM0118A-740-01-107_0 Caseta de ingreso A-A Acero transv. 1 - - 34 1.27 1 43.18
591 005IM0118A-740-01-107_0 Caseta de ingreso 4-4 SC - 2 1 1.26 0.25 0.25 0.15 0.05 0.63 -
592 005IM0118A-740-01-107_0 Caseta de ingreso 4-4 Acero Long. - - 4 2.61 3 -
593 005IM0118A-740-01-107_0 Caseta de ingreso 4-4 Acero transv. 1 - - 4 1.27 1 5.08
594 005IM0118A-740-01-107_0 Caseta de ingreso 6-6 SC - 2 1 1.04 0.25 0.25 0.15 0.04 0.52 -
595 005IM0118A-740-01-107_0 Caseta de ingreso 6-6 Acero Long. 1 - - 4 1.45 3 5.80
596 005IM0118A-740-01-107_0 Caseta de ingreso 6-6 Acero transv. 1 - - 3 1.27 1 3.81
597 005IM0118A-740-01-112_0 Edificio Administrativo 1-2/ D'-D' VT 2-2 1 3.50 0.20 - 0.10 0.07 0.35 -
598 005IM0118A-740-01-112_0 Edificio Administrativo 1-2/ D'-D' Acero Long. 1 - - 2 4.16 3 8.32
599 005IM0118A-740-01-112_0 Edificio Administrativo 1-2/ D'-D' Acero transv. 1 - - 13 0.27 1 3.51
600 005IM0118A-740-01-112_0 Edificio Administrativo 1-2/ D''-D'' VS - 01 1 3.50 0.20 - 0.15 0.11 0.53 -
601 005IM0118A-740-01-112_0 Edificio Administrativo 1-2/ D''-D'' Acero Long. 1 - - 4 4.16 3 16.64
602 005IM0118A-740-01-112_0 Edificio Administrativo 1-2/ D''-D'' Acero transv. 1 - - 13 0.51 1 6.63
603 005IM0118A-740-01-112_0 Edificio Administrativo 1-2/ D'''-D''' VT 2-2 1 3.50 0.20 - 0.10 0.07 0.35 -
604 005IM0118A-740-01-112_0 Edificio Administrativo 1-2/ D'''-D''' Acero Long. 1 - - 2 4.16 3 8.32
605 005IM0118A-740-01-112_0 Edificio Administrativo 1-2/ D'''-D''' Acero transv. 1 - - 13 0.27 1 3.51
606 005IM0118A-740-01-112_0 Edificio Administrativo 1-2 / E' - E' VS - 01 1 3.50 0.20 - 0.15 0.11 0.53 -
607 005IM0118A-740-01-112_0 Edificio Administrativo 1-2 / E' - E' Acero Long. 1 - - 4 4.16 3 16.64
608 005IM0118A-740-01-112_0 Edificio Administrativo 1-2 / E' - E' Acero transv. 1 - - 13 0.51 1 6.63
609 005IM0118A-740-01-112_0 Edificio Administrativo 1-1 VT 1-1 1 9.90 0.50 0.30 0.25 1.24 8.42 -
610 005IM0118A-740-01-112_0 Edificio Administrativo 1-1 Acero Long. 1 - - 4 10.22 5 40.88
611 005IM0118A-740-01-112_0 Edificio Administrativo 1-1 Acero transv. 1 - - 66 1.38 3 91.08
612 005IM0118A-740-01-112_0 Edificio Administrativo 1-1 VT 3-3 1 1.13 0.35 0.15 0.25 0.10 0.62 -
613 005IM0118A-740-01-112_0 Edificio Administrativo 1-1 Acero Long. 1 1 - - 4 1.44 4 5.76
614 005IM0118A-740-01-112_0 Edificio Administrativo 1-1 Acero Long. 2 1 - 4 1.50 3
615 005IM0118A-740-01-112_0 Edificio Administrativo 1-1 Acero transv. 1 - - 8 1.08 3 8.64

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 40 de 56


DATOS Metrados Dimensiones
Item Plano Ambiente Eje Id Cant. Largo hConc. hEncof. base Vconc Encof # L Tipo Total ml

616 005IM0118A-740-01-112_0 Edificio Administrativo 2-2 VT 1-1 1 9.90 0.50 0.30 0.25 1.24 8.42 -
617 005IM0118A-740-01-112_0 Edificio Administrativo 2-2 Acero Long. 1 - - 4 10.22 5 40.88
618 005IM0118A-740-01-112_0 Edificio Administrativo 2-2 Acero transv. 1 - - 66 1.38 3 91.08
619 005IM0118A-740-01-112_0 Edificio Administrativo 11-12 / D'-D' VS - 01 1 3.50 0.20 - 0.15 0.11 0.53 -
620 005IM0118A-740-01-112_0 Edificio Administrativo 11-12 / D'-D' Acero Long. 1 - - 4 4.16 3 16.64
621 005IM0118A-740-01-112_0 Edificio Administrativo 11-12 / D'-D' Acero transv. 1 - - 13 0.51 1 6.63
622 005IM0118A-740-01-112_0 Edificio Administrativo 11-12 / E-E VS - 01 1 3.50 0.20 - 0.15 0.11 0.53 -
623 005IM0118A-740-01-112_0 Edificio Administrativo 11-12 / E-E Acero Long. 1 - - 4 4.16 3 16.64
624 005IM0118A-740-01-112_0 Edificio Administrativo 11-12 / E-E Acero transv. 1 - - 13 0.51 1 6.63
625 005IM0118A-740-01-112_0 Edificio Administrativo 11-12 / E'-E' VS - 01 1 3.50 0.20 - 0.15 0.11 0.53 -
626 005IM0118A-740-01-112_0 Edificio Administrativo 11-12 / E'-E' Acero Long. 1 - - 4 4.16 3 16.64
627 005IM0118A-740-01-112_0 Edificio Administrativo 11-12 / E'-E' Acero transv. 1 - - 13 0.51 1 6.63
628 005IM0118A-740-01-112_0 Edificio Administrativo 11-11 VT 1-1 1 10.13 0.50 0.30 0.25 1.27 8.61 -
629 005IM0118A-740-01-112_0 Edificio Administrativo 11-11 Acero Long. 1 - - 4 10.95 5 43.80
630 005IM0118A-740-01-112_0 Edificio Administrativo 11-11 Acero transv. 1 - - 73 1.38 3 100.74
631 005IM0118A-740-01-112_0 Edificio Administrativo 11-11 VT 3-3 1 1.13 0.35 0.15 0.25 0.10 0.62 -
632 005IM0118A-740-01-112_0 Edificio Administrativo 11-11 Acero Long. 1 1 - - 4 1.44 4 5.76
633 005IM0118A-740-01-112_0 Edificio Administrativo 11-11 Acero Long. 2 1 - - 4 1.50 3 6.00
634 005IM0118A-740-01-112_0 Edificio Administrativo 11-11 Acero transv. 1 - - 8 1.08 3 8.64
635 005IM0118A-740-01-112_0 Edificio Administrativo 12-12 VT 1-1 1 10.13 0.50 0.30 0.25 1.27 8.61 -
636 005IM0118A-740-01-112_0 Edificio Administrativo 12-12 Acero Long. 1 - - 4 10.95 5 43.80
637 005IM0118A-740-01-112_0 Edificio Administrativo 12-12 Acero transv. 1 - - 73 1.38 3 100.74
- - -

