You are on page 1of 1
‘TECHNICAL PURCHASE SPECIFICATION ANUP [PEAWPENGGLTO. "annexure toP.0.No : |AHMEDABAD ——— Carbon Steel Forging. 1) Material specification SA 105 Material supplied to this specification shall confirmed to applicable requirements of SA 961 l2) Governing Code ASME Secl, Part A, ED.2013 [3) Size and Quanity ‘As per Purchase Order. l4) Delivery Condition ‘Normalised and tempered (Tempering temp. 665 Deg.C minimum) Is) Gasket Face Finish ‘a} Smooth finish to 63 AARH for Double Metal Jacketed Gasket b) Smooth fish to 125 AARH for Spiral Wound Gasket le) Additonal requirements a) Materiel shall be of fuly kiled quality, and produced to fine grain practic. Grain Size shall be § or higher and also reported in MTR. b) %0<=023% ©) _Allforgings shall be 100% UT tested as per SA 388. Acceptance criteria shall be as per clause 3.3.4 of c ‘ASME Seo, Vil Div.2 4) Allforgings shall be MT/PT examined on entire surface after final machining, 2) _ All forgings shall be free from injurious defects. No weld repairs are permited. 1) Hardness shall be less than 187 BHN, ‘9) When the component thickness exceeds 2 inches (50mm), specimens for mechanical testing shal be taken at 12 the thickness (1/27). hh) Material shall meet the requirement of NACE MR 0103 and NACE SP 0472. 7) Marking All forgings shall be stamped (low stress) as per section 19 of SA 105 and ‘must be co-relate with manufacturers test certificate. 8) _ Matoriel Test Report Required a) Material Test Report shall comply with all requirements as per section 12 of SA 105, 'b) MTC shall be to BS EN 10204 type 3.2 19) Material shall be procured from EIL approved vendors only. Tr : 0 | 76-06-2077 [esved For HTOST-2025 (CS Non Sid Flange-t) | ~Pankal Patel_| Rahul Nerkar | Sipak K. Bhavear Rev] DATE DESCRIPTION OF REVISION. ‘Assi. Menager | Manager | Head - Engineering of Bega TPS NO.H1961-2023/FO2 _|REVNO.}O>

You might also like