Client BP-JACOBS

Project Waste Management Area


Contractor BAUER Nimr LLC, Oman
Equipment A/C SPLIT UNIT
Tag No.
Monthly Work Order No.
Maintenan
Activity Description
Jan. Feb. Mar. Apr.

Check grills temperature and air flow.


Check gas pressure and fill if necessary.
Check the system for gas leak and repair if required.
Clean the filters.
Repair all system gas leak.
Check the auto operation.
Check and clean all the wiring and tighten all junctions.
Check terminals at compressor.
Repair the blower of indoor unit if required.
Repair the cooling fan and motor of outdoor unit if required.
Clean the whole system thoroughly.
Start and check the A/C for auto operation.
Check the condensate drain line repairs if necessary.

Performed by: Signature


Checked by: Signature
Date:
Legend OK
N/A Not Applicable
Report No.
Year
Contract No.
Location

Maintenance Period & Status Remark


May. Jun. Jul. Aug. Sep. Oct. Nov. Dec. s