Total Concreto 38.95 m3 393.55 m2 Total Encofrado

Ampliacin de cuarto tcnico

HV S.A. CONTRATISTAS 361485466.xls - Vigas Pgina 41 de 56


HV S.A. CONTRATISTAS 23-Aug-11

METRADOS APOYO DE CONTENEDORES


OBRA: PROYECTO CONGA

Partida : Zapatas de Columnas


Tota ml por Tota ml por
Tipo Peso ml
Diametro Diametro

1 8 mm - -
2 1/4" 0.25 - - Talud 0%
3 3/8" 0.56 604.80 ml 339.00 kg
4 1/2" 1.10 307.20 ml 338.00 kg
5 5/8" 1.60 - -
6 3/4" 2.35 - -
8 1" 4.20 - - 677.00 kg Total Acero

Datos Metrados Acero


PLANO Id Cant.
Largo Ancho hConc h exc V excav. V relleno Asolado Vconc Perfilado Encof # L Total ml
Tipo

TDM 111 del 21/06 FALSA ZAPATA 2.35 X 5.95 2 5.95 2.35 0.55 0.55 15.38 15.38 18.26
005IM0118A-740-01-113_0 APOYO DE CONTENEDORES 48 0.50 0.50 1.20 0.70 8.40 14.40 67.20 48.00 -
005IM0118A-740-01-113_0 Acero estribos 48 - - - - - 9 1.40 3 604.80
005IM0118A-740-01-113_0 Acero long. 48 - - - - - 4 1.60 4 307.20

15.38 - - 15.38 85.00 48.00 912.00

m3 m3 m2 m3 m2 m2 ml

HV S.A. CONTRATISTAS 361485466.xls - Apoyo contenedores Pgina 42 de 56


HV S.A. CONTRATISTAS 23-Aug-11
METRADO DE LOSAS ALIGERADAS
Obra : PROYECTO CONGA
Partida : LOSAS ALIGERADAS

Tota ml por Total Kg por


Tipo Peso ml
Diametro Diametro
1 6 mm - - 0.00% rea por m2 = 0.09 m3/m
2 8 mm 0.40 1,939.58 ml 776.00 kg Losita 0.05
3 1/4" - 59.40 ml - Viguetas 0.04
4 3/8" 0.56 2,905.60 ml 1,628.00 kg Ladrillo (m2)= 8.33 und/m2
5 1/2" 0.99 178.02 ml 177.00 kg
6 5/8" 1.55 - - 0.00%
7 3/4" 2.25 - - 0.00%
8 1" 3.97 - - 2,581.00 kg Total Acero

Datos Metrado Dimensiones


Concret ladrillo ladrillo
Item Plano Ambiente Id Cant area h Encofrado 15x30x30 # L Tipo Total ml
o 20x30x30

1 005IM0118A-740-01-106_0 Cuarto de Vigilancia Aligerado Izq. 1 19.8011 0.20 1.98 19.80 183.00 - -
2 005IM0118A-740-01-106_0 Cuarto de Vigilancia Acero Long. 1 1 - - - - 13 1.93 3/8" 25.09
3 005IM0118A-740-01-106_0 Cuarto de Vigilancia Acero Long. 2 1 - - - - 13 3.58 3/8" 46.48
4 005IM0118A-740-01-106_0 Cuarto de Vigilancia Acero Long. 3 1 - - - - 13 6.85 3/8" 89.05
5 005IM0118A-740-01-106_0 Cuarto de Vigilancia Acero de T 1 - - - - 24 5.17 8 mm 124.08
6 005IM0118A-740-01-106_0 Cuarto de Vigilancia Aligerado Der. 1 15.102 0.20 1.51 15.10 140.00 - -
7 005IM0118A-740-01-106_0 Cuarto de Vigilancia Acero Long. 1 1 - - - - 14 1.76 3/8" 24.64
8 005IM0118A-740-01-106_0 Cuarto de Vigilancia Acero Long. 2 1 - - - - 14 2.14 3/8" 29.96
9 005IM0118A-740-01-106_0 Cuarto de Vigilancia Acero Long. 3 1 - - - - 14 4.20 3/8" 58.80
10 005IM0118A-740-01-106_0 Cuarto de Vigilancia Acero Trans. 1 2 - - - - 9 1.53 3/8" 27.45
11 005IM0118A-740-01-106_0 Cuarto de Vigilancia Acero Trans. 2 2 - - - - 9 1.30 3/8" 23.40
12 005IM0118A-740-01-106_0 Cuarto de Vigilancia Acero de T 1 - - - - 9 5.70 8 mm 51.30
13 005IM0118A-740-01-106_0 Cuarto de Vigilancia VT 1-1 - perimetro 1 26.02 0.20 5.20 - -
14 005IM0118A-740-01-106_0 Cuarto de Vigilancia Ac. Long 1 - - - - 2 27.02 3/8" 54.04
15 005IM0118A-740-01-107_0 Caseta de Ingreso Aligerado Izq. 1 46.507 0.20 4.65 46.51 430.00 - -
16 005IM0118A-740-01-107_0 Caseta de Ingreso Acero Long. 1 2 - - - - 17 2.26 3/8" 76.84
17 005IM0118A-740-01-107_0 Caseta de Ingreso Acero Long. 2 1 - - - - 17 8.70 3/8" 147.90
18 005IM0118A-740-01-107_0 Caseta de Ingreso Acero Long. 3 1 - - - - 17 2.35 1/2" 39.95
19 005IM0118A-740-01-107_0 Caseta de Ingreso Acero de T 1 - - - - 30 7.61 8 mm 228.30
20 005IM0118A-740-01-107_0 Caseta de Ingreso Aligerado Der. 1 46.1405 0.20 4.61 46.14 427.00 - -
21 005IM0118A-740-01-107_0 Caseta de Ingreso Acero Long. 1 2 - - - - 17 2.26 3/8" 76.84
22 005IM0118A-740-01-107_0 Caseta de Ingreso Acero Long. 2 1 - - - - 17 8.40 3/8" 142.80
23 005IM0118A-740-01-107_0 Caseta de Ingreso Acero Long. 3 1 - - - - 17 2.35 1/2" 39.95
24 005IM0118A-740-01-107_0 Caseta de Ingreso Acero de T 1 - - - - 30 8.61 8 mm 258.30

