Professional Documents
Culture Documents
2
CEB
30903
Jan
2016
1.
The
implementation
of
plastics
use
ban
in
Melaka
recently
has
affected
the
total
amount
of
solid
generated
in
2016.
A
new
landfill
is
to
be
constructed
for
the
population
of
Melaka
Selatan
in
2017.
Estimate
the
area
required
(acre)
in
constructing
a
landfill
based
on
the
following
data:
i)
life
span
of
the
landfill
=
15
years
ii)
density
of
compacted
waste
=
530
kg/m3
iii)
waste
generated
=
0.9
kg/capita.day
iv)
average
height
=
15
m
v)
population
=
100,
000
vi)
cover
soil
to
waste
ratio
=
1:5
Generation
rate
=
0.9
kg/capita.day
x
100,000
capita
=
90,000
kg/day.
2)
i
-
Volume
waste
=
(90,000kg/day)
/
530kg/m3
=
169.8m3/day.
ii
-
volume
cover
=
0.2
x
169.8m3/day
=
33.96m3/day.
iii
-
total
volume
=
169.8m3/day
+
33.96m3/day
=
203.76m3/day.
iv)-
(203.76m3/day)
/
15
m
=13.584
m2/day
3)
area
required
for
15
yrs
=
13.584
m2/day
x
365
days/yr
x
15
yr
=
74372.4
m2
In
acre
=
74372.4
m2
x
0.000247105
acre/m2
=
18.38
acre
2.
The
local
waste
management
agency
has
proposed
to
set
up
a
waste
combustion
facility
next
to
the
existing
landfill
to
maximize
the
life
span
of
the
landfill.
Given
the
following
information,
determine
the
total
number
of
day
increase
and
percentage
(%)
of
volume
reduction
in
comparison
to
without
combustion
facility.
Total
of
2200
lb
as
discarded
waste
is
going
to
be
sent
to
the
combustion
facility
every
day.
It
is
assumed
that
the
specific
weight
of
the
residue
is
1000
lb/yd3.
Component
As
Inert
Weight
as
Reduced
discarded
residue
discarded
weight
(lb)
waste
(%)
(%)
(lb)
Organic
Food
wastes
50
5
1100
55
Paper
19.5
6
429
25.74
Cardboard
5
5
110
5.5
Plastics
11
10
242
24.2
Textiles
3
6.5
66
4.29
Rubber
1
9.9
22
2.18
Leather
0.5
9.0
11
0.99
Yard
wastes
3
4.5
66
2.97
Wood
2
1.5
44
0.66
Inorganic
Glass
2
98
44
43.12
Tin
cans
1
98
22
21.56
Aluminum
0.7
96
15.4
14.78
Other
metals
0.8
98
17.6
17.25
Dirt,
ash,
etc
0.5
68
11
7.48
Total
100
2200
225.48
Assuming
specific
weight
of
residue=specific
weight
of
discarded
waste
%
=
375
lb/yd3
Before
combustion
facility
=
2200
lb/375
lb/yd3
=
5.8667
yd3
With
combustion
facility
=
225.48
lb/1000
lb/yd3
=
0.2255
yd3
Volume
reduction
%
=
5.8667
0.2255
yd3
x
100
%
=
95%
Days
increase
in
assuming
1
day
landfill
volume
=
203.76m3
or
266.51
yd3
Volume
difference
=
5.8667
0.2255
yd3
=
5.6412
yd3
After
combustion
=
0.2255
yd3
thus
266.51
yd3/0.2255
yd3
=
1181
days
or
3.24
yrs
relative
extra
for
volume
reduced.