Contents
1 General Information 1
1.1 Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.2 Features in Standard module . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.2.1 Sheet Piling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.2.2 Anchors and Struts . . . . . . . . . . . . . . . . . . . . . . . . . . 2
1.2.3 Soil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
1.2.4 Loads and Supports . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.2.5 Staged Construction . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.2.6 Design Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.2.7 Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1.3 Features in Additional modules . . . . . . . . . . . . . . . . . . . . . . . . 4
1.3.1 Culmann module . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1.3.2 Eurocode 7 Verification module . . . . . . . . . . . . . . . . . . . . 4
1.3.3 Single Pile module . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1.3.4 Plastic module . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1.3.5 Feasibility module . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1.3.6 Settlement by vibration module . . . . . . . . . . . . . . . . . . . . 5
1.4 History . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
1.5 Limitations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.6 Minimum System Requirements . . . . . . . . . . . . . . . . . . . . . . . 8
1.7 Definitions of Symbols and Symbols . . . . . . . . . . . . . . . . . . . . . 9
1.8 Getting Help . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.9 Getting Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.10 Deltares . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.11 Deltares Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
1.12 Rijkswaterstaat . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
1.13 On-line software (Citrix) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
2 Getting Started 13
2.1 Starting D-S HEET P ILING . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
2.2 Main Window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
2.2.1 Menu bar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
2.2.2 Icon bar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
2.2.3 Input Diagram window . . . . . . . . . . . . . . . . . . . . . . . . 16
2.2.4 Stage Composer . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
2.2.5 Info bar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
2.2.6 Title panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
2.2.7 Status bar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
2.3 Files . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
2.4 Tips and Tricks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
2.4.1 Keyboard shortcuts . . . . . . . . . . . . . . . . . . . . . . . . . . 20
2.4.2 Exporting figures and reports . . . . . . . . . . . . . . . . . . . . . 21
2.4.3 Copying part of a table . . . . . . . . . . . . . . . . . . . . . . . . 21
3 General 23
3.1 File menu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
3.2 Tools menu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
3.2.1 Program Options . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
3.2.2 Profiles Library . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
3.3 Help menu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
3.3.1 Error Messages . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
3.3.2 Manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Deltares iii
D-S HEET P ILING, User Manual
4 Input 31
4.1 Project menu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
4.1.1 Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
4.1.2 User Defined Partial Factors . . . . . . . . . . . . . . . . . . . . . 32
4.1.2.1 Eurocode 7 General . . . . . . . . . . . . . . . . . . . 32
4.1.2.2 Eurocode 7 Dutch Annex . . . . . . . . . . . . . . . . . 34
4.1.2.3 Eurocode 7 Belgian Annex . . . . . . . . . . . . . . . . 36
4.1.2.4 CUR . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
4.1.3 Project Properties . . . . . . . . . . . . . . . . . . . . . . . . . . 40
4.1.4 View Input File . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
4.2 Construction menu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
4.2.1 Sheet Piling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
4.2.1.1 Sheet Piling Elastic Calculation . . . . . . . . . . . . . . 43
4.2.1.2 Sheet Piling Plastic Calculation . . . . . . . . . . . . . . 46
4.2.2 Combined wall wizard . . . . . . . . . . . . . . . . . . . . . . . . 48
4.2.3 Profiles Library . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
4.2.3.1 Profiles Library from manufacturers/distributors . . . . . . . 50
4.2.3.2 User Defined Profiles Library . . . . . . . . . . . . . . . . 53
4.2.4 Single Pile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
4.2.4.1 Single Pile Elastic Calculation . . . . . . . . . . . . . . 55
4.2.4.2 Single Pile Plastic Calculation . . . . . . . . . . . . . . 57
4.2.5 Diaphragm Wall . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
4.3 Soil menu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
4.3.1 Surfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
4.3.2 Soil Materials for Sheet Piling . . . . . . . . . . . . . . . . . . . . . 62
4.3.2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . 63
4.3.2.2 Earth pressure coefficients . . . . . . . . . . . . . . . . . 64
4.3.2.3 Curve Settings . . . . . . . . . . . . . . . . . . . . . . . 64
4.3.2.4 Modulus of subgrade reaction . . . . . . . . . . . . . . . 65
4.3.2.5 Settlement by vibration coefficients . . . . . . . . . . . . . 68
4.3.3 Soil Materials for Single Pile . . . . . . . . . . . . . . . . . . . . . 68
4.3.3.1 Soil Materials for Single pile loaded by forces . . . . . . . . 69
4.3.3.2 Soil Materials for Single pile loaded by user-defined soil dis-
placements . . . . . . . . . . . . . . . . . . . . . . . . . 70
4.3.3.3 Soil Materials for Single pile loaded by calculated soil dis-
placements . . . . . . . . . . . . . . . . . . . . . . . . . 71
4.3.4 Soil Profiles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
4.3.4.1 Adding Soil Profiles Manually . . . . . . . . . . . . . . . . 73
4.3.4.2 Adding Soil Profiles from CPT CPT Selection . . . . . . . 74
4.3.4.3 Adding Soil Profiles from CPT CPT Interpretation . . . . . 76
4.3.5 Water Levels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
4.3.6 Water Properties . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
4.4 Loads menu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
4.4.1 Uniform Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
4.4.2 Surcharge Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
4.4.3 Horizontal Line Loads / Horizontal Forces . . . . . . . . . . . . . . . 83
4.4.4 Moments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
4.4.5 Normal Forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86
4.4.6 Soil Displacements . . . . . . . . . . . . . . . . . . . . . . . . . . 86
4.5 Supports menu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
iv Deltares
Contents
4.5.1 Anchors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
4.5.2 Struts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
4.5.3 Spring Supports . . . . . . . . . . . . . . . . . . . . . . . . . . . 90
4.5.4 Rigid supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
4.6 Stages menu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
4.6.1 Stages Manager . . . . . . . . . . . . . . . . . . . . . . . . . . . 92
4.6.2 Stage(s) Overview . . . . . . . . . . . . . . . . . . . . . . . . . . 92
4.6.2.1 Stages Overview for Sheet Piling . . . . . . . . . . . . . . 92
4.6.2.2 Stage Overview for Single Pile . . . . . . . . . . . . . . . 95
5 Calculations 97
5.1 Calculation Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
5.1.1 Possibilities and limitations of the option First stage represents initial
situation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
5.1.2 Coarse vs. Fine calculation . . . . . . . . . . . . . . . . . . . . . . 98
5.2 Start Calculation for Sheet Piling . . . . . . . . . . . . . . . . . . . . . . . 98
5.2.1 Standard Calculation . . . . . . . . . . . . . . . . . . . . . . . . . 98
5.2.1.1 Fictive Earth Pressure Coefficients . . . . . . . . . . . . . 99
5.2.1.2 Calculation Progress . . . . . . . . . . . . . . . . . . . . 100
5.2.2 Design Sheet Piling Length . . . . . . . . . . . . . . . . . . . . . . 100
5.2.2.1 Design Sheet Piling Length (standard) . . . . . . . . . . . 100
5.2.2.2 Design Sheet Piling Length acc. to Eurocode 7 (General) . . 102
5.2.2.3 Design Sheet Piling Length acc. to CUR and Eurocode 7
(NL Annex) . . . . . . . . . . . . . . . . . . . . . . . . . 104
5.2.2.4 Design Sheet Piling Length acc. to Eurocode 7 (Belgian
Annex) . . . . . . . . . . . . . . . . . . . . . . . . . . . 105
5.2.3 Verify Sheet Piling . . . . . . . . . . . . . . . . . . . . . . . . . . 105
5.2.3.1 Verify Sheet Piling acc. to Eurocode 7 (General) . . . . . . 106
5.2.3.2 Verify Sheet Piling acc. to CUR and Eurocode 7 (NL Annex) 106
5.2.3.3 Verify Sheet Piling acc. to Eurocode 7 (Belgian Annex) . . . 109
5.2.4 Allowable Anchor Force . . . . . . . . . . . . . . . . . . . . . . . . 110
5.2.4.1 Verification Anchor Force . . . . . . . . . . . . . . . . . . 111
5.2.4.2 Allowable Anchor Force Results Diagram . . . . . . . . . . 112
5.2.5 Overall Stability . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113
5.2.5.1 Overall Stability acc. to Eurocode 7 (General) . . . . . . . 114
5.2.5.2 Overall Stability acc. to Eurocode 7 (NL Annex) . . . . . . 114
5.2.5.3 Overall Stability acc. to CUR 166 . . . . . . . . . . . . . . 115
5.2.5.4 Overall Stability acc. to Eurocode 7 (Belgian Annex) . . . . 115
5.3 Start Calculation for Single Pile . . . . . . . . . . . . . . . . . . . . . . . . 116
5.4 Batch Calculation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 116
5.5 Error Messages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117
Deltares v
D-S HEET P ILING, User Manual
7 Feasibility 141
7.1 Settlement by vibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . 141
7.2 Sheet Pile Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 142
7.2.1 Sheet Pile Installation based on NVAF lines . . . . . . . . . . . . . . 143
7.2.2 Sheet Pile Installation based on GeoBrain Experiences . . . . . . . . 144
7.3 GeoBrain Drivability Prediction . . . . . . . . . . . . . . . . . . . . . . . . 145
7.3.1 GeoBrain Prediction Menu bar . . . . . . . . . . . . . . . . . . . 147
7.3.2 GeoBrain Prediction Geotechnics menu . . . . . . . . . . . . . . . 147
7.3.3 GeoBrain Prediction Sheet pile menu . . . . . . . . . . . . . . . . 149
7.3.4 GeoBrain Prediction Installation menu . . . . . . . . . . . . . . . 151
7.3.5 GeoBrain Prediction Result menu . . . . . . . . . . . . . . . . . . 152
7.3.6 GeoBrain Prediction Prediction Report . . . . . . . . . . . . . . . 152
7.4 GeoBrain Drivability Experiences . . . . . . . . . . . . . . . . . . . . . . . 153
7.4.1 GeoBrain Experiences Search on Sheet Piling . . . . . . . . . . . 155
7.4.2 GeoBrain Experiences Search on CPT . . . . . . . . . . . . . . . 157
7.4.3 GeoBrain Experiences Search on Location . . . . . . . . . . . . . 159
vi Deltares
Contents
Deltares vii
D-S HEET P ILING, User Manual
14.7 Determine the minimum length (Steps 5 and 6 of the CUR 166 design procedure)229
14.8 Verify the modified sheet piling length according to CUR 166 design proce-
dure, method A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 231
14.8.1 Verification Calculation (Method A) . . . . . . . . . . . . . . . . . . 231
14.8.2 Verification Report . . . . . . . . . . . . . . . . . . . . . . . . . . 232
14.8.3 Verification Charts . . . . . . . . . . . . . . . . . . . . . . . . . . 233
14.8.4 Stability Verification . . . . . . . . . . . . . . . . . . . . . . . . . . 234
14.9 Verify the modified sheet piling length according to CUR 166 design proce-
dure, method B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 235
14.9.1 Verification Calculation (Method B) . . . . . . . . . . . . . . . . . . 235
14.9.2 Verification Report . . . . . . . . . . . . . . . . . . . . . . . . . . 236
14.10 Comparison between Methods A and B . . . . . . . . . . . . . . . . . . . . 237
14.11 Conclusion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 238
viii Deltares
Contents
23 Tutorial 16: Prediction of surface settlements during sheet pile installation 307
23.1 Introduction to the case . . . . . . . . . . . . . . . . . . . . . . . . . . . . 307
23.2 Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 308
23.3 Sheet Piling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 308
23.4 Soil Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 310
23.5 Calculation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 310
23.6 Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 310
23.7 Conclusion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 313
Deltares ix
D-S HEET P ILING, User Manual
x Deltares
Contents
Deltares xi
D-S HEET P ILING, User Manual
40 Benchmarks 411
Bibliography 413
xii Deltares
List of Figures
List of Figures
1.1 D-S HEET P ILING Options . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.2 Stress-Strain Relationship for Anchors . . . . . . . . . . . . . . . . . . . . 2
1.3 Soil Stress versus Displacement . . . . . . . . . . . . . . . . . . . . . . . 2
1.4 Hydrostatic pressure with additional pore pressures (in excess) . . . . . . . . 3
1.5 Deltares Systems website (www.deltaressystems.com) . . . . . . . . . . . . 10
1.6 Support window, Problem Description tab . . . . . . . . . . . . . . . . . . . 11
1.7 Send Support E-Mail window . . . . . . . . . . . . . . . . . . . . . . . . . 11
Deltares xiii
D-S HEET P ILING, User Manual
xiv Deltares
List of Figures
Deltares xv
D-S HEET P ILING, User Manual
xvi Deltares
List of Figures
10.1 Final situation after excavation, installation of an anchor and lowering of the
water level (tutorial 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 195
10.2 Excavation stages shown separately (tutorial 3) . . . . . . . . . . . . . . . . 196
10.3 Surfaces window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 197
10.4 Water Levels window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 197
10.5 Anchors window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 198
10.6 Stages Manager window . . . . . . . . . . . . . . . . . . . . . . . . . . . 198
10.7 Stages Overview window . . . . . . . . . . . . . . . . . . . . . . . . . . . 199
10.8 Moment/Force/Displacement Charts window for the second stage . . . . . . . 200
10.9 Moment/Force/Displacement Charts window for the third stage . . . . . . . . 200
10.10 Moment/Force/Displacement Charts window for the third stage with a new
sheet piling profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 201
10.11 Report window, Summary section . . . . . . . . . . . . . . . . . . . . . . 202
11.1 Surcharge load and horizontal line load in the last stage (tutorial 4) . . . . . . 203
11.2 Surcharge Loads window . . . . . . . . . . . . . . . . . . . . . . . . . . . 204
11.3 Horizontal Line Loads window . . . . . . . . . . . . . . . . . . . . . . . . 205
11.4 Stages Overview window showing input for the fourth stage . . . . . . . . . . 205
11.5 Input Diagram window for the fourth stage . . . . . . . . . . . . . . . . . . 206
11.6 Moment/Force/Displacement Charts window showing the effect the applied
loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 207
Deltares xvii
D-S HEET P ILING, User Manual
13.6 Soil Profiles window, Soil profile with concrete on the left side and additional
pore pressures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 218
13.7 Water Properties window . . . . . . . . . . . . . . . . . . . . . . . . . . . 218
13.8 Uniform Loads window . . . . . . . . . . . . . . . . . . . . . . . . . . . . 219
13.9 Anchors window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 219
13.10 Stages Overview window . . . . . . . . . . . . . . . . . . . . . . . . . . . 220
13.11 Input Diagram window for the last stage . . . . . . . . . . . . . . . . . . . . 220
13.12 Stress State Charts window showing compression caused by the concrete floor 221
13.13 Moment/Force/Displacement Charts window for the last stage . . . . . . . . 222
17.1 Pit excavation with water flow under the sheet pile wall (tutorial 10) . . . . . . 249
17.2 Water pressures distribution on both sides of sheet piling . . . . . . . . . . . 251
17.3 Soil Profiles window with additional pore pressures on left side . . . . . . . . 252
17.4 Soil Profiles window with additional pore pressures on right side . . . . . . . 252
17.5 Struts window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 253
17.6 Stress State Charts window . . . . . . . . . . . . . . . . . . . . . . . . . . 254
17.7 Chart Data window, Water Pressure Left tab . . . . . . . . . . . . . . . . . 254
17.8 Moment/Force/Displacement Charts window including the effects of the addi-
tional pore pressures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 255
18.1 Modeling a load with limited size parallel to the sheet piling (tutorial 11) . . . . 258
18.2 Surcharge Loads window . . . . . . . . . . . . . . . . . . . . . . . . . . . 259
18.3 Stages Overview window . . . . . . . . . . . . . . . . . . . . . . . . . . . 260
xviii Deltares
List of Figures
18.4 Moment/Force/Displacement Charts window, Results for the final stage . . . . 261
18.5 Moment/Force/Displacement Charts window, Results for the final stage with a
new sheet piling profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . 261
20.1 Pile (mooring post) loaded horizontally (by a ship) Tutorial 13 . . . . . . . . 285
20.2 Model window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 286
20.3 Pile window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 286
20.4 Soil Materials window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 287
20.5 Soil Profiles window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 287
20.6 Horizontal Forces window . . . . . . . . . . . . . . . . . . . . . . . . . . . 288
20.7 Moment/Force/Displacement Charts window . . . . . . . . . . . . . . . . . 289
Deltares xix
D-S HEET P ILING, User Manual
22.8 Start Calculation window, Design Sheet Piling Length tab for DA 3 . . . . . . 303
22.9 Start Calculation window, Verify Sheet Piling tab . . . . . . . . . . . . . . . 304
22.10 Calculation Progress window . . . . . . . . . . . . . . . . . . . . . . . . . 304
22.11 Report window, Summary section for Design Approach 1 . . . . . . . . . . . 305
22.12 Moment/Force/Displacement Charts window for the last stage . . . . . . . . 306
24.1 One stage excavation with a ProLock Sigma combined wall (Tutorial 17) . . . 315
24.2 Dimensions of a ProLock Sigma wall . . . . . . . . . . . . . . . . . . . . . 316
24.3 Sheet Piling window at long term (Tutorial-17a) . . . . . . . . . . . . . . . . 319
24.4 Surfaces window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 320
24.5 Stage Composer to assign the surface levels . . . . . . . . . . . . . . . . . 320
24.6 Soil Materials window for Sand moderate . . . . . . . . . . . . . . . . . . . 321
24.7 Start Calculation window, Verify Sheet Piling tab . . . . . . . . . . . . . . . 322
24.8 Calculation Progress window . . . . . . . . . . . . . . . . . . . . . . . . . 322
24.9 Report window - Summary for Tutorial-17a . . . . . . . . . . . . . . . . . . 323
24.10 Materials window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 324
24.11 Soil Profile window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 324
24.12 Moment/Force/Displacement Chart window for long term situation - Step 6.3 . 325
24.13 Sheet Piling window at short term (Tutorial-17b) . . . . . . . . . . . . . . . . 326
24.14 Uniform Load window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 326
24.15 Stage composer to assign the uniform load . . . . . . . . . . . . . . . . . . 327
24.16 Moment/Force/Displacement Chart window for short term situation - Step 6.3 . 327
25.1 One stage excavation with a ProLock Omega combined wall (Tutorial 18) . . . 330
25.2 Dimensions of a ProLock Omega wall . . . . . . . . . . . . . . . . . . . . . 331
25.3 Technical data for the MK-SR anchor wall (Tutorial 18) . . . . . . . . . . . . 333
25.4 Sheet Piling window at long term (Tutorial-18a) . . . . . . . . . . . . . . . . 335
25.5 Soil Materials window for Sand moderate . . . . . . . . . . . . . . . . . . . 336
25.6 Soil Materials window for Sand moderate . . . . . . . . . . . . . . . . . . . 336
25.7 Anchors window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 337
25.8 Stage composer to activate the anchor . . . . . . . . . . . . . . . . . . . . 337
25.9 Start Calculation window, Verify Sheet Piling tab . . . . . . . . . . . . . . . 338
25.10 Moment/Force/Displacement Chart window for long term situation - Step 6.3 . 339
25.11 Report window, Summary section for long term situation (Tutorial-18a) . . . . 339
25.12 Sheet Piling window at short term (Tutorial-18b) . . . . . . . . . . . . . . . . 340
25.13 Moment/Force/Displacement Chart window for short term situation - Step 6.3 . 341
26.1 Horizontal pile loaded by soil deformations caused by pond digging (tutorial 19) 343
26.2 M-N-Kappa diagrams for cross-sections 1 and 2 (tutorial 19) . . . . . . . . . 344
26.3 Model window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 345
26.4 Moment-Curvature Diagram (M-N-Kappa) window for cross-section 1 (top) . . 347
26.5 Moment-Curvature Diagram (M-N-Kappa) window for cross-section 2 (bottom) 348
26.6 Pile window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 348
26.7 Soil Materials window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 349
xx Deltares
List of Figures
31.1 Stability of anchor wall for a short anchor (Kranz theory) . . . . . . . . . . . 369
31.2 Stability of anchor wall for a long anchor . . . . . . . . . . . . . . . . . . . 370
36.1 Effect of a surcharge when not using the initial stage . . . . . . . . . . . . . 391
36.2 Effect of a surcharge when using the initial stage option . . . . . . . . . . . . 391
36.3 Soil stresses on both sides of the sheet pile wall, with and without the initial
stage option being used . . . . . . . . . . . . . . . . . . . . . . . . . . . . 392
Deltares xxi
D-S HEET P ILING, User Manual
xxii Deltares
List of Tables
List of Tables
2.1 Keyboard shortcuts for D-S HEET P ILING . . . . . . . . . . . . . . . . . . . 21
22.1 Overview of the Design Sheet Piling Length calculation for the different design
approaches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 303
29.1 Angle of wall friction values for clay, loam, sand and gravel (acc. to Table 4 of
NEN 6740:2006) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 359
Deltares xxiii
D-S HEET P ILING, User Manual
34.1 Design values of soil properties according to Step 6 of the CUR 166 procedure 381
34.2 Design values of ground and water levels according to Step 6 of the CUR 166
procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 381
34.3 Partial factors applied to soil parameters according to Table 3.7 of the CUR 166
design procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 384
34.4 Level variations according to Table 3.7 of the CUR 166 design procedure . . . 384
34.5 Partial factors applied to loads according to CUR 166 . . . . . . . . . . . . . 384
35.1 Partial factors for retaining structures acc. to the general Eurocode 7 . . . . . 386
35.2 Partial factors for overall stability acc. to Eurocode 1997-1 . . . . . . . . . . 387
35.3 Partial factors according to the Dutch Annex of Eurocode 7 . . . . . . . . . . 388
35.4 Level variations according to the Dutch Annex of Eurocode 7 . . . . . . . . . 388
35.5 Partial factors (for overall stability) on soil parameters acc. to the Dutch Annex
of Eurocode 7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 389
35.6 Partial factors acc. to the Belgian annex NBN-EN 1997-1 ANB . . . . . . . . 389
35.7 Partial factors for overall stability acc. to Eurocode 1997-1 . . . . . . . . . . 390
37.1 E-modulus vs. unit weight (De Leeuw & Timmermans) . . . . . . . . . . . . 395
37.3 Values of the rheological coefficient . . . . . . . . . . . . . . . . . . . . . 398
xxiv Deltares
1 General Information
1.1 Preface
D-S HEET P ILING (formerly known as MSheet) is a tool used to design sheet pile and diaphragm
walls and horizontally loaded piles. D-S HEET P ILINGs graphical interactive interface requires
just a short training period, allowing the user to focus their skills directly on the input of sound
geotechnical data and the subsequent design of the wall or single pile. D-S HEET P ILING comes
as a standard module that can be extended with other modules to fit more advanced applica-
tions:
Surcharge
Arbitrary Soil
Profiles
Excess Pore
Anchors Pressure
Struts
forces
Moments
Staged
Constructions
Stiffness. Uniform or variable values can be used for the elastic bending stiffness and
normal stiffness along the beam axis. A library is available for quick selection of stan-
dard and user-defined sheet piling profiles. A special combined wall wizard calculates
the relevant values for walls made from a combination of sheet piling and piles.
Deltares 1 of 416
D-S HEET P ILING, User Manual
moments and displacements that follow from the inputted normal force.
tensile stress
limited capacity
pre- stress
zero pressure
condition tensile strain
Anchors. Anchors are characterized by arbitrary direction, elastic normal stiffness, zero
pressure condition and limited capacity due to yielding or soil resistance (Figure 1.2).
Pre-tensioning of anchors is optional.
Struts. Struts are characterized by elastic normal stiffness, zero tension condition and
buckling force. Pre-compression of struts is optional.
1.2.3 Soil
Horizontal soil layers can be defined manually or automatically generated by D-S HEET P ILING
from a CPT interpretation, optionally in combination with a non-horizontal ground level. D-S HEET P ILING
models the stiffness of the soil as a series of discrete, independently acting, multi-linear
springs, forming an elastic foundation for a beam (which is used to model the wall).
virgin
loading
passive yield
un- re-
active yield
loading loading
relative displacement
Physical Non-linear. D-S HEET P ILING makes use of multi-linear relationships between
horizontal stress and displacement, with different values for active and passive yielding.
D-S HEET P ILING can determine these yield values from the well-established slip surface
theories of Culmann, Ktter or Mller-Breslau.
Elasto-Plastic. D-S HEET P ILING can accommodate the soil stiffness for the virgin load-
ing state and the unloading/reloading state.
Initial Stress. D-S HEET P ILING derives the initial horizontal stress from the approximate
initial vertical stress using Jkys equation for the lateral stress ratio K0 . D-S HEET P ILING
calculates additional stresses due to surcharge or a non-horizontal ground surface
based on Boussinesqs stress distribution theory.
2 of 416 Deltares
General Information
Pore Fluid. Hydrostatic pore fluid pressure from the input of a phreatic surface position
on either side of the wall. Additional pore pressures can also be specified, varying
linearly within the relevant layers, as schematized in Figure 1.4.
Figure 1.4: Hydrostatic pressure with additional pore pressures (in excess)
Forces: Line loads or distributed force loads, directed perpendicularly to the sheet pile
wall. Variable normal force along the beam axis.
Length optimization. D-S HEET P ILING can determine the critical length of the sheet
piling by reducing the length step-by-step until instability occurs or an admissible dis-
placement is exceeded.
Deltares 3 of 416
D-S HEET P ILING, User Manual
Anchor Force. D-S HEET P ILING checks whether the available soil resistance is sufficient
for the anchor force, using a slip surface theory according to Kranz (Kranz, 1953).
1.2.7 Results
D-S HEET P ILING can display a report with graphs and tables of displacements, bending mo-
ments, shear forces, pore pressures and soil stresses along the beam axis.
Safety. D-S HEET P ILING verifies the sheet piling, according to CUR 166 and EuroCode
for a selected stage by applying certain partial safety factors.
Length optimization. D-S HEET P ILING can determine the critical length of the sheet
piling, according to CUR 166 and EuroCode, by reducing the length step-by-step until
instability occurs or an admissible displacement is exceeded the sheet piling length, by
applying certain partial safety factors.
Overall Stability. D-S HEET P ILING verifies a sheet piling against loss of overall stability
by means of a Bishop calculation, according to CUR 166 and Eurocode.
Two different methods for design calculation according to CUR 166 and Eurocode 7 (NL) are
implemented: one using the partial factors prescribed by the design approach in all construc-
tion stages (method A) and the second using them only for a selected stage (method B).
A verification report containing all results according to the CUR 166 or EuroCode 7 design
procedure is also available.
Along the pile, several cross-sections with different widths and stiffness can be speci-
fied.
4 of 416 Deltares
General Information
The connection of the pile to a foundation can be modeled by defining a fixed support
or a spring support at a certain level. For the support conditions a distinction is made
between translation and rotation.
Several soil layers can be defined, divided by horizontal layer boundaries. Soil proper-
ties are input for each layer. The bottom soil layer is assumed to be infinitely thick.
The surface level on both sides of the pile must be identical and horizontal.
The water level determines the hydrostatic water pressure. Additional pore pressures
can also be introduced, varying linearly across each soil layer.
Externally calculated undisturbed soil displacements can be imposed on the pile. D-S HEET P ILING
can also calculate the influence of discrete bending moments and/or horizontal and nor-
mal forces on the pile.
The subgrade reaction is put to a minimum (active) and maximum (passive) pressure
on the pile by definition of earth pressure coefficients. Between these extreme values,
D-S HEET P ILING will apply a linear relation between the stress and the displacement, as
defined by a modulus of subgrade reaction. The earth pressure coefficients may be
calculated using the Brinch-Hansen method (Brinch-Hansen and Christensen, 1961)
or directly inputted. The modulus of subgrade reaction may be determined using the
Mnard theory (Mnard, 1971) (only for pile loaded by forces) or directly inputted.
Note: When using this module, the wall will be divided into 5 times more elements than in a
standard elastic calculation, to get accurate results for the stiffness.
Deltares 5 of 416
D-S HEET P ILING, User Manual
1.4 History
MSheet release 1.0 (1990) was based directly on MSheets forerunner DAMWAND/3,
which analyzed the construction of vertical sheet piling with horizontal ground surfaces.
MSheet release 2.0 (1992) implemented options for non-horizontal ground surfaces
and non-uniform loads (surcharges).
MSheet release 3.0 (1995) featured a new option for normal forces in the sheet pile
wall and also implemented a new multi-linear stress-displacement relation for the soil.
MSheet release 4.0 (1997) featured specific design procedures, based on the CUR
design guide (CUR, 2005) for discovering the critical length and checking safety.
MSheet release 5.0 (1998) was the first Windows version of MSheet. The improved
user manual could now also be accessed using the online Help function.
MSheet release 5.4 (2001) featured the following new options: overall soil stability
analysis (Bishop), a sheet piling library, extended support of CUR 166, and a report
on the vertical force balance. Improvements to the user interface included user-friendly
graphical input and the Stages Overview dialog.
MSheet Release 5.7 (2002) featured a new option for a first stage with initially non-
horizontal surfaces or initial surcharges. The release also included modules for sepa-
rately licensed models. The new initial stage option necessitated a refinement of the
soil yield stress calculation, even when the option was not selected. Therefore results
from release 5.7 were different to the results of previous releases.
MSheet release 6.1 (2004) featured a new single pile module, which supports the anal-
ysis of horizontally loaded piles. The release also included a wizard for convenient
input of combined walls. The report content could now be selected, with reports bear-
ing graphs, and improved layout of tabular results. Reports could now be exported in
different formats, including pdf and rtf and graphical and report output for the CUR 166
verify sheet piling option was implemented and. The refined soil yield stress calcu-
lation was made optional when the initial stage option was not selected. The default,
faster, coarse method therefore yields results that are the same as the results of re-
leases prior to release 5.7.
MSheet release 6.2 (2005) featured the new E-Consult module that enables users to
check their MSheet design for sheet pile walls against relevant execution experience
data. This may help to reduce failure costs during pile driving/vibrating. Without license
this module works in Demo mode. Currently the experiences are mainly from Dutch
locations; therefore their relevancy to other locations in the world may be limited.
MSheet release 7.1 (2005) features the ability to perform a vertical balance check on
the sheet pile wall. It is now possible to specify partial factors, allowing MSheet to be
used with the Eurocode model. The updated CUR 166 procedure (2005) (CUR, 2005)
is fully integrated in this MSheet version.
MSheet release 7.7 (2007). The partial factors and the design approaches according
to Eurocode 7 are fully supported in this MSheet version. Partial factors for loads are
added for the CUR 166 procedure. The calculation of the K 0 is modified. A shell factor
is inputted to take into account the effect of arching.
MSheet release 7.9 (2008). Loads/Soil displacements is possible again with the mod-
ule sheet piling. The moduli of subgrade reaction are automatically multiplied with the
6 of 416 Deltares
General Information
shell factor. The allowable number of anchors, struts, surfaces, layers, profiles and sur-
charge loads has been increased. Presence of warnings is indicated in the progress
screen. hell factor. The allowable number of anchors, struts, surfaces, layers, profiles
and surcharge loads has been increased. Presence of warnings is indicated in the
progress screen.
MSheet release 7.10 (2009). With the E-Consult module it is now possible to determine
the drivability of the Sheet Piling design using a prediction made with GeoBrain and to
check the Sheet Piling design by comparing it with experiences from the GeoBrain
database.
MSheet release 8.2 (March 2010). Soil displacements calculated from De Leeuw ta-
bles are available for single pile. Importing CPT data in Geotechnical Exchange Format
(GEF) format is now possible: the automatic CPT interpretation includes two soil-type
dependent rules (acc. NEN 6740 or CUR 166), including all additional soil parame-
ters. The Verification (EC7/CUR) module now includes also verification according to
the partial factors and method prescribed by the Dutch Annex of the Eurocode 7 (NEN,
september 2009).
D-S HEET P ILING release 9.1 (January 2011). The name of the program has changed:
D-S HEET P ILING replaces MSheet. Performing calculations in batch is described in the
manual (section 5.4).
D-S HEET P ILING release 9.2.1.5 (November 2011). It is possible to calculate the settle-
ment due to vibration of the sheet piling (installing as well as uninstalling). The Belgian
annex NBN-EN 1997-1 ANB of the Eurocode 7 (NBN-EN, january 2011) is incorpo-
rated. Forces from layers acting on the sheet piling are given in the report. It is possible
to see the slide planes used to calculate the lambdas in c,phi,delta method. It is pos-
sible to change the colors of the materials. The stress state charts are available for a
verification calculation.
D-S HEET P ILING release 9.2.3.2 (February 2013). A new class, called RC0, is added
to the Dutch Eurocode calculation, corresponding to the CUR class I for the design a
simple constructions. For vertical balance, the vertical forces due to active and passive
forces are taken by 1 m (this used to be the coating area), as prescribed in the CUR 166
recommendations. During a settlement by vibration calculation, it is possible to find the
settlements at points situated below the surface as well. For the Kranz calculation,
the loading due to anchor angle is now correctly calculated. When calculating soil
displacements with single pile, a few extra points close to the boundaries with the elastic
soil are calculated.
D-S HEET P ILING release 9.3 (November 2013). For Eurocode 7 with Belgian annex,
it is possible to use design values in the selected stage but representative values in
the previous stages (see section 5.2.3.3), as prescribed in the Flemish norm "Stan-
daardbestek 260" (SB260, 2012) relevant for the projects executed for the Flemish gov-
ernment. The yield forces and buckling forces must be inputted as design values (see
section 4.5.1 and section 4.5.2). The Eurocode 7 verification according to the Dutch
annex refers to NEN-EN 9997+C1:2012 (NEN, 2012). The Sheet Piling Library (sec-
tion 4.2.3) has been updated with new profiles (Gooimeer, Heuvelman, ESC Pile China
LTD, Europile/STS, Gampet, Profextru). Two tutorials have been added in the user man-
ual describing how to design the length of a synthetic wall (Tutorial 17 in chapter 24)
and how to model a synthetic wall with anchorage (Tutorial 18 in chapter 25).
D-S HEET P ILING release 14.1.1.6 (July 2014). Several improvements concerns the Sheet
Piling Library:
Deltares 7 of 416
D-S HEET P ILING, User Manual
The Sheet Piling Library has been updated with new profiles (Europile/STS, Pro-
fextru).
Cold formed sheet piles profiles are now available in the library with three qualities:
S 235, S 275 and S 355.
The maximum moment of synthetic profiles in the library is now a characteristic
value (without safety factor). During its importation, two factors are applied (the
modification factor kmod and the partial material factor M ) to get the design value
used in the calculation, see Figure 4.9.
The Verification calculation for EC7-General has been improved (names in the overview
table of the report and selection of method A or B). A warning message when starting
the program is displayed to attract the attention of the user on the importance of a good
estimation of the relative density for the calculated Settlements by Vibration.
D-S HEET P ILING release 15.1. This version contains many small improvements and
solved bugs. The main improvement is the new module Plastic Wall, allowing a plastic
analysis of the wall (section 1.3.4) by the input of the Moment-curvature (M-N-Kappa)
diagram of the profile (Figure 4.27). A tutorial is added in this manual (chapter 26)
describing how to perform a plastic analysis of a pile.
D-S HEET P ILING release 16.1. With this version, license(s) can be borrowed for a certain
period allowing working without connection to the licence server (see Figure 3.5 for
more information). This version also contains small improvements and solved issues
(for a complete list, download the Release Notes from the Download Portal of Deltares).
