You are on page 1of 1

LEED - Materials & Resources

Credit 4: Recycled Content Analysis, Access Floor

User Input: Change values for items in red based on specific project details.

Project Name: Project Name

Panel Type: CCN2500


Finish: No Finish
Understructure & FFH (in): Stringered 12

Dealer's Access Floor Selling Price (Material Only in total $) $0

Product Analysis: Unit/Qty Weight (lbs) Total (lbs) Post% Pre% Post (lbs) Pre (lbs)
Topsheet
CCN2500 Bottom Pan
Panel Shell Cement
Top Sheet 1 11.26 11.26 51.6% 10.6% 5.81 1.19
Bottom Pan 1 15.31 15.31 25.5% 6.8% 3.90 1.04
No Finish 1 0.00 0.00 0.0% 0.0% 0.00 0.00

Panel Shell Total: 26.57 36.6% 8.4% 9.71 2.23


No Finish
Panel Fill Mixture ###
Cement 1 8.95 8.95 0.0% 20.0% 0.00 1.79
Fly Ash 1 3.84 3.84 0.0% 100.0% 0.00 3.84
Gray Water 1 3.00 3.00 0.0% 100.0% 0.00 3.00

Panel Fill Mixture Total: 15.79 0.0% 54.7% 0.00 8.63

Pedestal Head Components


Top Plate 1.2 0.58 0.70 56.9% 31.4% 0.40 0.22
Stud 1.2 0.51 0.61 56.9% 31.4% 0.35 0.19
Stud
Pedestal Head Total: 1.31 56.9% 31.4% 0.74 0.41
Base Plate
Pedestal Base Stringer
Tube 1.2 0.57 0.68 41.2% 19.1% 0.28 0.13
Base Plate 1.2 0.44 0.53 56.9% 31.4% 0.30 0.17

Pedestal Base Total: 1.21 48.0% 24.5% 0.58 0.30

Stringer 1.8 1.30 2.34 25.5% 6.8% 0.60 0.16

Stringer Total: 2.34 25.5% 6.8% 0.60 0.16

Access Floor System Total: 47.22 24.6% 24.8% 11.64 11.73

Total Recycled %: 49.5%

Material Value Post Value Pre Value


$0 $0 $0

Post Consumer Content + 1/2 Pre Consumer Content = $0

You might also like