HV S.A. CONTRATISTAS 361485466.xls - Losa Aligerada Pgina 43 de 56


Datos Metrado Dimensiones
Concret ladrillo ladrillo
Item Plano Ambiente Id Cant area h Encofrado 15x30x30 # L Tipo Total ml
o 20x30x30

25 005IM0118A-740-01-107_0 Caseta de Ingreso VT 1-1 - perimetro 1 42.9 0.20 8.58 - -


26 005IM0118A-740-01-107_0 Caseta de Ingreso Ac. Long 1 - - - - 2 44.50 3/8" 89.00
27 005IM0118A-740-01-111_0 Cuarto Tcnico Aligerado 1 168.55 0.25 18.54 168.55 - 1,558.00 -
28 005IM0118A-740-01-111_0 Cuarto Tcnico Acero Long. 1 2 - - - - 22 3.16 3/8" 139.04
29 005IM0118A-740-01-111_0 Cuarto Tcnico Acero Long. 2 1 - - - - 22 8.51 3/8" 187.26
30 005IM0118A-740-01-111_0 Cuarto Tcnico Acero Long. 3 1 - - - - 22 4.46 1/2" 98.12
31 005IM0118A-740-01-111_0 Cuarto Tcnico Acero de T 1 - - - - 36 10.18 8 mm 366.48
32 005IM0118A-740-01-111_0 Cuarto Tcnico Acero Long. 1 1 - - - - 36 2.64 3/8" 95.04
33 005IM0118A-740-01-111_0 Cuarto Tcnico Acero Long. 2 1 - - - - 36 4.14 3/8" 149.04
34 005IM0118A-740-01-111_0 Cuarto Tcnico Acero Long. 3 1 - - - - 36 7.55 3/8" 271.80
35 005IM0118A-740-01-111_0 Cuarto Tcnico Acero de T 1 - - - - 32 16.16 8 mm 517.12
36 005IM0118A-740-01-111_0 Cuarto Tcnico VT 1-1 1 66.34 0.25 16.59 - -
37 005IM0118A-740-01-111_0 Cuarto Tcnico Ac. Long 1 - - - - 2 75.40 3/8" 150.80
38 005IM0118A-740-01-111_0 Cuarto Tcnico Estribos 1 - - - - 336 0.87 3/8" 292.32
39 005IM0118A-740-01-111_0 Cuarto Tcnico/ ampliacin Aligerado 1 16.1502 0.25 1.78 16.15 - 150.00 -
40 005IM0118A-740-01-111_0 Cuarto Tcnico/ ampliacin Acero Long. 1 2 - - - - 17 4.32 3/8" 146.88
41 005IM0118A-740-01-111_0 Cuarto Tcnico/ ampliacin Acero de T 1 - - - - 9 6.60 1/4" 59.40
42 005IM0118A-740-01-111_0 Cuarto Tcnico/ ampliacin VT 1-1 1 4.38 0.25 1.10 - -
43 005IM0118A-740-01-111_0 Cuarto Tcnico/ ampliacin Ac. Long 1 - - - - 2 10.98 3/8" 21.95
44 005IM0118A-740-01-111_0 Cuarto Tcnico/ ampliacin Estribos 1 - - - - 52 0.87 3/8" 45.24
45 005IM0118A-740-01-112_0 Modulo de oficinas 1 Aligerado 11 - 12 1 32.825 0.20 3.28 32.83 304.00 - -
46 005IM0118A-740-01-112_0 Modulo de oficinas 1 Acero Long. 1 2 - - - - 10 1.12 3/8" 22.48
47 005IM0118A-740-01-112_0 Modulo de oficinas 1 Acero Long. 2 3 - - - - 10 2.15 3/8" 64.50
48 005IM0118A-740-01-112_0 Modulo de oficinas 1 Acero Long. 3 1 - - - - 10 11.93 3/8" 119.30
49 005IM0118A-740-01-112_0 Modulo de oficinas 1 Acero de T 1 - - - - 40 4.58 8 mm 183.20
50 005IM0118A-740-01-112_0 Modulo de oficinas 2 Aligerado 1 - 2 1 31.849 0.20 3.18 31.85 295.00 - -
51 005IM0118A-740-01-112_0 Modulo de oficinas 2 Acero Long. 1 1 - - - - 10 1.12 3/8" 11.24
52 005IM0118A-740-01-112_0 Modulo de oficinas 2 Acero Long. 2 1 - - - - 10 1.35 3/8" 13.52
53 005IM0118A-740-01-112_0 Modulo de oficinas 2 Acero Long. 3 1 - - - - 10 12.28 3/8" 122.80
54 005IM0118A-740-01-112_0 Modulo de oficinas 2 Acero Long. 4 1 - - - - 10 2.81 3/8" 28.10
55 005IM0118A-740-01-112_0 Modulo de oficinas 2 Acero Long. 5 2 - - - - 10 3.20 3/8" 64.00
56 005IM0118A-740-01-112_0 Modulo de oficinas 2 Acero Long. 6 2 - - - - 10 2.40 3/8" 48.00
57 005IM0118A-740-01-112_0 Modulo de oficinas 2 Acero de T 1 - - - - 17 12.40 8 mm 210.80
- - - - -
40.00 409.00 1,779.00 1,708.00 5,082.60
m3 m2 und und ml
Ampliacin de cuarto tcnico

HV S.A. CONTRATISTAS 361485466.xls - Losa Aligerada Pgina 44 de 56


HV S.A. CONTRATISTAS 23-Aug-11

METRADO CISTERNA
OBRA: PROYECTO CONGA
Partida : CISTERNA
Tota ml por Tota ml por
Tipo Peso ml
Diametro Diametro