For the Vertical Balance, a factor of 1.1 is applied to the vertical component of the
anchor force according to article 9.7.5(a) of NEN (2012) and according to CUR 166
step 9.3 (see chapter 33). The plastic moments of the Arcelor are added in the Sheet
Piling Profiles Library (section 4.2.3).
1.5 Limitations
When working with D-S HEET P ILING, the following limitations apply:
Vertical piling.
Horizontal soil layers.
Only diaphragm wall, sheet pile walls and single piles can be analyzed with D-S HEET P ILING.
To analyze pile groups, use the D-P ILE G ROUP program from Deltares Systems.
Operating systems:
Windows 2003,
Windows Vista,
Windows 7 32 bits
Windows 7 64 bits
Windows 8
Hardware specifications:
1 GHz Intel Pentium processor or equivalent
512 MB of RAM
400 MB free hard disk space
SVGA video card, 1024 768 pixels, High colors (16 bits)
8 of 416 Deltares
General Information
CD-ROM drive
Microsoft Internet Explorer version 6.0 or newer (download from www.microsoft.com)
For use of the Feasibility module an Internet connection is needed.
Clicking on the Help button situated at the bottom-right side of a window will open the User
Manual.
Deltares 9 of 416
D-S HEET P ILING, User Manual
If problems are encountered, the first step should be to consult the online Help at
www.deltaressystems.com menu Software. Different information about the program can be
found on the left-hand side of the window (Figure 1.5):
In Support - Frequently asked questions are listed the most frequently asked technical
questions and their answers.
In Support - Known issues are listed the bugs of the program.
In Release notes are listed the differences between an old and a new version.
If the solution cannot be found there, then the problem description can be e-mailed (preferred)
or faxed to the Deltares Systems Support team. When sending a problem description, please
add a full description of the working environment. To do this conveniently:
10 of 416 Deltares
General Information
After clicking on the Send button, the Send Support E-Mail window opens, allowing
sending current file as an attachment. Marked or not the Attach current file to mail
check-box and click OK to send it.
The problem report can either be saved to a file or sent to a printer or PC fax. The document
can be emailed to support@deltaressystems.nl or alternatively faxed to +31(0)88 335 8111.
1.10 Deltares
Since January 1st 2008, GeoDelft together with parts of Rijkswaterstaat /DWW, RIKZ and
RIZA, WL |Delft Hydraulics and a part of TNO Built Environment and Geosciences are form-
ing the Deltares Institute, a new and independent institute for applied research and special-
ist advice. Founded in 1934, GeoDelft was one of the worlds most renowned institutes for
geotechnical and environmental research. As a Dutch national Grand Technological Institute
(GTI), Deltares role is to obtain, generate and disseminate geotechnical know-how. The in-
stitute is an international leader in research and consultancy into the behavior of soft soils
(sand clay and peat) and management of the geo-ecological consequences which arise from
these activities. Again and again subsoil related uncertainties and risks appear to be the key
factors in civil engineering risk management. Having the processes to manage these uncer-
tainties makes Deltares the obvious Partner in risk management for all parties involved in the
Deltares 11 of 416
D-S HEET P ILING, User Manual
civil and environmental construction sector. Deltares teams are continually working on new
mechanisms, applications and concepts to facilitate the risk management process, the most
recent of which is the launch of the concept "GeoQ" into the geotechnical sector.
1.12 Rijkswaterstaat
Rijkswaterstaat (RWS) is part of the Dutch Ministry for Traffic, Public Works and Water Man-
agement. RWSs tasks include the regulation, construction, management and maintenance
of public works. By supporting the development of D-S HEET P ILING, RWS is facilitating the
uniform and reliable design of sheet pile walls.
For more information on RWS, visit www.minvenw.nl.
12 of 416 Deltares
2 Getting Started
This Getting Started chapter aims to familiarize the user with the structure and user interface
of D-S HEET P ILING. The Tutorial section which follows uses a selection of case studies to
introduce the programs functions.
Click the button to see which modules are (at this moment) in used and who (within
the company) is using them.
When D-S HEET P ILING is started from the Windows menu bar, the last project that was worked
on will open automatically, unless the program has been configured otherwise under Tools:
Program Options (Figure 3.3).
The caption of the main window of D-S HEET P ILING displays the program name, followed by
the model. When a new file is created, the default model is Sheet Piling and the project name
is Project1.
Deltares 13 of 416
D-S HEET P ILING, User Manual
File Standard Windows options for opening and saving files as well as sev-
eral D-S HEET P ILING options for exporting and printing active windows
and reports (section 3.1).
Project Options for selecting the project model, defining partial factors and
properties, and viewing the input file (section 4.1).
Construction Options for defining the sheet pile/diaphragm wall, or single pile (sec-
tion 4.2).
Soil Options for defining ground surfaces, the properties and profiles of the
soil layers, water levels and water properties (section 4.3).
Loads Options for defining distributed surcharge, forces, moments and pre-
scribed soil displacements (section 4.4).
Supports Options for defining anchors, struts, rigid supports and springs (sec-
tion 4.5).
Stages Options for defining construction stages (for sheet pile walls) and view-
ing/defining the applied loads, supports and water levels for each stage
(section 4.6).
Calculation Analysis of the following, based on input values: resulting moments,
forces, displacements and stresses, stability analysis with decreasing
length of sheet piling; determining design values for the moment, an-
chor force and displacement according to the CUR step-by-step de-
sign procedure; checking anchor wall stability; checking overall stability
(chapter 5).
14 of 416 Deltares
Getting Started
Detailed descriptions of these menu options can be found in the Reference section.
Display a print preview of the current contents of the Input Diagram window.
Open the Project Properties window. Here the project title and other identification
data can be entered, and the Diagram Settings and Graph Settings for the project
can be determined.
Open the Stages Overview window. The contents of each construction stage can be
composed here by selecting or deselecting the loads and supports that are available,
choosing the computation method, entering water levels, and more.
Open the Sheet Piling or Pile window (depending on the model being used), con-
taining the properties of the sheet pile wall or single pile.
Deltares 15 of 416
D-S HEET P ILING, User Manual
In the upper part of the window, select one of the stages defined previously. The selected
stage will also be used in the Stage Composer (see below). Click on the buttons in the upper
part to activate the corresponding functions:
Rename stage:
Click this button to rename the current stage.
Double clicking in the window on items such as layers, supports and loads will open the
corresponding input windows.
Note: In the Input Diagram window, only half of the inputted height of the anchor wall is drawn
(between the anchor rod and the bottom of the anchor wall).
Click on the buttons in the Edit or Tools panel to activate the corresponding functions:
16 of 416 Deltares
Getting Started
Pan button
Click this button to move the drawing by clicking and dragging the mouse.
Zoom in button
Click this button to enlarge the drawing, and then click on the drawing on the part
which is to be at the center of the new image.
Deltares 17 of 416
D-S HEET P ILING, User Manual
For more information, see section 4.3.4, section 4.4 and section 4.5.
The Stage Composer is part of the main window, and consists of two separate boxes:
Upper The upper box contains all of the input options. For loads and supports, this
Box: box also indicates the number of defined loads or supports applied in the
selected stage, in relation to the total number of loads defined.
Lower The lower box displays an overview of the input that has been defined. A
Box: check-mark indicates that the input data has been linked to the selected
stage.
Click this button to display the Help topic of the selected input option.
Connect to Stages
When one of the input options is selected in the upper box (single click), an overview of
available input will appear in the lower box. To connect input to a particular stage, select a
stage in the Input Diagram window and use the check-boxes in the lower box to select the
input that applies to the selected stage.
Note: The Stages Overview window (section 4.6.2) can also be used to connect input to
stages.
18 of 416 Deltares
Getting Started
Select All Selects all loads or supports of the type selected in the upper box for
the current construction stage. This action is equivalent to marking all
the check-boxes one by one.
Deselect All Deselects all loads or supports of the type selected in the upper box for
the current construction stage. This action is equivalent to unmarking
all the check-boxes one by one.
Apply to All Marks all the check-boxes for all construction stages exactly the same
Stages way as for the current stage.
Apply from this Marks all the check-boxes for all construction stages higher than the
Stages On current one exactly the same way as for the current stage.
2.3 Files
*.dis Displacement file (ASCII):
Contains the calculated displacements from De Leeuw tables.
*.dxf Drawing Exchange Format file (ASCII):
Export file, containing the image of the current window (input diagram or output
charts and diagrams) within an added picture frame. Files of this type can be
used to import the image into applications such as AutoCAD.
*.err Error file (ASCII):
If there are any errors in the input, they are described in this file.
*.gef Geotechnical Exchange Format file (ASCII): Contains CPT-data.
*.geo Geometry file (ASCII):
Export file for the Deltares Systems geo-softwares, containing a description of
the geometry.
Deltares 19 of 416
D-S HEET P ILING, User Manual
*.html HTML-files:
Export file for reports.
*.shd Dump file (ASCII):
Contains calculation results used for graphical and report output.
*.shi Input file (ASCII):
Contains the input with the problem definition. After interactive generation, this
file can be reused in subsequent D-S HEET P ILING analyses.
*.shl Earth pressure coefficient file (binary):
Working file with information on the lateral earth pressure coefficients.
*.sho Output file (ASCII):
After a calculation has been performed, all output is written to this file. If there
are any errors in the input, they are described in this file.
*.shs Setting file (ASCII):
Working file with settings data. This file doesnt contain any information that is
relevant for the calculation, but only settings that apply to the representation of
the data, such as the grid size.
*.sti D-G EO S TABILITY input file (ASCII):
Export file for D-G EO S TABILITY (formerly known as MStab), containing the input
data needed for a stability calculation in D-G EO S TABILITY.
*.pdf Adobe PDF-files:
Export file for reports.
*.rtf Rich text format\-files:
Export file for reports.
*.txt ASCII-text-files:
Export file for reports.
*.wmf Windows Meta File (binary):
Export file for images, for instance containing the image of the current Top View
Foundation window within an added picture frame. Files of this type can be used
to import the image into applications such as Microsoft Word.
20 of 416 Deltares
Getting Started
Deltares 21 of 416
D-S HEET P ILING, User Manual
a) b)
c) d)
Figure 2.8: Selection of different parts of a table using the arrow cursor
To select a row, click on the cell before the row number (see b) in Figure 2.8). To select a
column, click on the top cell of the column (see c) in Figure 2.8). To select the complete table,
click on the top left cell (see d) in Figure 2.8). In some tables the button Copy is also present
at the left hand pane.
22 of 416 Deltares
3 General
This chapter contains a detailed description of the available menu options for inputting data
for a sheet pile or diaphragm wall project, and for calculating and viewing the results. The
examples in the tutorial section provide a convenient starting point for familiarization with the
program.
Open Folder to open the folder where the file was saved;
Close to close the Export complete window.
Export Report
This option allows the report to be exported in a different format, such as pdf, rtf or html
format.
Page Setup
This option allows definition of the way D-S HEET P ILING plots and reports are to be
printed. The printer, paper size, orientation and margins can be defined as well as
whether and where axes are required for plots. Click Autofit to get D-S HEET P ILING to
choose the best fit for the page.
Print Report
This option prints the calculation report.
Deltares 23 of 416
D-S HEET P ILING, User Manual
View
Toolbar Status bar Mark the relevant check-box to display the toolbar and/or status
bar each time D-S HEET P ILING is started.
Title panel Mark this check-box to display the project titles, as entered on the
Identification tab, in a panel at the bottom of the Input Diagram
window.
General
24 of 416 Deltares
General
Start-up with Click one of these toggle buttons to determine how a project
should be initiated each time D-S HEET P ILING is started.
No project: Use the buttons in the toolbar or the options in the
File menu to open an existing project or to start a new one.
Last used project: The last project to be worked on is opened
automatically.
New project: A new project is created comprising a sheet pile
wall with a "dummy" soil layer on both sides.
Note that the Start-up with option is ignored when
D-S HEET P ILING is started by double-clicking on an input
file.
Save on calculation The toggle buttons determine how input data is saved prior to
calculation. It can either be saved automatically, using the same
file name each time, or a file name can be specified every time
the data is saved.
Use Enter key to Use the toggle buttons to determine the way the Enter key is
used in D-S HEET P ILING: either as an equivalent of pressing the
default button (Windows style) or to shift the focus to the next
item in a window (for users accustomed to the DOS version(s) of
the program).
Feasibility To use the Feasibility module, the user has to enter an identifica-
tion name under User ID and a Password. Both will be provided
by Deltares Systems only for users with a license including the
use of the Feasibility module. Please contact the support team
at support@deltaressystems.nl to get them.
Deltares 25 of 416
D-S HEET P ILING, User Manual
Locations
Working directory D-S HEET P ILING will start up with a working directory for selection
and saving of files. Either choose to use the last used directory,
or specify a fixed path.
Directory for user de- Define the location of the file DSheetPilingProfilesUser.xml. This
fined pile library file contains the user-defined library with piles and sheet piling
(section 4.2.3).
Language
In this tab, the language to be used in the D-S HEET P ILING windows and on printouts can be
selected.
26 of 416 Deltares
General
Modules
For a D-S HEET P ILING installation based on floating licenses, the Modules tab can be used to
claim a license for the particular modules that are to be used. If the Show at start of program
check-box is marked then this window will always be shown at start-up.
For a D-S HEET P ILING installation based on a license dongle, the Modules tab will just show
the modules that may be used.
Refer to section 1.2 for more information about the D-Sheet Piling Standard module (earth
pressure coefficients) and refer to section 1.3 for more information about the other additional
modules.
Deltares 27 of 416
D-S HEET P ILING, User Manual
Click this button to see which modules are (at this moment) in used and
who (within the company) is using them.
Click this button to borrow the selected modules for a certain period. The
modules will be taken from the server pool and will be available on this
computer even if no connection to the license server is available. Set the
date and time for the expiration of the borrowing and press OK.
28 of 416 Deltares
General
3.3.2 Manual
Select the Manual option from the Help menu to open the User Manual of D-S HEET P ILING in
PDF format. Here help on a specific topic can be found by entering a specific word in the Find
field of the PDF reader.
3.3.4 Support
Use the Support option from the Help menu to open the Support window in which program
errors can be registered. Refer to section 1.9 for a detailed description of this window.
Deltares 29 of 416
D-S HEET P ILING, User Manual
30 of 416 Deltares
4 Input
Before analysis can be started, datas for the sheet pile wall, soil, loads and supports need to
be inputted.
4.1.1 Model
On the menu bar, click Project and then choose Model to open the input window. In this
window the required analysis models can be selected.
Model Select the Sheet piling option for analysis of sheet pile.
or
Select the Single pile option for analysis of horizontally loaded piles. The
single pile option is only available in combination with the corresponding
module (section 3.2.1).
or
Select the Diaphragm wall option for analysis of diaphragm walls.
Elastic calculation
With models Sheet piling and Single pile you can choose between an
Elastic calculation or a none Elastic calculation (i.e. Plastic) of the piling.
If Plastic is chosen, the Moment - Curvature diagram (M-) of the piling
will contain 2 branches for Sheet piling (see Figure 4.11) and 4 branches
for Single pile (see Figure 4.24).
With models Diaphragm wall, a Plastic analysis is always performed with
4 branches in the Moment - Curvature diagram (M-) (see Figure 4.27).
Deltares 31 of 416
D-S HEET P ILING, User Manual
Options
Mark the Check vertical balance check-box to perform a vertical balance
check.
Mark the Verification (EC7/CUR) check-box to enable the special calcu-
lation functions for sheet piling and diaphragm wall design according to
the Eurocode 7 and the CUR 166 model guidelines. This option is only
available in combination with the corresponding module (section 3.2.1).
Mark the Settlement by vibration check-box to calculate the surface
settlements during the installation of a sheet piling by vibration. Refer to
chapter 39 for background information.
Single pile Select the type of pile loading: forces or soil displacements. In case of pile
loaded by soil displacements, the soil displacements can be either user
input or automatically calculated using De Leeuw tables (section 37.1.1).
The General document of the Eurocode 7 (NEN-EN, March 2005) distinguishes three different
design approaches: 1, 2 or 3.
32 of 416 Deltares
Input
Figure 4.2: User Defined Partial Factors window, EC7 General tab
Factors on loads Enter the user defined partial factor applied to the different kind of
loads:
permanent unfavorable load,
permanent favorable load,
variable unfavorable load,
variable favorable load.
Factors on effect Enter the user defined partial factor applied to the effect of the loads:
of the loads Factor on effect of load corresponds to the effect of permanent
loads (unfavorable and favorable) and variable favorable loads.
Factor on variable load, unfavorable corresponds to the effect of
variable unfavorable loads.
Material factors Enter the user defined partial factor applied to the cohesion and the
tangent value of the friction angle.
Overall stability Enter the user defined partial factor applied to:
factors the driving moment,
the cohesion,
the tangent value of the friction angle,
used during the Overall Stability verification (chapter 32).
Resistance fac- Enter the user defined partial factor applied to the bearing capacity and
tors the earth resistance.
Geometry modi- Enter the user defined surface level at the passive side: the level of the
fication resisting soil is lowered below the expected level by an amount equal
to the Increase retaining height percentage of the distance between
the lowest support and the excavation level, limited to a maximum (i.e.
Maximum increase retaining height).
Deltares 33 of 416
D-S HEET P ILING, User Manual
Vertical balance Enter the user defined partial factor on base resistance b applied on
factors the characteristic value of the base resistance of the ground Rb;k to get
the design value of the base resistance Rb;d (Equation 33.1):
Rb;d = Rb;k /b
This input is available only if the Check vertical balance check-box was
enabled in the Model window (section 4.1.1).
Click this button to reset all values to the default values prescribed in
the EuroCode 7 - Part 1: General rules.
Note: The default values prescribed by Eurocode 7 are written at the left of each input area
of the User Defined Partial Factors window. If modified, the value appears in red color.
Note: According to Eurocode 7 partial factors can be applied either on the loads themselves
or on their effect. D-S HEET P ILING allows the user to choose between those two options in the
Verify Sheet Piling tab of the Start Calculation window (section 5.2.3).
34 of 416 Deltares
Input
Factors on loads Enter the user defined partial factor applied to the different kind of
loads:
permanent unfavorable load,
permanent favorable load,
variable unfavorable load,
variable favorable load.
Material factors Enter the user defined partial factor applied to:
the cohesion,
the tangent value of the friction angle,
the modulus of subgrade reaction.
Deltares 35 of 416
D-S HEET P ILING, User Manual
Overall stability Enter the user defined partial factor applied to the soil properties:
factors the cohesion,
the tangent value of the friction angle,
the (saturated and unsaturated) unit weight,
used during the Overall Stability verification (chapter 32).
Vertical balance Enter the user defined partial factor on base resistance b applied on
factors the characteristic value of the base resistance of the ground Rb;k to get
the design value of the base resistance Rb;d (Equation 33.1):
Rb;d = Rb;k /b
This input is available only if the Check vertical balance check-box was
enabled in the Model window (section 4.1.1).
Click this button to reset all values to the default values prescribed in
the Dutch Annex of the Eurocode 7.
Note: The default values prescribed by the Dutch Annex of the Eurocode 7 are written at
the left of each input area of the User Defined Partial Factors window. If modified, the value
appears in red color.
Note: The default values prescribed by the Dutch Annex of the Eurocode 7 for RC 1 and RC 2
correspond to those of safety classes respectively II and III of the CUR recommendations,
except for the factor on driving moment in case of overall stability.
For background information on the Dutch Annex of the EuroCode, see section 35.2.
In its national annex, Belgium selected Design Approach 1. Therefore, verification is per-
formed only for the two combinations of DA1: set 1 and set 2.
36 of 416 Deltares
Input
Factors on loads Enter the user defined partial factor applied to the different kind of
loads:
permanent unfavorable load,
permanent favorable load,- variable unfavorable load,
variable favorable load.
Factors on effect Enter the user defined partial factor applied to the effect of the loads:
of the loads Factor on effect of load corresponds to the effect of permanent
loads (unfavorable and favorable) and variable favorable loads.
Factor on variable load, unfavorable corresponds to the effect of
variable unfavorable loads.
Material factors Enter the user defined partial factor applied to the cohesion and the
tangent value of the friction angle.
Resistance fac- Enter the user defined partial factor applied to the bearing capacity and
tors the earth resistance.
Geometry modi- Enter the user defined surface level at the passive side: the level of the
fication resisting soil is lowered below the expected level by an amount equal
to the Increase retaining height percentage of the distance between
the lowest support and the excavation level, limited to a maximum (i.e.
Maximum increase retaining height).
Overall stability Enter the user defined partial factor applied to the soil properties:
factors the cohesion,
the tangent value of the friction angle,
the (saturated and unsaturated) unit weight,
used during the Overall Stability verification (chapter 32).
Deltares 37 of 416
D-S HEET P ILING, User Manual
Vertical balance Enter the user defined partial factor on base resistance b applied on
factors the characteristic value of the base resistance of the ground Rb;k to get
the design value of the base resistance Rb;d (Equation 33.1):
Rb;d = Rb;k /b
This input is available only if the Check vertical balance check-box was
enabled in the Model window (section 4.1.1).
Click this button to reset all values to the default values prescribed in
the Belgian Annex of the Eurocode 7.
Note: The default values prescribed by the Belgian Annex of the Eurocode 7 are written at
the left of each input area of the User Defined Partial Factors window. If modified, the value
appears in red color.
For background information on the Belgian Annex of the EuroCode, see section 35.3.
4.1.2.4 CUR
In this window (Figure 4.5) the defaults partial factors prescribed in the CUR 166 Dutch de-
sign code are given and can be modified by the user. Those partial factors are used for the
following verification methods according to CUR 166:
The CUR 166 Dutch design procedure distinguishes three different safety classes called
Class I, Class II and Class III which differ by their reliability indexes, see section 34.1.
38 of 416 Deltares
Input
Factors on loads Enter the user defined partial factor applied to the different kind of
loads:
permanent unfavorable load,
permanent favorable load,
variable unfavorable load,
variable favorable load.
Material factors Enter the user defined partial factor applied to:
the cohesion,
the tangent value of the friction angle,
the modulus of subgrade reaction.
Deltares 39 of 416
D-S HEET P ILING, User Manual
Vertical balance Enter the user defined partial factor on base resistance b applied on
factors the characteristic value of the base resistance of the ground Rb;k to get
the design value of the base resistance Rb;d (Equation 33.1):
Rb;d = Rb;k /b
This input is available only if the Check vertical balance check-box was
enabled in the Model window (section 4.1.1).
Click this button to reset all values to the default values prescribed in
CUR 166.
Note: The default values prescribed by CUR 166 (CUR, 2005) are written at the left of each
input area of the User Defined Partial Factors window. If modified, the value appears in red
color.
For background information on CUR 166 design method, see chapter 34.
Titles Use Title 1 to give the project a unique, easily recognizable name. Title
2 and Title 3 can be added to indicate specific characteristics of the
calculation. The three titles will be included on printed output.
Date The date entered here will be used on printouts and graphic plots for
this project. Either mark the Use current date check-box to automati-
cally use the current date on each printout, or enter a specific date.
Drawn by Enter the name of the user performing the calculation or generating the
printout.
Project ID Enter a project identification number.
Annex ID Specify the annex number of the printout.
40 of 416 Deltares
Input
Mark the check-box Save as default to use these settings every time D-S HEET P ILING is started
or a new project is created.
Rulers Mark this check-box to display the horizontal and vertical rulers.
Large cursor Mark this check-box to use the large cross hair cursor instead of the
small one.
Info bar Mark this check-box to display the information bar at the bottom of the
Input Diagram window.
Grid Mark this check-box to display a grid in each Input Diagram window.
Snap to Grid Mark this check-box to ensure that objects align to the grid automat-
ically when they are moved or positioned in a drawing window. This
option applies only to graphical input.
Grid distance Use this field to set the distance between grid points.
Same scale for x Mark this check-box to use the same scale for the horizontal and verti-
and y axis cal directions.
Identification Mark this check-box to display the names of the soil layers in the Input
names Diagram window.
Loads Mark this check-box to display loads in the Input Diagram window. This
option is available only for a sheet pile wall or a pile loaded by forces.
Supports Mark this check-box to display supports in the Input Diagram window.
Level markers Mark this check-box to display the markers of the phreatic levels (right
and left) and the different layers levels.
Material colors Mark this check-box to display each soil material using a different color.
It is recommended that this option is deselected if printouts are to be
photo-copied or faxed.
Layers This option can only be used if the check-box Identification names has
been marked. Soil layers may be identified by their material name, their
index in the list of materials, or their index in the list of layers in the soil
profile.
Deltares 41 of 416
D-S HEET P ILING, User Manual
Overall scale Use these toggle buttons to indicate whether the calculated quantities
such as the stresses, displacements, moments and transverse forces
are to be displayed using a scale based upon the maximum values for
each phase (OFF) or the maximum values over all construction stages
(ON).
Layer bound- Mark this check-box to display dotted lines between soil boundaries.
aries
Material colors Mark this check-box to display material using different colors.
Draw layer over Mark this check-box to draw layers over the full width of the chart.
full width
Envelope dis- Mark this check-box to display a gray line showing the maximum and
playing overall minimum values for all stages.
minimum and
maximum
Draw level mark- Mark this check-box to display the markers of the phreatic levels (right
ers and left) and the different layers levels.
Draw sheet pil- Mark this check-box to display the sheet piling element, with its name
ing elements beside.
Identification Mark this check-box to display the names of the soil layers.
names
Overall scale Use these toggle buttons to indicate whether the calculated quantities
such as the stresses, displacements, moments and transverse forces
are to be displayed using a scale based upon the maximum values for
each phase (Off) or the maximum values over all construction stages
(On).
42 of 416 Deltares
Input
The data will be displayed in the D-S HEET P ILING main window. Click on the Print Active
Window icon to print the file.
First, the top level of the sheet piling is entered. Next, click the Insert row button to insert a
new row or click the Add row button to add one. The stiffness and/or acting width for each
section can be varied. Alternatively, use the Paste icon to paste the complete content from
an external source into the table.
Sheet piling top Enter the top level of the sheet piling in relation to a freely chosen
level reference level.
See section 4.2.2.
Import profile This option allows the name and bending stiffness of the section to be
from library selected from a library. The library contains the standard profiles of dif-
ferent manufacturers and additional user-defined ones (section 4.2.3).
Name The default name of the section can be changed here if desired.
Deltares 43 of 416
D-S HEET P ILING, User Manual
Material type Select the material of the sheet piling from the available drop-down list:
User defined, Steel, Concrete, Wood, Synthetic. D-S HEET P ILING will
automatically determine the value of the material factor M as given in
the Dutch norm, except for User defined for which M must be entered
by the user.
Section bottom Enter the vertical co-ordinate of the bottom of the sheet piling, in rela-
level tion to the reference level. Use several sections if the bending stiffness
varies along the vertical axis of the sheet piling.
Note: Sheet piling length may not be larger than 100 m.
Elastic Enter the bending stiffness of the section (product of Youngs Modulus
stiffness EI E and moment of inertia I ) per running meter if it has not already been
imported from a library.
Acting width The acting width can be used when the effective width changes along
the sheet piling (section 38.1.1).
D-S HEET P ILING uses the acting width as a multiplication factor for the
sheet piling stiffness and all loads, supports and reactions, except the
normal force, see Equation 27.1 in chapter 27 .
Allow. elas. Enter the characteristic value (i.e. without safety factors) of the allow-
charac. moment able elastic moment Mcharac;EL .
Modification Enter the modification factor kmod to count for duration life of the syn-
factor thetic material. For long term situation, the Dutch norm NEN 6702
prescribes a modification factor of 0.45 and for short term situation, a
factor of 0.5.
Material Enter the partial safety factor M , only if the User defined material type
factor is selected. Otherwise, the program will automatically apply the follow-
ing factors (acc. to the corresponding Eurocode) to calculate the design
allowable moment:
Steel: M = Mo = 1, acc. to Eurocode 3 Part 5, art. 5.1.1(4) ;
Concrete: M = C = 1.1, acc. to Eurocode 2 Part 1.1, art. 3.1.6;
Wood: M = M,fi = 1 , acc. to Eurocode 5 Part 1-2, art. 2.3(1);
Synthetic: M = 1.2
Reduction factor Enter the reduction factor applied to the maximum allowable moment
maximum fMmax . This reduction factor can be for example factor B < 1 as
moment defined in article 5.2.2(2) of Eurocode 3 - Part 5 that takes account of
a possible lack of shear force transmission in the interlocks of a sheet
piling for single and double U-piles.
Allow. elas. The design value of the maximum allowable elastic moment Mdesign;EL
design moment is automatically calculated by the program using the following formula:
Mcharac;EL kmod fMmax
Mdesign;EL =
M
where:
kmod is the modification factor,
M is the material factor,
fMmax is the reduction factor applied to the maximum moment.
44 of 416 Deltares
Input
Reduction factor Enter the reduction factor fEI applied to the stiffness EI . The corrected
EI factor is EIcorrected = EI fEI . This reduction factor can be for
example factor D < 1 as defined in article 6.4(3) of Eurocode 3 - Part
5 accounting for the possible reduction due to insufficient shear force
transmission in the interlocks.
Note to reduction Enter a note to describe why a reduction factor is applied.
factor
If the Check vertical balance option in the Model window of (section 4.1.1) is selected, addi-
tional input data are needed for the vertical balance check:
Height The thickness of the sheet piling profile, i.e. the height of the cross-
section.
Coating area The area of coating of the sheet piling (> 1). This is defined as the
length of the perimeter of the sheet piling section per running meter of
wall.
Note: This parameter should be used for the vertical force balance
check (chapter 33) in the unplugged case. However, according to ar-
ticle 5.3 of the CUR 166 recommendations (part 1), the coating area
has to be used only in case of a single pie, not in case of a retaining
wall. Therefore, for unplugged case, the program uses a wall surface
of 1 m2 /m.
Section area The cross-sectional area of the sheet piling, per running meter.
Elastic section The section modulus (also called resisting moment in the Netherlands)
modulus W_el of the sheet piling, per running meter, used for a Feasibility control
(Feasibility) (chapter 7).
Max point The representative cone resistance of the soil at the bottom of the sheet
resistance piling. This is equal to the maximum point resistance qb;max as defined
(p_r;max;point) in article 7.6.2.3(e) of the Dutch Annex of Eurocode 7 (NEN, 2012), see
Equation 33.6 in chapter 33.
The maximum point resistance qb;max is used to calculate Rb;k ,
the characteristic value of the base resistance, according to article
7.6.2.3(5) of Eurocode 7:
Rb;cal Ab qb;max
Rb;k = =
where Ab is the base area under the (sheet) pile.
Xi factor The correlation factor as defined in article 7.6.2.3(5) of Eurocode 7
(according to (NEN-EN, March 2005):
EC7; depends Rb;cal + Rs;cal
Rc;k = Rb;k + Rs;k = =
on number of
CPTs) (Rc;cal )mean (Rc;cal )min
min ;
3 4
where:
Rc;k is the characteristic compressive resistance of the ground,
Rb;k is the characteristic value of the base resistance,
Rs;k is the characteristic value of the shaft resistance.
3 and 4 are correlation factors depending on the number n of CPTs.
For n = 1, = 1.40 acc. to Table A.10 of the general Eurocode 7
(NEN-EN, March 2005) and = 1.39 acc. to the Dutch Annex of the
Eurocode 7 (NEN, 2012) (default in D-S HEET P ILING).
Deltares 45 of 416
D-S HEET P ILING, User Manual
If the Settlement by vibration option in the Model window of (section 4.1.1) is selected, addi-
tional input data are needed:
Width of sheet The width of the sheet piles, used for the calculation of the settlements
piles due to vibratory installation and removal of sheet piles (chapter 39).
Number of The number of piles which are installed simultaneously (chapter 39).
simultaneously
installed piles
Note: If the acting width changes at the position of a load, anchor or support, D-S HEET P ILING
will use the width below this position as the acting width per meter for this load or support.
Edit moment This option opens the Moment-Curvature Diagram (M-N-Kappa) win-
curvature dow (Figure 4.11) in which the elasto-plastic behaviour of the sheet
diagram pile can be defined, using 2 branches. In this window, the moment-
curvature diagram is also displayed.
Plastic moment See Figure 4.11.
positive
Plastic moment See Figure 4.11.
negative
Admiss. plas. Enter the characteristic value (i.e. without safety factors) of the allow-
charac. moment able elastic moment Mcharac;PL .
46 of 416 Deltares
Input
Admiss. plas. The design value of the maximum allowable plastic moment Mdesign;PL
design moment is automatically calculated by the program using the following formula:
Mcharac;PL kmod fMmax
Mdesign;PL =
M
where:
kmod is the modification factor,
M is the material factor,
fMmax is the reduction factor applied to the maximum moment.
Figure 4.11: Moment-Curvature Diagram (M-N-Kappa) window for a plastic sheet piling
calculation (2 branches)
Name The default name of the section can be changed here if desired.
Section bottom Enter the vertical co-ordinate of the bottom of the sheet piling, in rela-
level tion to the reference level. Use several sections if the bending stiffness
varies along the vertical axis of the sheet piling.
Note: Sheet piling length may not be larger than 100 m.
Thickness The thickness of the sheet piling profile, i.e. the height of the cross-
section.
Elastic Enter the flexural elastic stiffness of the section, called EIelastic in Fig-
stiffness EI ure 4.12, (product of Youngs Modulus E and moment of inertia I ) per
running meter if it has not already been imported from a library.
Plastic moment Enter the plastic moment of the positive part of the moment-curvature
positive diagram (in compression), called Mpl in Figure 4.12.
Symmetric Mark this option in case of a symmetric moment-curvature diagram.
Deltares 47 of 416
D-S HEET P ILING, User Manual
Plastic moment Enter the plastic moment of the negative part of the moment-curvature
negative diagram (in traction), called Mpl;neg in Figure 4.12. If option Symmetric
is marked, the Plastic moment negative is automatically equal to the
Plastic moment positive.
Note: The Combined Wall wizard will yield output of the bending moment for the center-to-
center distance between two piles, e.g. the discrete moment for a pile and the attached part
of the sheet piling. For a section with single piles, the soil reaction must be manually modified
to model the effect of arching, see section 4.3.2 and section 5.2.1.
48 of 416 Deltares
Input
Deltares 49 of 416
D-S HEET P ILING, User Manual
Number of sheet Enter the number of sheet piles between each pair of single piles.
piles
Note: When using the Combined Wall wizard, the program assumes a material factor M
and a modification factor kmod of 1 (i.e. steel), see Figure 4.14. If other materials than steel
are used, the user has to enter its own values for M and kmod by selecting a User defined
material type.
Figure 4.14: Sheet Piling window, Result of using the combined wall wizard (per center-
to-center distance)
Click the or buttons in these windows to open the Sheet Piling Profiles window
(Figure 4.15). In this window the properties of both sheet piling and single piles can be
selected.
50 of 416 Deltares
Input
Figure 4.15: Sheet Piling Profiles Library window, Hot rolled sheet piles tab
Figure 4.16: Sheet Piling Profiles Library window, Cold formed sheet piles tab
This tab is identical to Hot rolled sheet piles tab except that the steel qualities are different:
Deltares 51 of 416
D-S HEET P ILING, User Manual
Figure 4.17: Sheet Piling Profiles Library window, Synthetic sheet piles tab
Figure 4.18: Sheet Piling Profiles Library window, Combined sheet piles tab
52 of 416 Deltares
Input
Factor Enter the modification factor kmod to count for duration life of the synthetic
k_mod material. For long term situation, the Dutch norm NEN 6702 prescribes
a modification factor of 0.45 and for short term situation, a factor of 0.5.
