You are on page 1of 1
Sardar Sarovar Narmada Nigam Ltd. (A Wholly Owned Government of Gujarat Undertaking) Block No. 12, 2nd Floor, Fax: 23223056 New Sachivalaya Complex, Gandhinagar-382 010.Gujarat No. DGM (Co-ordi)/2012/PR-3/Part-| Date. 13/11/2013 To, (1) The Chief Engineer (Dam & vadodara), SSNNL, Vadodara (2) The Chief Engineer (SBC),SSNNL, Rajkot. (3) The Chief Engineer (Amdavad), SSNNL,Gandhinagar. (4) The Chief Engineer (Mehsana),SSNNL, Mehsana. (6) The Chief Engineer (Patan),SSNNL, Patan. (6) The Chief Engineer (KBC),SSNNL, Gandhidham. Sub: Guide lines for Network planning, Designing and preparation of estimates of minors and sub minors as underground Pipe Line (UGPL) in SSP Command. With reference to above subject and SSNNL's letter no. DGM (Co-ordi) /2012/PR-3/Part-I. dtd. 25/10/2013, clarification is _ as follow:- The Para 2 in the above referred letter i.e. "Further, | am directed to requested you to take up implementation of 1(one) UGPL project covering (the minor along with it's sub minors) in each ‘Division under their jurisdiction on pilot basis and based on it's result / performance feedback remaining area can be taken up accordingly. It is also requested to verify adoptability of the technical criteria/suggestions proposed by WAPCOS, region wise/branch wise for your jurisdiction." The above Paragraph in the said letter is. meant for implementation of sub-minor i.e. for tendering & construction purpose. With this clarification, it is requested not to stop the survey work/ design work of UGPL, being carried-out by WAPCOS. * This letter issues with the approval of the competent authority of SSNNL obtained on even no. of file. Dy. General Manager (Co-ordi.) SSNNL, Gandhinagar. Conserve

You might also like