1 8 mm 0.40 - -
2 1/4" - - - Talud 0%
3 3/8" 0.56 10,726.06 ml 6,007.00 kg
4 1/2" 0.99 338.40 ml 336.00 kg
5 5/8" 1.55 - -
6 3/4" 2.25 - -
8 1" 3.97 - - 6,343.00 kg Total Acero

Datos Metrados Acero


PLANO Id Cant.
Largo Ancho hConc h exc V excav. Vconc Encof perfilado # L Total ml
Tipo

005IM0118A-740-01-108_0 CISTERNA 1 10.05 8.00 4.00 321.60 - - -


005IM0118A-740-01-108_0 CISTERNA 1 4.75 8.00 3.00 114.00 - - -
005IM0118A-740-01-108_0 CISTERNA 1 1.90 2.20 1.35 5.64 - - -
005IM0118A-740-01-108_0 CISTERNA 3 8.00 0.65 0.60 9.36 - - -
005IM0118A-740-01-108_0 CISTERNA 2 10.05 0.65 0.60 7.84 - - -
005IM0118A-740-01-108_0 CISTERNA 2 4.70 0.65 0.60 3.67 - - -
005IM0118A-740-01-108_0 CISTERNA 1 4.70 0.70 0.40 1.32 - - -
005IM0118A-740-01-108_0 CISTERNA 1 4.70 1.74 0.20 1.64 - - -
PLANO ENVIADO A BISA SOBREEXCAVACIN CI LADOS 2 10.05 2.80 4.00 144.72 - - 89.89 -
PLANO ENVIADO A BISA SOBREEXCAVACIN CI LADOS 1 8.00 2.80 4.00 57.60 - - 35.78
PLANO ENVIADO A BISA SOBREEXCAVACIN CI ESQUINAS 4 29.23 - - 17.55 -
PLANO ENVIADO A BISA SOBREEXCAVACIN CD LADOS 2 4.75 2.30 3.00 44.18 - - 31.86 -
PLANO ENVIADO A BISA SOBREEXCAVACIN CD LADOS 1 8.00 2.30 3.00 37.20 - - 26.83 -
PLANO ENVIADO A BISA SOBREEXCAVACIN CD ESQUINAS 4 14.67 - - 9.98 -
005IM0118A-740-01-108_0 CISTERNA A/A 1 7.50 0.25 4.05 - 7.59 62.78 -
005IM0118A-740-01-108_0 Acero Vertical 1 - - - 43 5.11 3 219.73
005IM0118A-740-01-108_0 Acero Vertical 1 - - - 43 4.90 3 210.70
005IM0118A-740-01-108_0 Acero Vertical 1 - - - 43 3.88 3 166.84
005IM0118A-740-01-108_0 Acero Horizontal 1 - - - 48 8.10 3 388.80

HV S.A CONTRATISTAS 361485466.xls 361485466.xls - Cisterna Pgina45 de 56


Datos Metrados Acero
PLANO Id Cant.
Largo Ancho hConc h exc V excav. Vconc Encof perfilado # L Total ml
Tipo
005IM0118A-740-01-108_0 CISTERNA A'-A'/ A''-A'' 2 1.50 0.20 1.55 - 0.93 10.54 -
005IM0118A-740-01-108_0 Acero Vertical 2 - - - 7 1.76 3 24.64
005IM0118A-740-01-108_0 Acero Vertical 2 - - - 7 1.91 3 26.74
005IM0118A-740-01-108_0 Acero Horizontal 2 - - - 14 2.06 3 57.68
005IM0118A-740-01-108_0 CISTERNA B/B 1 7.50 0.25 4.05 - 7.59 62.78 -
005IM0118A-740-01-108_0 Acero Vertical 1 1 - - - 43 5.11 3 219.73
005IM0118A-740-01-108_0 Acero Vertical 2 1 - - - 43 4.90 3 210.70
005IM0118A-740-01-108_0 Acero Vertical 3 1 - - - 43 3.88 3 166.84
005IM0118A-740-01-108_0 Acero Horizontal 1 - - - 48 8.10 3 388.80
005IM0118A-740-01-108_0 CISTERNA C/C 1 7.50 0.25 3.05 - 5.72 47.28 -
005IM0118A-740-01-108_0 Acero Vertical 1 1 - - - 43 3.95 3 169.85
005IM0118A-740-01-108_0 Acero Vertical 2 1 - - - 43 4.12 3 177.16
005IM0118A-740-01-108_0 Acero Horizontal 1 - - - 36 8.10 3 291.60
005IM0118A-740-01-108_0 CISTERNA 1-1 1 9.80 0.25 4.35 - 10.66 87.44 -
005IM0118A-740-01-108_0 Acero Vertical 1 1 - - - 56 5.41 3 302.96
005IM0118A-740-01-108_0 Acero Vertical 2 1 - - - 56 5.20 3 291.20
005IM0118A-740-01-108_0 Acero Vertical 3 1 - - - 56 3.88 3 217.28
005IM0118A-740-01-108_0 Acero Horizontal 1 - - - 50 9.90 3 495.00
005IM0118A-740-01-108_0 CISTERNA 1-1 1 4.95 0.25 3.35 - 4.15 34.84 -
005IM0118A-740-01-108_0 Acero Vertical 1 1 - - - 29 4.41 3 127.89
005IM0118A-740-01-108_0 Acero Vertical 2 1 - - - 29 4.24 3 122.96
005IM0118A-740-01-108_0 Acero Horizontal 1 - - - 48 5.05 3 242.40
005IM0118A-740-01-108_0 CISTERNA 2-2 1 4.45 0.25 3.50 - 3.89 32.90 -
005IM0118A-740-01-108_0 Acero Vertical 1 1 - - - 26 4.00 3 104.00
005IM0118A-740-01-108_0 Acero Vertical 2 1 - - - 26 3.94 3 102.44
005IM0118A-740-01-108_0 Acero Horizontal 1 - - - 40 5.05 3 202.00
005IM0118A-740-01-108_0 Gancho 1 - - - 26 1.13 3 29.38
005IM0118A-740-01-108_0 CISTERNA 3-3 1 9.80 0.25 4.05 - 9.92 81.41 -
005IM0118A-740-01-108_0 Acero Vertical 1 1 - - - 56 4.94 3 276.64
005IM0118A-740-01-108_0 Acero Vertical 2 1 - - - 56 3.88 3 217.28
005IM0118A-740-01-108_0 Acero Vertical 3 1 - - - 56 5.11 3 286.16
005IM0118A-740-01-108_0 Acero Horizontal 1 - - - 48 9.90 3 475.20
005IM0118A-740-01-108_0 CISTERNA 3-3 1 4.95 0.25 3.35 - 4.15 34.84 -
005IM0118A-740-01-108_0 Acero Vertical 1 1 - - - 29 3.95 3 114.55

