- KIRTESH GAND

ESH GANDHI
SLAB DESIGN :
Read following Instructions carefully :
1. Give slab parameters such as span in X direction and Y direction and support conditions.
2. Give Eff.cover, Overall slab th. and load data
3. Use Ctrl + Shift + S to copy format in worksheet SLAB FORMAT once only to start with.
4. Use Ctrl + Shift + A to copy design results in worksheet SLAB FORMAT.
5. Use Ctrl + Shift + P to get format for Print in worksheet SLAB FORMAT.
6. Sequence of above commands must be maintained.
7. All other worksheets must be closed while operating macros.
8. Entire worksheet is protected so do not attempt to make any changes.
9. Once the slab design is completed, take out the print and exit the worksheet i.e. DO NOT SAVE.
This way every time the worksheet is opened, fresh copy area will be available. If necessary copy
data of worksheet SLAB FORMAT in new file.
10. For Calculation of span/depth ratios ref. NOTE at end of worksheet.

Project : JMC Date : 6/14/2017


3
S1 ______ 0 0 SLAB X Y CC (Eff.cover cm.)
| | 0 S1 3 6.6 2
6.6 | | 0 (X & Y are clear spans)
| | 0 Give continuity conditions: Cont.=2, Discont.=1
|______ | 0 1 North edge
NORTH 1 [] 2 West & East edge
/|\ SLAB DIAGRAM 1 South edge
|
Displayed supp.cond.is Clockwise from North
Project : JMC Date : 6/14/2017
TBL1 ========================================================================
Slab Short Long Span Overall Finish Filling Live Total Support
No. Span Span Ratio Slab Load Load Load Load Cond.
Ly/Lx Th. (work) (work) (work) (Lim) Cont.2
m. m. cm. Kg/sqm. Kg/sqm. Kg/sqm. T/sqm. Dis. 1
Lx Ly R T FF Fil LL Wlim
------------------------------------------------------------------------------------------------------------------------------------------
S1 4.13 7.73 1.87 115 100 0 300 4.913 1211
================================================================================

TBL2 ========================================================================
Beam L Lx/2 Ly- Short span Long span
SLAB w.Lx/2 Lx/2 South Centre North West Centre
T/m m m OR West Centre East South Centre
------------------------------------------------------------------------------------------------------------------------------------------
S1 10.14 2.07 5.67 Coeff. 0.000 0.071 0.094 0.000 0.043
Eff. B.M. 0.00 5.94 7.87 0.00 3.60
Case No 7 Cover = 2 Ast 0.00 1.39 1.84 0.00 0.84
================================================================================

______ _______ _____ ________


| | | |
| | | |
| | | |
|______ _______ _____| |_______ |

SLAB DIAGRAM Required Layout SLAB DIAGRAM


Layout 1 2 Layout 2

0.1 0.25 1.8 1.75


Support condition for Layout 1 = 1211 Clockwise from North
Support condition for Layout 2 = 2111 Anticlockwise from East
Slab Type for Layout 1 = 4
Slab Type for Layout 2 = 8

Support condition for display in Output = 1211 Clockwise from North


Slab Type No. = 8
IS456 Case No. = 7 RNG3
Slab IS456
Ratio Short span Coeff. Long span Coeff. Type Case
South Centre North West Centre East No. No.
OR West Centre East South Centre North 0 9
1.75 0.000 0.069 0.091 0 0.043 0 1 8
1.87167 0.000 0.071 0.094 0.000 0.043 0.000 2 7
2 0 0.073 0.097 0 0.043 0 3 4
0.25 4 8
(i.e.R>2) 5 6
D.L. 0.000 0.083 0.100 0 0 0 6 4
L.L. 0.000 0.100 0.111 0 0 0 7 3
TOTAL 0.000 0.085 0.101 0 0 0 8 7
9 4
Required slab B.M.Coeff. 10 5
Ratio Short span Coeff. Long span Coeff. 11 2
South Centre North West Centre East 12 4
OR West Centre East South Centre North 13 3
1.87167 0.000 0.071 0.094 0.000 0.043 0.000 14 2
15 1
RNG1 Coeff. for -ve moments
1 1.1 1.2 1.3 1.4 1.5 1.75 2 Long1
1 0.032 0.037 0.043 0.047 0.051 0.053 0.06 0.065 1
2 0.037 0.043 0.048 0.051 0.055 0.057 0.064 0.068 2
3 0.037 0.044 0.052 0.057 0.063 0.067 0.077 0.085 3
4 0.047 0.053 0.06 0.065 0.071 0.075 0.084 0.091 4
5 0.045 0.049 0.052 0.056 0.059 0.06 0.065 0.069 5
6 0 0 0 0 0 0 0 0 6
7 0.057 0.064 0.071 0.076 0.08 0.084 0.091 0.097 7
8 0 0 0 0 0 0 0 0 8
9 0 0 0 0 0 0 0 0 9