This factor is used to determine the admissible design moment from the
admissible characteristic moment, using the following equation:
Mcharac kmod fMmax
Mdesign =
M
Factor Enter the partial safety factor M . This factor is used to determine the ad-
gamma_m missible design moment from the admissible characteristic moment, using
equation above.
See Figure 4.15 for the definition of the other parameters.
Piles
The location of the data file containing user defined profiles can be changed via the Tools
menu section 3.2.
Deltares 53 of 416
D-S HEET P ILING, User Manual
Figure 4.20: Sheet Piling Profiles Library window, User defined piles tab
54 of 416 Deltares
Input
First, the top level of the pile is entered. Next, click the Insert row button to insert a new
row or click the Add row button to add one. The stiffness and/or diameter can be varied
for each section. Alternatively, use the Paste icon to paste the complete content from an
external source into the table.
Pile top level Enter the top level of the pile in relation to a freely chosen reference
level.
Import profile Click here to import the name, diameter and bending stiffness of the
from library section from the D-S HEET P ILING library (section 4.2.3).
Name Change the default name for the section, if desired.
Deltares 55 of 416
D-S HEET P ILING, User Manual
Material type Select the material of the sheet piling from the available drop-down list:
User defined, Steel, Concrete, Wood, Synthetic. D-S HEET P ILING will
automatically determine the value of the material factor M as given in
the Dutch norm, except for User defined for which M must be entered
by the user.
Section bottom Enter the vertical co-ordinate of the bottom of the pile, in relation to
level the reference level. Use several sections if the bending stiffness varies
along the depth.
Elastic Enter the elastic bending stiffness (product of Youngs Modulus E and
stiffness EI moment of inertia I ) of the pile for each section.
Diameter Enter the equivalent diameter of the pile. D-S HEET P ILING uses this
value as the acting width for the soil reaction.
Allow. elas. Enter the characteristic value (i.e. without safety factors) of the allow-
charac. moment able elastic moment Mcharac;EL .
Modification Enter the modification factor kmod to count for duration life of the syn-
factor thetic material. For long term situation, the Dutch norm NEN 6702
prescribes a modification factor of 0.45 and for short term situation, a
factor of 0.5.
Material Enter the partial safety factor M , only if the User defined material type
factor is selected. Otherwise, the program will automatically apply the follow-
ing factors (acc. to the corresponding Eurocode) to calculate the design
allowable moment:
Steel: M = Mo = 1, acc. to Eurocode 3 Part 5, art. 5.1.1(4) ;
Concrete: M = C = 1.1, acc. to Eurocode 2 Part 1.1, art. 3.1.6;
Wood: M = M,fi = 1 , acc. to Eurocode 5 Part 1-2, art. 2.3(1);
Synthetic: M = 1.2
Reduction factor Enter the reduction factor applied to the maximum allowable moment
maximum fMmax . This reduction factor can be for example factor B < 1 as
moment defined in article 5.2.2(2) of Eurocode 3 - Part 5 that takes account of
a possible lack of shear force transmission in the interlocks of a sheet
piling for single and double U-piles.
Allow. elas. The design value of the maximum allowable elastic moment Mdesign;EL
design moment is automatically calculated by the program using the following formula:
Mcharac;EL kmod fMmax
Mdesign;EL =
M
where:
kmod is the modification factor,
M is the material factor,
fMmax is the reduction factor applied to the maximum moment.
56 of 416 Deltares
Input
Note: Input data must be design values as no safety system is included with the Single Pile
module.
Edit moment This option opens the Moment-Curvature Diagram (M-N-Kappa) win-
curvature dow (Figure 4.24) in which the elasto-plastic behaviour of the pile can
diagram be defined, using 4 branches. In this window, the moment-curvature
diagram is also displayed.
EI branch 2 See Figure 4.24 below.
positive
EI branch 3 See Figure 4.24 below.
positive
EI branch 2 See Figure 4.24 below.
negative
EI branch 3 See Figure 4.24 below.
negative
Moment point 1 See Figure 4.24 below.
positive
Moment point 2 See Figure 4.24 below.
positive
Plastic moment See Figure 4.24 below.
positive
Moment point 1 See Figure 4.24 below.
negative
Moment point 2 See Figure 4.24 below.
negative
Plastic moment See Figure 4.24 below.
negative
Admiss. plas. Enter the characteristic value (i.e. without safety factors) of the allow-
charac. moment able elastic moment Mcharac;PL .
Deltares 57 of 416
D-S HEET P ILING, User Manual
Admiss. plas. The design value of the maximum allowable plastic moment Mdesign;PL
design moment is automatically calculated by the program using the following formula:
Mcharac;PL kmod fMmax
Mdesign;PL =
M
where:
kmod is the modification factor,
M is the material factor,
fMmax is the reduction factor applied to the maximum moment.
Figure 4.24: Moment-Curvature Diagram (M-N-Kappa) window for a plastic pile calcula-
tion (4 branches)
Name The default name of the section can be changed here if desired.
Section bottom Enter the vertical co-ordinate of the bottom of the sheet piling, in rela-
level tion to the reference level. Use several sections if the bending stiffness
varies along the vertical axis of the sheet piling.
Note: Sheet piling length may not be larger than 100 m.
Elastic Enter the elastic flexural stiffness (branch 1), called EIelastic in Fig-
stiffness EI ure 4.25, which is the product of elastic Youngs Modulus E and mo-
ment of inertia I .
EI branch 2 Enter the flexural stiffness of the 2nd branch of the moment-curvature
positive diagram (in compression), called EI2 in Figure 4.25.
EI branch 3 Enter the flexural stiffness of the 3rd branch of the moment-curvature
positive diagram (in compression), called EI3 in Figure 4.25.
Moment point 1 Enter the limit moment of the of the 1st branch of the moment-curvature
positive diagram (in compression), called M1 in Figure 4.25.
58 of 416 Deltares
Input
Moment point 2 Enter the limit moment of the of the 2nd branch of the moment-curvature
positive diagram (in compression), called M2 in Figure 4.25.
Plastic moment Enter the plastic moment of the positive part of the moment-curvature
positive diagram (in compression), called Mpl in Figure 4.25.
Symmetric Mark this option in case of a symmetric moment-curvature diagram.
EI branch 2 Enter the flexural stiffness of the 2nd branch of the moment-curvature
negative diagram (in traction), called EI2;neg in Figure 4.25. If option Symmetric
is marked, the EI branch 2 negative is automatically equal to the EI
branch 2 positive.
EI branch 3 Enter the flexural stiffness of the 3rd branch of the moment-curvature
negative diagram (in traction), called EI3;neg in Figure 4.25. If option Symmetric
is marked, the EI branch 3 negative is automatically equal to the EI
branch 3 positive.
Moment point 1 Enter the limit moment of the of the 1st branch of the moment-curvature
negative diagram (in traction), called M1;neg in Figure 4.25. If option Symmetric
is marked, the Moment point 1 negative is automatically equal to the
Moment point 1 positive.
Moment point 2 Enter the limit moment of the of the 2nd branch of the moment-curvature
negative diagram (in traction), called M2;neg in Figure 4.25. If option Symmetric
is marked, the Moment point 2 negative is automatically equal to the
Moment point 2 positive.
Plastic moment Enter the plastic moment of the negative part of the moment-curvature
negative diagram (in traction), called Mpl;neg in Figure 4.25. If option Symmetric
is marked, the Plastic moment negative is automatically equal to the
Plastic moment positive.
The curvature of the three points of the moment-curvature relationship in Figure 4.25 is
Deltares 59 of 416
D-S HEET P ILING, User Manual
given by:
M1 M1;neg
1 = 1;neg = (4.1)
EIelastic EIelastic
M2 M1 M2;neg M1;neg
2 = 1 + 2;neg = 1;neg + (4.2)
EI2 EI2;neg
Mpl M2 Mpl M2;neg
3 = 2 + 3;neg = 2;neg + (4.3)
EI3 EI3;neg
The content of the Diaphragm Wall window is identical to the Sheet Piling window for plastic
calculation but with extra inputs, as the elasto-plastic behaviour of the diaphragm wall contains
4 branches.
60 of 416 Deltares
Input
Figure 4.27: Moment-Curvature Diagram (M-N-Kappa) window for a diaphragm wall cal-
culation
Thickness The thickness of the sheet piling profile, i.e. the height of the cross-
section.
See Figure 4.24 and Figure 4.25 for the definition of the other parameters.
4.3.1 Surfaces
On the menu bar, click Soil and then choose Surfaces. In the window displayed (Figure 4.28),
the positions of the various ground surfaces, that will occur on different sides of the sheet
piling during the different stages, can be specified. Use the Stage Composer or the Stages
Overview window to connect the surfaces (for each stage) to the left or right of the sheet pile
wall.
Deltares 61 of 416
D-S HEET P ILING, User Manual
Up to 10 surfaces can be specified. To add a surface, click Add. The name of the new
surface is displayed in an appearing edit-box. Change the name as required. Enter the first
co-ordinate (horizontal in relation to the sheet piling, vertical in relation to the reference level).
Click the Add row button to add the next co-ordinate. Alternatively, use the Paste button
, to paste the complete content from an external source into the table.
Distance & Level Both the Distance from the sheet piling and Level of that part of the
surface are expressed in meters. The level is specified in relation to
the reference level.
D-S HEET P ILING can only convert a non-horizontal surface to horizon-
tal wall pressures in case of the c, phi, delta method (section 4.6.1).
The relevant calculation method must be selected for each construc-
tion stage.
Figure 4.29: Soil Materials window for the Ka , K0 , Kp soil parameters or Mixed models
62 of 416 Deltares
Input
Figure 4.30: Soil Materials window for the c, , soil parameters model
Now the soil materials can be linked to the soil profiles and the water properties for the soil
can be determined, both described in section 4.3.
4.3.2.1 General
The general soil parameters for a particular soil material can be specified in this sub-window
(Figure 4.31).
Unsat. total unit weight Enter the weight of a unit volume of soil above the water table
(generally unsaturated).
Sat. total unit weight Enter the weight of a unit volume of soil below the water table
(generally saturated).
Cohesion Enter the drained cohesion.
Friction angle phi Enter the friction angle of soil.
Delta friction angle Enter the friction angle between soil and sheet piling. For back-
ground information, see section 29.1.
Shell factor Enter the shell factor of the soil to take into account the effect
of arching. This factor will be automatically applied on passive
and active earth pressure coefficients and on moduli of subgrade
reaction. For background information, see section 38.1.2.
Deltares 63 of 416
D-S HEET P ILING, User Manual
Manual Mark this check-box to enter the earth pressure coefficients manually.
Mller-Breslau Mark this check-box to get D-S HEET P ILING to determine earth pressure
(Straight slip coefficients according to Mller-Breslau section 28.2.2.
surfaces)
Ktter (Curved Mark this check-box to get D-S HEET P ILING to determine earth pressure
slip surfaces) coefficients according to Ktter section 28.2.3.
Active, Neutral or If Manual is selected, the values for the active, neutral, and passive
Passive earth pressure coefficients (Ka , K0 , Kp ) should be entered manually.
The following restriction applies: 0 Ka K0 Kp .
If Manual is not selected, the active, neutral, and passive earth
pressure coefficients (Ka , K0 , Kp ) are calculated automatically by
D-S HEET P ILING.
64 of 416 Deltares
Input
Figure 4.34: Soil Materials window, Modulus of subgrade reaction Secant sub-window
k1, k2, k3 Enter values for the secant moduli at 50, 80 and 100% of Ka Kp
(Figure 4.35), on the Top side and Bottom side of each soil layer.
D-S HEET P ILING also applies the k1 value to unloading and reloading
if the Use an unloading/reloading curve option has been selected in
the Curve Settings window.
Deltares 65 of 416
D-S HEET P ILING, User Manual
Select from CUR Click this button to select a soil type directly from table 3.3 of the
166 (Table 3.3) CUR 166 (CUR, 2005) (Figure 4.3.2.4). The soil type indication in the
first column includes typical values of the CPT resistance qc (in MPa)
for sand and typical values of undrained cohesion Cu (in kPa) for clay
and peat. Only lowest values are given in D-S HEET P ILING to use
the highest value the user must manually multiply the lowest value by
2.25.
horizontal stress
k1 k2 k3
kpv
horizontal displacement
66 of 416 Deltares
Input
Figure 4.37: Soil Materials window, Modulus of subgrade reaction Tangent (D-Sheet
Piling Classic) sub-window
The following values can be specified for the tangent modulus of subgrade reaction at the top
and bottom sides of the soil layer (see Figure 4.38, below).
k0 unloading Enter the value for unloading/reloading, if this option was selected in
/reloading the Curve Settings window (see above).
k1,. . . , k4 Enter values for the tangent moduli, at the Top side and the Bottom
side of the soil layer, of the different branches.
1-3 [%] Define the intersection points of the branches, by entering the corre-
sponding stress levels as a percentage of Ka Kp .
arctan k4
passive: Kpv
arctan k3
neutral: K0v
2[%] 3[%] 100%
active: Kav arctan k2
1[%]
Note: When importing a CPT, the tangent moduli of subgrade reaction are automatically filled
in using extrapolated values from Table 3.3 of CUR 166, as the soil materials list contains
more materials than those listed in Table 3.3 of CUR 166. The extended values can be found
in section 30.3.2.
Deltares 67 of 416
D-S HEET P ILING, User Manual
Relative density Enter the relative density of the soil in [%]. The relative density (or
density index) ID is the ratio of the difference between the void ratios of
a cohesion-less soil in its loosest state and existing natural state to the
difference between its void ratio in the loosest and densest states:
emax e
ID = emax emin
100
The relative density depends on the consistency of the soil as shown
in Table 4.1. The default value in D-S HEET P ILING is 72.5%.
Horizontal per- Enter the horizontal permeability of the soil in [m/s]. The default value
meability in D-S HEET P ILING is 103 m/s.
Soil layer type Select the type of soil from the drop-down menu.
Specify the names of the soil materials in the left-hand table. The soil materials entered here
can be connected to their geometry using the Soil Profiles input window (section 4.3.4).
For Single pile model, the content of the Soil Materials window depends on the loading type:
For loading by forces and by user-defined soil displacements, the General soil param-
eters, the Earth pressure coefficients and the Modulus of subgrade reaction must be
specified for each material;
For loading by calculated soil displacements, only the General soil parameters must be
specified for each material.
68 of 416 Deltares
Input
Figure 4.40: Soil Materials window for Single Pile loaded by forces
General:
Unsat. total unit Enter the weight of a unit volume of soil above the water table (generally
weight unsaturated).
Sat. total unit Enter the weight of a unit volume of soil below the water table (generally
weight saturated).
Cohesion Enter the drained cohesion.
Friction angle Enter the friction angle of soil.
phi
Note: When using the Brinch-Hansen method the same soil material should not be used at
different depths in a soil profile. Instead a copy of the soil should be made, with a different
name. See section 37.2.1 for more information.
Note: Active and neutral earth pressure coefficients normally need to be set to zero for the
situation of a single pile loaded by soil displacement. This means that the input value for the
passive earth pressure coefficient leads to the effective resisting pressure, taking the effect of
arching into account. Selecting Brinch-Hansen will cause this to happen automatically.
Modulus of subgrade reaction: User-defined values for the modulus of subgrade reaction can
be entered in this sub-window. Alternatively, for a pile loaded by forces, D-S HEET P ILING can
calculate the modulus of subgrade reaction according to Mnards theory.
Deltares 69 of 416
D-S HEET P ILING, User Manual
Figure 4.41: Soil Materials window, Modulus of subgrade reaction sub-window (Pile
loaded by forces)
Emod Mnard If Menard is selected, then D-S HEET P ILING will determine the modulus
Soil type Mnard of subgrade reaction from the input of the pressiometric modulus and
the soil type. The background description on Mnards theory (sec-
tion 37.2.2) includes a correlation between the pressiometric modulus
and the cone resistance. The option Menard is only available for single
piles loaded by forces (section 4.1.1).
k If Manual is selected, the values for the modulus of subgrade reaction
at the top and bottom side of a layer can be entered manually.
4.3.3.2 Soil Materials for Single pile loaded by user-defined soil displacements
The input is identical to Soil Materials window for Single pile loaded by forces (Figure 4.40)
except that the Modulus of subgrade reaction can only be user-defined.
Figure 4.42: Soil Materials window for Single pile loaded by user-defined soil displace-
ments
70 of 416 Deltares
Input
4.3.3.3 Soil Materials for Single pile loaded by calculated soil displacements
The automatic calculation of horizontal soil displacements is based on De Leeuw tables
(De Leeuw, 1963). The stresses and displacements from those tables are used to automati-
cally determine the modulus of subgrade reaction at each depth. For background information,
see section 37.1.1.
The earth pressure coefficients are automatically determined at each depth using Brinch-
Hansen theory from the input cohesion and friction.
Both values of the modulus of subgrade reaction and the passive earth pressure coefficient
can be found in the Input section of the Report window (section 6.2).
Figure 4.43: Soil Materials window for Single pile loaded by calculated soil displacements
Unsat. total unit Enter the weight of a unit volume of soil above the water table (generally
weight unsaturated).
Sat. total unit Enter the weight of a unit volume of soil below the water table (generally
weight saturated).
Cohesion Enter the drained cohesion.
Friction angle Enter the friction angle of soil.
phi
Deltares 71 of 416
D-S HEET P ILING, User Manual
Horizontal be- The behavior (Stiff, Elastic or Foundation) of the layer must be spec-
havior ified. De Leeuw theory assumes an elastic incompressible cluster of
layers based on foundation layer(s) and eventually covered with stiff
layer(s). Therefore, only the system of layers presented in the figure
below is allowed where:
Elastic and foundation layer should be present at least one time;
Stiff layer (if present) should not be positioned below elastic or foun-
dation layer
Other systems will lead to fatal error during calculation.
Elasticity (E) Enter the elastic modulus of the elastic soil layer. Mark the Use de-
fault elasticity option to use the elasticity automatically calculated by
D-S HEET P ILING according to De Leeuw and Timmermans theory based
on the dry unit weight (section 37.1.1).
In the input window, different profiles can be specified for each side and for each construction
stage. To add a profile, three options are available:
72 of 416 Deltares
Input
Once the soil materials are defined (section 4.3.2 and section 4.3.3),
click this button to add a soil profile by manual input of the Top level
and Material of each layer. Refer to section 4.3.4.1.
Click this button to add a soil profile by importing a CPTCPT from file
through the Select CPT window by either selecting an existing CPT file
(only in GEF format) or by importing a CPT from the DINO database
(Data and Information of the Subsurface of The Netherlands). Refer to
section 4.3.4.2 and section 4.3.4.3.
Click this button to delete the selected profile.
Click this button to create a copy of the selected profile: the entire
profile will be copied including the CPT-values, the layers and the addi-
tional pore pressures.
Note: If no soil material was previously defined, D-S HEET P ILING uses the default empty soil
material named New Material as shown in Figure 4.44.
Soil profile name This field displays the name of the selected profile. The name of
the profile can be overwritten if desired. Unique and recognizable
names should be used because the profile name is used in other
D-S HEET P ILING windows to select the appropriate soil data.
Top level [m] Enter the level of the top of the soil layer. The layers must be entered
from top to bottom. The bottom soil layer is assumed to be infinitely
thick.
Deltares 73 of 416
D-S HEET P ILING, User Manual
Material Click the input field to select one of the available soil materials. A
soil profile must be specified for each stage. On the basis of lay-
ers that are fully or partially located under the specified surface level,
D-S HEET P ILING itself defines the soil layers to profile to profile that
are present during a construction stage. However, there must be soil
present at the location of the specified surface. Because the surface
does not need to be horizontal, a soil layer may sometimes be above
the sheet piling.
Ad. pore pr. at Enter the additional pore water pressure at the top and bottom of each
top/bottom soil layer. The additional pressure is modeled as varying linearly over
the layer. The total pore water pressure is taken as the sum of the
additional pore pressure and the hydrostatic pore water pressure (see
section 4.3.5). See the Note below.
Note: If the surface does not run horizontally, the additional pore water pressure at the
surface level is not always equal to zero. D-S HEET P ILING does not adjust the additional pore
water pressure, but displays a warning in the output file instead. A warning is also displayed
if an additional pore water pressure is entered above the water level.
Click on the Import from File button to open the Open dialog that al-
lows a GEF file containing the CPT results to be selected. The GEF
file (Geotechnical Exchange Format) is a Dutch standard developed
by CUR. The results of the selected CPT are displayed in the CPTip
window (refer to paragraph Adding Soil Profiles from CPT CPT Inter-
pretation just after for the CPT interpretation).
Click on the Import from Dino button to open the Select CPT for
D-S HEET P ILING window (Figure 4.47) that allows importing one or more
CPTs from the DINODINO database (DINO). CPT searching is per-
formed from the Google Map. Zooming in to the location of the project
will display the CPTs as separate points (Figure 4.48). Just click on
it to display the CPT results in the CPTip window (refer to paragraph
Adding Soil Profiles from CPT CPT Interpretation just after for the
CPT interpretation).
74 of 416 Deltares
Input
Click this button to display a map view including city, street and motor-
way names and representation.
Click this button to display a satellite view.
Click this button to display a combination of the Map and Satellite views.
Zoom in:
Click this button to enlarge the map.
Zoom out:
Click this button to reduce the map.
Pan:
Click this button to move the map by dragging the mouse.
Minimum length Enter a minimum length for the CPTs displayed on the map.
of CPTs
Deltares 75 of 416
D-S HEET P ILING, User Manual
Figure 4.48: Select CPT for D-Sheet Piling window after zoom in
76 of 416 Deltares
Input
Rule Select the interpretation rule used by D-S HEET P ILING to automatically
interpret the imported CPT. Two different rules are available:
The NEN (Stress dependent) rule
The CUR rule
Each rule describes a certain soil type by defining the relationship be-
tween the CPT resistance and the Friction Ratio. For background infor-
mation on both rules, refer to section 30.2.
Minimum layer All interpretation rules make use of one additional parameter: the min-
thickness imum layer thickness, specified in the Min. layer thickness input field
below the selection list. To prevent D-S HEET P ILING from generating lay-
ers that are too thin to be significant when modeling the problem, the
minimum layer thickness should be increased.
To use the proposed soil layer interpretation, click the OK button to transport the interpretation
into a soil profile to be used in the project (Figure 4.50).
Deltares 77 of 416
D-S HEET P ILING, User Manual
Note: When a soil profile is determined from a CPT interpretation, the soil names and prop-
erties of the created soil materials are automatically filled in the Soil Materials window using
Table 1 of NEN 6740 for the general parameters and using an extrapolation of Table 3.3 of
CUR 166 for the secant moduli of subgrade reaction (section 30.3).
Note: If during the interpretation of a CPT, the point corresponding to the cone resistance
and the friction ratio of a layer is situated outside the limits of the diagram of the selected rule
(i.e. Figure 30.2 and Figure 30.3 in section 30.2), the program will assign an Undetermined
material to this layer with unrealistic properties. Thats why the user must always review the
automatic interpretation of the CPT before performing a calculation. In such case, the user
must select himself the appropriate material from the drop-down list of available materials
using its expertise.
Click the button to display graphic representations of the pore pressures, the cone
resistance, the friction and the percentage of friction of the selected CPT (Figure 4.51).
78 of 416 Deltares
Input
Name Enter a name for the water level. Use unique and recognizable names,
because the water level name is used in other D-S HEET P ILING windows
to select the appropriate data.
Level [m] Enter the water level (relative to the reference level).
D-S HEET P ILING models hydrostatic pore water pressures by defining the hydrostatic pressure
at a point as proportional to its depth below the water level. If a total pore pressure distribution
other than this triangular, hydrostatic, distribution is required then the user must also input
additional pore pressures for each layer (section 4.3.4).
A water level will only be active in the stages that are selected using the Stage Composer
(section 2.2.4) or the Stages Overview window (section 4.6.2).
Deltares 79 of 416
D-S HEET P ILING, User Manual
After entering all the data in the Soil menu, proceed to the Loads menu.
Name This field displays the name of the displayed load, which can be
overwritten. Use unique and recognizable names because the
load name is used in other windows of D-S HEET P ILING to select
the appropriate data.
Load on the left side Enter the magnitude of the load on the left hand side of the sheet
[kN/m2 ] pile wall.
Load on the right side Enter the magnitude of the load on the right hand side of the
[kN/m2 ] sheet piling.
Permanent/variable Select the duration of load application, Permanent or Variable.
This option is available only if the Verification (EC7/CUR) option
is selected in the Model window (section 4.1.1).
80 of 416 Deltares
Input
A uniform load consists of a distributed vertical q-load acting on the horizontal soil surface,
from the sheet piling to infinity. The value of the q-load can be different on each side of the
sheet piling.
q-load
sheet piling
A uniform load will only be active in the stages that are selected using the Stage Composer
(section 2.2.4) or the Stages Overview window (section 4.6.2).
Note: The surcharge can only be applied if the c, , soil parameters model has been
selected (section 4.1.1).
Deltares 81 of 416
D-S HEET P ILING, User Manual
Surcharge load name This field displays the name of the displayed load, which can be
overwritten. Use unique and recognizable names because the
load name is used in other windows of D-S HEET P ILING to select
the appropriate data.
Permanent/variable Select the duration of load application, Permanent or Variable.
This option is available only if the Verification (EC7/CUR) option
is selected in the Model window (section 4.1.1).
Favorable/ unfavorable Select the type of load, Favorable, Unfavorable or leave it
D-S HEET P ILING determined. This option is available only if the
Verification (EC7/CUR) option is selected in the Model window
(section 4.1.1).
Note: When the option D-Sheet Piling determined is selected
for determining if a load is either favorable or unfavorable, the
program first defines the passive side using only the surface lev-
els at both side (the lower side is set to passive). Then the loads
situated at the passive side are considered as favorable and the
loads at the active side are considered as unfavorable. This au-
tomatic determination can therefore be incorrect in some cases;
for example, when the lower side, due to water pressures, is ac-
tually the active side. Thats why using this option requires some
careful.
Distance [m] Enter the distance from the sheet piling to the relevant part of
the surcharge. A surcharge always acts on the soil surface. The
distances to the sheet piling are always positive and must be
entered in ascending order. The maximum number of points is
15.
Load [kN/m2 ] Enter the magnitude of the surcharge at each point.
82 of 416 Deltares
Input
load
1 3 4 6 7 9 10
distance
Figure 4.57: Distribution of surcharges according to the inputted values of Figure 4.56
D-S HEET P ILING models surcharges using Boussinesqs formula, see Equation 28.7 (section 28.3).
A surcharge will only be active in the stages that are selected using the Stage Composer
(section 2.2.4) or the Stages Overview window (section 4.6.2).
for Sheet piling model, choose Horizontal Line Loads to open the corresponding input
window (Figure 4.58);
for Single pile model, choose Horizontal Forces to open the corresponding input window
(Figure 4.59).
Horizontal line loads (or forces) are loads perpendicular to the sheet piling (or single pile),
directed towards the right. Up to 10 loads can be added.
Deltares 83 of 416
D-S HEET P ILING, User Manual
Name The name of the horizontal line load (i.e. force) can be overwritten.
Use unique and recognizable names because the load name is used in
other windows of D-S HEET P ILING to select the appropriate data.
Level Enter the vertical position of the line load in relation to the reference
level. The value must be above the foot, and below the top, of the
sheet piling.
Load Enter the magnitude of the load (in kN per running meter for sheet
piling or in kN for single pile). D-S HEET P ILING assumes that a force
with positive sign points to the right.
Permanent/ vari- Select the duration of load application, Permanent or Variable. This
able option is available only if the Verification (EC7/CUR) option is selected
in the Model window (section 4.1.1).
Favorable/ unfa- Select the type of load, Favorable, Unfavorable or leave it
vorable D-S HEET P ILING determined. This option is available only if the Verifica-
tion (EC7/CUR) option is selected in the Model window (section 4.1.1).
Note: When the option D-Sheet Piling determined is selected for de-
termining if a load is either favorable or unfavorable, the program first
defines the passive side using only the surface levels at both side (the
lower side is set to passive). Then the loads situated at the passive
side are considered as favorable and the loads at the active side are
considered as unfavorable. This automatic determination can therefore
be incorrect in some cases; for example, when the lower side, due to
water pressures, is actually the active side. Thats why using this option
requires some careful.
level force
sheet piling
A horizontal line load (i.e. force) will only be active in the stages that are selected using the
Stage Composer (section 2.2.4) or the Stages Overview window (section 4.6.2).
84 of 416 Deltares
Input
4.4.4 Moments
On the menu bar, click Loads and then choose Moments to open the corresponding input
window. When, for example, a floor is connected to the sheet pile wall a moment load can
occur along the length of the sheet pile wall. Up to 10 moments can be added.
Name The name of the moment load can be overwritten. Use unique and
recognizable names, because the load name is used in other windows
of D-S HEET P ILING to select the appropriate data.
Level Enter the vertical position of the moment in relation to the reference
level. The values must be within the range of the top and the foot of the
sheet piling.
Moment Enter the magnitude of the moment (kN per running meter for Sheet
piling but kN for Single pile). A moment with a rotation from the posi-
tive X-axis to the positive Y-axis (counter clockwise) receives a positive
sign.
level moment
sheet piling
A moment will only be active in the stages that are selected using the Stage Composer (sec-
tion 2.2.4) or the Stages Overview window (section 4.6.2).
Deltares 85 of 416
D-S HEET P ILING, User Manual
Name Enter a name for the force. Use unique and recognizable names, be-
cause the load name is used in other windows of D-S HEET P ILING to
select the appropriate data.
Force at Enter the value of the normal force at the levels explained below.
Normal forces, i.e. distributed forces that act along the axis of the sheet piling section, intro-
duce an additional (secondary) moment. Due to wall friction, the normal force (the result of
an applied vertical line load) will decrease along the depth of the sheet piling. To account for
this friction, the user may input the value of the normal force at the following levels:
If friction is to be ignored (conservative) then the same value can be entered at all levels. Up
to 10 normal forces can be added.
A normal force load will only be active in the stages that are selected using the Stage Com-
poser (section 2.2.4) or the Stages Overview window (section 4.6.2).
Note: For Sheet piling model, soil displacements are applied only at the first stage.
86 of 416 Deltares
Input
Level Enter the vertical position (relative to the reference level) of the points
where the soil displacement is to be defined. The first point must coin-
cide with the top of the sheet piling, and the last point with the foot of
the sheet piling even if the displacement there is zero. The intermediate
points must be in order of decreasing level.
Displacement Enter the magnitude of the undisturbed soil displacement. A soil dis-
placement in the direction of the positive X-axis (to the right) receives
a positive sign.
4.5.1 Anchors
This option is available only for Sheet piling model (section 4.1.1). On the menu bar, click
Supports and then choose Anchors to open the corresponding input window.
Deltares 87 of 416
D-S HEET P ILING, User Manual
Wall height Enter the vertical projection of the height of the anchor wall: for an
(Kranz) anchor wall of H and anchor bar inclined with an angle , the Wall
height (Kranz) is h cos . This parameter only needs to be specified
if performing a stability check of the anchor wall according to Kranz
(Kranz, 1953) (see chapter 31).
Length Enter the length of the anchor tendon.
Angle Enter the angle between the anchor tendon and the horizontal axis. A
negative angle indicates an anchor tendon that runs downwards from
the sheet pile wall.
Design Yield Enter the design value of the yield force for the anchor.
Force Note: According to CUR 166 (paragraph 7.2.1), to get the design yield
force Fy;d , the representative yield force Fy must be divided by a safety
factor of 1.4.
Side Select if the anchor is to be on the right- or left-hand side of the sheet
piling.
Refer to Tutorial 18 in chapter 25 for a concrete example of anchor system using the technical
specifications provided by the manufacturer.
Note: When determining the maximum anchor force, D-S HEET P ILING assumes that the an-
chor rod is attached in the middle of the anchor wall. On the top, it is assumed that the anchor
plate runs through to the surface, or at least that it may be calculated as if the anchor wall
runs through to the surface. In practice, this will be the case if the total height of the anchor
wall is greater than half the distance from the bottom of the anchor plate to the surface. When
the anchor is drawn in the Input Diagram window (section 2.2.3), only half of the inputted Wall
height of the anchor is drawn (between the anchor rod and the bottom of the anchor wall).
Anchors can be pre-tensioned with an initial force to support the sheet pile wall. Each con-
struction stage can have its own anchors and up to 10 anchors can be added. Pre-tensioned
anchors are modeled by the pre-stress force, with no associated stiffness for the stage in
which the pre-stress force is applied. For all other stages D-S HEET P ILING models anchors
using discrete springs. D-S HEET P ILING always uses a zero pressure condition in the stress
strain relation (Figure 4.66).
tensile stress
limited capacity
pre- stress
zero pressure
condition tensile strain
D-S HEET P ILING calculates the stiffness of the anchor using the following equation:
An anchor will only be active in the stages that are selected using the Stage Composer (sec-
tion 2.2.4) or the Stages Overview window (section 4.6.2).
88 of 416 Deltares
Input
Grout Anchors
The modeling of a grout anchor in D-S HEET P ILING depends on the type of analysis:
For a Kranz stability analysis (section 5.2.4), CUR 166 (art. 4.7.2) and also EAU 2004
(art. 8.4.9.8) prescribe to define the (effective) length of the anchorage as the length
from the sheet pile wall to the middle of the grout body.
For a standard calculation (section 5.2.1), nothing is prescribed by CUR 166 about the
yield force of the anchor. However, the anchor tip position depends on the tensile stress
distribution along the anchor. This differs for a mono or a duplex-anchor as shown in
art. 5.5.4 of CUR 166. As a grout anchor is often a mono-anchor, the (effective) length
of the anchorage can be defined as the length from the sheet pile wall to the third of the
grout body.
In both cases, D-S HEET P ILING doesnt calculate automatically this adapted anchor length. The
user has to define it in the Anchors window.
4.5.2 Struts
This option is available only for Sheet piling model (section 4.1.1). On the menu bar, click
Supports and then choose Struts to open the corresponding input window (Figure 4.67).
Deltares 89 of 416
D-S HEET P ILING, User Manual
Struts can be pre-compressed with an initial force to support the sheet pile wall. Each con-
struction stage can have its own struts and up to 10 struts can be added. D-S HEET P ILING
models struts using discrete springs. D-S HEET P ILING always uses a zero tension condition in
the stress strain relation (Figure 4.68).
compressive stress
limited capacity
pre- stress
zero tension
condition compressive strain
D-S HEET P ILING calculates the stiffness of the strut using the following equation:
A strut will only be active in the stages that are selected using the Stage Composer (sec-
tion 2.2.4) or the Stages Overview window (section 4.6.2).
A spring support provides an elastic resistance against translation or rotation. The stiffness of
the spring is determined using the data entered for the spring constants for translation and/or
rotation.
90 of 416 Deltares
Input
where:
A spring support will only be active in the stages that are selected using the Stage Composer
(section 2.2.4) or the Stages Overview window (section 4.6.2).
Rigid supports can be used to suppress translation and/or rotation of the sheet piling (or single
pile) at certain points. Up to 10 rigid supports can be added.
A rigid support will only be active in the stages that are selected using the Stage Composer
(section 2.2.4) or the Stages Overview window (section 4.6.2).
Deltares 91 of 416
D-S HEET P ILING, User Manual
An overview of loads, supports and additional data that may vary for each stage.
Selection of specific loads, supports and additional input data for each stage.
Input of anchor and strut forces, and the input of a prescribed pile top displacement.