HV S.A CONTRATISTAS 361485466.xls 361485466.xls - Cisterna Pgina46 de 56


Datos Metrados Acero
PLANO Id Cant.
Largo Ancho hConc h exc V excav. Vconc Encof perfilado # L Total ml
Tipo
005IM0118A-740-01-108_0 Acero Vertical 2 1 - - - 29 4.12 3 119.48
005IM0118A-740-01-108_0 Acero Horizontal 1 - - - 48 5.05 3 242.40
005IM0118A-740-01-108_0 CISTERNA 2'-2' / 2''-2'' 2 2.20 0.20 1.55 - 1.36 14.88 -
005IM0118A-740-01-108_0 Acero Vertical 1 2 - - - 56 1.91 3 213.92
005IM0118A-740-01-108_0 Acero Vertical 2 2 - - - 56 1.76 3 197.12
005IM0118A-740-01-108_0 Acero Horizontal 2 - - - 14 9.90 277.20
005IM0118A-740-01-108_0 CISTERNA 2'-2' / 1'-1' 2 1.00 0.15 0.55 - 0.17 2.53 -
005IM0118A-740-01-108_0 Acero Vertical 1 2 - - - 4 0.76 3 6.08
005IM0118A-740-01-108_0 Acero Vertical 2 2 - - - 4 0.70 3 5.60
005IM0118A-740-01-108_0 Acero Horizontal 2 - - - 2 1.10 3 4.40
005IM0118A-740-01-108_0 TECHO CIST. CONTRAINC. 1 9.55 7.50 0.25 - 17.91 71.63 -
005IM0118A-740-01-108_0 Acero Long. 1 - - - 54 10.80 3 582.93
005IM0118A-740-01-108_0 Acero Trans. 1 - - - 66 8.21 3 541.86
005IM0118A-740-01-108_0 TECHO CIST. DOMEST. 1 1 3.45 3.68 0.25 - 3.17 12.70 -
005IM0118A-740-01-108_0 Acero Long. 1 - - - 24 3.55 3 85.20
005IM0118A-740-01-108_0 Acero Trans. 1 - - - 24 3.68 3 88.32
005IM0118A-740-01-108_0 TECHO CIST. DOMEST. 2 1 3.45 3.57 0.25 - 3.08 12.32 -
005IM0118A-740-01-108_0 Acero Long. 1 - - - 24 3.55 3 85.20
005IM0118A-740-01-108_0 Acero Trans. 1 - - - 24 3.57 3 85.68
005IM0118A-740-01-108_0 TECHO CIST. DOMEST. 1 1 1.00 2.78 0.25 - 0.70 2.78 -
005IM0118A-740-01-108_0 Acero Long. 1 - - - 4 2.88 3 11.52
005IM0118A-740-01-108_0 Acero Trans. 1 - - - 18 1.10 3 19.80
005IM0118A-740-01-108_0 TECHO CIST. DOMEST. 2 1 1.00 2.67 0.25 - 0.67 2.67 -
005IM0118A-740-01-108_0 Acero Long. 1 - - - 4 2.77 3 11.08
005IM0118A-740-01-108_0 Acero Trans. 1 - - - 18 1.10 3 19.80
005IM0118A-740-01-108_0 FONDO CIST. CONTRAINC. I 1 9.80 1.26 0.20 - 2.47 -
005IM0118A-740-01-108_0 Acero Long. 1 - - - 46 1.36 3 62.56
005IM0118A-740-01-108_0 Acero Trans. 1 - - - 10 10.40 3 104.00
005IM0118A-740-01-108_0 FONDO CIST. CONTRAINC. C A-A' 1 3.72 1.80 0.20 - 1.34 -
005IM0118A-740-01-108_0 Acero Long. 1 - - - 16 4.33 3 69.28
005IM0118A-740-01-108_0 Acero Trans. 1 - - - 34 2.36 3 80.24
005IM0118A-740-01-108_0 FONDO CIST. CONTRAINC. C A'-A'' 1 1.80 1.50 0.15 - 0.41 -
005IM0118A-740-01-108_0 Acero Long. 1 - - - 16 2.36 3 37.76
005IM0118A-740-01-108_0 Acero Trans. 1 - - - 16 2.06 3 32.96

HV S.A CONTRATISTAS 361485466.xls 361485466.xls - Cisterna Pgina47 de 56


Datos Metrados Acero
PLANO Id Cant.
Largo Ancho hConc h exc V excav. Vconc Encof perfilado # L Total ml
Tipo
005IM0118A-740-01-108_0 FONDO CIST. CONTRAINC. C A''-B 1 3.63 1.80 0.20 - 1.31 -
005IM0118A-740-01-108_0 Acero Long. 1 - - - 16 4.24 3 67.84
005IM0118A-740-01-108_0 Acero Trans. 1 - - - 32 2.36 3 75.52
005IM0118A-740-01-108_0 FONDO CIST. CONTRAINC. D 1 9.80 4.04 0.20 - 7.92 -
005IM0118A-740-01-108_0 Acero Long. 1 - - - 46 4.14 3 190.44
005IM0118A-740-01-108_0 Acero Trans. 1 - - - 36 10.40 3 374.40
005IM0118A-740-01-108_0 FONDO CIST. 1 1 4.45 3.12 0.20 - 2.78 -
005IM0118A-740-01-108_0 Acero Long. Sup 1 - - - 20 3.79 3 75.80
005IM0118A-740-01-108_0 Acero Long. Inf 1 - - - 20 2.53 3 50.60
005IM0118A-740-01-108_0 Acero Trans. Sup 1 - - - 14 5.07 3 70.98
005IM0118A-740-01-108_0 Acero Trans. Inf 1 - - - 14 5.12 3 71.68
005IM0118A-740-01-108_0 FONDO CIST. 2 1 4.45 3.12 0.20 - 2.78 -
005IM0118A-740-01-108_0 Acero Long. Sup 1 - - - 20 3.79 3 75.80
005IM0118A-740-01-108_0 Acero Long. Inf 1 - - - 20 3.53 3 70.60
005IM0118A-740-01-108_0 Acero Trans. Sup 1 - - - 14 5.07 3 70.98
005IM0118A-740-01-108_0 Acero Trans. Inf 1 - - - 14 5.12 3 71.68
005IM0118A-740-01-108_0 FONDO CIST. ZONA CENTRAL 1 4.45 1.75 0.20 - 1.56 -
005IM0118A-740-01-108_0 Acero Long. Sup 1 - - - 20 2.18 3 43.60
005IM0118A-740-01-108_0 Acero Long. Inf 1 - - - 20 2.84 3 56.80
005IM0118A-740-01-108_0 Acero Trans. 1 - - - 14 1.85 3 25.90
005IM0118A-740-01-108_0 C BASE 1 3 8.00 0.65 0.60 - 9.36 31.14 -
005IM0118A-740-01-108_0 C BASE 1 2 14.75 0.65 0.60 - 11.51 36.96 -
005IM0118A-740-01-108_0 C BASE CENTRAL 1 14.75 0.70 0.40 - 4.13 12.36 -
005IM0118A-740-01-108_0 TECHO REFUERZO ADICIONAL - - - -
005IM0118A-740-01-108_0 Acero Longitudinal 1 1 - - - 14 6.40 3 89.60
005IM0118A-740-01-108_0 Acero Longitudinal 2 1 - - - 38 5.20 3 197.60
005IM0118A-740-01-108_0 Acero Longitudinal 3 1 - - - 38 6.40 4 243.20
005IM0118A-740-01-108_0 Acero transversal 1 - - - 17 5.60 4 95.20
005IM0118A-740-01-108_0 Acero Entrada CD 1 2 - - - 1 1.78 3 3.56
005IM0118A-740-01-108_0 Acero Entrada CD 1 2 - - - 1 0.80 3 1.60
005IM0118A-740-01-108_0 Acero Entrada CD 1 1 - - - 1 2.65 3 2.65
005IM0118A-740-01-108_0 Acero entrada CCI 1 1 - - - 1 1.67 3 1.67
005IM0118A-740-01-108_0 Acero entrada CCI 2 1 - - - 1 1.58 3 1.58
005IM0118A-740-01-108_0 Acero entrada CCI 3 1 - - - 1 0.84 3 0.84

