You are on page 1of 2

Pakistan Army Amuunition Depot

Strip and Mat Footing Patoki

IMMEDIATE SETTLEMENT COMPUTATIONS


Foundation Type mat
Footing Width (m) 3
Footing Length (m) 1
Footing Depth (m) 1.5
At Corner At Center
qo (Kpa) Bm) Lm) M H (m) N m Es (Mpa) I1 I2 IF (from table) DH (mm) DH (mm)

100 1.5 0.5 0 28.5 19.00 0.35 20.6 0.526 0.008 0.77003125 2.606 10.425
3.049
10.17
D/B 0.5
L/B 0.333333

Depth
D/B L/B m
Factor
0.5 0.3 0.77 (ft) (m)
Values from Chart 15 5.0
0.5 1 0.3 0.77 22 7.3
0.6 1 0.3 0.74
0.7 1 0.3 0.72
0.8 1 0.3 0.69
0.9 1 0.3 0.67
1 1 0.3 0.65
2 1 0.3 0.56
3 1 0.3 0.529
4 1 0.3 0.51 Ew 85.545 Mpa
5 1 0.3 0.5
10 1 0.3
POLICE LINES AT DAGGAR, BUNER
KOT BLOCK

IMMEDIATE SETTLEMENT COMPUTATIONS


Foundation Type Strip
Footing Width (m) 1
Footing Length (m) 5
Footing Depth (m) 3.1
At Corner At Center
qo (Kpa) Bm) Lm) M H (m) N m Es (Mpa) I1 I2 IF (from table) DH (mm) DH (mm)

100 0.5 2.5 5 1.25 2.50 0.3 5 0.327 0.134 0.52607013 7.728 30.912
3.049
10.17
D/B 3.1
L/B 5

Depth
D/B L/B m
Factor
3.1 5.0 0.5261 (ft) (m)
Values from Chart 3 1.0
0.5 1 0.3 0.77 10 3.3
0.6 1 0.3 0.74
0.7 1 0.3 0.72
0.8 1 0.3 0.69
0.9 1 0.3 0.67
1 1 0.3 0.65
2 1 0.3 0.56
3 1 0.3 0.529
4 1 0.3 0.51
5 1 0.3 0.5
10 1 0.3

You might also like