92 of 416 Deltares
Input
Pile top Mark this check-box to activate a prescribed piling top displacement
displacement for the selected stage. Positive values indicate a displacement to the
right. Displacements are specified in relation to the configuration at
the start of stage 1. If the check-box is not marked, D-S HEET P ILING
assumes that the top of the sheet piling can move freely. An alter-
native method of ensuring zero displacement of the top of the wall
is to use a rigid support (section 4.6.2.2).
Passive side Select from the drop-down list which side is the passive side: Left,
Right or leave D-Sheet Piling determined it automatically.
Note: The option D-Sheet Piling determined works in most of the
cases correctly. However, if this option is used simultaneously with
the option D-Sheet Piling determined to determine if the loads are
favorable or unfavorable, the automatic determination of the pas-
sive side can be incorrect because the automatic determination of
the favorable/unfavorable nature of a load is sometimes incorrect,
as explained in the note in section 4.4.1, section 4.4.2 and in sec-
tion 4.4.3. Thats why using this option requires some careful.
Deltares 93 of 416
D-S HEET P ILING, User Manual
Methods For each side and for each stage, select the method that
D-S HEET P ILING will use to calculate the lateral earth pressure ra-
tios:
C, phi, delta (cohesion, soil friction angle and friction angle be-
tween soil and wall): With this option selected D-S HEET P ILING
derives the lateral earth pressure coefficients using Culmanns
method. This method is the usual choice in most cases. It is based
on straight slip surfaces and includes the influence of soil weight,
non-horizontal ground surfaces and non-uniform surcharge.
Ka , K0 , Kp (active, neutral and passive lateral earth pressure co-
efficients): With this option selected, D-S HEET P ILING will use user-
specified coefficients or ones derived automatically from the Mller-
Breslau equations (straight slip surface, horizontal soil surface) or
Ktter equations (curved slip surface, horizontal ground surface).
For more details, see the Soil Materials input window section 4.3.2.
Water levels For each side and for each stage, select the water level. Water
levels may be added or modified in the Water Level window (sec-
tion 4.3.5).
Surfaces For each side and for each stage, select one of the available ground
surfaces from the drop down list. Ground surfaces may be added or
modified in the Surfaces input window.
Soil profiles For each side and for each stage, select one of the available layer
profiles from the drop down list. Layer profiles may be added or
modified in the Profiles input window.
Anchors For each stage, select the anchors that are used by marking the cor-
responding check-boxes. Anchors may be added via the Supports
menu.
Pre-tensioning For each selected anchor, the corresponding check-box in the list of
forces pre-tensioning forces may be marked. Once a check-box is marked,
the pre-tensioning force can be entered in the same cell of the table.
If an anchor is deselected, the corresponding pre-tensioning also
becomes deselected, and the corresponding check-box is disabled.
Note: In case of inclined anchor, the input pre-stress force is along
the inclined anchor, not normal to the sheet piling.
Struts For each stage, select the struts that are to be used by marking the
corresponding check-boxes. Struts may be added via the Supports
menu.
Pre-compressions For each selected strut, the corresponding check-box in the list
of pre-compression forces may be marked. Once a check-box is
marked, the pre-compression force can be entered in the same
cell of the table. If a strut is deselected, the corresponding pre-
compression also becomes deselected, and the corresponding
check-box is disabled.
Spring supports Supports and loads may be selected for each stage by marking the
Rigid supports corresponding check boxes. Supports and loads may be entered
Uniform loads with the input windows in the Soil menu and the Loads menu.
Surcharges Surcharges may be selected to act on either side of the sheet piling.
Horizontal line loads
Moments
Normal forces
Note: The Soil Displacements as defined from the Loads menu (section 4.4.6) are not
94 of 416 Deltares
Input
present in the Stages Overview window for Sheet Piling model (Figure 4.72) because they
are applied only at the first stage.
For more detail about the menus mentioned above, see section 4.3 to section 4.5.
Note: Working with construction stages is not possible for the Single pile model.
Water levels Select the water level. Water levels may be added or modified in the
Water Levels window (section 4.3.5).
Surfaces Select one of the available ground surfaces from the drop-down list.
Ground surfaces may be added or modified in the Surfaces window
(section 4.3.1).
Soil profiles Select one of the available layer profiles from the drop down list.
Layer profiles may be added or modified in the Profiles input window
(section 4.3.4).
Spring supports All supports and loads may be selected by marking the correspond-
Rigid supports ing check boxes. Supports and loads may be entered using the
Horizontal line loads input windows in the Soil menu (section 4.3) and the Loads menu
Moments (section 4.3.4).
Normal Forces
For more details about the menus mentioned above, see section 4.3 and section 4.3.4.
Deltares 95 of 416
D-S HEET P ILING, User Manual
96 of 416 Deltares
5 Calculations
First stage Mark this check-box to let D-S HEET P ILING determine equal neutral
represents stresses at both sides, for initially non-horizontal surfaces or initial sur-
initial situation charges. The possibilities and limitations are outlined in section 5.1.1.
Also see chapter 38 for background information.
Coarse/Fine Select either the faster, classic, coarse element determination of active
and passive pressures, or the more accurate fine element determina-
tion. D-S HEET P ILING applies the fine determination implicitly when the
First stage represents initial situation option has been selected. Note
that the fine and coarse methods may yield different results, as ex-
plained in section 5.1.2.
Reduce delta Mark this check-box to allow reduction of the wall friction angles ac-
friction angle(s) cording to CUR 166. This means that:
according to for 30 , no change is made to ;
CUR for 30 < 35 , is reduced to 16.6 ;
for > 35 , is reduced to 17.2 .
This option is only available when using the C, phi, delta soil parame-
ters module. The check-box is marked as default.
Note: This reduction applies for both Standard and Verification calcu-
lation:
in case of a Verification calculation, this reduction applies on the (cal-
culated) design values;
in case of a Standard calculation or a Verification calculation with
representative values (incl. step 6.5 of CUR), this reduction applies on
the representative values.
5.1.1 Possibilities and limitations of the option First stage represents initial situation
Only non-uniform loads and non-horizontal surfaces are allowed in combination with
a first initial stage. Uniform loads, horizontal line loads, moments and normal forces
cannot be used in a first initial stage.
Sheet piling deformation will not occur in a first initial stage, unless the initial neutral soil
Deltares 97 of 416
D-S HEET P ILING, User Manual
stress becomes equal to the active or passive value at some part along the sheet piling.
The layers and phreatic surface in a first initial stage must be continuous at the position
of the sheet piling.
98 of 416 Deltares
Calculations
Recalculation Automatic
earth pressure Selecting Automatic leaves the values of the lateral earth pressure ra-
coefficients tios that are calculated by the Culmann (c, phi, delta) method as they
are.
Manual
In order to review or modify the lateral earth pressure ratios calculated
by the Culmann (c, phi, delta) method, select Manual and click Editor.
This will open the Fictive Earth Pressure Coefficients window, where
the values can be viewed and modified (section 5.2.1.1).
Start Click Start to perform the analysis (using the stated sheet piling length).
The calculation progress is displayed in the Calculation Progress win-
dow (section 5.2.1.2).
Coefficients of Select the construction stage for which the earth pressure ratios are
construction stage to be modified.
Recalculation Click this button to restore the original Culmann values.
Select side to The vertical position along the sheet piling for which the earth pres-
show coefficients sure coefficients have been calculated.
Level The vertical position along the sheet piling.
Ka, Ko, Kp The active, neutral and passive earth pressure coefficient values,
which can be modified.
Deltares 99 of 416
D-S HEET P ILING, User Manual
A report can now be generated (section 6.2). If errors are found in the input data, any calcula-
tion can be performed and the Error Messages window opens in which more details about the
error(s) are given. Those errors must be corrected first before performing a new calculation.
For more explanations about the possible errors and how to solve them, refer to section 5.5.
If the sheet pile wall is found to be unstable then the calculation process is stopped and the
following warning message appears: Calculation finished: Sheet piling becomes unstable.
The sheet piling is considered to be unstable if 100% of the mobilized resistance or if the dis-
placement reaches 25% of the sheet piling length. The stage at which the instability occurred
is also indicated in the Calculation Progress window.
Figure 5.5: Start Calculation window, Design Sheet Piling Length tab
Construction Select the construction stage for which a stability analysis is to be used
stage in order to determine the minimum length for the sheet piling.
Pile length From Enter the range of pile lengths over which the analysis should be per-
/ Down to / formed, and the Decrement in length for each analysis step.
Decrement
If the option Verification (EC7/CUR) has been selected in the Model window (section 4.1.1),
four types of design can be performed as shown in Figure 5.6:
Representative Select this option to perform a standard design calculation using the
representative input values. This calculation is equivalent to the stan-
dard design calculation performed in Figure 5.5.
EC7 General Select this option to perform a design calculation according to the Eu-
rocode 7 design code using the partial factors prescribed in Eurocode
7 Part 1: General rules (NEN-EN, March 2005).
EC7 NL Select this option to perform a design calculation according to the Eu-
rocode 7 with the recommendations and partial factors prescribed in
the Dutch annex NEN-EN 1997-1/NB and the complementary standard
NEN 9097-1.
EC7 B Select this option to perform a design calculation according to the Eu-
rocode 7 with the recommendations and partial factors prescribed in
the Belgian annex NBN EN 1997-1 ANB.
CUR Select this option to perform a design calculation according to the
CUR 166 Dutch design code (CUR, 2005).
Design ap- Select the corresponding design approach for which the design calcu-
proach lation will be performed. See chapter 35 for more information.
Figure 5.8: Start Calculation window, Design Sheet Piling Length tab - Output
the mobilized resistance, defined as the actual total passive soil reaction divided by the
The analysis stops if the sheet piling becomes unstable. Instability is defined as reaching
100% of the mobilized resistance, or as the maximum displacement exceeding 25% of the
sheet piling length.
5.2.2.3 Design Sheet Piling Length acc. to CUR and Eurocode 7 (NL Annex)
The Dutch Annex of the Eurocode 7 (NEN, september 2009) prescribes the same design
procedure as the CUR design procedure, except that the default partial factors are different.
If CUR or EC7 NL is selected (Figure 5.9) then D-S HEET P ILING will apply step 6.3 of the CUR
design procedure (section 34.2) using the partial factors of either CUR or EC7 NL. These
factors can either be applied to the selected stage only (method B), or also to all preceding
stages (method A) (section 34.3.1).
Figure 5.9: Start Calculation window, Design Sheet Piling Length tab EC7 NL / CUR
Partial factor set Choose the required Partial factor set for:
The safety class (Class I, II or III) of the CUR step-by-step design pro-
cedure (chapter 34).
The class (RC 1, 2 or 3) of the procedure prescribed in the Dutch An-
nex of Eurocode 7;
For both D-S HEET P ILING assumes that low representative values have
been entered for cohesion and friction, and the modulus of subgrade
reaction (section 4.3.2). D-S HEET P ILING will divide the input cohesion
and the angle of internal friction by class-dependent partial safety fac-
tors. D-S HEET P ILING will also divide the low representative value of the
modulus of subgrade reaction by 1.3.
Partial factors Select this option to apply partial factors to all stages (method A) (sec-
(design values) tion 34.3.1). All stages are therefore calculated using design values.
on all stages The functioning of method A is schematized in the second column of
(method A) Table 5.8.
Partial factors Select this option to apply partial factors on the selected stage only
(design values) (method B), which means that the selected stage is calculated using
in selected stage design values whereas the previous stages are calculated using rep-
only (method B) resentative values (section 34.3.1). The functioning of method B is
schematized in Table 5.8.
Table 5.8: Schematization of the calculation methods A and B according to EC7-NL and
CUR in case of 4 stages
(1)
Design values (d) in the stage to be controlled, characteristic values (char)
in previous stage(s)
Figure 5.10: Start Calculation window, Design Sheet Piling Length EC7 B
Set Select the corresponding set for which the design calculation will be performed.
(section 5.2.3.3) Verification acc. to Eurocode 7 with Belgian Annex NBN EN 1997-
1 ANB;
To start the verification, click Start. After analysis is complete, the results can be viewed by
opening the Report window from the Results menu (section 6.2.2).
Figure 5.11: Start Calculation window, Verify Sheet Piling tab EC7 General
Design Select the design approach according to Eurocode 7 for which the ver-
approach ification will be performed. See chapter 35 for more information.
Check stability Select this check-box to perform an overall stability calculation using
for all stages modified values for soil properties (cohesion, friction angle and unit
weight) depending on the Design approach chosen for all stages.
5.2.3.2 Verify Sheet Piling acc. to CUR and Eurocode 7 (NL Annex)
The Dutch Annex of the Eurocode 7 (NEN, september 2009) prescribes the same design
procedure as the CUR design procedure, except that the default partial factors are different.
If CUR or EC7 NL is selected, two different methods according to the CUR 166 design proce-
dure can be selected:
If method A (Partial factors (design values) in all stages) is selected, D-S HEET P ILING
applies partial factors (corresponding to the inputted set) in all stages. All stages are
therefore calculated using design values. The functioning of method A is schematized
in the second column of Table 5.11.
If method B (Partial factors (design values) in verified stage only ) is selected, D-S HEET P ILING
applies partial factors (corresponding to the inputted set) only in the selected final
stage(s), and all previous stages have the Representative set applied. The selected
stage is calculated using design values whereas the previous stages are calculated
using representative values. The functioning of method B is schematized in Table 5.11.
Table 5.11: Schematization of the calculation methods A and B according to EC7-NL and
CUR in case of 4 stages
(1)
Design values (d) in the stage to be controlled, characteristic values (char)
in previous stage(s)
If the Partial factors (design values) in all stages (method A) method is selected, the following
window is displayed (Figure 5.12).
Figure 5.12: Start Calculation window, Verify Sheet Piling tab for EC7 NL and CUR meth-
ods with Partial factors in all stages (method A)
Partial factor set Change the Partial factor set to the relevant class:
Safety class I, II or III according to CUR 166 inputted in the Default
Partial Factors window (section 4.1.2);
RC 1, 2 or 3 according to the Dutch Annex of Eurocode 7.
D-S HEET P ILING uses the partial factors set to modify the input soil
properties (cohesion, friction and modulus of subgrade reaction)
and levels during all stages.
Anchor stiffness Enter a multiplication factor for the anchor stiffness. This factor is
multiplication factor used in Step 9.1 of the verification (see below), for all stages. The
in all stages default value is 1.
Check stability Select this check-box to perform an overall stability calculation us-
for all stages ing:
modified values for cohesion, friction angle and driving moment for
CUR
modified values for cohesion, friction angle and unit weight for
EC7 NL
depending on the Partial factor set chosen for all stages.
If the Partial factors (design values) in all stages (method B) method is selected, the following
window is displayed Figure 5.13.
Figure 5.13: Start Calculation window, Verify Sheet Piling tab for EC7 NL and CUR meth-
ods with Partial factors in verified stage only (method B)
Stage List of the stages as defined in the Stages Manager window (sec-
tion 4.6.1).
Verify Select the Stage for which verification is to be performed by marking
the relevant check-box(es). Leaving the check-box unselected means
that this stage will not be verified.
Partial factor set Change the Partial factor set to the relevant class:
Safety class I, II or III according to CUR 166 inputted in the Default
Partial Factors window (section 4.1.2);
RC 1, 2 or 3 according to the Dutch Annex of Eurocode 7.
D-S HEET P ILING uses the partial factors set to modify the input soil prop-
erties (cohesion, friction and modulus of subgrade reaction) and levels
during all stages.
Anchor stiffness Enter a multiplication factor for the anchor stiffness for the different
multiplication stages. This factor is used in Step 9.1 of the verification (see below).
factor The default value is 1.
Check stability Select this check-box to perform an overall stability calculation using:
for all verified modified values for cohesion, friction angle and driving moment for
stages CUR
modified values for cohesion, friction angle and unit weight for EC7 NL
depending on the Partial factor set chosen for all stages.
Verification consists of the execution of six steps of the CUR 166 design procedure:
Step 6.1 and step 6.3 determine the design moment and the shear force in the sheet
piling at the Ultimate Limit using a low design value design value for the modulus of
subgrade reaction (k / k ). For step 6.1, the water and surface levels at the passive
side are increased whereas for step 6.3 they are lowered.
Step 6.2 and step 6.4 determine the design moment and the shear force in the sheet
piling at the Ultimate Limit State using a high design value for the modulus of subgrade
reaction (k 2.25). For step 6.2, the water and surface levels at the passive side are
increased whereas for step 6.4 they are lowered.
Step 6.5 determines the design value for deformation at the Serviceability Limit State.
Step 9.1 determines the design value for the anchor force at the Ultimate Limit by in-
creasing the anchor stiffness using the multiplication factor specified in the input window
(see above).
During all steps, D-S HEET P ILING assumes that low representative values have been entered
for cohesion and friction, as well as for the modulus of subgrade reaction (see section 4.3.2).
The modified values of the soil properties and levels can be found in the verification report
(see section 6.2.2).
Figure 5.14: Start Calculation window, Verify Sheet Piling tab - EC7 B
Check stability Select this check-box to perform an overall stability calculation using
for all stages modified values for soil properties (cohesion, friction angle and unit
weight).
Partial factors If this method is selected, D-S HEET P ILING applies the partial safety fac-
(design values) tors in all stages. This is the design method prescribed in the Eu-
in all stages rocode 7.
(method A)
Partial factors If this method is selected, D-S HEET P ILING applies the safety partial fac-
(design values) tors only in the verified stage and all previous stages used characteris-
in verified stage tic (i.e. representative) values. This is the design method prescribed in
only (method B) paragraph 4.4.2 of the Flemish norm "Standaardbestek 260" (SB260,
2012) used for the projects executed for the Flemish government. The
functioning of this method is schematized in Table 5.15.
Table 5.15: Schematization of the calculation method according to table 21-4-9 of SB 260
Construction Select the stage for which the anchor force is to be verified.
stage
Start Click this button to perform the verification (section 5.2.4.1).
Draw Results Click this button to open the Allowable Anchor Force Results Diagram
window and view the slip surface and key data (section 5.2.4.2).
Kranz (Kranz, 1953) has derived formulas for a short anchorage; this means that the passive
slip surface from the sheet piling and the active slip surface from the anchor wall intersect. This
intersection leads to a reduced capacity of the soil resistance against the anchor force. For
a long anchorage, there is no intersection of the two slip surfaces and therefore no reduction
of soil resistance capacity. The applicability of the method for a long anchorage is limited to
anchor walls where the distance from the soil surface to the toe of the anchor wall is smaller
than approximately twice the height of the anchor wall. Grout anchors are always considered
as short anchorage. For background information, see Allowable Anchor Force in chapter 31.
Grout anchors are always considered as short anchorage. For background information, see
Allowable Anchor Force in chapter 31.
Figure 5.16: Start Calculation window, Allowable Anchor Force tab showing results
Figure 5.19: Start Calculation window, Overall Stability tab - EC7 General
Design Choose the Eurocode design approach. D-S HEET P ILING will modify the
approach soil parameters (cohesion, friction angle and unit weight) depending on
the Design Approach chosen.
Partial factor set Choose the class (RC 1, 2 or 3). D-S HEET P ILING will modify the soil
parameters (cohesion, friction angle and unit weight) depending on the
Partial factor set chosen.
Partial factor set Choose the CUR 166 safety class (Class I, II or III). D-S HEET P ILING will
modify the soil parameters (cohesion and friction angle) and the driving
moment according to CUR 166 table 2.7.
After clicking OK, D-S HEET P ILING will use Bishops method (chapter 32) to find the critical slip
circle. The critical slip circle and stability factor are shown schematically in the result window.
Then the Start Batch Calculation window opens where the location of the files must be speci-
fied (Figure 5.25).
Sheet piling:
Maximum number of nodes exceeded!
Maximum number of different kinds of bars exceeded!
Calculation:
Stiffness matrix is not filled properly!
Ratio of stiffness sheet piling / Mod.of subgrade reaction too small!
No passive side found of the sheet piling.
Sheet piling becomes unstable (not converged)
Not converged: Maximum number of iterations exceeded
No convergence
Uplift will occur
Anchor:
Anchor above ground surface Change the anchor properties in the
Anchor window (section 4.5.1).
Cross section for anchor incorrect (= 0)
Length for anchor incorrect (= 0)
Read dumpfile:
Eurocode verification:
Maximum During Eurocode verification, the maximum allowable percentage of
percentage of mobilization (of 100%) is reduced as a partial resistance factor is ap-
mobilization plied (section 4.1.2). However, the instability criterion stays at 100%
exceeded thats why this error message is given.
Initial calculation:
Initial stress-less situation request a continuous surface
Initial stress-less situation request the same soil profiles on both sides
Initial stress-less situation is only possible with C, phi, delta method
Initial stress-less situation : no soil displacements allowed
Initial stress-less situation : no head displacements allowed
Initial stress-less situation : no uniform distributions allowed
Initial stress-less situation : no horizontal loads or moments allowed
All the above error messages refer to the limitations of the calculation option First stage rep-
resents initial situation given in section 5.1.1.
Method Ka , K0 , Kp :
On the left side a surcharge The Ka , K0 , Kp model is limited to uniform loads. In case
load is defined. of surcharge, the c, phi, delta model must be used.
On the right side a surcharge
load is defined.
On the left side the surface is The Ka , K0 , Kp model is limited to horizontal surfaces. In
not horizontal. case of non-horizontal surfaces, the c, phi, delta model
must be used.
On the right side the surface
is not horizontal.
Use of method:
In the next profile(s) the difference between the highest and lowest phi in the layers is more
then 15 degrees.
According to CUR 166 article 4.5.8, a Culmann calculation with straight slip surfaces is not
allowed. Either reduce your phis or try a Ka , K0 , Kp calculation.
In a verification the Ka , K0 and Kp are recalculated with reduced phi and deltas. This
was impossible with the next layer/layers while they have a manual given Ka , K0 and Kp .
The Ka , K0 and Kp are calculated according to Brinch Hansen per material.
General:
The stress in the layer is used in this calculation, therefore a material
should not be used in more than one layer.
The next material(s) occur in more than one layer:
No construction stages defined
Too many construction stages defined Up to 50 stages
can be defined
Level of first soil displacement must coincide with top level of sheet
piling
On the left side, no surface has been selected
Level surface near sheet pile is situated above top sheet piling
Level surface near sheet pile is situated beneath toe sheet piling
More than one normal force defined Only one normal
force per stage is
allowed.
Normal force X is not constant
Normal force must be constant when two levels coincide
At least two soil displacement points required (sheet piling top and
bottom)
Levels of soil displacements are not decreasing
No points defined in surface
X-coordinates surface are not increasing
No soil layers defined
Soil profile X: Levels soil layers must be decreasing,
The soil layer X is not defined
No side defined
Not enough points defined (needs at least two)
X-coordinates of the surcharge load are not increasing
Negative values specified
Negative spring stiffness defined
No sheet piling sections defined
Too many sheet piling sections defined Up to 20 sections
can be defined.
Sheet piling length must be at least 1 m.
Sheet piling length may not be larger than 100 m.
Include minor Select this option to display tabular results for every finite element node
nodes along the sheet piling, as opposed to just the major nodes.
Multiple stage To apply the same result selection for all stages, first use the Multiple
selection stage selection tree view on the right hand side. By clicking Apply to all
stages, this general selection will be applied to the tree view on the left
hand side.
Graphs Clicking Select all and then Apply under Graphs will cause pictures of
the geometry and graphs of the moments, forces and displacements to
be included for all stages.
6.2 Report
On the menu bar, click Results and then choose Report to view the results of the analysis,
in report format with tables and graphs (section 5.2.1). Depending on the type of calculation
performed (section 5.2), the report will contain different results:
Results of a Verify Sheet Piling analysis according to CUR and Eurocode 7 (NL Annex)
(section 6.2.2)
Results of a Verify Sheet Piling analysis according to Eurocode 7 (General and Belgian
annex) (section 6.2.3)
Click the Print active window icon to print the report. Choose the Export Report option
from the File menu to save the report, for example in RTF format.
Anchors and Struts: state and force in the anchors/struts for all relevant stages
(the force is given in the direction of the anchor/strut);
Calculation Errors: possible warnings indicating if instability occur during a stage;
Input Data Left/Right gives an overview of the input for each construction stage:
If the Ka , K0 , Kp method is used for the selected side, the values of the calcu-
lated Earth pressures coefficients Ka , K0 and Kp are given in a table (see
Figure 6.3);
Figure 6.3: Report window, Input Data Left/Right section for Ka , K0 , Kp method
If the c, phi, delta method is used for the selected side, the table of the
Earth pressures coefficients is empty (see "n.a" in Figure 6.4) but an addi-
tional paragraph called Calculated Earth Pressure Coefficients Left/Right is
present: in the table displayed, column "Fictive earth pressure coefficients"
gives the values of the lateral earth pressure ratios calculated by the Cul-
mann (c, phi, delta). These values can also be found in the Fictive Earth
Pressure Coefficients window (section 5.2.1.1). Refer to section 28.2.1 for
background information.
Figure 6.4: Report window, Input Data Left/Right section for Culmann method
Soil Collapse (Figure 6.5) Soil Collapse gives the output of the integrated horizon-
tal forces on the left and right hand sides. D-S HEET P ILING calculates the mobilized
force resistance from the ratio between the actual force and the maximum force
along the passive side. In cases with a single support/anchor/strut, the maximum
moment and the mobilized moment are also calculated, around the location of the
support. On the passive side, D-S HEET P ILING only takes the stress contributions
below that location into account.
Vertical Force Balance (Figure 6.6) gives a rough indication of the upward forces
that result from the friction by soil movement on the active and passive sides. This
method is only useful if the friction is mainly caused by excavation, e.g. not by
normal forces. For background information, refer to chapter 33.
Anchors/Struts (Figure 6.7) gives the force in all anchor and strut.
Figure 6.9: Report window, Settlement by Vibration - Settlement in requested point sec-
tion
The report is largely self-descriptive. Fragments of the result sections are displayed in Fig-
ure 6.2 to Figure 6.9. Click the Print active window icon on the menu bar to print the report.
Choose the Export Report option from the File menu to save the report, for example in RTF
format.
Click on the buttons at the top of the Report window to browse through the report:
Zoom in button
Click this button to enlarge the content of the selected page.
Zoom out button
Click this button to reduce the content of the selected page.
Zoom full page
Click this button to enlarge the page to fit the window.
Zoom page width
Click this button to enlarge the page width to fit the window.
Move to first page
Click this button to go to the first page of the report.
Move to previous page
Click this button to go to the previous page of the report.
Move to next page
Click this button to go to the next page of the report.
6.2.2 Report for a Verify Sheet Piling calculation acc. CUR and EC7 NL
A verification analysis according to CUR 166 or Eurocode 7 (Annex NL) is performed using the
Verify Sheet Piling tab of the Start Calculation window (section 5.2.3).The verification report
contains the same elements as described in the regular analysis report (section 6.2.1), except
for the following sections:
lected stages of the Verify Sheet Piling tab in the Start Calculation window (sec-
tion 5.2.3), for six CUR 166 steps (6.1, 6.2, 6.3, 6.4, 6.5 and 9.1) plus step 6.5
using a multiplication of 1.2 for the displacement, moment and force;
Anchors and Struts: state of anchors and struts for each selected stage and for
the six CUR 166 steps (6.1, 6.2, 6.3, 6.4, 6.5 and 9.1);
Overall Stability per Stage: safety factor for each stage;
Figure 6.10: Report window, Summary section for a CUR or EC7 NL verification
Construction Stages section (for each stage and for the six CUR 166 steps) contain-
ing:
Outline (Picture) shows a diagram of the geometry with layers and supports, in-
cluding geometrical modifications by the selected safety class;
Input Data Left/Right gives an overview of the input for each construction stage,
Refer to section 34.2 for background information on the CUR 166 verification steps. Refer to
section 35.2 for background information on the Dutch Annex of Eurocode 7.
6.2.3 Report for a Verify Sheet Piling calculation acc. EC7 General and EC7 B
A verification analysis according to Eurocode 7-General and Eurocode 7-Belgian is performed
using the Verify Sheet Piling tab of the Start Calculation window (section 5.2.3).The report
for a EC7-General and EC7-B verification contains the same elements as described in the
regular analysis report (section 6.2.1), except for the following sections:
lected stages of the Verify Sheet Piling tab in the Start Calculation window (sec-
tion 5.2.3), for the selected design approach:
for the EC7-General verification: DA 1, DA 2 or DA 3;
for the EC7-Belgian verification: ANB set 1 (i.e. DA 1 set 1) and ANB set 2 (i.e.
DA 1 set 2) plus an extra design approach called Deformation corresponding
to a representative calculation (no partial factors).
Anchors and Struts: state of anchors and struts for each selected stage and for
Construction Stages section (for each stage and for the selected DA) containing:
Outline (Picture) shows a diagram of the geometry with layers and supports, in-
cluding geometrical modifications by the selected design approach;
Input Data Left/Right gives an overview of the input for each construction stage,
including modifications by the partial factors of the selected DA;
Note: For design approaches DA 1 set 1 and DA 2, the maximum values of the bending
moment given in the Summary section of the Report can be different from those given in the
Moment/Force/Displacement Charts window (section 6.3.3) because the bending moment
given in the Report includes the partial factor on the effect of the loads whereas the actual
values in the Moment/Force/Displacement Charts window not.
Click the Previous stage and Next stage icons, , to view the results of the other construc-
tion stages. Click on the Print active window icon to print the displayed graphics.
For the three charts, the grey dotted lines indicate the maximum values obtained from all
stages.
For the Bending Moment chart (left chart of Figure 6.12), the Admiss. elas. design moment
inputted in the Sheet Piling window (section 4.2.1.1) is also drawn as two green dotted vertical
lines (of -300 and 300 kNm in Figure 6.12). In case of a Plastic calculation, the Admiss. plas.
design moment inputted in the Sheet Piling window (section 4.2.1.2) is also drawn as two blue
dotted vertical lines (of -350 and 350 kNm in Figure 6.12).
Click the right hand mouse button, and choose View Data to open the Chart Data window
(Figure 6.13). In this window the data used to generate the charts can be viewed and copied,
for example for use in spreadsheets.
For the three charts (Bending Moments, Shear Forces and Displacement), three types of
datas are available:
Note: The anchor force Fsupport given chart data in the Shear Forces chart of the Mo-
ment/Force/Displacement Charts window is the actual total force in the anchor (normal to the
sheet piling), whilst the shear force illustrated as acting on the sheet pile wall is only the hori-
zontal component of the anchor force. Thus the size of the jump in the shear force diagram
will only be the same as the value given for Fsupport if the anchor is horizontal.
6.3.2 Charts for a Verify Sheet Piling calculation acc. CUR and EC7 NL
A verification analysis according to CUR 166 or Eurocode 7 (Annex NL) is performed using the
Verify Sheet Piling tab of the Start Calculation window (section 5.2.3). The verification graphs
of the bending moments, shear forces and displacements along the sheet piling (Figure 6.14)
are available for the selected stage, for all six CUR 166 verification steps (6.1, 6.2, 6.3, 6.4, 6.5
and 9.1). See also the description for the Moment/Force/Displacement Charts from a regular
analysis (section 6.3.1).
Click the View Verification Step icon to open a diagram of the changes made for the se-
lected verification step. For background information on the CUR 166 verification steps, see
section 34.2.
6.3.3 Charts for a Verify Sheet Piling calculation acc. EC7 General and EC7 B
A verification analysis according to Eurocode 7 (General and Belgian annex) is performed
using the Verify Sheet Piling tab of the Start Calculation window (section 5.2.3). The verifica-
tion graphs of the bending moments, shear forces and displacements along the sheet piling
(Figure 6.15) are available for the selected stage, only for the design approach (DA) selected
in the Verify Sheet Piling tab of the Start Calculation window (section 5.2.3).
the black continuous line is the bending moment calculated for the selected stage,
except for design approaches DA 1 set 1 and DA 2 for which this line corresponds
to the intermediary calculated bending moment without partial factor on the effect
of the loads;
the red dotted line is the maximum (between all stages) calculated bending mo-
ment multiplied by the partial factor on the effect of the loads. For design ap-
proaches DA 1 set 2 and DA 3, the red line is indeed the grey line as any partial
factor applies on the effect of the loads. For design approaches DA 1 set 1 and
DA 2, the red line is the black continuous line multiplied by the partial factor on the
effect of the loads;
the green dotted vertical line is the Admiss. elas. design moment inputted in the
the black continuous line is the shear force calculated for the selected stage;
the black continuous line is the displacement calculated for the selected stage;
See also the description for the Moment/Force/Displacement Charts from a regular analysis
(section 6.3.1).
Note: For design approaches DA 1 set 1 and DA 2, the maximum moment and the maximum
shear force given in the Moment/Force/Displacement Charts window are less than those given
in the Summary section of the Report window while they should be equal. The reason for this
is that the Moment/Force/Displacement Charts window shows the intermediary calculated
moments and forces before multiplying them with the partial factor on the effect of the loads
(1.35 as default) whereas the Summary section of the Report window shows the final design
moments and forces.
Click the right hand mouse button, and choose View Data to open the Chart Data window
(Figure 6.16). In this window the data used to generate the charts can be viewed and copied,
for example for use in spreadsheets chart data.
For the three charts (Bending Moments, Shear Forces and Displacement), three types of
datas are available:
the Water Pressure graph represents the water pressure (including the user-defined
additional pore pressure) acting on the sheet pile wall at both sides;
the Effective Stress graph represents the horizontal effective stress acting on the sheet
pile wall at both sides;
the difference between the horizontal total stress at the active and passive sides).
The total stress is the sum of the effective stress and the water pressure.
the red line represents the resulting effective stress acting on the sheet pile wall
(i.e. the difference between the horizontal effective stress at the active and passive
sides).
Click the Previous stage and Next stage buttons, , to view the results of the other con-
struction stages.
Click the Print active window button to print the displayed graphics.Click the right hand
mouse button, and choose View Data to open the Chart Data window (Figure 6.18). In this
window the data used to generate the charts can be viewed and copied, for example for use
in spreadsheets chart data.
Water Pressure The water pressure (including the user-defined additional pore pres-
Left sure) acting on the left side of the sheet pile wall.
Water Pressure The water pressure (including the user-defined additional pore pres-
Right sure) acting on the right side of the sheet pile wall.
Resulting Stress The resulting total stress (i.e. sum of the effective stress and the water
pressure) acting on the sheet pile wall (i.e. the difference between the
horizontal total stress at the active and passive sides):
0 0
resulting = active + Pw;active passive + Pw;passive
Effective Stress The horizontal effective stress acting on the left side of the sheet pile
Left wall.
Effective Stress The horizontal effective stress acting on the right side of the sheet pile
Right wall.
Click the Effective Stress icon to view the horizontal effective stress acting on the
sheet pile wall at both sides.
Click the Water pressure icon to view the water pressure (including the user-defined
additional pore pressure) acting on the sheet pile wall at both sides.
Click the Resulting stress icon to view the resulting total stress (i.e. sum of the effec-
tive stress and the water pressure) acting on the sheet pile wall (i.e. the difference
between the horizontal total stress at the active and passive sides):
0 0
resulting = active + Pw;active passive + Pw;passive .
Click the Previous stage and Next stage icons, , to view the results of the other construc-
tion stages. Click the Print active window icon to print the displayed graphics.
The blue line corresponds to the settlements due to sheet pile volume;
The red line corresponds to the settlements due to densification;
The black line corresponds to the total settlement (sum of settlements due to sheet pile
volume and due to densification).
For background information about the determination of the settlements due to vibration, refer
to chapter 39.
Click the Active slide planes icon to view the slides planes in each point along the
sheet pile wall at the left and right sides, used to calculate the active earth pres-
sure coefficients, as given in the Fictive Earth Pressure Coefficients window (sec-
tion 5.2.1.1).