RNG2 Coeff. for +ve moments


1 1.1 1.2 1.3 1.4 1.5 1.75 2 Long2
1 0.024 0.028 0.032 0.036 0.039 0.041 0.045 0.049 1
2 0.028 0.032 0.036 0.039 0.041 0.044 0.048 0.052 2
3 0.028 0.033 0.039 0.044 0.047 0.051 0.059 0.065 3
4 0.035 0.04 0.045 0.049 0.053 0.056 0.063 0.069 4
5 0.035 0.037 0.04 0.043 0.044 0.045 0.049 0.052 5
6 0.035 0.043 0.051 0.057 0.063 0.068 0.08 0.088 6
7 0.043 0.048 0.053 0.057 0.06 0.064 0.069 0.073 7
8 0.043 0.051 0.059 0.065 0.071 0.076 0.087 0.096 8
9 0.056 0.064 0.072 0.079 0.085 0.089 0.1 0.107 9

Coeff.for one way slab (i.e. R > 2)


Coeff.-ve B.M. Coeff.+ve B.M. Span/d(=Eff.d) ratio
RNG4 D.L. L.L. RNG5 D.L. L.L. Pt Span/d
1 0.083 0.111 1 0.042 0.083 RNG6
2 0.083 0.111 2 0.042 0.083 0 40
3 0.100 0.111 3 0.083 0.100 0.1 40
4 0.100 0.111 4 0.083 0.100 0.2 34
5 0.083 0.111 5 0.042 0.083 0.3 28.5
6 0.000 0.000 6 0.125 0.125 0.4 25.5
7 0.100 0.111 7 0.083 0.100 0.5 23.5
8 0.000 0.000 8 0.125 0.125 0.6 22.5
9 0.000 0.000 9 0.125 0.125 0.7 21.5
Calc. for reqd.slab Th. 0.8 21
0 40 Pt 9.94231 9.94231
0.1 40 0.0123 40 1.3 52 32
NOTE :
Table RNG6 lists Span/d ratios calculated using modification factors
obtained from Fig.3 of IS456 multiplied by 20 (which is the ratio for
simply supported slab ref.cl.22.2.1). Mutiplying factor of 1.3 (which
will modify the basic ratio of 20 to 26 ref.cl.22.2.1) for continuous
slab is used by other calculations in the worksheet.
Other calculations take care of cl.23.1 also.
Span/d ratios are valid only for Fy = 415 n/mm^2
O NOT SAVE.
necessary copy

Steel grade
500

===============
Min. Check
Slab for
Th. Th.
Reqd.

--------------------------
9.94 O.K.
================

===============
Long span
East
North
--------------------------
0.000
0.00
0.00
================
0.032
0.037
0.037
0.047
0
0.045
0
0.057
0

0.024
0.028
0.028
0.035
0.035
0.035
0.043
0.043
0.056
Project 0702, Pump house at Bhatiya (Terrace level slab) Date : 10/6/2008
TBL1 ====================================================================
Slab Short Long Span Overall Finish Filling Live Total Support Min.
No. Span Span Ratio Slab Load Load Load Load Cond. Slab
Ly/Lx Th. (work) (work) (work) (Lim) Cont.2 Th.
m. m. cm. Kg/sqm. Kg/sqm. Kg/sqm. T/sqm. Dis. 1 Reqd.
Lx Ly R T FF Fil LL Wlim

TS1 2.54 8.08 3.18 10 250 0 200 1.050 1121 8.81


TS2 2.54 8.08 3.18 10 250 0 200 1.050 2121 7.56

END1

TBL2 ====================================================================
Beam L Lx/2 Ly- Short span Long span
SLAB w.Lx/2 Lx/2 South Centre North West Centre East
T/m m m OR West Centre East South Centre North

TS1 1.33 1.27 6.81 Coeff. 0.103 0.088 0.000 0.000 0.000 0.000
Eff. B.M. 0.70 0.60 0.00 0.00 0.00 0.00
ase No 7 Cover = 2 Ast 2.78 2.37 0.00 0.00 0.00 0.00
TS2 1.33 1.27 6.81 Coeff. 0.091 0.054 0.091 0.000 0.000 0.000
Eff. B.M. 0.62 0.36 0.62 0.00 0.00 0.00
ase No 5 Cover = 2 Ast 2.46 1.44 2.46 0.00 0.00 0.00

END2