HV S.A CONTRATISTAS 361485466.xls 361485466.xls - Cisterna Pgina48 de 56


Datos Metrados Acero
PLANO Id Cant.
Largo Ancho hConc h exc V excav. Vconc Encof perfilado # L Total ml
Tipo
005IM0118A-740-01-108_0 CUARTO DE TABLEROS 2 6.30 0.70 0.95 - - -
005IM0118A-740-01-108_0 SUBESTACIN 1 6.30 1.72 1.40 - - -

Cisterna 465.06 127.20 654.74 -


m3 m3 m2

Sobreexcavacin 327.60 - - 211.89

SOLADO EN CISTERNA
UBICACIN L L M2 NOTA: Partidas en rojo
CISTERNA DOMSTICA 3.95 9.4 37.13 El metrado de los nichos debajo de cuarto de tableros y subestacin han
CISTERNA DOMSTICA 8 1.17 9.36 sido retirados de la partida de excavacin de cisterna, dicho metrado se lo
presentar como adicional aparte
CISTERNA CONTRA INCENDIO 8.45 1.88 15.886
CISTERNA CONTRA INCENDIO 8.45 4.66 39.377
CISTERNA CONTRA INCENDIO 6.25 2.2 13.75
CISTERNA CONTRA INCENDIO 2.2 2.2 4.84
CISTERNA CONTRA INCENDIO 8.8 1.35 11.88
CISTERNA CONTRA INCENDIO 1.17 8 9.36
CISTERNA CONTRA INCENDIO 2.77 8 22.16
164.00 m2

HV S.A CONTRATISTAS 361485466.xls 361485466.xls - Cisterna Pgina49 de 56


HV S.A. CONTRATISTAS 9-Sep-11

METRADOS PISOS Y PAVIMENTOS

OBRA: PROYECTO CONGA

Partida : MOVIMIENTO DE TIERRA


Cdigo Descripcin Metrado
1 COMPACTACIN AL 100% DE SU M.S.D. 3890.09 m2
2 AFIRMADO COMPACTADO AL 100% DE SU M.S.D. e=0.20 m 921.67 m2
3 BASE DE AFIRMADO COMPACTADO PARA PISO RIPIO 178.23 m2
4 PAVIMENTO FLEXIBLE 3266.09 m2
5 AFIRMADO PARA CAMINO DE SERVICIO 316.88 m2
6 AFIRMADO COMPACTADO AL 100% DE SU M.S.D. e=0.25 m 3266.09 m2
7 ESCARIFICADO DE SUELO NATURAL Y COMPACTADO 1123.83 m2
8 CORTE Y RELLENO EN TERRENO 10332.95 m2