Click the Passive slide planes icon to view the slides planes in each point along
the sheet pile wall at the left and right sides, used to calculate the passive earth
pressure coefficients, as given in the Fictive Earth Pressure Coefficients window
(section 5.2.1.1).
Click the Previous stage and Next stage icons, , to view the results of the other construc-
tion stages. Click the Print active window icon to print the displayed graphics.
to evaluate the settlements due to vibratory installation and removal of sheet piles (sec-
tion 7.1);
to evaluate the feasibility of a project by comparison with prior experiences. Two expe-
rience sources are available in the Feasibility module:
In order to check the feasibility of sheet pile driving, the NVAF (Nederlandse
in 2002 at Deltares together with contractors and an engineering firm, which aims
to develop a prediction model for the feasibility of different types of geotechnical
engineering works. The details of hundreds of projects involving the driving of
sheet pilings were received for study. The Feasibility module gives access for
the user to those experiences, as explained in section 7.2.2, section 7.3 and sec-
tion 7.4.
Note: When using the Feasibility module, the aim is not to judge the feasibility of the project
as input into D-S HEET P ILING but only to provide the user with experiences on practical feasi-
bility. The user retains the final responsibility for the project.
The calculated settlements will be displayed in the Settlement by Vibration Charts window
(section 6.6) and in the Report (Figure 6.8) at the surface level. To know the settlements at
particular points (within the soil profile), enter their positions in the Positions Vibration Settle-
ment window (Figure 7.1). The calculated settlements at those particular points will be display
in the Report, in section Settlement in request point (Figure 6.9).
The calculation of the settlement by vibration is started from the Feasibility menu by selecting
the option Settlement by Vibration Calculation (Figure 7.2).
The settlements are calculated for the active side/right side of the sheet pile and first (initial)
step. Ground level is the level next to the sheet pile wall.
Settlement results are shown in the Settlement by vibration Charts window, available from the
Results menu (section 6.6) and in the Report (Figure 6.9).
Figure 7.4:
textitE-Consult Sheet Pile Installation window, Show NVAF lines option
In the Experience lines NVAF option, different lines can be selected from a drop down menu,
as shown in Figure 7.5.
A distinction is made between High Frequency (HF ) and Low Frequency (LF ) vibrations for
the sheet pile driving. For both vibration frequencies, general charts (ending with the number
5, 10, 15 or 20, for example HF 15) and charts for the most important cities of the Netherlands
(for example HF Rotterdam) are available. The final number of the general charts corresponds
to the average cone resistance of the soil in MPa. For example, <LF 10> means sheet pilings
driven using low frequency vibrations in a soil having an average cone resistance of 10 MPa.
In the graph Resisting moment vs. Sheet Pile length, the current sheet pile input is indicated
by a blue point section 4.2.1. According to Figure 7.4, it is an <AZ 13> sheet piling profile
with a resisting moment of 1300 cm3 /m and a length of 16 m. If this point lies below the
NVAF-lines, successful pile driving is guaranteed for the selected sheet piling profile. If the
point lies above the NVAF-lines (which is the case in Figure 7.4), damage could occur during
pile driving. In the latter case, the sheet piling properties need to be changed either by de-
creasing the sheet pile length, or by increasing the resisting moment. New calculations must
be performed with this new profile to verify the sheet piling stability.
For a detailed description on the use of the Feasibility module with NVAF experience lines,
see the Experience data tutorial example chapter 19 or (Harderwijk and NVAF/PSW, 2002).
Figure 7.6: E-consult Sheet Pile Installation window, Show Experiences option
In the Region option, different regions from the Netherlands, Belgium and Germany can be
selected from a drop-down menu, as shown in Figure 7.7.
To get the most relevant information about each project, move the cursor over the project. To
view all of the information, click on the project and read the following information at the right
In Figure 7.6 it can be seen that the blue circle and black box denoting D-S HEET P ILING and
manual input respectively lie within the general area for which experience has been obtained.
This is an indication that the installation has a fairly common combination of sheet pile length
and resisting moment, although if there are a lot of Poor experiences near to an input this
could be an indication that the combination is likely to experience problems on installation.
CPT The name of the imported CPT (section 4.3.4). No CPT imported is
indicated by n.a.
Resisting The Resisting moment of the sheet piling inputted in the Sheet Piling
moment window (section 4.2.1).
Sheet piling The length of the sheet piling inputted in the Sheet Piling window (sec-
length tion 4.2.1).
Water level to Ground water level with respect to ground surface of the first stage (a
surface negative value indicates ground water is under ground surface).
Click this button to first modify the other data before performing a pre-
diction. When clicking this button, the user is directed through the dif-
ferent items of a menu bar. If the user does not know the answer to a
question, default values are used (section 7.3.1).
Click this button to predict directly, without changing the default values
for other data. When clicking this button, the user is directly directed to
the Result menu (section 7.3.5) if all required information are correct.
If not, the user is directed through the different items of a menu bar
(section 7.3.1) to fill in the missing required information.
This button is available only if a CPT was previously imported in the
Soil Profiles window (section 4.3.4).
Select Search for CPT to import a GEF-CPT file from the DINO
database (Data and Information of the Subsurface of The Nether-
lands). The search is made using a map. Refer to (DINO) for more
information on the DINO database.
Figure 7.12: GeoBrain Prediction window, Installation menu for the three methods of driv-
ing (Vibrate, Drive and Pressing)
The Prediction Report window opens (Figure 19.15) with the default Internet Explorer pro-
gram. Using the appropriate icon on the menu bar, this prediction report can either be printed
and/or saved as a PDF document.
Figure 7.17: GeoBrain Experiences window, Type of similarity between the soil profile of
the GeoBrain database and the soil profile of the D-S HEET P ILING project
Click the Back button to return to the main search window (Figure 7.16).
Page: Select a specific page by clicking on the appropriate page number. The
current page displayed is indicated by an arrow below the page
number.
Click the Next button to go to the next page.
Profile The soil profile of the project.
Project The name of the project. Click on the name to access detailed informa-
tion as shown in Figure 7.19.
Sheet pile The sheet pile profile and length.
Equipment The drive method (Vibrate, Drive or Pressing) and the correspond-
ing type of machine (Vibratory hammer, Pile hammer or Pressing ma-
chine).
Result The quality of the project result.
Refine query Refine the search by clicking the appropriate requirement, see below
for a detailed description.
Clicking on the name of the project, give access to more detailed information on the selected
project as shown in Figure 7.19. In the window displayed, all sort information on Situation,
Geotechnics, Sheet piling, Installation, Surroundings and Experiences are available by click-
ing the corresponding name on the menu bar at the top. Click on Back to return to the projects
list (Figure 7.18) and inspect other projects.
Figure 7.19: GeoBrain Experiences window, Detailed information on the selected project
Using the Refine query table at the right side of the window (Figure 7.18), it is possible to
refine the search by clicking the appropriate requirement displayed in green. In parenthesis is
the number of projects of the GeoBrain database that meet this requirement.
The available requirements concern the quality of the result, the project location, some sheet
pile installation settings and some undesirable occurrences as listed below:
Using the Refine Query table, it is also possible to change requirements by clicking the arrow
behind the requirement, as shown in Figure 7.20 (a) for Length and Resisting moment. This
will result in an enlargement of the search results as shown in Figure 7.20 (b) allowing the
user to change the requirements.
(a) (b)
Figure 7.21: GeoBrain Experiences window, Search on Sheet Piling GeoBrain Experi-
ences window, Search on CPT
Current CPT file The name of the CPT file providing the soil profile of the project. Three
options are available to get a CPT file:
Select Upload CPT to import a GEF-CPT file by clicking the Browse
button;
Select Search for CPT to import a GEF-CPT file from the DINO
database (Data and Information of the Subsurface of The Netherlands).
The search is made using a map. Refer to (DINO) for more information
on the DINO database.
Select Default CPT to select a GEF-CPT file from a drop-down list
containing default CPT for the main Dutch cities.
CPT similarity Select from the drop-down menu a type of similarity between the soil
profile of the GeoBrain database and the soil profile of the current
project.
Click this button to start the search. The GeoBrain Experiences win-
dow displays a list of projects arranged alphabetically, with the same
features as a Search on Sheet Piling. So refer to (section 7.3) for a
detailed description.
Figure 7.22: GeoBrain Experiences window, Search on Location View the total per area
Click this button to display a map view including cities, street and
motorway names and representation.
Click this button to display a satellite view.
Click this button to display a combination of the Map and Satellite
views.
Zoom in:
Click this button to enlarge the map.
Zoom out:
Click this button to reduce the map.
Pan:
Click this button to move the map by dragging the mouse.
Click this button to return to the main search window (Fig-
ure 7.16).
Zooming out (Figure 7.22) will display the results as pie (i.e. total experiences per area)
whereas zooming in (Figure 7.23) will display the results as separate points (i.e. individual
experiences).
In case of results display as pie, click on the pie (Figure 7.24, left) to get the name of the
corresponding province and the number of projects. Click on the Click here link to display
a detailed list of those projects. Refer to section 4.5 for a detailed description of the resulting
list.In case of results display as individual points, drag the hand cursor on a point (Figure 7.24,
left) to get the name of the corresponding experience and click on the point to display more
details on this experience. Refer to section 4.5 for a detailed description of the resulting list.
To learn the steps needed to enter the project geometry and properties.
To calculate and display the bending moments, shear forces and deflection of the wall,
as well as stresses in the soil, using earth pressure coefficients (Ka , K0 , Kp ).
GL=0
-2.0
CLAY
-4.0
-6.00 PEAT
CLAY
CLAY
AZ 13
-13.0
SAND
-16.0
8.2 Project
In the Project menu, the project model and project properties are described.
8.2.1 Model
To create a new project, follow the steps described below:
1. Start D-S HEET P ILING from the Windows task bar (Start/Programs/Deltares Systems/DSheetPiling).
2. If the D-S HEET P ILING installation is based on floating licenses then the Module window
may appear at this point. If this is the case then ensure that the modules mentioned in the
introduction of each tutorial have been selected. Click OK to close the window.
3. Click File and choose New on the D-S HEET P ILING menu bar to start a new project. This
will result in a screen similar to Figure 8.2.
7. Deselect the option Check vertical balance as a vertical balance check is not part of this
exercise.
8. Deselect the option Verification (EC7/CUR) as a CUR or EuroCode design check is not
part of this exercise.
9. Click OK and proceed to the definition of the sheet piling.
10. A message may appear stating that for all stages the method used is set to Ka , K0 , Kp .
Click Yes to continue.
See Project Model (section 4.1.1) for a detailed description of this window.
11. On the menu bar, click Project and then choose Properties to open the Project Properties
window Figure 8.4.
12. Fill in <Tutorial 1 for D-S HEET P ILING > and <Excavation using Ka, Ko and Kp> for Title
1 and Title 2 respectively in the Identification tab. The settings of the other tabs of the
Project Properties window are set to their default values.
See Project Properties window (section 4.1.3) for a detailed description of this window.
8.3 Construction
This menu deals with the input of the retaining structure. In this example the sheet piling data
needs to be specified.
13. Click Construction on the menu bar and choose Sheet Piling or click on the Sheet piling
button on the icon bar.
14. In the input window displayed (Figure 8.6), enter the top and toe level of the sheet piling. In
this case, the top level (Sheet piling top level) is at 0.0 m and the bottom (Section bottom
level) at -16 m.
15. The bending stiffness can be entered manually, or imported from the library that is inte-
grated in D-S HEET P ILING. To use the library, click the . . . button.
16. In the Sheet Piling Profiles Library window (Figure 8.5), select Arcelor profile <AZ 13>
and in the Select maximum moment sub-window, select <S240> which means steel
with a yield stress of 240 N/mm2 . This will give a sheet piling with a bending stiffness
of 41370 kNm2 /m and a maximum allowable moment in elastic behavior of 312 kNm/m.
17. Use the Select button to return to the Sheet Piling menu. The sheet properties of the
selected sheet pile type will be displayed in the window.
18. Click OK to close the Sheet Piling window. The next stage is to define the ground surface
positions.
Note: The default acting width is 1.0 m. This allows for easy interpretation of output results
as the acting width is a multiplication factor for the sheet piling stiffness and all loads, supports
and reaction forces except the normal forces. Normal forces are always inputted per acting
width of the construction. For more information on normal forces, see section 4.4.5. The
acting width needs only be changed in the case of a combined wall consisting of sections with
different acting widths. For more detail, please refer to section 4.2.1.
8.4 Soil
In the menu item Soil the soil surfaces, properties and soil profile can be specified. Water
levels, pore pressures additional to those caused by the water level, and water properties are
also defined here.
8.4.1 Surfaces
After defining the sheet piling, the ground surfaces must be defined. In D-S HEET P ILING, this
is done by first specifying different surface levels and then specifying which surface levels are
active on the left and right hand side of the excavation.
In this project, two horizontal surfaces need to be defined. The ground level surface (named
<GL>) at 0 m, and the surface for the excavation level at -7 m. After defining these surfaces,
the <GL> surface needs to be active on the right hand side and the <GL-7> excavation
level on the left hand side.
Define surfaces
Choose Soil and then Surfaces to display an input window in which the following should be
done:
19. Rename the first surface <GL>. Enter <0.00> m for the vertical Level. As the surface is
horizontal, the distance parameter may be ignored.
20. Click Add to add a surface with the name <GL-7> and enter <-7.00> m for its vertical
level, as indicated in Figure 8.7.
Note: D-S HEET P ILING displays an overview of the surfaces defined in the lower box of the
Stage Composer sub-window (if Surface left or Surface right has been selected), as indicated
in Figure 8.8. See also activate surfaces in the next section.
Activate surfaces
Which surfaces should be applied on the left and right hand sides of the sheet piling may now
be selected. This selection is made using the Stage Composer located at the left hand side
of the main window for D-S HEET P ILING.
22. Click Surface left and select the surface with description, <GL-7>.
23. Click Surface right and select the surface with description, <GL>.
Notice that on activating the surfaces, the Input Diagram changes to the actual situation. The
Input Diagram now indicates the excavation level, as shown in Figure 8.9.
See Surfaces (section 4.3.1) for a detailed description of the Surfaces window.
Figure 8.9: Input Diagram with excavation level applied on the left hand side
For D-S HEET P ILING, material properties are divided into three groups:
General properties
Earth pressure coefficients
Modulus of subgrade reaction
General properties
24. To enter the layer properties, click Soil and then choose Materials on the menu bar to
display the input window shown in Figure 8.10.
Note: When the unsaturated unit weight of a soil layer is not relevant because it is always
below the water table, any value entered in the Unsaturated total unit weight box will not be
used.
Note: Input of the internal friction angle is not required when the earth pressure coefficients
are entered manually. Input of cohesion is always required, see section 29.1 for more detail.
27. Select Mller-Breslau (straight slip surfaces) to automatically generate earth pressure co-
efficients according to the Mller-Breslau method.Selecting either Mller-Breslau or Ktter
enables input of the Friction angle phi, the Delta friction angle, the Overconsolidation ratio
and the Grain type.
28. Enter <17> for Friction angle phi and <11> for Delta friction angle, as indicated in Fig-
ure 8.12.
29. Leave the Shell factor, the Overconsolidation ratio (OCR) and the Grain type to their default
values.
Note: The Mller-Breslau method of determining earth pressure coefficients is based upon
straight slip surfaces. This method has limitations, as described in the NEN 6740, art. 12.4.2
(NEN, 2006) and CUR 166 (CUR, 2005). Generally the Mller-Breslau method is used when
the soils friction angle is equal or less than 30 . The Ktter method is generally used for
larger friction angles. For more information see section 28.2.2 and section 28.2.3. The method
selected also has an impact on the way the delta friction angle is determined. Suggestions for
correlations between the friction angle and the delta friction angle can be found in Table 29.1.
30. Click the Curve Settings button in the Soil Materials window, the window shown in Fig-
ure 8.13 appears.
31. Select Tangent (D-S HEET P ILING Classic) to enter the modulus of subgrade reaction manu-
ally.
32. Make sure the check-box Use unloading/reloading curve is not marked. Marking this
check-box is only necessary when using an elasto-plastic model which follows a differ-
ent branch of the curve for unloading than for reloading. This example just uses a simple
elastic model.
33. Select <1> in the Number of curves for spring characteristics box. When entering the
moduli of subgrade reaction manually, the user defines the number of curves for spring
characteristics, which is the number of branches (with a different inclination) that will be
used in the multi-linear relationship between horizontal soil stress and displacement. This
number can vary from 1 to 4. In this simple example, only one branch is used.
34. Click OK to close the Curve Settings window.
35. Enter the values of the Modulus of subgrade reaction for the only branch selected (Fig-
ure 8.14). According to Table 8.1 in the case description, this value is k1 = 2000 kN/m3
(virgin loading) for both the top and the bottom of the layer.
Figure 8.14: Soil Materials window, Modulus of subgrade reaction Tangent (D-Sheet Pil-
ing Classic)
36. Repeat this process for the two other soil materials by adding two additional materials,
<Peat> and <Sand>, and entering the soil properties from Table 8.1in the same way as
for the clay layer (Figure 8.15). Please note that for sake of simplicity, the properties of the
second clay layer are identical to the properties of the first layer. In this case the properties
only need to be entered once. Note that for friction angles larger than 30 degrees it is
advised to use the Ktter method to determine the values for Ka , K0 and Kp . Hence,
select this method for the sand layer in this example.
37. Click OK to confirm the input data for the layer properties.
See section 4.3.2 for a detailed description of this window. The next stage is to enter the
profile of layer positions.
After entering the soil profile, the Input Diagram window should appear as indicated in Fig-
ure 8.17.
Figure 8.17: Input Diagram window confirming the entered soil profile
Note: The bottom level of the layer is not entered: D-S HEET P ILING assumes the lowest layer
to extend to the bottom of the sheet piling.
After entering the water level, the Input Diagram window should appear as indicated in Fig-
ure 8.19.
8.6 Stages
The excavation of the soil on the right hand side of the sheet pile wall is the only stage
considered in this tutorial, so no further input is required.
8.7 Calculation
45. Accept the default Coarse as this model does not contain any loads or slopes close to the
sheet piling (see the Note below).
46. Click OK to close this window.
Note: In D-S HEET P ILING the earth pressure coefficients are calculated at certain nodes along
the wall. The Coarse method only calculates the values of the earth pressure coefficients at
major nodes. The Fine method calculates the values at the minor nodes as well (five times
more). Therefore, calculation with the Fine method takes significantly longer. It should be
noted that the results may differ slightly according to the method employed. These differences
occur mostly at slopes or loads close to the sheet piling. In these cases the Fine method is
recommended, in other cases faster calculations can be made with the Coarse method. For
more information, see section 5.2.1.
47. To start calculation, select Calculation from the menu and then choose Start or press the
function key F9.
Figure 8.21: Start Calculation window, Standard tab to perform a standard calculation
48. In the Standard tab displayed (Figure 8.21), click Start to calculate the results. D-S HEET P ILING
opens the Save As window if the project has not already been saved to disk.
49. Specify a project name, <Tutorial-1> for example (this name will be referred to in other
tutorial examples). During the analysis, a Calculation Progress window appears (Fig-
ure 8.22).
50. Click Close once the analysis has been completed. The results can now be displayed
using the Result menu.
8.8 Results
As expected, the maximum displacement is at the top of the sheet pile wall. Shear forces
and moments are nil at the top and the bottom of the sheet piling as the displacement is not
constrained here. The magnitude of the maximum moment in the sheet pile wall is around
160 kNm, which is less than this sections maximum moment for elastic behavior, so the wall
will not fail in bending. The sections maximum moment for elastic behavior for AZ 13 profile is
312 kNm as shown under Mmax;el (for the yield strength) in the Sheet Piling Profiles Library
window (Figure 8.5).
Note: When the magnitude of the moment is more than the maximum allowable moment for
elastic behavior, the moment chart is represented in red line, which is not the case for this
tutorial (see Tutorial 3, section 10.6.1 for an example).
Note: The chart data can be viewed and then copied by clicking the right-hand mouse button
in the Moment/Force/Displacement Charts window and select View Data. The table of data is
then displayed as shown in Figure 8.24.
The discontinuities in the effective stress distribution coincide with the junction of two layers,
as the properties of each layer are different.
This effective stress distribution is the same as the third chart of Figure 8.25, but it is displayed
on top of the Input Diagram. To view the water pressure and resulting stress click on the Mode
icons to the left of the diagram. Maximum values are displayed at the bottom of the window.
More results and information are available in a report. How to choose and view the content of
a report is described in the next tutorial (chapter 9).
8.9 Conclusion
Various input windows are used to enter the details of a project that is to be modeled and
analyzed. Once these details have been input, they can be used to calculate a range of
results, including bending moments, shear forces and displacement in the sheet pile wall and
the effective soil stresses. One way to view these results is to display them graphically on the
screen.
This tutorial is presented in the file Tutorial-2.shi and uses the CPT-GEF file Tutorial-2 CPT 01.gef.
2.0 2.0
GL=0.0
-1.5
-2.0
-7.0
-16.0
1. Open the first tutorial by clicking Open in the File menu and selecting the appropriately
named tutorial, i.e. <Tutorial-1.shi>.
2. Save the project with a new name by clicking Save As in the File menu and by entering
<Tutorial-2> as project name.
3. On the menu bar, click Project and then choose Properties to open the Project Properties
window.
4. Fill in <Tutorial 2 for D-S HEET P ILING > and <Excavation using c, phi and delta> for Title
1 and Title 2 respectively in the Identification tab.
5. Click Project on the menu bar and then choose Model.
6. Select the c, phi, delta model (Figure 9.3).
7. Mark the Check vertical balance check-box to perform this check along with the standard
calculations.
8. Unmark the Verification (EC7/CUR) check-box as a design code verification is not part of
this exercise.
9. Click OK to apply these changes. A window will appear asking for confirmation of this
change; select Yes to continue, using the c, phi, delta model.
12. Click the Import from file button. In the Open window displays, select the CPT-GEF file
named <Tutorial-2 CPT 01.gef> from the Project/Tutorials directory where the program
was installed (Figure 9.5).
The CPTip window opens (Figure 9.6) where the CPT results (cone resistance, friction and
friction ratio) are displayed. At the right of the window, D-S HEET P ILING automatically interprets
the imported CPT into a soil profile, based on the interpretation rule that is selected by the
user in the Rule selection box.
13. Select <NEN (Stress Dependent)> as CPT interpretation Rule and leave the Minimum
layer thickness to its default value <0.50 m>.
14. Click OK to go back to the Soil Profiles window (Figure 9.7) which now contains a new
profile named CPT 01 corresponding to the CPT.
Figure 9.7: Soil Profiles window after importation of the CPT 01 file
15. Select the previously manually added profile named <New Profile> and click the Delete
button to delete it as it is not used anymore.
16. Click OK to see the effect in the Input Diagram window.
17. Use the Zoom buttons in the Edit panel to enlarge the limits of the diagram and see the
different layers of the new soil profile imported from CPT (Figure 9.8).
Figure 9.8: Input Diagram window with new soil profile from CPT
18. Open the Soil Materials window from the Soil menu and note that below the previously in-
putted soil materials (Clay, Peat and Sand), 11 new soil materials have been automatically
created and their general parameters filled in (Figure 9.9).
Figure 9.9: Soil Materials window using the c, phi, delta model
Note: When using the c, phi, delta model, the earth pressure coefficients are implicitly calcu-
lated by D-S HEET P ILING using Culmanns method. Therefore the sub-window Earth pressure
coefficients of the Soil Materials window disappears (compared to the previous tutorial) as
can be seen in Figure 9.9.
The three secant moduli of subgrade reaction are also automatically filled for those 11 materi-
als; however the current modulus is the Tangent modulus with only one slope. Therefore, the
Secant option first needs to be activated.
19. Delete the Clay, Peat and Sand materials by selecting them and clicking the Delete button,
as they are not used anymore.
20. Click the Curve Settings button.
21. In the Curve Settings window, select the Secant option (Figure 4.33).
22. Click OK to see the effect in the Soil Materials window (Figure 9.11).
23. Click OK to close the window.
Figure 9.11: Soil Materials window with Secant moduli of subgrade reaction
Note: The Secant definition is based on the stress-displacement diagram according to CUR
166. This diagram always uses three branches, with intersections at 50, 80 and 100% of
Ka Kp . The slope of the different branches is defined indirectly, via the three secant moduli
at the intersection points.
24. Choose Soil and Surfaces to display an input window in which the surface on the right
hand side of the sheet pile wall can be changed.
25. Select the first surface, named <GL>.
26. Fill in the values that are listed in the table of Figure 9.12 below.
27. Click OK to see the result of this change to the form of the surface named <GL> in the
Input Diagram window (Figure 9.13).
28. Open the Sheet Piling window from the Construction menu or click on the Sheet piling
button on the icon bar.
29. In the Vertical balance sub-window, enter the maximum point resistance, Maximum Point
resistance (Pr;max;point), as <6.330 MPa>, and a Xi factor of <1.39> as prescribed in
Table A.10a of NEN-EN 9997-1:2006 (NEN, 2012). Additional information may be found in
section 4.2.1. Note that some other parameters have appeared in the Sheet Piling window,
as indicated in Figure 9.14. As the sheet pile type was selected from the library, these have
been added automatically. For a user-defined sheet pile the values of these parameters
would need to be input at this stage.
30. Click OK to close the window.
Note: The maximum point resistance Pr;max;point value used here is actually the maximum pile
tip resistance as defined in the Dutch design code NEN-EN 9997-1:2006 (NEN, 2012). It is
derived from a combination of cone resistances. For more information see also (chapter 33).
The program D-Foundations (formerly known as MFoundation) for the design of bearing piles
based on CPT has been used to determine this value and leads to 6329.716 kPa.
Figure 9.14: Sheet Piling window showing additional parameters for the vertical balance
check
9.6 Calculation
The forces, moments and displacements for this project will need to be recalculated as the
input has been changed.
31. Select Calculation from the menu bar and then choose Start or press the function key F9.
32. Click Start to start the calculation. Earth pressure coefficient recalculation is left as Auto-
matic since manual modification is only required in exceptional situations where the user
wishes to specify earth pressure coefficients individually (section 38.1.2).
33. The Calculation Progress window indicates that the Calculation is finished but there are
errors or warnings (see summary in report) (Figure 9.16). Those warnings are detailed in
the Report window, see section 9.7.3.
Note: If the c, phi, delta model is not selected then D-S HEET P ILING cannot perform the
calculation and an error message will be displayed. If this occurs, simply change the model in
the Model window to c, phi, delta and start the calculation again.
9.7 Results
It can be seen that part of the moment chart (red line) exceeds the maximum allowable mo-
ment (dotted green line) of 312 kNm. That means the selected sheet piling section must be
changed to avoid failing in bending. By selecting an AZ 19 profile, the maximum moment for
elastic behavior is raised to 466 kNm.
36. In the Sheet Piling window, click the . . . button to open the Sheet Piling Profiles Library
window.
37. In the Sheet Piling Profiles Library window, select Arcelor profile <AZ 19> and in the
Select maximum moment sub-window.
38. Use the Select button to return to the Sheet Piling menu.
39. Click OK to confirm.
40. Perform a new calculation and check that the magnitude of the maximum calculated mo-
ment (449.2 kNm) is now less than the maximum allowable moment (Figure 9.18).
These results can also be found in the report, so long as the appropriate content has been
selected in the Report Selection window.
41. Click Results and then Report Selection to open the Report Selection window.
42. Click on the Select All button at the bottom of the window to get a detailed report.
43. Click OK to generate a report with the selected content.
9.7.3 Report
The total report contains full details of the input, a results overview, and graphical and tabular
results.
44. To view the report with the selected content, click Results on the menu bar and select
Report. Results can be found by looking in this report, or they can be displayed visually,
as described in section 8.8.
45. In the Summary section of the Report, the warning message given in the Calculation
Progress is explained (Figure 9.20): there is a large difference between the friction angles
of the different layer of the profile.
46. Click File and choose Print Preview Report to preview the report as it will be printed. In
the Print Preview window, click File and choose Save As to export the report to Rich Text
Format (RTF) files. Files of this type can be used for further editing with a text editor.
To check if the vertical force balance criteria have been met, ensure the Vertical force balance
option has been selected in the tree view of the Report Selection window, opened from the
Results menu. Then display the report by clicking on Results and then Report. Results are
given for unplugged and plugged cases in the latter the soil in the concave parts of the sheet
piling cross-section is considered as contributing to the cross-sectional area of the base of the
sheet pile. Therefore looking at the results of the unplugged case is more conservative. It can
be seen (Figure 9.21) that the sum of the vertical forces (7.09 kN) is much less than the
vertical force capacity of the soil at the toe of the sheet pile wall (61.94 kN unplugged and
1439.03 kN plugged). The report writes explicitly that the Resultant goes up which means
that the vertical toe capacity is sufficient.
Figure 9.21: Report window showing vertical force balance check results
Note: If the vertical force capacity is not sufficient then modifications to the soil friction
direction can be made, as described in chapter 33.
9.8 Conclusion
This tutorial shows that the c, phi, delta method is generally preferable because it includes
the influence of soil weight and gives a more detailed representation of the soil strength. This
tutorial has also shown how to input the necessary parameters for, and access the results of,
a vertical force balance check.
Staged calculations are necessary because the sheet piling must be stable in all phases dur-
ing construction, and because the construction sequence influences the results of subsequent
stages.
To analyze the construction of a sheet pile wall using more than one stage and to check
that the sheet piling is stable in all phases of construction.
To apply an anchor.
To lower the water level on one side of the sheet pile wall.
25.0
GL=0
-2.0 2.0
CLAY
-4.0
-6.0 PEAT
CLAY
AZ 13
-13.0
SAND
-16.0
Figure 10.1: Final situation after excavation, installation of an anchor and lowering of the
water level (tutorial 3)
Stage 1 (Initial stage), the soil surfaces on the left and the right hand sides of the sheet
pile wall are at -2 m and 0 m respectively, and the water level is at -2 m.
Stage 2 (Apply anchor), a row of anchors is installed with one anchor every 3 m, on the
right hand side at -1.5 m. The properties of the anchors are laid out in Table 10.1, along
with their conversion to values per running meter.
Stage 3 (Excavate and lower water table), the soil on the left hand side is excavated to
-7 m and the water level on that side is also lowered to -7 m.
pre-stress 80 kN/m'
-2.0
stage 1 stage 2
-7.0
stage 3
10.2 Surfaces
To model the staged excavation, one more surface level needs to be input for the left side of
the sheet pile wall.
1. First, open the input file that was saved earlier under the name <Tutorial-1.shi>, and save
it with the name <Tutorial-3>.
2. On the menu bar, click Project and then choose Properties to open the Project Properties
window.
3. Fill in <Tutorial 3 for D-Sheet Piling> and <Staged excavation with pre-stressed anchors>
for Title 1 and Title 2 respectively in the Identification tab.
4. Open the Surfaces window from the Soil menu.
5. Click the Insert button.
6. Change the name of this new surface into <GL-2> and enter the level as -2 m.
10.4 Anchors
The anchor that will be applied in the third stage needs to be entered.
When adding or inserting a construction stage, a copy is made of the current stage. This
implies that three equal stages are now present.
15. Click the Overview option in the Stages menu or click on the Stage overview button on
the icon bar. The window displayed enables assembly of the construction stages from the
building blocks that have been defined.
16. Select the Water levels and Surfaces as shown in Figure 10.7.
17. Select the anchor in the last two stages.
18. Enter a pre-stress force of 80 kN/m after selecting the <Anchor> in the Pre-tensioning
forces sub-window.
Note: Anchors should normally be applied as a separate stage. When anchors are combined
with other loads, such as a change in excavation level, or change in water level the stiffness
is active prior to applying the loads.
Note: Anchor pre-stress forces need only be entered for the first stage that they are applied.
For the first stage where an anchor is added, the anchor is modeled as a force applied to the
wall, with no associated stiffness. For subsequent stages D-S HEET P ILING models the anchor
as a spring.
Note: The excavation and the lowering of the water table are implemented by changing the
water level and the surface, not by changing the soil profile.
19. Click Start in the Calculation menu to open the Start Calculation window or press the
function key F9.
20. Click Start to perform the calculation. The message Calculation finished in the Calculation
Progress window indicates that the sheet piling is stable in all stages. If the wall was
unstable in any stage then a message would indicate so at this point.
For example, in the second stage the applied anchor pre-stress force can be seen to be 80 kN
as expected, as indicated in Figure 10.8. In the final stage it can be seen that the anchor force
has risen to about 147 kN, as indicated in Figure 10.9.
Moreover, in the final stage, part of the moment chart (red line) exceeds the maximum al-
lowable moment (dotted green line) of 312 kNm, as shown in Figure 10.9. That means the
selected sheet piling section must be changed to avoid failing in bending. By selecting an
AZ 13 profile with a yield stress of 270 N/mm2 (section S270) instead of 240 N/mm2 (current
S240 section), the maximum moment for elastic behavior is raised to 351 kNm.
22. In the Sheet Piling window, click the button to open the Sheet Piling Profiles Library
window.
23. In the Select maximum moment sub-window, select <S270> which means steel with a
yield stress of 270 N/mm2 This will give a maximum allowable moment in elastic behavior
of 351 kNm/m.
24. Perform a new calculation and check that the magnitude of the maximum moment (346.0 kNm)
is now less than this sections maximum moment for elastic behavior which means the wall
will not fail in bending (Figure 10.10).
Figure 10.10: Moment/Force/Displacement Charts window for the third stage with a new
sheet piling profile
Note: Changing the maximum moment section of the sheet piling has any effect on the
calculated bending moments as the stiffness is unchanged. Only the maximum allowable
moment (dotted green lines) will be shifted making the calculated moment acceptable.
10.6.2 Report
25. The Summary section of the Report window (Figure 10.11) shows that the anchor is elastic
in both stages.
10.7 Conclusion
This third tutorial example analyzes the construction of a sheet pile wall using more than one
stage and checks that the wall is stable in all phases of construction. It also shows how to
apply a pre-stressed anchor and lower the water level on one side of the wall. However, in
the final stage, the maximum moment exceeded the maximum moment for elastic behavior.
Therefore, the sheet piling section has been changed to avoid failure in bending.
To learn how loads, such as surcharges and horizontal line loads, are modeled in
D-S HEET P ILING;
To note that when a surcharge load is applied, only the c, phi, delta method can be
used.
25.0
2.0
2.0 kN/m2
GL=0
50 kN/m
-2.0 2.0
CLAY
anchor level -1.5m -4.0
-6.0 PEAT
CLAY
AZ 13
-13.0
SAND
-16.0
Figure 11.1: Surcharge load and horizontal line load in the last stage (tutorial 4)
1. Open the input file <Tutorial-3.shi>, and save it with a new name: <Tutorial-4>.
2. On the menu bar, click Project and then choose Properties to open the Project Properties
window.
3. Fill in <Tutorial 4 for D-Sheet Piling> and <Applying loads> for Title 1 and Title 2 respec-
tively in the Identification tab.
4. In the Project menu select Model and select c, phi, delta soil parameters.
5. Click Loads in the menu bar and then choose Surcharge Loads.
6. In the input window displayed, define a load with the name <Traffic load>, working from
a distance <0 m> to a distance <2 m> from the sheet pile wall, with a magnitude of
<20 kN/m2 >.
7. Click OK to confirm the input.
Note: Surcharge loads which have the same value throughout and continue to a very long
distance from the wall can be modeled using the Uniform Loads option. See section 4.4.1 for
more information.
8. Click Loads in the menu bar and then choose Horizontal Line Loads.
9. In the input window displayed, define a load with the name <Mooring force>, acting at a
level of 0 m and with a magnitude of -50 kN/m.
11. Open the Stages Manager and select the last stage.
12. Click the Add button to add a stage, that is copied from the selected stage and change the
name to <Loads applied>.
13. Open the Stages Overview window and select <Traffic load> acting on the right hand
side and <Mooring force> in the last stage. Apply all other levels, supports and so on as
in the fourth stage.
Figure 11.4: Stages Overview window showing input for the fourth stage
14. Click OK to see the representation of the traffic load and the mooring force in the fourth
stage of the Input Diagram window (Figure 11.5).
15. Select Calculation from the menu and then choose Start or press the function key F9.
16. In the Start Calculation window, click Start to perform the calculation.
17. Close the Calculation Progress window when finished.
Note: If the c, phi, delta model is not selected then D-S HEET P ILING cannot perform the
calculation and an error message will be displayed. If this occurs, simply change the model in
the Model window to c, phi, delta and start the calculation again.
11.4 Results
18. Open the Moment/Force/Displacement Charts window from the Results menu for a graph-
ical overview of the effect of applying the loads in the final stage.
It can be seen that the displacement at the top is around zero, while the maximum displace-
ments are around 100 mm, the magnitude of the bending moments is slightly reduced, the
shear force has increased and the anchor force is now around 190 kN/m.
Figure 11.6: Moment/Force/Displacement Charts window showing the effect the applied
loads
11.5 Conclusion
This tutorial shows how to input a surcharge load and a horizontal line load. When a surcharge
load is applied, only the c, phi, delta - model (Culmann) can be used.
To use D-S HEET P ILING to find the shortest sheet piling length for which the design is still
stable.
GL=0
-2.0
CLAY
-4.0
-6.00 PEAT
CLAY
CLAY
AZ 13
-13.0
SAND
-16.0
4. Click Start in the Calculation menu or press the function key F9 to open the Start Calcula-
tion window.
Figure 12.2: Start Calculation window, Design Sheet Pile Length tab
7. Click Start to start the calculation. The following results will be displayed:
Figure 12.3: Start Calculation window, Design Sheet Piling Length tab, design calculation
results
The calculation can be repeated for shorter decrements, over a smaller range, for further
optimization. Once the length is optimized a calculation needs to be performed using the
optimized length. This will provide the additional output information.
It can be seen that the maximum mobilized resistance (section 5.2.2) is around 63% and
therefore the design is indeed stable. Moreover, the maximum moment (158.7 kN) is less that
the maximum allowable moment for elastic behavior (312 kNm for the actual wall section).
Note: D-S HEET P ILING defines instability as occurring when either 100% of the resistance has
been mobilized or when the maximum displacement exceeds 25% of the sheet piling length.
For more information, see section 5.2.2.
12.3 Conclusion
D-S HEET P ILING can be used to analyze a range of sheet piling lengths to determine the short-
est length for which the wall will still be stable. This length can then be input by the user if
desired.
To model the effect of a concrete floor positioned below the natural water level.
15.0
-4.0
-4.5
CLAY
-10.0
PU 6
CONCRETE -11.0
SAND
-16.0
Stage 4: De-watering of the pit by reducing the water level to -11 m and construction of
1 m of concrete on the bottom.
-6.0
-6
-11.0
Stage 2 Stage 3
-11.0
Stage 4
B A Water pressure
Secondly, the effect of the tension piles underneath the floor, preventing the floor from uplift in
the final stage needs modeling. The difference in water level heights on each side of the wall
results in an up thrust acting on the base of the concrete floor. This up thrust is countered
by the pull of the floors tension piles. Note that the weight of the concrete is not taken into
account as it is assumed to be born by the piles and therefore will not act on the soil layers
directly below the concrete. In this example, the water level is at -4.5 m on the right hand side,
and at -11 m on the left hand side, i.e. touching the bottom of the impermeable concrete floor.
Therefore the magnitude of this load that needs to be applied is (11 - 4.5) 10 = 65 kN/m2 .
For background information on this topic, see section 38.3.
E 20 106
K= = = 1 106 kN/m3 (13.1)
b/2 40/2
The unit weight of the concrete is not zero, but it is modeled here as almost zero because it is
assumed that the floors weight is transmitted to the support piles and therefore does not act
on the soil directly below the floor. Phi and delta are modeled as zero to better represent the
homogeneous, as opposed to granular, nature of concrete when compared to soil. The value
for the cohesion is taken as half the compressive strength of the concrete, so that with Kp = 1
the passive stress is equal to the concretes compressive stress see Equation 29.2.
11. Open the Layers window from the Soil menu, and select Tangent modulus of subgrade
reaction, with 1 curve for spring characteristics in the window opened by clicking on the
Curve Settings button.
12. For concrete select Manual to input the Earth pressure coefficients. The behavior of con-
crete is well modeled using, use Ka = K0 = 0 and Kp = 1, provided the cohesion has
been defined as described above.
13. For the other soil materials select Ktter (curved slip surfaces) for automatic calculation of
the earth pressure coefficients using Ktters method (the Mller-Breslau method should
not be used because the sands have high friction angles; for the clay either method could
be used, using Ktter for all layers has been chosen for consistency). When using the
Culmann method, the input of the earth pressure coefficients will be ignored, but these
coefficients are needed for when the Ka , K0 , Kp method is selected, as will be the case for
the left hand side once the concrete is in place. Then define the sands, clay and concrete
as described in Table 13.1.
14. Open the Soil Profiles window from the Soils menu and define two soil profiles. Input the
soil profiles left and right as indicated in Figure 13.5 and Figure 13.6.
Figure 13.6: Soil Profiles window, Soil profile with concrete on the left side and additional
pore pressures
Note: The sum of the weight of the concrete floor and the forces of the piles connected to
the floor equals the excess pore water pressure: there must be equilibrium at the base of the
floor.
13.3.6 Anchors
The anchor that will be applied in the third stage needs to be entered.
26. Open the Stages Manager window from the Stages menu.
27. Define four stages with the names <Excavation to -6m>, <Anchor on right side>, <Excavate
to -11> and <Dewatering left side>.
28. Click the Overview option in the Stages menu or click on the Stage overview button on
the icon bar.
29. For all stages the c, , method is selected except for stage 4, where the Ka , K0 , Kp method
is used on the side of the concrete i.e. on the left side.
30. Select the Water levels, Surfaces and Soil profiles as shown in Figure 13.10.
31. Select the anchor from stages 2. For stage 2, enter a pre-stress force of <200 kN/m2 >
after selecting pre-stressed anchor check-box in the Pre-tensioning forces sub-window.
32. Select the Uniform load <Forces from piles> for the final stage.
33. Click OK to see the effect in the last stage of the Input Diagram window (Figure 13.11).
35. After calculation is complete, open the Stress State Charts window from the Results menu.
The Resulting Stress chart for stage 4 (Figure 13.12) shows that the concrete layer exer-
cises a compressive shear force on the sheet piling in this stage.
36. In addition, by clicking the right-hand mouse button, the View Data window shows that the
pore water pressure below the level of the floor is the same on both sides of the sheet pile
wall, as expected (i.e. 65 kN/m2 ).
Figure 13.12: Stress State Charts window showing compression caused by the concrete
floor
the black line represents the resulting total stress acting on the sheet pile wall (i.e. the
difference between the horizontal total stress at the active and passive sides). The total
stress is the sum of the effective stress and the water pressure.
the red line represents the resulting effective stress acting on the sheet pile wall (i.e.
the difference between the horizontal effective stress at the active and passive sides).
37. Open the Moment/Force/Displacement Charts window from the Results menu. The Bend-
ing Moment chart for stage 4 (Figure 13.13) shows that the maximum allowable moment
is not reached which means no failure by bending.
13.6 Conclusion
Concrete floors that are below the natural water table can be modeled as a soil layer with
relevant properties. The effects caused by the absence of water above the impermeable floor
are modeled by a uniform load acting on the floor, and a water table with additional pore
pressures below the floor.
It should be noted that in this tutorial the anchor is applied under water, which is not very
realistic. It would me more appropriate to first lower the water table to a level that allows
for construction of the anchor. In that case, modeling the water pressures in the sand and
clay layers would need extra attention. As the short term behavior of the clay layer can be
assumed impermeable this needs similar attention as for the modeling of the concrete floor.
To select the modulus of subgrade reaction from Table 3.3 of the CUR 166 design code.
To design the sheet piling length according to the CUR 166 design code by performing a
standard verification of the sheet piling stability for different lengths, using partial factors
and level variations for all stages.
The CUR 166 design procedure distinguishes three safety classes, corresponding to three
different reliability indices . In this tutorial, the selected safety class is class II, which corre-
sponds to considerable damage in the case of overall failure and minor personal safety risks,
and has a reliability index = 3.4.
The design of the sheet pile wall with a single anchor is performed by determining the mini-
mum length of the sheet piling using a stability analysis. For different lengths, D-S HEET P ILING
checks that the mobilized resistance does not reach 100% and that the maximum displace-
ment does not exceed 25% of the sheet pile length. During each analysis with a given sheet
pile length, five combinations (referred as steps 6.1, 6.2, 6.3, 6.4 and 6.5) of modified soil
properties, surface levels and water levels are checked. See section 34.2 for a description of
those five combinations and the design values used, as well as the other steps supported by
D-S HEET P ILING.
The CUR 166 procedure allows application of partial factors and level variations:
Method A is more conservative (section 34.3.1). User-defined partial factors and level changes
can also be applied, once they have been defined in the User Defined Partial Factors window
(section 4.1.2).
Note: When performing a CUR verification for Safety Class III a partial factor of 1.25 also
needs to be applied to unfavorable uniform loads (see section 34.2). For all other cases the
partial factor is 1.00. As D-S HEET P ILING cannot tell which loads are favorable and which are
unfavorable, the user themselves needs to specify the partial factor to be applied to each
uniform load in the Uniform Loads window (section 4.4.1).
14.2 Model
First modify the method for the determination of the earth pressure coefficients.
1. Open the input file <Tutorial-3.shi>, and save it with name <Tutorial-7a>.
2. On the menu bar, click Project and then choose Properties to open the Project Properties
window.
3. Fill in <Tutorial 7 for D-S HEET P ILING > and <Design code checking acc. CUR 166> for
Title 1 and Title 2 respectively in the Identification tab.
4. Open the Model window from the Project menu, and select the C, phi, delta soil parameters
model and the Verification (EC7/CUR) option.
5. Click OK to confirm this choice.
Note: The Verification sub-window in the Surcharge Loads window is only available if the
Verification (EC7/CUR) option in the Model window was marked.
15. In the Stages Manager window add a new stage named <Apply load>.
16. Click OK.
17. Open the Stages Overview window and select <Temporary load> acting on the right side
for stage 4. Apply in stage 4 the same levels, supports and so on as in stage 3 as shown
in Figure 14.5.
18. Click OK.
19. Open the Sheet Piling window from the Construction menu.
20. Select an Arcelor <AZ 17> profile from the library, with a <S430> section.
The default values prescribed by CUR 166 (CUR, 2005) are written at the left of each input
area of the User Defined Partial Factors window. If modified, the value appears in red color.
14.7 Determine the minimum length (Steps 5 and 6 of the CUR 166 design procedure)
The following steps determine the minimum sheet pile length according to the CUR 166 design
procedure. All stages are checked implicitly for method A, with level variations and partial
factors applied for all stages.
Figure 14.7: Start Calculation window, Design Sheet Piling Length tab
23. Select Start from the Calculation menu or press the function key F9.
24. In the Start Calculation window, select the Design Sheet Piling Length tab.
25. Select the CUR design code.
26. Select the last Construction stage <4: Apply load>, to check all stages up to and including
the final stage.
27. Select the Partial factor set (safety class) <Class II>.
28. Select Partial factors (design values) in all stages (method A).
29. Specify checks for the Pile Length ranging From <20 m> Down to <12 m> with a Decre-
ment of <1 m>.
30. Click the Start button.
The results (Figure 14.8) show that for a length of 13 m the sheet piling becomes unstable as
the mobilized resistance reaches 100%. Therefore, the minimum length is 14 m.
Figure 14.8: Start Calculation window, Design Sheet Piling Length tab: Results from 20 m
down to 12 m
Note: D-S HEET P ILING assumes input of low representative values for soil strength and stiff-
ness when applying partial factors section 34.1.
31. Check that the last stage is indeed the most critical by repeating the above steps, selecting
each of the other stages. Note that the sheet piling does indeed become unstable in the
final stage earlier than in the others.
To get a more accurate result of when the piling becomes unstable or when the anchor yields,
the Pile length inputs at the top of the window must be adapted.
32. Select the final stage as this is the most critical, enter a pile length From <14 m> Down
to <13 m> with a Decrement of <0.25 m> and click Start again.
Figure 14.9: Start Calculation window, Design Sheet Piling Length tab: Results from 14 m
down to 13 m
The results (Figure 14.9) show that the minimum stable length is 13.75 m. It seems acceptable
to reduce the sheet piling length from 16 m to 14 m, whilst still leaving a good safety margin.
See section 5.2.2 for more details on designing sheet piling lengths.
14.8 Verify the modified sheet piling length according to CUR 166 design
procedure, method A
The sheet piling design calculation just performed (section 14.7) does not provide a lot of
results about the moments, shear forces and displacements of the wall, or about which com-
bination between steps 6.1 to 6.5 gives the most unfavorable results. It does not check all
combinations required according to CUR 166. To get all of this information, a Verify Sheet
Piling calculation must be performed for the modified length of 14 m.
33. Open the Sheet Piling window from the Construction menu.
34. Change the Section bottom level from <-16 m> to <-14 m>.
35. Click OK to confirm.
In the Summary section at the beginning of the Report, it can be seen that the results for step
6.3 are the same as those of Figure 14.9 for a sheet pile length of 14 m. (The Design Sheet
Piling Length option only checks for step 6.3 as it is intended as a rough guide rather than
a full verification.) In other words, the maximum moment is -704.90 kNm and the maximum
mobilized resistance is 87.5%. As the maximum displacement is given only for step 6.5 in the
Summary section, no direct comparison is possible with the value of -182.3 mm found from
Figure 14.9. The displacements diagram must be used.
In the window displayed (Figure 14.12), note that the maximum displacement occurs when
selecting the last construction stage and <Step 6.3> at the top of the window. The maximum
displacement is equal to -182.3 mm, the value obtained from the Design Sheet Piling Length
in Figure 14.9 for a sheet pile length of 14 m.Also note that the moment doesnt exceed the
maximum allowable moment (dotted green line) of 716 kNm.
45. Click the View Verification Step icon at the top of the window to open a diagram of the
changes made for the verification step 6.3 (Figure 14.13).
According to the default level variations for class II given in Figure 14.6, step 6.3 includes the
following geometry changes:
For background information on the CUR 166 verification steps, see section 34.2.
46. In the Report window, use the Move to next page and Move to previous page buttons,
to see the Overall Stability results for stage 4 (Figure 14.14).
The overall stability for the verified stage is estimated using the Bishop method with circular
slip planes. See chapter 32 for background information. As the stability factor is more than 1
for all stages, the wall will be stable according to the Bishop method.
Figure 14.14: Report window, Overall Stability for the final stage
Note: The Overall Stability can also be determined using the Overall Stability tab of the Start
Calculation window by selecting the appropriate safety class and stage.
The verification report also contains the modified values of the soil parameters and levels.
See section 6.2.2 and section 6.3.2 for more details on the verification report and charts.
14.9 Verify the modified sheet piling length according to CUR 166 design
procedure, method B
In the previous paragraph, a Method A design according to the CUR 166 procedure was
performed, which means that partial factors and level variations were applied to all stages.
To perform a Method B design, these partial factors need to be applied only to the most
unfavorable stage.
Figure 14.15: Start Calculation window, Verify Sheet Piling tab (Tutorial-7b)
See section 5.2.3 for more details on verify sheet piling calculations.
Note: Method B applies partial factors and level changes only to the final stage. Therefore,
theoretically, every stage must be verified as the final stage, using the appropriate safety
class. The stages to be verified as a final stage are selected in the Verify Sheet Piling tab of
the Start Calculation window. To perform a complete method B verification for a construction
with n stages involves n! calculations. For this tutorial it has been decided to only check the
final stage. Anything cant be concluded about the performance of the previous construction
stages. Refer to section 34.3.1 for more information about the differences between method A
and method B.
Table 14.2: Comparison of methods A and B for the maximum values in stage 4
Applying partial factors on the representative input values in all stages will give different results
to when applying them only in one of the stages. The CUR 166 design procedure allows both
methods. Applying partial factors to the final stage only (method B) can result in a more
economical design, but requires verification of each stage as the final stage.
14.11 Conclusion
The Design Sheet Piling Length option allows the minimum stable length for the sheet piling
to be found, using a global check according to CUR 166. After inputting this new length, a
complete verification can be performed with the Verify Sheet Piling option giving more final
results. CUR Method A (Tutorial-7a) applies the same partial factor set to all construction
stages whereas CUR Method B (Tutorial-7b). In this tutorial, the maximum allowable moment
for elastic behavior is reached; the sheet piling profile should therefore be changed to avoid
failure in bending.
25.0
GL=0
-2.0 2.0
CLAY
-4.0
-6.0 PEAT
CLAY
AZ 13
-13.0
SAND
-16.0
1. Open the input file <Tutorial-3.shi>, and save it with a new name: <Tutorial-8>.
According to the results (Figure 15.2), the actual representative anchor force is 135 kN
whereas the allowable anchor force is 196 kN. Therefore, the anchor wall is stable.
Note: The Actual anchor force CUR is not available because no verification calculation
according to CUR was previously performed.
There are different ways to increase the allowable anchor force in case of unstable anchors:
inclining the anchor downwards, increasing the sheet piling length, increasing the anchor
length, or lowering the application point of the anchor. To decrease the actual anchor force,
the anchor properties must be modified, or the spacing between anchors can be reduced
this will correspond to an increase in the cross sectional area per running meter (/m).
10. Click the Draw Results button. The window displayed (Figure 15.3) shows the active and
passive slip surfaces on the anchor wall.
For more details on the passive and active anchor wall pressures calculation, see chapter 31.
15.3 Conclusion
D-S HEET P ILING can calculate the allowable force in an anchor making it possible for the user
to compare this value to the actual force in the anchor. To increase the allowable anchor force
the sheet piling length can be increased, the anchor can be inclined, it can be made longer or
it can be applied lower down the wall.
To enter a combined pile and sheet piling wall using D-S HEET P ILINGs combined wall
wizard.
To make the necessary correction to the modulus of subgrade reaction to compensate
for arching of the piles below the depth of the sheet piling.
GL=0
-1.0
CLAY HZ775C-12+PU12
-5.0
SAND
SAND
HZ775C-12
-10.0
The center-to-center distance between the piles is 2.33 m. The King pile is an H-profile, by
Arbed, type HZ775C-12, has a diameter of 0.53 m, a wall thickness of 10 mm and a flexural
stiffness of 843759 kNm2 . The sheet piling between each pair of piles consist of three sheet
piling sections, type PU 12, each part having a width a 0.6 m and a flexural stiffness of
45360 kNm2 /m. The length of the piles is 10 m and the length of the sheet piling is 5 m.
Plan view
sheet piling
(EI=45360 kNm2/m)
2,33m
RL 0m
clay
RL -5m
clay/2
0,6m RL -6m
5m
sand
RL -10m
One section of the combined wall, consisting of one pile and three sheet-piling parts, will be
considered for calculation purposes. Output of discrete moments and forces is required for
this section. The calculation of the action width and the flexural stiffness per running meter
can be performed conveniently, by using the combined wall wizard (section 4.2.2).
The amount of soil that will react if pile displacement occurs is usually larger than the pile width
as a result of arching. Therefore the soil properties along the lower part of the combined wall
must be modified, using a shell factor s of 2 for clay and 2.5 for sand. These values are
obtained from tests or calculations. For more information, see section 38.1.2. A shell factor of
1 is applied for soils in contact with the sheet piling as the sheet piling prevents arching from
taking place.
5. Open the Sheet Piling window from the Construction menu or click on the Sheet piling
button on the icon bar.
6. Click on the Combined Wall. . . button.
7. In the window displayed, select the appropriate pile and sheet pile types that will be used
in the wall by clicking the button: for the Piles, select the <HZ775C-12> type with
section S240 and for the Sheet pile select the <PU 12> type. The Name and the Stiffness
EI are automatically filled in. Enter the Number of sheet piles between each pair of piles
as 3. For the other values, see Figure 16.3 below or refer to Figure 16.2.
As a result, the acting width, flexural stiffness and bottom levels of the combined wall are au-
tomatically calculated by D-S HEET P ILING in the Sheet Piling window, as shown in Figure 16.4
below.
16.4 Soil
The following steps permit the definition of the soil materials, surfaces, profiles and water
levels for this tutorial:
9. Open the Surfaces window from the Soil menu and define two surfaces with names <Left>
and <Right> with levels 0 m and -5 m respectively.
10. Open the Soil Materials window from the Soil menu, and define the soils using the param-
eters given in Table 16.1, using the Mller-Breslau (straight slip surfaces) method for an
automatic calculation of the Earth pressure coefficients by D-S HEET P ILING. Select Tangent
with <1> as the Number of curves for spring characteristics in the Curve Settings window
to allow input of the modulus of subgrade reaction as given in Table 16.1.
11. Open the Profiles window from the Soil menu and define the soil profile shown in Fig-
ure 16.1, with the top levels of <Clay>, <Deep Clay> and <Sand> at 0 m, -5 m and
-6 m respectively.
12. Open the Water Levels window of the Soil menu, and define a water level named <WL>
at -1 m.
13. Open the Stages Overview window of the Stages menu to define the left and right surfaces.
14. In the Start Calculation window, click OK to calculate the results.
16.5 Results
The calculation results can be found in the report.
15. Start the calculation by selecting Start in the Calculation menu and clicking OK. When the
calculation is complete close the Calculation Progress window.
16. In the Results menu, click Report.
In the Input Data section of the report, the input data can be found. The stiffness EI of the
upper and lower sections is given in kNm2 in the column Corrected stiffness EI. This value
corresponds to the stiffness per running meter calculated in section 16.3, multiplied by the
acting width:
In the Modulus of Subgrade Reaction paragraph of the report (Figure 16.7), note that the
values of the moduli of subgrade reaction correspond to the user-defined values (Figure 16.5)
multiplied by the shell factor:
The resulting moments and forces apply to one full section of the wall, consisting of one pile
and three sheet-piling parts. The maximum moment acting on the upper 5 m can be seen
by opening the Moment/Force/Displacement Charts from the Results menu and right clicking
over the moment graph to select the Chart Data. Scrolling down to a Depth of 5 m shows
that the maximum moment in this part is around 120 kNm at the level of -5 m. The maximum
moment acting on the lower 5 m is around 216 kNm. The pile therefore has to be able to resist
216 kNm. If the maximum is reached in the upper part, it is common practice to assume that
this maximum moment acts on the pile only. The dimensioning of the sheet piling is usually
based on the transmission of moments in the horizontal direction, and is therefore outside
the scope of this example. In this tutorial, the maximum allowable moment for the pile only is
2184 kNm (according to Figure 16.3). Therefore, this maximum is not reached.
16.6 Conclusion
The combined wall wizard is a useful tool for inputting a combined wall: it converts the con-
stituent parts into the correct D-S HEET P ILING model. Moduli of subgrade reaction need to be
modified for the soil materials where only the piles are present, to compensate for arching.
To calculate and input the additional pore pressure distribution in order to model the
total pore pressures caused by the water flow under the toe of the sheet piling.
To analyze the effect of these pressures on the sheet pile wall.
5.0m
GL=0
-1.0
-2.0
Strut 1
-7.0
Strut 2 CLAY
-9.0
-10.0 AZ 14
CLAY -12.0
-13.0
PEAT PEAT
SAND
-18.0
Figure 17.1: Pit excavation with water flow under the sheet pile wall (tutorial 10)
di 1
Wi = h w P di (17.1)
ki k i
11 1
Wclay = 9 10 2 1 1 11
= 30 kN/m2
108 108
+ 109
+ 109
+ 108
(17.4)
1 1
Wpeat = 9 10 2 1 1 11
= 27.27 kN/m2
109 108
+ 109
+ 109
+ 108
(17.5)
Note that the sum of the magnitudes of these additional pore pressures is 90 kN/m2 (ignoring
rounding errors) which is the same as the pressure difference between the levels of the two
phreatic surfaces. It can also be seen that the water pressure on both sides of the toe of the
sheet pile is the same: 8 10 + (5.45 + 27.27) = 17 10 - (30.00 + 27.27) = 112.7
0.0
-1.0
clay
Wpeat
-9.0 Wclay
-10.0
Wpeat
-12.0
25.5 20.0 80.0 110.0
62.8 30.0 peat -13.0
62.7 120.0
Wclay sand
62.8 60.0 92.7 150.0
total hydrostatic total hydrostatic
pressure pressure pressure pressure
Note: In general, this approximation method is sufficient. For cases with a major difference
in water pressure, or for very critical cases, a flow calculation should be performed using a
specialized program, such as Deltares Systems MSeep.
17.3.1 Model
4. In the Model window, select the Ka, Ko, Kp soil parameters model.
5. Deselect the Check vertical balance and the Verification (EC7/CUR) options as they are
not used in this tutorial.
Figure 17.3: Soil Profiles window with additional pore pressures on left side
Figure 17.4: Soil Profiles window with additional pore pressures on right side
17.3.8 Struts
13. In the Struts window from the Supports menu, define two struts at levels -2 m and -7 m
with properties as indicated in Figure 17.5. As only half of the problem is considered due
to symmetry, the length of the strut needs to be entered as 5.0 m. In this example buckling
is not taken into account, therefore a large value for the buckling force is entered.
17. In the window displayed (Figure 17.7), read the water pressures values at different depths
at the left side in the Water Pressure Left tab. They are the sum of the excess pore
pressure and the hydrostatic water pressure (w depth).
18. Open the Moment/Force/Displacements window to view the effect of this seepage on the
construction.
Figure 17.8: Moment/Force/Displacement Charts window including the effects of the ad-
ditional pore pressures
17.5 Conclusion
Water flow under the toe of a sheet pile wall causes a pore pressure distribution in the sur-
rounding soil that is not proportional to the depth below the water table. The correct total
pressure distribution can be modeled by calculating and inputting additional pore pressures
for each soil layer.
To model a load with limited size in the directions parallel and perpendicular to the sheet
pile wall.
1,5m
d1=1.5m
45o
d2=2.25m
q1
q2
PEAT
-7.0
CLAY AZ 13 CLAY
-13.0
SAND -16.0
Figure 18.1: Modeling a load with limited size parallel to the sheet piling (tutorial 11)
18.3 Modeling of load with limited size parallel to the sheet piling
The crane load has a limited size parallel to the sheet piling. In order to model it in D-S HEET P ILING,
this load is considered in two parts in order to roughly model the changing width of the load
spread as a function of its distance from the sheet pile wall. Each part is modeled as being
distributed over an assumed load spread angle of 45 (see Figure 18.1). This produces the
following distribution formula:
F L
qi = (18.1)
L b L + 2di
Therefore:
F 600
q1 = = = 88.89 kN/m2 (18.2)
b (L + 2d1 ) 1.5 (1.5 + 2 1.5)
(from 1.5 m to 2.25 m behind the wall)
F 600
q2 = = = 66.67 kN/m2 (18.3)
b (L + 2d2 ) 1.5 (1.5 + 2 2.25)
(from 2.25 m to 3 m behind the wall).
Note: This crane load could be treated as just one part, since it has a rectangular shape. It
has been considered in two parts for better accuracy. For more information on modeling loads
with limited dimensions see section 38.2.
6. Select Uniform Loads in the Loads menu, and enter a load of 20 kN/m2 on the right side.
Use the name <Platform load> for easy reference in the Stages Overview.
7. Select Surcharge Loads in the Loads menu to enter the crane load.
8. In the window displayed, add a surcharge with the name <Crane load> as shown in
Figure 18.1. The <Crane load> has the distribution given in Figure 18.2 below.
9. In the Stages Manager window, add a fourth stage, named <Platform load and crane
load>.
10. In the Stages Overview window, activate the uniform load and the surcharge by selecting
them in the Surcharges right sub-window, as indicated in Figure 18.3.
11. Start the calculation by selecting Start from the Calculation menu.
18.4 Results
As a result of the platform load and the crane load the bending moments have increased, as
indicated in Figure 18.4.
12. Open the Moment/Force/Displacement Charts window to see the effect of the increased
loading. The maximum bending moment has increased to 514 kNm and exceeds now the
maximum allowable moment (dotted green line) of 351 kNm, as shown in Figure 18.4. That
means the selected sheet piling section must be changed to avoid failing in bending. By
selecting an AZ 13 profile with a yield stress of 430 N/mm2 (section S430), the maximum
moment for elastic behavior is raised to 559 kNm.
Figure 18.4: Moment/Force/Displacement Charts window, Results for the final stage
13. In the Sheet Piling window, click the . . . button to open the Sheet Piling Profiles Library
window and select <S430>.
14. Perform a new calculation and check that the magnitude of the maximum moment is now
less than this sections maximum moment for elastic behavior which means the wall will
not fail in bending (Figure 18.5).
Figure 18.5: Moment/Force/Displacement Charts window, Results for the final stage with
a new sheet piling profile
18.5 Conclusion
Loads with a limited size parallel to the sheet pile wall need to be adjusted so their effect can
be correctly calculated. This modification is performed by assuming the load acts over the
wall within the limits of lines extending at 45 from the front of where the load is applied.
To check the sheet pile installation feasibility using the Dutch NVAF-experience lines
and the experiences from the GeoBrain experiences database (GeoBrain).
To predict the feasibility using forecasting models in GeoBrain.
To compare the current design with experiences in the GeoBrain experience database.
This tutorial is presented in the file Tutorial-12.shi and uses the CPT-GEF file Tutorial-12 CPT 02.gef.
In Tutorial 7a, the design was checked for stability according to the CUR 166 design proce-
dure. In this tutorial, the added value of the D-S HEET P ILING Feasibility module is used to
provide pile driving experience data to aid the user in feasibility decisions. Different checks
are performed:
(section 19.3.2) Results of the D-S HEET P ILING design are compared to (NVAF) charts
for different kind of piling driving vibrators and different soil conditions;
(section 19.3.1) Results of the D-S HEET P ILING design are displayed on graphs for com-
parison with the GeoBrain experiences;
(section 19.4) A prediction of the feasibility of the design is performed, using additional
data as a CPT in GEF format and some additional information concerning the equip-
ment, the foundation and the condition of the sheet piles;
(section 19.5) A prediction of the feasibility of the design is performed, by simply search-
ing experiences in the GeoBrain database similar to the D-S HEET P ILING project. Search
can be based either on sheet pile (section 19.5.1), on CPT (section 19.5.2) or on loca-
tion (section 19.5.3).
The soil profile is deduced from the results of the provided CPT-GEF file using the interpreta-
tion rule prescribed by CUR.
12. Click Soil on the menu bar and then choose Profiles.
13. Click the Add from CPT button at the left-bottom of the Soil Profiles window. The Select
CPT window opens.
14. Click the Import from file button. In the Open window displays, select the CPT-GEF file
named <Tutorial-12 CPT 02.gef> from the Project/Tutorials directory where the program
was installed.
The CPTip window opens (Figure 19.3) where the CPT results (cone resistance, local friction
and friction ratio) are displayed. At the right of the window, D-S HEET P ILING automatically
interprets the imported CPT into a soil profile, based on the interpretation rule that is selected
by the user in the Rule selection box.
15. Leave the CPT interpretation Rule and the Minimum layer thickness to their defaults and
click OK to go back to the Soil Profiles window (Figure 19.4) which now contains a new
profile named CPT 02 corresponding to the CPT.
Figure 19.4: Soil Profiles window after importation of the CPT 02 file
16. Select the previously manually added profile named <New Profile> and click the Delete
button to delete it as it is not used anymore.
17. Click OK to see the effect in the Input Diagram window.
18. Use the Zoom buttons in the Edit panel to enlarge the limits of the diagram and see the
different layers of the new soil profile imported from CPT (Figure 19.5).
Figure 19.5: Input Diagram window with new soil profile from CPT
Note that the top layer of the new soil profile is now situated below the ground surface.
19. In the Soil Profiles window, increase the Top level of the top layer to <0 m>.
23. From the Feasibility menu, select the Sheet Pile Installation option. D-S HEET P ILING will
now contact, on-line, with the GeoBrain experience database (GeoBrain).
24. In the Feasibility Sheet Pile Installation window, the option Show Experiences is by default
selected.
A screen similar to Figure 19.6 will appear. The number of experiences can be different
from Figure 19.6 as the GeoBrain database continuously grows. Users without a license
for the Feasibility module will only see a limited number of experiences. Once again, the
D-S HEET P ILING design will appear as a blue dot.
Figure 19.6: E-consult Sheet Pile Installation window showing GeoBrain Experiences
For this tutorial example, the D-S HEET P ILING design is within range of experiences and seems
to be surrounded by different experiences labeled as Good project result (green crosses).
The user should check if these experiences are indeed comparable to the D-S HEET P ILING
design.
25. Select one of the nearby Good experiences, using the mouse. On the right hand side,
additional information, including a soil profile is shown.
Please refer to Sheet Pile Installation based on GeoBrain Experiences (section 7.2.2) for a
translation of the Dutch headings and a detailed description of this window.
26. In the Feasibility Sheet Pile Installation window, select the Show NVAF lines in the upper
left hand corner of the window.
In the window displayed (Figure 19.7), the LF 5 chart is selected by default for low frequency
driving in a soil with an average cone resistance of 5 MPa along the pile.
Figure 19.7: E-consult Sheet Pile Installation window showing NVAF lines
The current sheet piling input is indicated by a blue mark. As this mark lies below the NVAF-
lines, successful pile driving should be guaranteed for this type of sheet piling with a length of
16 m and a resisting moment of 1940 cm3 /m.
By selecting different graphs from the Experience lines NVAF list it can be seen that the design
considered does not meet the feasibility criteria for all combinations of cone resistances and
frequencies. Hence some care should be taken. From the graphs one can also get an idea
of the capacity needed for successful pile driving. In this case (LF 5) a minimum capacity of
800 kN seems necessary.
Note: By selecting a different sheet pile profile (i.e. different resisting moment W ) and/or
by entering a different sheet pile length in the Sheet Piling window, the user must close and
re-open to the Feasibility Sheet Pile Installation window to see the influence on the feasibility.
27. In the Feasibility menu, choose GeoBrain Drivability Prediction. D-S HEET P ILING will now
contact, on-line, to the GeoBrain experience database.
At the top of the GeoBrain Prediction window displayed (Figure 19.8), available data are in-
dicated: the name of the CPT previously imported (section 19.2.3), the Sheet piling length
and Resisting moment of this tutorial previously inputted in the Sheet Piling window (sec-
tion 19.2.1) and the Water level to surface of this tutorial previously inputted in the Water
Levels window. It is possible to make a rough prediction with only this information by clicking
Predict. To get a better prediction follow the steps from step 29 below.
28. In the GeoBrain Prediction window displayed (Figure 19.8), click Refine to add the infor-
mation given in Table 19.1.
A main screen appears, showing the imported CPT amongst other information. Both ques-
tions 1 and 4 have been filled automatically, but questions 2, 3, 5 and 6 need to be filled using
the information of Table 19.1:
30. Select <boulder clay> as type of present stiff clay from the drop down for Question 2 and
enter a thickness of <3 m> for Question 3.