TIPO DE
ITEM ESPECIALIDAD Plano NOMBRE DE AMBIENTE Id. DESCRIPCIN AREA (m2)
PISO

1 Estructuras 005IM0118A-740-01-104 Edificio Administrativo Pisos y pavimentos 1 COMPACTACIN AL 100% DE SU M.S.D. 3,229.10
2 Estructuras 005IM0118A-740-01-104 Vereda permetro de edifico administrativo Pisos y pavimentos 1 COMPACTACIN AL 100% DE SU M.S.D. 146.38
3 Estructuras 005IM0118A-740-01-104 Patio de Ingreso Pisos y pavimentos 1 COMPACTACIN AL 100% DE SU M.S.D. 147.71
4 Estructuras 005IM0118A-740-01-104 Area de recreacin y descanso Pisos y pavimentos 1 COMPACTACIN AL 100% DE SU M.S.D. 111.82
5 Estructuras 005IM0118A-740-01-104 Area de Seguridad N 1 Pisos y pavimentos 1 COMPACTACIN AL 100% DE SU M.S.D. 25.21
6 Estructuras 005IM0118A-740-01-104 Area de Seguridad N 2 Pisos y pavimentos 1 COMPACTACIN AL 100% DE SU M.S.D. 20.72
7 Estructuras 005IM0118A-740-01-104 Area de Seguridad N 4 Pisos y pavimentos 1 COMPACTACIN AL 100% DE SU M.S.D. 20.72
8 Estructuras 005IM0118A-740-01-104 Area de Ingreso lateral de Personal Pisos y pavimentos 1 COMPACTACIN AL 100% DE SU M.S.D. 63.57
9 Estructuras 005IM0118A-740-01-104 Veredas de ingreso Pisos y pavimentos 2 AFIRMADO COMPACTADO AL 100% DE SU M.S.D. e=0.20 m 300.88
10 Estructuras 005IM0118A-740-01-104 Rampa de ingreso Pisos y pavimentos 2 AFIRMADO COMPACTADO AL 100% DE SU M.S.D. e=0.20 m 3.01
11 Estructuras 005IM0118A-740-01-104 Cuarto de Vigilancia Pisos y pavimentos 2 AFIRMADO COMPACTADO AL 100% DE SU M.S.D. e=0.20 m 25.86
12 Estructuras 005IM0118A-740-01-104 Cuarto de Vigilancia - vereda Pisos y pavimentos 2 AFIRMADO COMPACTADO AL 100% DE SU M.S.D. e=0.20 m 15.00
13 Estructuras 005IM0118A-740-01-104 Caseta de ingreso Pisos y pavimentos 2 AFIRMADO COMPACTADO AL 100% DE SU M.S.D. e=0.20 m 78.94
14 Estructuras 005IM0118A-740-01-104 Cisterna Pisos y pavimentos 1 COMPACTACIN AL 100% DE SU M.S.D. 124.86
15 Estructuras 005IM0118A-740-01-104 Cuarto tcnico Pisos y pavimentos 2 AFIRMADO COMPACTADO AL 100% DE SU M.S.D. e=0.20 m 66.19
16 Estructuras 005IM0118A-740-01-104 Cuarto tcnico - veredas Pisos y pavimentos 2 AFIRMADO COMPACTADO AL 100% DE SU M.S.D. e=0.20 m 56.37
17 Estructuras 005IM0118A-740-01-104 Planta de tratamiento Pisos y pavimentos 2 AFIRMADO COMPACTADO AL 100% DE SU M.S.D. e=0.20 m 77.77
18 Estructuras 005IM0118A-740-01-104 Zona sur - este por planta de tratamiento Pisos y pavimentos 2 AFIRMADO COMPACTADO AL 100% DE SU M.S.D. e=0.20 m 119.42

HV S.A. CONTRATISTAS 361485466.xls - Losas y Pavimentos Pgina 50 de 56


TIPO DE
ITEM ESPECIALIDAD Plano NOMBRE DE AMBIENTE Id. DESCRIPCIN AREA (m2)
PISO
19 Estructuras 005IM0118A-740-01-104 Conteiners Pisos y pavimentos 2 AFIRMADO COMPACTADO AL 100% DE SU M.S.D. e=0.20 m 178.23
20 Estructuras 005IM0118A-740-01-104 Conteiners Pisos y pavimentos 3 BASE DE AFIRMADO COMPACTADO PARA PISO RIPIO 178.23
21 Estructuras 005IM0118A-740-01-104 Zona de Estacionamiento Pisos y pavimentos 4 PAVIMENTO FLEXIBLE 3,266.09
22 Estructuras 005IM0118A-740-01-104 Camino de servicio Pisos y pavimentos 5 AFIRMADO PARA CAMINO DE SERVICIO 298.59
23 Estructuras 005IM0118A-740-01-104 Zona -losas de ventilacin Pisos y pavimentos 5 AFIRMADO PARA CAMINO DE SERVICIO 18.29
24 Estructuras 005IM0118A-740-01-104 Zona de Estacionamiento Pisos y pavimentos 6 AFIRMADO COMPACTADO AL 100% DE SU M.S.D. e=0.25 m 3,266.09
25 Estructuras 005IM0118A-740-01-104 Plat. Adm .y parte de estacionamiento Pisos y pavimentos 8 CORTE Y RELLENO EN TERRENO 10,332.95
26 Estructuras 005IM0118A-740-01-104 Parte de estacionamiento Pisos y pavimentos 7 ESCARIFICADO DE SUELO NATURAL Y COMPACTADO 1,123.83

HV S.A. CONTRATISTAS 361485466.xls - Losas y Pavimentos Pgina 51 de 56


HV S.A. CONTRATISTAS 5-May-11

METRADOS FALSO PISO

OBRA: PROYECTO CONGA

Partida : Falso Piso

item Especialidad Ubicacin id cant area metrado

1 Estructuras cuarto tecnico subestacin 1 16.58 16.58


2 Estructuras cuarto tecnico Tableros 1 17.88 17.88
3 Estructuras cuarto tecnico Grupo electrgeno 1 22.95 22.95
3 Estructuras cuarto tecnico Grupo electrgeno 1 9.9 9.9
4 Estructuras cuarto de vigilancia Dormitorio 1 10.94 10.94
5 Estructuras cuarto de vigilancia SH 1 3.25 3.25
6 Estructuras cuarto de vigilancia Kitchenet - Comedor 1 11.81 11.81
7 Estructuras Caseta ingreso Hall ingreso 1 28.79 28.79
8 Estructuras Caseta ingreso Almacen 1 14.27 14.27
9 Estructuras Caseta ingreso Vigilancia 1 9.93 9.93
10 Estructuras Caseta ingreso Terraza 1 7.64 7.64
11 Estructuras Caseta ingreso Terraza 1 7.64 7.64
12 Estructuras Caseta ingreso 3 SH 1 6.68 6.68
168.26 m2

Ampliacin de cuarto tcnico

HV S.A. CONTRATISTAS 361485466.xls - Falso Piso Pgina 52 de 56


HV S.A. CONTRATISTAS 5-May-11

METRADOS CONTRAPISO

OBRA: PROYECTO CONGA

Partida : CONTRAPISO

item Especialidad Ubicacin id cant area metrado

1 Estructuras cuarto de vigilancia Dormitorio 1 10.94 10.94


2 Estructuras cuarto de vigilancia SH 1 3.25 3.25
3 Estructuras cuarto de vigilancia Kitchenet - Comedor 1 11.81 11.81
4 Estructuras Caseta ingreso Hall ingreso 1 28.79 28.79
5 Estructuras Caseta ingreso Almacen 1 14.27 14.27
6 Estructuras Caseta ingreso Vigilancia 1 9.93 9.93
7 Estructuras Edificio Administrativo Edificio Administrativo 1
8 Estructuras Caseta ingreso 3 SH 1 6.68 6.68

85.67 m2
HV S.A. CONTRATISTAS 5-May-11

METRADOS MATERIAL FALTANTE


OBRA: PROYECTO CONGA

Partida : Material Faltante

DESCRIPCIN METRADO
Grout 1"/ Grout cementicio sikagrout 212 o similar 23.83 m2
Rejilla ancho 0.60m 30.63 ml

metrado/Un Total
ITEM ESPECIALIDA Plano Ubicacin Descripcin de Material Id. Cant. d. Und. Metrado
D