31. Enter <0> obstacle for Question 5 and select <good> as condition of the subsurface on
site from the drop down menu for Question 6 as shown in Figure 19.10.
Note: The soil profile determined in Figure 19.10 uses the 3-types with gravel from NEN rule
(section 30.2.3) as CPT interpretation rule and a minimum layer thickness of 0.2 m whereas
the soil profile determined in the Soil Profiles window (Figure 19.4) uses the CUR rule (sec-
tion 30.2.1) as CPT interpretation rule and a minimum layer thickness of 0.5 m. Those explain
the differences between both profiles.
Question 7 has already been entered, but Questions 8, 13 and 14 need to be filled using the
33. Select <ArcelorMittal> as producer and <Z-profiel AZ19> as type of sheet pile for Ques-
tion 8. Questions 9 to 12 are automatically filled in.
34. Select <used sheet piles, moderately repair> for Question 13 and select <Double> for
Question 14 from the drop down menus as shown in Figure 19.11.
36. Select <Vibrate> from the drop down menu for Question 15, select yes for Question 16
and select <PVE 2323VM> for Question 17 as shown in Figure 19.12.
In this case the risk is Large to Not feasible. At the bottom of the window (Figure 19.13), five
measures are indicated which might reduce the risk. For example, using a different vibra-
tory hammer with a centrifugal force exceeding 2000 kN and installing single new sheet pile
instead might reduce the risk.
Note that the risk decreased as it is now Small to Reasonably large. Fewer measures (two
instead of five) are indicated at the bottom, below the bars (Figure 19.14). They both concern
the choice of the sheet pile profile.
It is possible to get a complete report in PDF format containing the input and results.
45. Click on the link Go to Report to download the input and results as a pdf-file at the bottom
of the Result menu of the GeoBrain Prediction window.
46. Click again on the link View the report here as a pdf-file.
The Prediction Report window opens (Figure 19.15) with the default Internet Explorer pro-
gram. Using the appropriate icon on the menu bar, this prediction report can either be printed
Note: At the top of the GeoBrain Experiences window displayed (Figure 19.16), available
data are indicated: the name of the CPT previously imported (section 19.2.3) and the Sheet
piling length and Resisting moment of this tutorial, as previously inputted in the Sheet Piling
window (section 19.2.1).
(section 19.5.1) Search experiences based on similar sheet piling length and resisting
moment of the project;
(section 19.5.2) Search experiences based on a similar soil profile deduced from the
imported CPT;
(section 19.5.3) Search experiences close to the location of the current project, by using
a map.
The GeoBrain Experiences window displays a list of 35 projects arranged alphabetically (Fig-
ure 19.17). The number of experiences can be different from Figure 19.17 as the GeoBrain
database continuously grows.
Using the Refine query table at the right side of the window (Figure 19.17), it is possible
to refine the search by selecting the appropriate requirement using the information given in
Table 19.1for the second prediction:
Those choices will result in decreasing the number of similar projects from 35 to 2, as shown
in Figure 19.18.
Figure 19.18: GeoBrain Experiences window, Search on Sheet piling after refinement
Using the Refine Query table, it is also possible to change requirements by clicking the arrow
behind the requirement.
In the window displayed (Figure 19.19), all sort information on Situation, Geotechnics, Sheet
piling, Installation, Surroundings and Experiences are available by clicking the corresponding
name.
54. Click on Back to return to the projects list of Figure 19.18 and inspect other projects if
wanted.
55. Click on the Back button to return to the first search page.
56. Select <Moderate similarity> from the drop-down menu and click on the CPT button
(Figure 19.20).
The GeoBrain Experiences window displays a list of 2 projects arranged alphabetically (Fig-
ure 19.21). The number of experiences can be different from Figure 19.21 as the GeoBrain
database continuously grows. As previously (section 19.5.1) it is possible to access to detailed
information on each project by clicking on its name. Selecting a less strict similarity condition
in the first page, for example <Moderate similarity>, will result in much more projects in the
resulting list.
57. Click on the Back button to return to the first search page.
58. Click on the Location button.
In the map of the Netherlands displayed (Figure 19.22), a zoom on the desired location must
be performed:
59. Use the Zoom in button and the Hand cursor to reduce the map to the Zuid-Holland
(Figure 19.23 left) and then continue to the city of Rotterdam (Figure 19.23 right), for
example. Zuid-Holland (Figure 19.23 left) and then continue to the city of Rotterdam (Fig-
ure 19.23 right), for example.
Depending on the zoom intensity, results will be displayed as pie (Figure 19.23 left) or as
separate points (Figure 19.23 right). Clicking on the pie or on the point(s) will display the
details of the corresponding project(s).
19.6 Conclusion
After checking a sheet pile wall for stability, the Feasibility menu can be used to check the
chosen sheet piling feasibility for driving. The chosen sheet piling can be compared to the
GeoBrain experience database and NVAF-lines. If the sheet piling is changed to give better
driving feasibility then it needs to be re-checked for stability.
To use the single pile model of D-S HEET P ILING to analyze a pile subjected to a horizontal
force.
-4.5
CLAY -6.8
-8.3 SAND
-9.6
CLAY 2
-11.6 SAND 2
CLAY 3 -13.2
SAND 3 SAND 3
-20.5
Figure 20.1: Pile (mooring post) loaded horizontally (by a ship) Tutorial 13
7. Open the Pile window from the Construction menu or click on the Pile button on the
icon bar.
8. Enter a pile consisting of one single element named <Mooring post>, with a Pile top level
of <-0.5 m> and a Section bottom level of <-20.5 m>, i.e. a length of 20 m.
9. In this example a steel tubular pile is used, having a Diameter of 1200 mm, i.e. <1.2 m>,
a Stiffness EI of <4 000 000 kNm2 > and a Maximum moment for elastic behavior of
<3800 kNm>. Enter a Reduction factor for EI and for the maximum moment of <1> as
no reduction factor is used in this project.
Note: The Pile window is similar to the Sheet Piling window for the Sheet Piling model,
but the parameters differ because of the dimensions of the input.Also the available options in
the main menu are slightly different. Note also that working with construction stages is not
possible for the single pile model.
13. Open the Water Levels window from the Soil menu, and enter a water level of <-2 m>.
Note: The Brinch-Hansen and Menard method automatically takes into account the effect of
arching (section 37.2), but if the user chooses to define their own coefficients then they must
modify them as described in section 37.1. When using the Brinch-Hansen method, the same
soil layer should not be used at different depths in a profile, as the strength is a function of
depth. Instead a copy of the soil layer, with a different name, should be made for the second
depth. It is also recommended that thick soil layers are split into two or more thinner layers
section 37.2.1.
15. Select these different inputs in the Stage Overview window, such as the <Ship load> to
activate them.
20.5 Results
16. Start a calculation and save the project using <Tutorial-13> as file name. Note that the
pile is stable as no message is displayed to the contrary.
17. Open the Moment/Force/Displacement Charts window to view the results of the calcula-
tion.
The maximum displacement of the pile is around 9 cm, which meets the condition that was
stated in the case description, of a maximum allowable displacement of 10 cm. The maximum
allowable bending moment of 3800 kNm is also not exceeded.
20.6 Conclusion
D-S HEET P ILING allows the modeling of simple single pile models, loaded by forces and mo-
ments. The single pile module allows the effect of arching to be taken into account, by ap-
plication of Brinch-Hansens theory. The input and calculation method is similar to that for a
sheet pile wall.
For this project, the road embankment is implemented as a surcharge load and the soil dis-
placements caused by this road embankment are automatically calculated, by D-S HEET P ILING
using the De Leeuw tables (De Leeuw, 1963). De Leeuw tables (De Leeuw, 1963).
Note: An alternative to De Leeuw tables is to calculate the soil displacements at the location
of the pile caused by the road embankment using finite element program. In such case,
the output displacements of this FEM analysis are used as User defined displacements in
D-S HEET P ILING.
-0.5
-1.5
-2.5 SAND 1
CLAY 1
-4.5
CLAY 2
-6.5
CLAY 3
-8.5
CLAY 4
-10.5
-12.5
SAND 2
Figure 21.1: Horizontal pile loaded by (calculated) soil deformations caused by embank-
ment raise (tutorial 14)
Note: Active and neutral earth pressure coefficients normally need to be set to zero for the
situation of a single pile loaded by soil displacement. This means that the input value for the
passive earth pressure coefficient leads to the effective resisting pressure, taking the effect
of arching into account. Selecting the option Pile loaded by calculated soil displacements
will cause this to happen automatically because in such case the Brinch-Hansen method is
automatically used for the calculation of the earth pressure coefficients.
7. Open the Pile window from the Construction menu or click on the Pile button on the
icon bar.
8. Enter a pile consisting of one single element, with a Pile top level of <-0.5 m> and a
Section bottom level of <-12.5 m>, i.e. a length of 12 m. The Stiffness EI of the pile is
<63900 kNm2 >, the Diameter is <40 cm> and the Maximum moment is <300 kNm>.
Enter a Reduction factor for EI and for the maximum moment of <1> as no reduction
factor is used in this project.
11. Open the Soil Profiles window from the Soil menu, and define manually the soil profile as
shown in Figure 21.1.
12. Open the Water Levels window from the Soil menu, and enter a water level of <-1.5 m>.
13. Open the Surcharges Loads window from the Loads menu.
14. Enter the road embankment properties given in Figure 21.4 below.
15. Active the surcharge load in the Stage Composer by selecting it.
18. Active the rigid support in the Stages Composer by selecting it.
The Input Diagram window confirms the entered Surcharge Load and Rigid Support.
21.6 Results
19. Start a calculation, and note that the pile is stable, as no message is displayed to the
contrary.
20. Open the Moment/Force/Displacement Charts window.
The Moment/Force/Displacement Charts window (Figure 21.7) shows that the maximum mo-
ment in the pile is around 182 kNm, which is much less than the allowable maximum (i.e.
1000 kNm), so constructing the road embankment should not cause problems for this pile.
In the Displacements chart, the dotted line corresponds to the calculated soil displacements.
The numerical values can be found in the report.
21. Open the Report window to see the Calculated Displacements with Tables from De Leeuw
section (Figure 21.8).
Note: The results of a calculation are highly influenced by the soil displacements and the
value of the horizontal subgrade modulus in the displacing soil layers.
21.7 Conclusion
D-S HEET P ILING also allows the analysis of single piles subjected to impose soil deformations.
Those soil displacements can either be user-defined or automatically calculated displace-
ments from De Leeuw tables.
The partial factors recommended by Eurocode 7 (NEN-EN, March 2005) are given in Fig-
ure 22.2. These partial factors apply to actions or their effects, ground resistance and mate-
rial properties. In this tutorial, the verification is performed for three design approaches of the
Eurocode 7: design approaches 1, 2 and 3.
According to EuroCode 7, use of the Culmann method (delta, c, phi soil parameters) for
the calculation of the active and passive earth pressure coefficients is acceptable.For the
neutral earth pressure coefficient, the formula used in D-S HEET P ILING (k0 =
calculation of the
(1 sin ) OCR) is the one prescribed in the Eurocode for a horizontal ground surface.
1. Open the input file <Tutorial-7a.shi>, and save it with name <Tutorial-15>.
2. In the Project Properties window, fill in <Tutorial 17 for D-S HEET P ILING > and <Design
code checking acc. to Eurocode 7> for Title 1 and Title 2 respectively in the Identification
tab.
3. In the Sheet Piling window, modify the Section bottom level to <-14 m>.
4. Open the Default Partial Factors window from the Project menu, and select the EC7 Gen-
eral tab.
5. Click on the Reset button to reset all values to the default values prescribed by the Eu-
rocode 7 (NEN-EN, March 2005) (Figure 22.2).
Figure 22.2: User Defined Partial Factors window, EC7 General tab
Note: The default values of the User Defined Partial Factors window can be modified to be
in accordance with the values prescribed in the National Annex of the EuroCode 7 of each
European country. The EC7 NL tab prescribed the values given by the Dutch National Annex
(NEN, september 2009).
22.4 Determine the minimum length using partial factors from Eurocode 7
The minimum sheet pile length is first determined according to the Eurocode 7 for the four
design approaches. Level variations and partial factors given in Figure 22.2 are applied for all
stages.
Figure 22.3: Start Calculation window, Design Sheet Piling Length tab with an
AZ 17/S430 profile
The results (Figure 22.3) show that for a length of 20 m the maximum allowable moment is
reached. Therefore, a different sheet piling profile must be selected with a higher maximum
allowable moment.
12. Open the Sheet Piling window from the Construction menu.
13. Select an Arcelor <AZ 25> profile from the library, with a <S430> section.
14. In the Design Sheet Piling Length tab of the Start Calculation window perform a new design
calculation by clicking the Start button.
The results (Figure 22.4) show that for a length of 13 m the sheet piling becomes unstable
as the mobilized resistance reaches 100%. Therefore, the minimum length is approximately
14 m.
Figure 22.4: Start Calculation window, Design Sheet Piling Length tab with an
AZ 25/S430 profile
15. Check that the last stage is indeed the most critical by repeating the above steps, selecting
each of the other stages. Note that the sheet piling does indeed become unstable in the
final stage earlier than in the others.
To get a more accurate result of when the piling becomes unstable or when the anchor yields,
the Pile length inputs at the top of the window must be adapted.
16. Select the final stage as this is the most critical, enter a pile length From <14 m> Down
to <13 m> with a Decrement of <0.25 m> and click Start again.
Figure 22.5: Start Calculation window, Design Sheet Piling Length tab for DA 1 set 1
The results (Figure 22.5) show that the minimum stable length is approximately 13.25 m.
Figure 22.6: Start Calculation window, Design Sheet Piling Length tab for DA 1 set 2
Figure 22.7: Start Calculation window, Design Sheet Piling Length tab for DA 2
Note: For design approach 2, the maximum allowable percentage of mobilization is not 100%
but 100%/1.40 = 71.7% as the partial resistance factor is 1.4 for this design approach instead
of 1.0 for the others (see Figure 22.2). Thats why for a length of 14 m with a mobilized
resistance of 75.6% (> 71.7%) the sheet piling is considered as unstable.
Figure 22.8: Start Calculation window, Design Sheet Piling Length tab for DA 3
Table 22.1: Overview of the Design Sheet Piling Length calculation for the different design
approaches
For this project, the design sheet piling length can vary from 13.25 m to 16.75 m depending
on the chosen design approach: both design approaches DA 1 set 2 and DA 3 give the largest
sheet piling length (including anchor yielding) whereas design approach DA 1 set 1 gives the
smallest sheet piling length (without anchor yielding).
Results of DA 1 set 2 (Figure 22.6) and DA 3 (Figure 22.8) are identical because both ap-
proaches use the same default partial factors (Figure 22.2). Both approaches give the largest
design length.
For DA 2, the maximum allowable percentage of mobilization is not 100% but 100%/1.40 = 71.7%
as the partial resistance factor is 1.4 for this design approach instead of 1.0 for the others (see
Figure 22.2).
20. Open the Sheet Piling window from the Construction menu.
21. Change the Section bottom level to <-13.5 m>.
22. Click OK to confirm.
23. Select the Start option from the Calculation menu or press the function key F9.
24. In the Start Calculation window, select the Verify Sheet Piling tab.
25. Choose EuroCode and then select Design approach 1.
At the end of the calculation, the message Calculation finished: sheet piling becomes unstable
appears in the Calculation Progress window (Figure 22.10), which means that the current
length of the sheet piling is not acceptable according to Design Approach 1 of the EuroCode 7.
The report results must be therefore investigated.
27. Click on the Close button to close the Calculation Progress window.
The Summary section of the Report window (Figure 22.11) shows that the sheet pile wall is
considered as stable according to Design Approach 1 set 1 but unstable according to Design
Approach 1 set 2 of Eurocode 7 for stage 3.
22.5.3 Charts
29. Open the Moment/Force/Displacement Charts window from the Results menu.
The maximum moment and the maximum shear force for stage 4 given at the bottom of the
Moment/Force/Displacement Charts window (Figure 22.12) are respectively 666.5 kNm and
210.0 kN. These are less than those given in the Summary section of the Report window,
respectively 899.8 kNm and 283.5 kN (Figure 22.11) while they should be equal. The reason
for this is that the Moment/Force/Displacement Charts window shows the intermediary calcu-
lated moments and forces before multiplying them with the partial factor on the effect of the
loads (1.35 in this tutorial) whereas the Summary section of the Report window shows the
final design moments and forces. Moreover, in the moment chart, two lines are represented:
The continuous line with a maximum value of 666.5 kNm corresponds to the interme-
diary calculated moments: black line corresponds to values below the maximum allow-
able moment whereas red line corresponds to values above the maximum allowable
moment;
The red dotted line with a maximum value of 899.8 kNm corresponds to the intermediary
calculated moments multiplied by the partial factor on the effect of the loads (i.e. 1.35
in this tutorial, therefore: 666.5 1.35 899.8);
The green dotted vertical line (1056 kNm) corresponds to the maximum allowable mo-
ment as inputted in the Sheet Piling window.
As part of the moment chart exceeds the maximum allowable moment (dotted green line), the
selected sheet piling section should be changed to avoid failing in bending.
22.6 Conclusion
D-S HEET P ILING allows the user to check a sheet pile wall according to the Eurocode 7, which
will become the only relevant design code for geotechnical projects in Europe within the next
few years. In this tutorial, the partial factors prescribed in EuroCode 7, Part 1: General rules
(NEN-EN, March 2005) have been used. However, each country can prescribed its own
design method and partial factors via the National Annex of the Eurocode. As information,
D-S HEET P ILING now supports the Dutch Annex.
The soil parameters needed for a settlement by vibration calculation are given in Table 23.1.
23.2 Model
1. Open <Tutorial-7a.shi> and save it with the name <Tutorial-16>.
2. In the Identification tab of the Project Properties window, change Title 1 and Title 2 to re-
spectively <Tutorial 16 for D-S HEET P ILING > and <Prediction of settlements by vibration>.
3. In the Model window, deselect the option Verification (EC7/CUR) as it is not used and
select the Settlement by vibration option.
7. Click the Select button to return to the Sheet Piling window (Figure 19.2). The needed
parameters are automatically filled in.
8. Enter a Section bottom level of <-16 m> and leave the Number of simultaneously installed
piles to <2>.
23.5 Calculation
13. In the Feasibility menu, select Settlement by vibration to start the calculation.
A window appears showing the calculation progress. The calculation can take some time.
23.6 Results
14. To see the charts output, select Settlement by Vibration Charts from the Results menu.
The Settlement by vibration Charts window displays the settlement vs. the distance to sheet
pile. The settlements are calculated for the active side (i.e. right side in this example) of the
sheet pile and first step.
15. Choose During installation from the drop-down menu at the top left of the Settlement by
Vibration Charts window to display the settlements during installation of the sheet piling
(Figure 23.7).
16. Choose During removal from the drop-down menu at the top left of the Settlement by
Vibration Charts window to display the settlements during removal of the sheet piling (Fig-
ure 23.8).
17. Choose Total settlement from the drop-down menu at the top left of the Settlement by
Vibration Charts window to display the settlements due to installation + removal of the
sheet piling (Figure 23.9).
Figure 23.9: Settlements by Vibration Charts window, Total settlement (installation + re-
moval)
For each chart, three lines are shown. The blue line corresponds to the settlements due to
sheet pile volume. The red line corresponds to the settlements due to densification. The black
line corresponds to the total settlement (sum of settlements due to sheet pile volume and soil
densification).
18. Click the right hand mouse button and select View Data to open the Chart Data window
(Figure 23.10).
In this window the data used to generate the charts can be viewed and copied, for example for
use in spreadsheets. For this tutorial, the maximum settlement after installation and removal
of the sheet pile wall is estimated to 23.5 mm, which is acceptable.
Figure 23.10: Chart Data window for the Total settlement (installation + removal)
23.7 Conclusion
After checking a sheet pile wall for stability, the Settlement by vibration option from the Feasi-
bility menu can be used to evaluate the settlements due to vibratory installation and removal
of the sheet pile wall.
The soil profile consists of a clayey sand land layer and a sand layer. The layer properties
are provided in Table 24.1. On the excavated site the surface is not horizontal. An occasional
uniform surcharge of 2 kPa can be present on the right surface.
Figure 24.1: One stage excavation with a ProLock Sigma combined wall (Tutorial 17)
To start, the calculation is made for a synthetic profile length of 1.5 m, with 2 wooden piles
per meter and for a pile tip level of -2.5 m, as shown in Figure 24.1. This tutorial will show
that the calculated bending moment for such construction exceeds the allowable moment
(section 24.2.6). Thats why the synthetic profile must be lengthened from 1.5 m to 2 m
(section 24.2.7).
The properties of the ProLock Sigma profile are shown in Table 24.2. The properties of the
(soft) wooden piles used in this project are provided in Table 24.3, per pile and per linear
meter (considering 2 wooden piles per linear meter).
Because the wooden piles are inserted in the ProLock Sigma profile, the properties of both
the synthetic profile and the wooden pile are added to get the properties of the wall, as shown
in Table 24.4.
24.2.1 Project
To create a new project, follow the steps described below:
1. Start D-S HEET P ILING from the Windows task bar (Start/All Programs/Deltares Systems/D-
Sheet Piling).
2. Click File and choose New on the D-S HEET P ILING menu bar to start a new project.
3. Click Project on the menu bar and then choose Model.
4. Select Sheet piling.
5. Select the Mixed model (Figure 24.3).
6. Deselect the option Check vertical balance as a vertical balance check is not part of this
exercise.
7. Select the option Verification (EC7/CUR) as a EuroCode design check will be performed.
8. Save the project with name <Tutorial-17a> by clicking Save in the File menu.
To give the project a meaningful description, follow the steps described below:
9. Open the Project Properties window from the Project menu or click on the Project Proper-
ties icon on the icon bar.
10. Fill in <Tutorial 17 for D-Sheet Piling> and <ProLock Sigma with 2 wooden piles per
meter> for Title 1 and Title 2 respectively in the Identification tab.
11. Open the Sheet Piling window from the Construction menu or click on the Sheet piling
button on the icon bar.
12. In the window displayed, define the top part consisting of only sheet profiles as the con-
tribution of the wooden piles above the water level (i.e. -0.5 m) is neglected because of
decomposition of wood. Use the Import profile button to import the specifications of the
ProLock Sigma profile. Change the Modification factor into <0.45>. Enter a Reduction
factor EI and a Reduction factor maximum moment of <1> as no reduction factor is used
in this project.
13. In the second row, define the second part of the synthetic wall consisting of the ProLock
Sigma profile with 2 wooden piles per meter as given in Table 24.4 (Figure 24.3).
14. In the third row, define the lowest part consisting of only 2 wooden piles. The proper-
ties given in the last column of Table 24.3 correspond to a width of 200 mm (2 piles).
The request values in the Sheet Piling window are per running meter. All the values
of the table must therefore be divided by 0.2 m (i.e. the Acting width) to get an in-
put in running meter: W = 196/0.2 = 980 cm3 /m, Mmax =1.62/0.2 = 8.09 kNm/m and
Note: For the bending stiffness EI , the maximum value (between SLS and ULS) given in
Table 24.3 is used as it provides the maximum calculated bending moment.
Note: The use of the Combined Wall tool as in Tutorial 9 (chapter 16) is not applicable in this
tutorial because the wooden piles are inserted into the synthetic profile.
24.2.3 Soil
In the menu Soil, the soil materials, the surfaces, the soil profile and the water levels for this
tutorial can be specified.
24.2.3.1 Surfaces
On the excavated side, the surface is not horizontal. This can be defined in the Surfaces
window:
16. Open the Surfaces window from the Soil menu and define a surface with name <Right>
with level 0 m.
17. Define a second surface with name <Left> and fill in the values that are listed in the table
of Figure 24.4.
Which surfaces should be applied on the left and right hand sides of the sheet piling may now
be selected. This selection is made using the Stage Composer located at the left side of the
Input Diagram window.
18. In the upper box of the Stage Composer, click Surface left and select the surface with
description <Left> in the lower box (Figure 24.5). The effect can be directly seen in the
Input Diagram window.
19. Repeat this for Surface right by linking it with the <Right> surface.
23. Click the Overview option in the Stages menu or click on the Stage overview button on the
icon bar.
24. Select method <C, phi, delta> for the Left side.
25. Click OK to confirm.
24.2.5 Calculation
The verification of the synthetic wall is made according to the Dutch Annex of the Eurocode 7.
26. Select the Start option from the Calculation menu or press the function key F9.
27. In the Start Calculation window, select the Verify Sheet Piling tab.
28. Choose EC7 NL and then select Partial factors (design values) in all stages (method A).
29. Select <RC 0> as Partial factor set.
24.2.6 Results
30. Click Start to perform the design calculation. When the calculation is complete, an error
message appears at the bottom of the window (Figure 24.8).
31. Close the Calculation Progress window and open the Report form the Results menu to get
more details about this error message.
32. Go to paragraph 2 named Summary using the Move to next page button.
The Calculation Errors section (Figure 24.9) indicates that the sheet piling becomes unstable.
For steps 6.3 and 6.4, the sheet piling is unstable and no results are available.
33. Open the Sheet Piling window form the Construction menu and change the Section bottom
level of the middle part of the wall into <-2 m>.
A shell factor of 1 is applied for soils in contact with the sheet piling as the sheet piling prevents
arching from taking place. As a consequence, the Sand, moderate layer must be divided into
2 layers, from -1.5 m to -2 m and below -2 m with a shell factor of 1 and 2 respectively.
38. Open the Soil Profile window and enter the new profile (Figure 24.11).
39. Perform a new calculation. No error message appears at the end of the calculation.
40. Open the Moment/Force/Displacement Chart window to inspect the results (Figure 24.12).
Figure 24.12: Moment/Force/Displacement Chart window for long term situation - Step
6.3
The maximum calculated moment (2.2 kNm) is now situated in the middle part of the wall
(composed of the ProLock Sigma profile and 2 wooden piles per meter). In this part, the al-
lowable moment (5.56 m) is higher than in the lowest part (1.62 kNm), thats why the maximum
calculated moment now passes.
Note: Usually, to design the length of the wall, the option Design Sheet Piling Length is used
(section 5.2.2). However, in case of combined wall, this option can be used only to design the
lower part of the wall (i.e. wooden piles), but not the upper part. Thats why, the design length
will be determined manually, by changing the bottom level of the ProLock Sigma profile.
41. Save the current project with a new name by clicking Save As in the File menu and by
entering <Tutorial-17b> as project name.
42. Open the Sheet Piling window from the Construction menu or click on the Sheet piling icon
on the icon bar.
43. In the window displayed, change the Maximum moment for the three parts using the values
given in Table 24.4.
44. Click OK to confirm the input.
45. Click Loads in the menu bar and then choose Uniform Loads.
46. In the input window displayed, define a load with the name <Surface load>, with a mag-
nitude of <2 kN/m2 >. The load is defined as <Permanent> and <Unfavourable> as it
is on the active side.
47. Click OK to confirm the input.
48. Activate the Surface load in the Stage Composer by selecting Uniform loads in the upper
box and by marking Surface load in the lower box (see Figure 24.15).
24.3.3 Results
The verification calculation at short term can now be performed:
49. Start the calculation by pressing the function key F9 and clicking Start. No error message
appears at the end of the calculation.
50. Open the Moment/Force/Displacement Chart window to inspect the results (Figure 24.16):
the allowable moment is not exceeded in all calculation steps.
Figure 24.16: Moment/Force/Displacement Chart window for short term situation - Step
6.3
24.4 Conclusion
A design calculation at long and short term for a combined wall consisting of a ProLock Sigma
profile and wooden piles has been performed. The maximum calculated bending moments
per section of the wall are reported in Table 24.5, for two different lengths of the ProLock
profile. With a length of 2 m, the maximum calculated moments do not exceed the allowable
moments; the strength of the wall is therefore enough.
Table 24.5: Maximum calculated bending moments, per wall section (tutorial 17)
Note: The stability of the wall is secured. A shorter length of the piles (i.e. a tip level at -2 m
instead of -2.5 m) is not possible as this will lead to an unstable wall.
The soil profile consists of a clayey sand land layer, a clay layer and a sand layer. The layer
properties are provided in Table 25.1. An occasional uniform surcharge of 5 kPa can be
present on the right surface.
Figure 25.1: One stage excavation with a ProLock Omega combined wall (Tutorial 18)
To start, the calculation is made for a synthetic profile length of 3 m, with 2 wooden piles per
meter and for a pile tip level of -4 m, as shown in Figure 25.1. A row of inclined anchors is
installed at level -0.25 m, with one anchor every 2 m. This tutorial will show that the calculated
bending moment for such construction does not exceed the allowable moment.
Note: As the construction is loaded by the vertical component of the anchor force, the bearing
capacity of the piles has to be verified. This verification is not part of this tutorial.
The properties of the ProLock Omega profile are shown in Table 25.2. The properties of the
(soft) wooden piles used in this project are provided in Table 25.3, per pile and per linear
meter (considering 2 wooden piles per linear meter).
Because the wooden piles are inserted in the ProLock Omega profile, the properties of both
the synthetic profile and the wooden pile are added to get the properties of the wall, as shown
in Table 25.4.
The anchor is chosen from the JLD anchor systems: a MK-SR anchor wall with the char-
acteristics given in Figure 25.3 and a GEWI anchor bar of 16 mm diameter and 6 m length
(Table 25.5).
Figure 25.3: Technical data for the MK-SR anchor wall (Tutorial 18)
Table 25.5: Technical data for the GEWI Threadbar (Tutorial 18)
25.2.1 Project
This tutorial is based on the previous tutorial (chapter 24) as the input is quite similar:
1. Open the previous tutorial by clicking Open in the File menu and selecting <Tutorial-
17a.shi>.
2. Save the project with a new name by clicking Save As in the File menu and by entering
<Tutorial-18a> as project name.
To give the project a meaningful description, follow the steps described below:
3. Open the Project Properties window from the Project menu or click on the Project Proper-
ties icon on the icon bar.
4. Fill in <Tutorial 17 for D-Sheet Piling> and <ProLock Omega with 2 wooden piles per
meter> for Title 1 and Title 2 respectively in the Identification tab.
5. Open the Sheet Piling window from the Construction menu or click on the Sheet piling
button on the icon bar.
6. In the window displayed, define the top part consisting of only sheet profiles as the con-
tribution of the wooden piles above the water level (i.e. -0.5 m) is neglected because of
decomposition of wood. Use the Import profile button to import the specifications of the
ProLock Omega profile. Change the Modification factor into <0.45>.
7. In the second row, define the second part of the synthetic wall consisting of the ProLock
Omega profile with 2 wooden piles per meter as given in Table 25.4.
8. In the third row, define the lowest part consisting of only 2 wooden piles. The proper-
ties given in the last column of Table 24.3 correspond to a width of 300 mm (2 piles).
The request values in the Sheet Piling window are per running meter. All the values
of the table must therefore be divided by 0.3 m (i.e. the Acting width) to get an input
in running meter: W = 662/0.3 = 2207 cm3 /m, Mmax =5.04/0.3 = 16.80 kNm/m and
EI = 224/0.3 = 1491 kNm2 /m.
9. Click OK to confirm the input.
Note: For the bending stiffness EI , the maximum value (between SLS and ULS) given in
Table 25.3 is used as it provides the maximum calculated bending moment.
Note: The use of the Combined Wall tool as in Tutorial 9 (chapter 16) is not applicable in this
tutorial because the wooden piles are inserted into the synthetic profile.
25.2.3 Soil
In the menu Soil, the soil materials, the surfaces, the soil profile and the water levels for this
tutorial can be specified.
25.2.3.1 Surfaces
On the excavated side, the surface is horizontal, on the contrary of the previous tutorial. This
can be changed in the Surfaces window:
10. Open the Surfaces window from the Soil menu and define the surface named <Left> with
<-2.5 m>.
11. Open the Soil Materials window from the Soil menu, and add the <Clay> material by
clicking the button. Enter the parameters given in Table 24.1, using the Mller-
Breslau (straight slip surfaces) method for an automatic calculation of the Earth pressure
coefficients by D-S HEET P ILING and using a Shell factor of <1>.
12. Click again the button to duplicate this layer and rename the created material with
<Clay, shell>. Change the Shell factor into <1.5>.
25.2.4 Anchor
For this project, an anchor wall type MR-SR in combination with a GEWI bar 16 mm are
chosen and represented in Figure 25.6.
The input parameters for the anchor needed by the program first have to be determined (per
running meter) using the datas given in Figure 25.3 and Table 25.5:
18. In the upper box of the Stage Composer, click Anchors and select the anchor <JLD MR-
SR anchor + GEWI d16> in the lower box (Figure 25.8). The effect can be directly seen in
the Input Diagram window.
25.2.5 Calculation
The verification of the synthetic wall is made according to the Dutch Annex of the Eurocode
7, with safety class RC1.
19. Select the Start option from the Calculation menu or press the function key F9.
20. In the Start Calculation window, select the Verify Sheet Piling tab.
21. Choose EC7 NL and then select Partial factors (design values) in all stages (method A).
22. Select <RC 1> as Partial factor set.
23. Click Start to perform the calculation.
25.2.6 Results
No error occurred. The charts of the bending moment can be inspected:
For the middle section of the wall (ProLock Omega with 2 wooden piles, the maximum calcu-
lated moment (10.0 kNm) does not exceed the allowable moment (12.10 kNm), likewise for
the lowest section of the wall composed of 2 wooden piles per meter (Figure 25.10).
Figure 25.10: Moment/Force/Displacement Chart window for long term situation - Step
6.3
26. The Summary section of the Report window (Figure 25.11) shows that the anchor is elastic
in all CUR steps.
Figure 25.11: Report window, Summary section for long term situation (Tutorial-18a)
27. Save the current project with a new name by clicking Save As in the File menu and by
entering <Tutorial-18b> as project name.
28. Open the Sheet Piling window from the Construction menu or click on the Sheet piling icon
on the icon bar.
29. In the window displayed, change the Maximum moment for the three parts using the values
given in Table 25.4.
30. Click OK to confirm the input.
31. Click Loads in the menu bar and then choose Uniform Loads.
32. In the input window displayed, define a load with the name <Surface load>, with a mag-
nitude of <5 kN/m2 >. The load is defined as <Permanent> and <Unfavourable> as it
is on the active side.
33. Click OK to confirm the input.
34. Activate the Surface load in the Stage Composer by selecting Uniform loads in the upper
box and by marking Surface load in the lower box.
25.3.3 Results
The verification calculation at short term can now be performed:
35. Start the calculation by pressing the function key F9 and clicking Start. No error message
appears at the end of the calculation.
36. Open the Moment/Force/Displacement Chart window to inspect the results (Figure 25.13):
the allowable moment is not exceeded in all calculation steps.
Figure 25.13: Moment/Force/Displacement Chart window for short term situation - Step
6.3
In the three sections of the combined wall, the maximum calculated moment does not exceed
the allowable moment (Figure 25.13).
25.4 Conclusion
A design calculation at long and short term for an anchored combined wall consisting of
a ProLock Omega profile and wooden piles and a JLD anchor has been performed. The
maximum calculated bending moments per section do not exceed the allowable moment. The
stability of the anchored wall is therefore enough.
Figure 26.1: Horizontal pile loaded by soil deformations caused by pond digging (tutorial
19)
The soil displacements at the location of the pile caused by the digging of the pond were
calculated using a finite element program. In such case, the output displacements of this
FEM analysis are used as User defined displacements in D-S HEET P ILING. The modulus of
subgrade reaction in the soft layers is also derived from the results of this FEM analysis.