1 Estructuras 005IM0118A-740-01-101_1 Edificio administrativo Grout 1"/ Grout cementicio sikagrout 212 o similar CM-1 49 0.3481 m2 17.91
2 Estructuras 005IM0118A-740-01-101_1 Edificio administrativo Grout 1"/ Grout cementicio sikagrout 212 o similar CM-2 26 0.1634 m2 4.46
3 Estructuras 005IM0118A-740-01-101_1 Edificio administrativo Grout 1"/ Grout cementicio sikagrout 212 o similar CM-3 4 0.3481 m2 1.46
5 Estructuras 005IM0118A-740-01-105_1 Area de Recreacin y descanso C 9-9 Rejilla ancho 0.60m 1 10.11 ml 10.11
6 Estructuras 005IM0118A-740-01-105_1 rea de Seguridad C 9-9 Rejilla ancho 0.60m 1 6 ml 6
7 Estructuras 005IM0118A-740-01-105_1 rea de ingreso lateral de personal C 9-9 Rejilla ancho 0.60m 1 10.11 ml 10.11
8 Estructuras 005IM0118A-740-01-105_1 Ingreso a Patio de ingreso 2 C 9-9 Rejilla ancho 0.60m 1 2.65 ml 2.65
9 Estructuras 005IM0118A-740-01-105_1 Ingreso a Patio de ingreso 1 C 9-9 Rejilla ancho 0.60m 1 1.76 ml 1.76

HV S.A. CONTRATISTAS 361485466.xls - Material Faltante Pgina 54 de 56


HV S.A. CONTRATISTAS 2-Sep-11
METRADO DE COLUMNAS DE AMARRE DEL SEGUNDO TRAMO - ADICIONAL
Obra : PROYECTO CONGA
Partida : COLUMNAS
Tipo Peso ml Tota ml por Diametro Total Kg por Diametro

1 8 mm 0.40 157.45 ml 63.00 kg


2 1/4" - - -
3 3/8" 0.56 217.24 ml 122.00 kg
4 1/2" 0.99 - -
5 5/8" 1.55 - -
6 3/4" 2.25 - -
8 1" 3.97 - - 185.00 kg Total Acero

DATOS METRADO Dimensiones


Item Plano Ambiente Id Cant. Largo Ancho hConc. hEncof. Vconc Encof # L Tipo Total ml

1 005IM0118A-740-01-101 Batera de baos 1 CA-01 15 0.20 0.15 1.21 1.21 0.54 9.98 -
2 005IM0118A-740-01-101 Batera de baos 1 Acero Long 15 - - 4 1.17 3 70.20
3 005IM0118A-740-01-101 Batera de baos 1 Estribos 15 - - 5 0.67 1 50.25
4 005IM0118A-740-01-101 Batera de baos 1 CA-01 1 0.20 0.15 0.44 0.44 0.01 0.24 -
5 005IM0118A-740-01-101 Batera de baos 1 Acero Long 1 - - 4 0.40 3 1.60
6 005IM0118A-740-01-101 Batera de baos 1 Estribos 1 - - 2 0.67 1 1.34
7 005IM0118A-740-01-101 Kitchenet 1/cto de limp. CA-01 2 0.20 0.15 1.21 1.21 0.07 1.33 -
8 005IM0118A-740-01-101 Kitchenet 1/cto de limp. Acero Long 2 - - 4 1.17 3 9.36
9 005IM0118A-740-01-101 Kitchenet 1/cto de limp. Estribos 2 - - 5 0.67 1 6.70
10 005IM0118A-740-01-101 Batera de baos 4 CA-01 6 0.20 0.15 1.21 1.21 0.22 3.99 -
11 005IM0118A-740-01-101 Batera de baos 4 Acero Long 6 - - 4 1.17 3 28.08
12 005IM0118A-740-01-101 Batera de baos 4 Estribos 6 - - 5 0.67 1 20.10
13 005IM0118A-740-01-101 Batera de baos 5 CA-01 3 0.20 0.15 1.21 1.21 0.11 2.00 -
14 005IM0118A-740-01-101 Batera de baos 5 Acero Long 3 - - 4 1.17 3 14.04
15 005IM0118A-740-01-101 Batera de baos 5 Estribos 3 - - 5 0.67 1 10.05
16 005IM0118A-740-01-101 Batera de baos 5 CA-01 7 0.20 0.15 0.44 0.44 0.09 1.69 -
17 005IM0118A-740-01-101 Batera de baos 5 Acero Long 7 - - 4 0.40 3 11.20
18 005IM0118A-740-01-101 Batera de baos 5 Estribos 7 - - 2 0.67 1 9.38
19 005IM0118A-740-01-101 Batera de baos 6 CA-01 12 0.20 0.15 1.21 1.21 0.44 7.99 -
20 005IM0118A-740-01-101 Batera de baos 6 Acero Long 12 - - 4 1.17 3 56.16
21 005IM0118A-740-01-101 Batera de baos 6 Estribos 12 - - 5 0.67 1 40.20
22 005IM0118A-740-01-101 Batera de baos 6 CA-01 2 0.20 0.15 0.44 0.44 0.03 0.48 -
23 005IM0118A-740-01-101 Batera de baos 6 Acero Long 2 - - 4 0.40 3 3.20
24 005IM0118A-740-01-101 Batera de baos 6 Estribos 2 - - 2 0.67 1 2.68
25 005IM0118A-740-01-101 Kitchenet 2 CA-01 5 0.20 0.15 1.21 1.21 0.18 3.33 -
26 005IM0118A-740-01-101 Kitchenet 2 Acero Long 5 - - 4 1.17 3 23.40
27 005IM0118A-740-01-101 Kitchenet 2 Estribos 5 - - 5 0.67 1 16.75

1.69 31.04

HV S.A. CONTRATISTAS 361485466.xls - Columnetas - Adicional Pgina 55 de 56


CORTE Y RELLENO COMPENSADO 6833.81 M2

CONFORMACION DE SUB BASE CON MATERIAL PROPIO 1958 M2

AMBIENTE AREA UND

EDIFICIO ADMINISTRATIVO Y CUARTOS TECNICOS


1 5790.81 M2

PATIO DE INGRESO
2 64 M2

JARDINES EN ESTACIONAMIENTO
3 1074 M2

CASETA DE INGRESO
4 85 M2

AREA DE LA CISTERNA
5 116 M2

VEREDAS EN ESTACIONAMIENTO
6 233 M2

ESTACIONAMIENTO HABILITADO
7 1725 M2

You might also like