The flexural stiffness of the pre-tensionned concrete pile is based on M-N-Kappa diagrams
(Figure 26.2). In those diagrams, four branches are distinguished:
Table 26.3: Moment and curvature values of the M-N-Kappa diagram of cross-section 1
(tutorial 19)
Point My EIpoint
[kNm] [10-3 /m] [kNm2 ]
Point 0 0.0 0.000
Point 1: Concrete starts cracking 54.0 2.296 23522
Point 2: Steel starts yielding 118.5 13.048 9082
Point 3: Start plasticity 169.2 31.564 5361
Table 26.4: Moment and curvature values of the M-N-Kappa diagram of cross-section 2
(tutorial 19)
Point My EIpoint
-3
[kNm] [10 /m] [kNm2 ]
Point 0 0.0 0.000
Point 1: Concrete starts cracking 89.1 3.574 24929
Point 2: Steel starts yielding 141.6 6.634 21341
Point 3: Start plasticity 186.3 17.438 10686
26.3 Pile
To enter the pile data:
8. Open the Pile window from the Construction menu or click on the Pile button on the
icon bar.
9. For the first element, enter <Head> as Name, a Material type as <User defined>, a Pile top
level of <-1.55 m>, a Section bottom level of <-2.05 m> and a Diameter of <35 cm>.
10. Click on Edit moment-curvature diagram to open the Moment-Curvature Diagram (M-N-
Kappa) window (Figure 26.4).
11. Enter the moments given in Table 26.3 and use the flexural stiffness per point to calculate
the flexural stiffness per branch, see Note below.
12. Mark Symmetric to use the same values in traction and in compression.
13. Click OK to return to the Pile window.
14. Enter a Max.
Note: The flexural stiffness given in Table 26.3 and Table 26.4 is a value at a point, but in the
Moment-Curvature Diagram (M-N-Kappa) window the flexural stiffness of a branch must be
given:
M2 M1 118.5 54
EIbranch 2 = = 118.5 2.296 = 5999 kNm2
M2
1
EIpoint 2 9082 1000
M3 M2 169.2 118.5
EIbranch 3 = = 169.2 13.048 = 2739 kNm2
M3
2
EIpoint 3 5361 1000
15. For the second element, enter <Rest> as Name, a Material type as <User defined>, a
Section bottom level of <-25.5 m> and a Diameter of <35 cm>.
16. Click on Edit moment-curvature diagram to open the Moment-Curvature Diagram (M-N-
Kappa) window (Figure 26.5).
17. Enter the moments given in Table 26.4 and use the flexural stiffness per point to calculate
the flexural stiffness per branch (see equations below).
18. Mark Symmetric to use the same values in traction and in compression.
19. Click OK to return to the Pile window.
M2 M1 141.6 89.1
EIbranch 2 = = 141.6 = 17151 kNm2
M2 3.574
1
EIpoint 2 21341 1000
M3 M2 186.3 141.6
EIbranch 3 = = 186.3 = 4139 kNm2
M3 6.635
2
EIpoint 3 10686 1000
24. Open the Soil Profiles window from the Soil menu, and define manually the soil profile as
shown in Figure 26.1.
25. Open the Water Levels window from the Soil menu, and enter a water level of <-2.2 m>.
26. Open the Springs Supports window from the Supports menu.
27. Enter a spring support at level <-1.55 m> with a Translation stiffness of <1500> kN/m.
28. Active the spring support in the Stages Composer by selecting it.
31. Active the rigid support in the Stages Composer by selecting it.
The Input Diagram window (Figure 26.11) confirms the entered Rigid Supports, Spring Sup-
ports and Soil Displacements.
26.8 Results
34. Start a calculation, and note that the pile is stable, as no message is displayed to the
contrary.
35. Open the Moment/Force/Displacement Charts window.
The Moment/Force/Displacement Charts window (Figure 26.12) shows that the maximum
moment in the pile is around 181.3 kNm in the Rest section. This is more than the allow-
able elastic moment (89.1 kNm), but less than the allowable plastic moment (186.3 kNm), so
digging the pond should not cause problems for this pile.
26.9 Conclusion
D-S HEET P ILING allows the plastic analysis of a single pile. This tutorial shows that the maxi-
mum calculated moment can be reached for an elastic analysis, but not for a plastic analysis.
d4 w d2 w
b EI + N = b f (x, w) (27.1)
dx4 dx2
where:
D-S HEET P ILING solves Equation 27.1 numerically using the finite element method. This means
that the wall is divided into a number of sub-sections (called elements) that are connected at
the edges. These connections are called nodes. At these nodes, the displacements and
rotations of both connected elements are equal, thus creating a continuous beam.
D-S HEET P ILING automatically defines the position of the nodes. Nodes are always created at:
The length of an element never exceeds 1/20 of the total wall length. For an Elastic cal-
culation, each element is further sub-divided into 5 sections. For a Plastic calculation, the
number of nodes is multiplied by 5 compare to the Elastic calculation, but the elements are
not sub-divided. Displacements, shear forces, bending moments and horizontal water and
soil pressures are determined for each boundary of a section.
Initial Stress (section 28.1): D-S HEET P ILING uses Jkys formula to determine the lateral
stress ratio at initial stress;
Yield (section 28.2): D-S HEET P ILING uses slip surface theories to determine the lateral
stress for active and passive yielding. Passive yielding occurs when the ultimate soil
stress under compression is reached. Active yielding occurs when the ultimate soil
stress under extension is reached.
Surcharge
When a surcharge is present, D-S HEET P ILING determines an additional lateral pressure ratio,
using Boussinesqs formula (see Equation 28.7 in section 28.3), to obtain the neutral earth
pressure. The Culmann method is used to determine the active and passive earth pressures.
The assumed shape of the slip surface will influence the calculated earth pressure values.
Theoretically, straight slip surfaces only occur when wall friction is absent. Since wall friction
is always present in reality, actual slip surfaces will always be curved. However, when deter-
mining the active lateral earth pressure there is just a minor difference between values based
on straight and curved slip surfaces. On the other hand, a passive lateral earth pressure
based on a straight slip surface can considerably exaggerate the real value. This is espe-
cially true for soils with high friction angles (). The Mller-Breslau and Culmann methods of
determining earth pressure coefficients are based upon straight slip surfaces. Using straight
slip surfaces has limitations, as described in the NEN 6740, art. 12.4.2 (NEN, 2006) and
CUR 166 (CUR, 2005). Generally the Mller-Breslau (and Culmann) method is used when
the soils friction angle, phi, is equal or less than 30 . The Ktter method is generally used for
larger friction angles. The method selected also has an impact on the way the delta friction
angle is determined. Suggestions for correlations between the friction angle and the delta
friction angle are available in literature.
The information in the following sections describes how D-S HEET P ILING determines the yield
values of the lateral stress ratio for the following methods:
28.2.1 Culmann
For non-horizontal soil surfaces, values of the coefficients of active and passive lateral earth
pressure (Ka and Kp ) can be found using Culmanns formulas (Culmann, 1866).
N Q
Q N T
T B
The method is based on the equilibrium between the applied surcharge B , the soil weight
W , the total force from the sheet piling Q, the normal force N and the shear force T along
one straight slip surface, as illustrated below. The Culmann method takes the stratification of
soil along the slip surface into account. D-S HEET P ILING iteratively determines a slip surface
that results in the maximum active pressure and the minimum passive pressure. From this
calculated pressure, D-S HEET P ILING determines different coefficients in each point from the
top to the toe of the sheet pile wall.
The slip surfaces resulting in the maximum active pressure and the minimum passive pressure
are available in the Slide Planes C, Phi, Delta Calculation window (section 6.7).
D-S HEET P ILING uses the following equations, which have been simplified by assuming a ver-
tical sheet pile wall and horizontal ground surface:
cos2
Ka = q 2 (28.3)
sin sin(+)
1+ cos
and
cos2
Kp = q 2 (28.4)
sin sin(+)
1 cos
where is the angle of wall friction and is the soil friction angle.
The validity of Equation 28.4 is limited to the following conditions for sheet pilings with a rough
surface:
Negative values cannot be entered. D-S HEET P ILING will add a negative sign to when
determining Kp .
1 sin sin (2 + ) n o
Ka = exp + + 2 tan (28.5)
(1 + sin ) 2
sin
with : cos (2 + ) = sin
Note: If the distance between the surcharge and the wall exceeds 5 times the height of the
wall, D-S HEET P ILING does not take the surcharge into account.
The formula is based on the principle of superposition. A specific surcharge can therefore be
achieved by applying multiple line loads. Since the original formula is valid for a homogeneous,
semi-infinite solid, some adaptation is needed in order to include the influence of the sheet
pile wall. Therefore, a multiplication factor f is applied to the Boussinesq stress, resulting in
the following formula:
2P x2 y
H = f (28.7)
(x2 + y 2 )2
where:
Note: If Kp < Ka and/or K0 < Ka , then D-S HEET P ILING will calculate new K0 and/or Kp
ratios: Kp = Ka and/or K0 = Ka . The additional horizontal earth pressure due to load q
becomes:
KP
H = [(1 2 ) + sin 1 cos 1 sin 2 cos 2 ] (28.8)
29.1 Strength
When applying the calculation formulas of Mller-Breslau or Ktter, D-S HEET P ILING uses the
equations below to determine the yield stresses from the active and passive lateral effective
earth pressures:
p
a0 = Ka v0 2c Ka (29.1)
0 0
p
p = Kp v + 2c Kp (29.2)
with v 0 and p 0 a 0.
The linear distribution of vertical stress that D-S HEET P ILING assumes in order to apply these
formulas is only accurate for zero or uniform loads and horizontal surfaces.
Wall Friction
The values given in Table 29.1 Angle of wall friction values for clay, loam, sand and gravel
(acc. to Table 4 of NEN 6740:2006) for the angle of wall friction are prescribed by
NEN 6740:2006 (Table 4) for clay, loam, sand and gravel. In the case of peat, the angle of
wall friction should be set to zero.
Table 29.1: Angle of wall friction values for clay, loam, sand and gravel (acc. to Table 4 of
NEN 6740:2006)
Wall surface Roughness for straight slip surface for curved slip surface
Very rough > 10 d50 0.67
Rough 0.5 10 d50 0.67 2 - 2.5 with a maxi-
mum of 7.5
Semi-rough 0.1 - 0.5 d50 0.33 0.5
Smooth < 0.1 d50 0 0
29.2 Stiffness
The modulus of subgrade reaction, k describes the ratio between an increment of horizontal
stress and an increment of sheet pile wall displacement.
dH
k= (29.3)
dWH
The modulus of subgrade reaction is not a constant value, but actually depends on the depth
in the soil and the magnitude of the deformation. Correlation with other data is commonly
used (for example, with a cone penetration resistance qc or a Youngs modulus). General
guidelines on how to determine the modulus of subgrade reaction are contained in Terzaghi
(Terzaghi, 1955) and Mnard (Mnard, 1971). For Dutch conditions, additional guidelines are
provided in CUR publication 166 (CUR, 2005). Fortunately, the influence of a change in the
value of k on the resulting moments, forces and displacements is relatively small, since the
effect of k is only to the power of 1/4 (see Equation 27.1 in chapter 27).
Unloading in D-S HEET P ILING results in elasto-plastic behavior, as shown in Figure 29.1, below.
h D A p
a C
B
displacement w
In such a case, D-S HEET P ILING uses the following calculation procedure to determine the soil
stress and stiffness.
If the vertical stress changes, D-S HEET P ILING performs a shift in the diagram that relates
the horizontal stress to the displacement. The horizontal stress increment is related to
the vertical stress increment by means of H = K0 V (see Figure 29.2 below).
New horizontal soil pressures acting on the wall (h *) are determined on the basis of
the new spring characteristics (k *) and the wall displacement from the previous stage
(w0 in the illustration).
These new pressures mean that there is no longer equilibrium for the wall displacement
w0 . Therefore, new displacements are calculated (based on the new spring character-
istics).
Note: In Figure 29.2 the new spring (i.e. modulus of subgrade reaction k ) is usually identical
to the spring of the previous stage k , except in few cases:
When arching occurs, the modulus of subgrade reaction k must be multiplied by the
shell factor s. This is done automatically by the program, see Equation 38.3 in sec-
tion 38.1.2;
When a slope is present, k must be reduced compare to the horizontal situation. This
is not done by the program, the user has to determine and enter the new value in the
Soil Materials window (section 4.3.2.4);
When excavation occurs, the modulus of subgrade reaction can be slightly reduced.
This is not done by the program.
horizontal earth
pressure
p
*h
arctan k* p
h
arctan k h= Ko v
a
W displacement w
o
Moreover, when using the Feasibility module, a different simplest rule is used, called 3-type
rule with gravel from NEN (section 30.2.3), based on a simplification of the interpretation rule
prescribed by NEN 6740.
Table 30.2: Secant moduli of subgrade reaction from Table 3.3 of CUR 166
If the slip planes intersect, the anchor is treated as a short anchorage (section 31.1)
and a slip plane from the rotation point of the sheet piling to the toe of the anchor wall
is assumed according to Kranz theory (Kranz, 1953).
If the slip planes do not intersect, the anchor is treated as a long anchorage (sec-
tion 31.2) and the plate is analyzed as a stand-alone anchorage plate.
H Ec
Ea
Er
H -T
= arc tan
L cos B
rotation point
Figure 31.1: Stability of anchor wall for a short anchor (Kranz theory)
Note: The angle of the active slip plane and the positions of the rotation point in Figure 31.1
are automatically determined by the program. The rotation point is the first point below the
excavation level for which the calculated shear force in nil.
The equilibrium of the forces from the sheet piling, the anchor plate, the slip plane, the weight
of vertical soil slices and the loads lead to the allowable anchor force:
Ea (E0 + Er ) + Ec
P = (31.1)
Es
where:
Note: Calculation of the allowable anchor force P is performed for two cases: Ea and Er
calculated with and without loads, and the minimum is used.
Ep
E0 T
The equilibrium of the forces from the sheet piling and the anchor plate lead to the allowable
anchor force:
P = Ep E0 (31.2)
where:
Note: The applicability of the method for long anchorage is limited to anchor walls where
T is smaller than approximately twice the height of the anchor wall. If this is not the case, a
warning message will be displayed.
Note: Calculation of the allowable anchor force P is performed for two cases: Ep calcu-
lated with and without loads, and the minimum is used. Moreover, only Surcharge loads
(section 4.4.2) are taken into account (not Uniform Loads section 4.4.1).
Note: For long anchorage, the anchor force P is also checked for a short anchor (Kranz the-
ory) because it has been noticed that for long anchorage in some cases de Kranz verification
can be decisive.
A stability analysis according to Bishop assumes a circular slip surface, defined by a center
point and a tangent line. D-S HEET P ILING uses a grid of trial center points for the center of the
slip surface. The initial center points range from 4 m above to 4 m below the top of the sheet
piling in the vertical direction, and from 1 m to 7 m from the sheet piling on the passive side
in the horizontal direction. The grid spacing is 1 meter in each direction. Twelve trial tangent
lines are used, ranging from 1 m below the toe of the sheet piling to half the length of the
sheet piling below the toe. D-S HEET P ILING iteratively moves the grid of trial center points in
the direction of the lowest safety factor. D-S HEET P ILING assumes that all uniform loads end at
a distance from the wall of 5 times the length of the sheet piling. D-S HEET P ILING does not take
into account any stability reduction due to an intersection of the slip plane with the anchorage
plate.
peat peat
AZ 13
clay clay
sand sand
Optionally an input file and geometry file can be written for further stability analysis with
D-G EO S TABILITY (formerly known as MStab), see section 5.2.5. Cohesion and phi are writ-
ten as representative values. A non-uniform surcharge from D-S HEET P ILING is written to the
D-G EO S TABILITY input file as a mean value. This may create a small difference between the
stability results from D-G EO S TABILITY and D-S HEET P ILING.
D-S HEET P ILING considers the following contributions to the vertical force acting on the sheet
pile wall:
D-S HEET P ILING cannot determine the vertical forces caused by soil friction in detail, because
the required knowledge of the relative vertical displacement history is not produced as a result
of D-S HEET P ILING analysis. By default D-S HEET P ILING uses the safe assumption that friction
acts downwards on the active side, and upwards on the passive side (Figure 33.1). This
assumption is only useful if the default direction of the friction along the sheet piling is mainly
caused by the effect of the excavation itself. This may not be the case when normal force
loading also occurs.
The calculated design axial compression load on the (sheet) pile Fv is compared to the design
value of the base resistance of the (sheet) pile Rb;d :
qb;max Ab b
Rb;d = (33.1)
b
with:
Rb;k
Rb;d = according to article 7.6.2.3(4) of Eurocode 7 (33.2)
b
Rb;cal
Rb;k = according to article 7.6.2.3(5) of Eurocode 7 (33.3)
Rb;cal = Ab qb;max according to article 7.6.2.3(5) of Eurocode 7 (33.4)
where:
Rb;cal + Rs;cal Rc;cal (Rc;cal )mean (Rc;cal )min
Rc;k = Rb;k + Rs;k = = = min ;
3 4
(33.5)
For the calculation of the vertical force capacity of the soil Fmax , D-S HEET P ILING performs
this check for the case where plugging does not occur and also where it does (Figure 33.2).
In this latter case the area is taken to be the cross-sectional area of the sheet piling plus
the area of the plugged soil. However, for the calculation of the resulting vertical force Fv
in the unplugged case, a wall surface of 1 m2 /m is used instead of the paint surface (Acoat )
in accordance with the CUR 166 recommendations (part 1), leading therefore to the same
results for both plugged and unplugged cases.
The maximum point resistance, qb;max is a special average cone resistance, as defined in the
qc;I;mean is the mean cone resistance over trajectory I, that runs from the pile point level
to a level that is at least 0.7 times and at most 4 times the equivalent diameter
(Deq ) deeper (with this lower depth selected to make qb;max a minimum). If
b > 1.5 a, then Deq is equal to a.
qc;II;mean is the mean cone resistance over trajectory II, starting at the bottom of trajec-
tory I and ending at the pile point, with this value not larger than the previous
value in the trajectory;
qc;III;mean is the mean cone resistance over trajectory III, between the pile point level to
a level 8 times the equivalent diameter higher, with this value not larger than
the previous value in the trajectory;
Deq is the equivalent pilep diameter:
Deq = 1.13 a b/a
where a and b are respectively the smallest and the largest dimensions of the
largest cross-section of the pile point;
p is the pile factor, ranging from 0.5 for some bored piles types to 1.0 for some
driven piles;
is the pile base shape factor;
s is the pile base cross-section shape factor.
For special exceptions and further definition of factors, see the Dutch Annex of Eurocode 7
citepNEN9997-1+C1:2012.
The CUR method allows some modifications to be made should the vertical balance not be
met, as described below:
If the vertical balance is not met, assuming wall friction upwards on the passive side and
downwards on the active side, then the wall begins to move downwards (relative to the soil on
both sides of the wall). This means that the friction on the active side will now also be acting
upwards. The user can therefore enter a negative value for , the wall friction angle, in the
bottom layer on the active side only (a new soil type will need to be defined with this new wall
friction value, and the active and passive sides will need different profiles). This will have the
effect of reversing the friction direction on the side with this negative . If the vertical force
balance is still not met with this different friction direction in the bottom layer then the friction
direction in the second layer up on the active side can also be reversed in the same manner,
and so on.
Note: The vertical balance cannot be calculated correctly under combined walls. It is not pos-
sible to indicate CPT resistances for both toe levels. The calculation only takes into account
the lower toe resistance, the upper toe resistance is neglected.
The values of the partial safety factors are determined by the mechanism being considered,
by the variation of the parameter, and by the required safety level. The value of a partial safety
factor for a certain parameter is usually indicated by design codes or guidelines. The partial
safety factors are determined by the mechanism being considered, by the variation of the
parameter, and by the required safety level. The value of a partial safety factor for a certain
parameter is usually indicated by design codes or guidelines.
The use of representative values in combination with partial factors yields a high and/or low
design value for each parameter. Analysis of different combinations of the high and low val-
ues of parameters inside a variation study can be used to check whether failure is always
prevented or if serviceability is still ensured at the required safety level.
Probability
of this value
occuring
5% 5%
The partial safety factors provided in design guidelines are in turn derived from the required
values of a reliability index . The equation below, for example, produces the low design value
X = (34.1)
The in this expression is used as an influence parameter to model the predominance of the
parameter in relation to the considered failure mechanism.
The CUR design procedure distinguishes the following three safety classes, with correspond-
ing reliability indexes:
Class I Relatively simple constructions, no personal safety risks and relatively minor
damage in the case of overall failure. = 2.5
Class II Considerable damage in the case of overall failure; minor personal safety
risks. = 3.4
Class III Major damage in the case of overall failure and/or considerable personal
safety risks. = 4.2
34.2 Support of the CUR 166 step-by-step procedure by D-S HEET P ILING
In CUR publication 166 (CUR, 2005), the design of a sheet piling with single anchorage is
summarized by defining 11 steps. D-S HEET P ILING supports particular parts of the following
steps:
Step 5: Determine the minimum length of the sheet piling using a stability analysis
(section 5.2.2) including modified soil properties, surface levels and water
levels. Modification is performed according to sub-step 6.3 (as described
below)
Step 6: Determine the design values for sheet piling dimensions
Five combinations of modified soil properties, surface levels and water lev-
els. Those five combinations are referred as sub-steps 6.1, 6.2, 6.3, 6.4 and
6.5.Modified soil properties are calculated by applying partial factors on the
input low representative values for cohesion, friction and modulus of subgrade
reaction of the soil. Modified ground and water levels are calculated by apply-
ing level variations on the input water levels at the active and passive sides
and on the input ground level at the passive side. Figure 34.2 to Figure 34.6
gives a schematic representation of the modifications for each sub-steps and
Table 34.1gives an overview of the design values for each sub-steps.If safety
classes I, II or III are selected, the values of the partial factors and level vari-
ations defined in the User Defined Partial Factors window (section 4.1.2) are
used.
The design values for the Surcharges (section 4.4.2) and Uniform Loads
section 4.4.1 are calculated using the input partial factor in the correspond-
ing window. Values of partial factors for permanent or temporary loads are
prescribed in table 3.7 of (CUR, 2005). Mean values of bending stiffness
section 4.2.1 and anchor stiffness (section 4.5.1) must be entered. See ta-
bles 3.1 and 3.3 of (CUR, 2005) for representative values of soil parameters.
D-S HEET P ILING offers the Lowest values of the modulus of subgrade reac-
tion according to table 3.3 in section 4.3.2. If the Highest values are re-
quired the user needs to input them manually, multiplying the Lowest value
by 2.25.For a given length of the sheet piling, D-S HEET P ILING calculates the
maximum moment and the maximum displacement obtained from the five
sub-steps. If 100% of the mobilized resistance or if a displacement of 25%
of the sheet piling length are reached, the sheet piling is considered to be
unstable.
Step 7: Determine the design moment (section 5.2.3) in the sheet piling by performing
analysis for the five combinations of Step 6 presented above. The design
moment corresponds to the maximum moment determined from the five sub-
steps.
Step 9: Determine the design anchor force (section 5.2.3) by performing analysis for
the five combinations of Step 6 presented above using a higher value for the
anchor stiffness. This new stiffness is determined using a multiplication factor
specified by the user (see the Verify Sheet Piling tab of the Start Calculation
window in section 5.2.3) according to the selected safety class. The design
anchor force corresponds to the maximum anchor force determined from the
five sub-steps.
Step 9.7: Check vertical force balance (section 6.2) with the simplified assumption of
total friction on the active and passive sides. If the vertical balance is not met
then reversal of the wall friction force direction in the lower layers is permitted.
See chapter 33 for background information.
Step 10: Determine the design displacements (section 5.2.3) from the Serviceability
Limit calculation which corresponds to Step 6.5. This means that the input
low representative values for the cohesion, friction and modulus of subgrade
reaction are used to find the design value, with no modification on the input
ground and water levels needed.
Step 11.1: Check anchor wall stability (section 5.2.4) using the Kranz method. See chap-
ter 31 for background information.
Step 11.3: Check overall sheet piling stability (section 5.2.5) using the Bishop method.
The strength parameter of cohesion and the friction angle phi are divided by
1.5 and 1.2 respectively, for all safety classes (for safety classes see sec-
tion 34.1). The driving moment is multiplied by 0.9 (class I), 1.0 (class II)
or 1.1 (class III) as prescribed in table 3.11 from CUR 166. For background
information, see chapter 32.
Table 34.1: Design values of soil properties according to Step 6 of the CUR 166 proce-
dure
Table 34.2: Design values of ground and water levels according to Step 6 of the CUR 166
procedure
step 6.1
Figure 34.2: Schematic representation of the soil stiffness, surface levels and water levels
modifications according to step 6.1 of the CUR 166 design procedure
step 6.2
Figure 34.3: Schematic representation of the soil stiffness, surface levels and water levels
modifications according to step 6.2 of the CUR 166 design procedure
step 6.3
Figure 34.4: Schematic representation of the soil stiffness, surface levels and water levels
modifications according to step 6.3 of the CUR 166 design procedure
step 6.4
Figure 34.5: Schematic representation of the soil stiffness, surface levels and water levels
modifications according to step 6.4 of the CUR 166 design procedure
step 6.5
Figure 34.6: Schematic representation of the soil stiffness, surface levels and water levels
modifications according to step 6.5 of the CUR 166 design procedure
step 9.1
Note: For steps 6.1 to 6.4, if the water level exceeds the ground level when increased, then
it is set equal to the ground level.
34.3.1 Partial safety factors On all stages (method A) or one stage (method B)
The CUR 166 procedure itself does not prescribe whether partial factors on strength and load
should be applied to all construction stages, or just to the stage that is checked. Application of
partial factors during only one stage can be beneficial, because it allows lower safety factors to
be applied during previous stages. D-S HEET P ILING supports the application of partial factors
to both individual stages (method B) and to all construction stages (method A) (section 34.2).
Method A applies the partial factor set to all construction stages. Method B checks all stages
as a final stage. Method B assumes low representative values, with no partial factors, for
all stages apart from the final stage being checked. The partial factors corresponding to the
selected safety class are only applied to the final stage. Using method B allows each stage
to be checked (as a final stage) using a different safety class, which can result in a more
economical design. Method A, however, gives a more conservative approach and requires
less calculation.
Table 34.4: Level variations according to Table 3.7 of the CUR 166 design procedure
section 35.1: The general Eurocode 1997 - Part 1: General rules (NEN-EN, March
2005);
section 35.2: The Dutch annex of the Eurocode 7 (NEN, september 2009) which pre-
scribes the same design procedure as the CUR 166 design procedure (CUR, 2005),
except that the default partial factors are different;
section 35.3: The Belgian annex of the Eurocode 7 (NBN-EN, january 2011).
The Design Approach used will depend on the choice of the country where the verification is
performed/the construction takes place, in order to conform to their design methods. It should
be verified that a rupture or excessive deformation will not occur with the appropriate set of
partial factors applied.
Table A.3 gives the recommended partial factors on actions or on the effects of actions;
Table A.4 gives the recommended partial factors for soil parameters;
Table A.13 gives the recommended partial resistance factors for retaining structures.
For design approaches DA 1 combination 2 and DA 3, the partial factors are applied on
the loads whereas for design approaches DA 1 combination 1 and DA 2, the partial factors
are applied on the effect of the loads. In this second case, D-S HEET P ILING multiplies the
calculated moments and shear forces with a factor of 1.35 and applies a partial factor of only
1.1 (= 1.5/1.35) instead of 1.5 to the temporary unfavorable loads.
The partial resistance factor R;e has an effect on the maximum percentage of mobilized
resistance by decreasing it to a limited value of 100%/R;e instead of 100%.
Table 35.1: Partial factors for retaining structures acc. to the general Eurocode 7
DA 1 DA 1 DA 2 DA 3
set 1 set 2
Partial factors on actions (F ) or the effects of actions (E ):
Permanent, unfavorable G;dst 1.35 1 1.35 1
Permanent, favorable G;stb 1 1 1. 1
Temporary, unfavorable Q;dst 1.5 1.3 1.5 1.3
Temporary, favorable Q;stb 0 0 0 0
Partial factors on soil parameters (M ):
Tangent of the angle of shearing resis. 1 1.25 1 1.25
Effective cohesion c0 1 1.25 1 1.25
Undrained shear strength cu 1 1.4 1 1.4
Unconfined strength qu 1 1.4 1 1.4
Weight density 1 1 1 1
Partial resistance factors (R ):
Bearing capacity R;v 1 1 1.4 1
Sliding resistance R;h 1 1 1.1 1
Earth resistance R;e 1 1 1.4 1
Ground surfaces
According to Eurocode 7, the level of the resisting soil is lowered below the nominally expected
level by an amount a equal to 10% of the distance between the lowest support and the
excavation level, limited to a maximum of 0.5 m.
Water levels
The design input value for the position of the phreatic surfaces and the free water is defined
by the user.
Table A.3 gives the recommended partial factors on actions or on the effects of actions;
Table A.4 gives the recommended partial factors for soil parameters;
Table A.14 gives the recommended partial resistance factors for overall stability.
Note: D-S HEET P ILING is not a program dedicated to overall stability and performs therefore a
quick stability check by applying partial factors only on soil parameters. For a complete overall
stability check, the user has to divide the calculated resisting moment by R;e . Besides,
if approaches DA 1,1 or DA 2 are used, the user has to multiply the driving moment (i.e.
resulting effect of the actions on the failure surface) by E . If approaches DA 1,2 or DA3 are
used, the user has to enter a design magnitude for loads.
The soil parameters of cohesion and friction angle are divided by the prescribed partial factors.
For the unit weight, low and high design values are used (i.e. input representative values are
respectively divided and multiplied by the prescribed partial factor. The minimum calculated
overall stability factor of both calculations is kept.
Table 35.2: Partial factors for overall stability acc. to Eurocode 1997-1
DA 1 DA 1 DA 2 DA 3
set 1 set 2
Partial factors on actions (F ) or the effects of actions (E ):
Permanent, unfavorable G;dst 1.35 1 1.35 1
Permanent, favorable G;stb 1 1 1. 1
Temporary, unfavorable Q;dst 1.5 1.3 1.50 1.3
Temporary, favorable Q;stb 0 0 0 0
Partial factors on soil parameters (M ):
Tangent of the angle of shearing resis. 1 1.25 1 1.25
Effective cohesion c 0 1 1.25 1 1.25
Undrained shear strength cu 1 1.4 1 1.4
Unconfined strength qu 1 1.4 1 1.4
Weight density 1 1 1 1
Partial resistance factors (R ):
Earth resistance R;e 1 1 1.1 1
The overall sheet piling stability is checked using the Bishop method (chapter 32). According
to Eurocode 1997-1, circular slip surfaces where ground or embankment material is relatively
homogeneous and isotropic can be assumed.
Reliability Class 1: Low consequence for loss of human life, and economic, social or
environmental consequences small or negligible. = 3.3
Reliability Class 2: Medium consequence for loss of human life, economic, social or
environmental consequences considerable. = 3.8
Reliability Class 3: High consequence for loss of human life, or economic, social or
environmental consequences very great. = 4.3
Note: Another Reliability Class called RC 0 is also available in D-S HEET P ILING (see Figure 4.3
in section 4.1.2.2) corresponding to Class I of the CUR procedure (section 34.1) for the design
a simple constructions ( = 2.5).
The Dutch annex the level of the resisting soil is lowered below the nominally expected level by
an amount a equal to 10% of the distance between the lowest support and the excavation
level, limited to a maximum of 0.5 m.
Table 35.5: Partial factors (for overall stability) on soil parameters acc. to the Dutch Annex
of Eurocode 7
Table A.3 ANB gives the recommended partial factors on actions or on the effects of
actions;
Table A.4 ANB gives the recommended partial factors for soil parameters;
Table A.13 ANB gives the recommended partial resistance factors for retaining struc-
tures.
Table 35.6: Partial factors acc. to the Belgian annex NBN-EN 1997-1 ANB
Combination 1 Combination 2
Partial factors on actions (F ) or the effects of actions (E ):
Permanent, unfavorable G;dst 1.35 1
Permanent, favorable G;stb 1 1
Temporary, unfavorable Q;dst 1.5 1.1
Temporary, favorable Q;stb 0 0
Partial factors on soil parameters (M ):
Tangent phi 0 1 1.25
Effective cohesion c0 1 1.25
Undrained strength cu 1 1.4
Unit weight 1 1
Partial resistance factors (R ):
Bearing capacity R;v 1 1
Sliding resistance R;h 1 1
Earth resistance R;e 1 1
For combination 2, the partial factors are applied on the loads whereas for combination 1,
the partial factors are applied on the effect of the loads. In this second case, D-S HEET P ILING
multiplies the calculated moments and shear forces with a factor of 1.35 and applies a partial
factor of only 1.1 (= 1.5/1.35) instead of 1.5 to the temporary unfavorable loads.
Table 35.7: Partial factors for overall stability acc. to Eurocode 1997-1
Combination 1 Combination 2
Partial factors on actions (F ) or the effects of actions (E ):
Permanent, unfavorable G;dst 1.35 1
Permanent, favorable G;stb 1 1
Temporary, unfavorable Q;dst 1.5 1.1
Temporary, favorable Q;stb 0 0
Partial factors on soil parameters (M ):
Tangent of the angle of shearing resis- f 1 1.25
tance
Effective cohesion c0 1 1.25
Undrained shear strength cu 1 1.4
Unconfined strength qu 1 1.4
Weight density 1 1
Partial resistance factors (R ):
Earth resistance R;e 1 1
Figure 36.1: Effect of a surcharge when not using the initial stage
The stress following from the Boussinesq assumption is multiplied by a factor f to account for
the existence of the sheet piling, see section 28.3.
Figure 36.2: Effect of a surcharge when using the initial stage option
The neutral stress changes when the initial stage option is used, whilst the active and passive
yield stresses remain the same as when the initial stress option is not used. This is illustrated
in Figure 36.3 below.
horizontal p horizontal p
stress stress
with initial
n without initial
a
n without initial a
with initial
displacement displacement
Figure 36.3: Soil stresses on both sides of the sheet pile wall, with and without the initial
stage option being used
On both sides of the sheet piling, the same value of initial neutral horizontal stress will result,
as long as the theoretical neutral stress is within the yield limits (a < n < p ). If this
condition can not be satisfied on a certain side however, the neutral stress will be set equal to
the yield limit, and deformation of the sheet piling will occur.
The load correction by the initial option remains active during all following stages, as long as
the soil is not excavated. See Equation 36.4 and Equation 36.5.
The solution method for single piles used by D-S HEET P ILING is the same as the solution
method for a sheet pile wall chapter 27 although some changes have been made to account
for the differences between a long wall and a single pile (where arching occurs).
To calculate the effect of soil displacements on a pile, the following steps should be performed:
Determine the soil displacements which would exist at the location of interest, where
the pile not presents, using one of both options:
Calculated soil displacements by D-S HEET P ILING using the De Leeuw tables (section 37.1.1);
User defined soil displacements calculated from an other program, for example a finite
element program;
Use D-S HEET P ILING to determine the displacements, moments and forces in the pile as
a result of these input undisturbed soil displacements (section 37.1.2).
Note: In case of an inputted embankment load, D-S HEET P ILING schematizes it as an equiv-
alent uniform load with a certain width as illustrated in Figure 37.2.
Limitations
The method has the following limitations:
As Poisson ratio = 0.5 is used (i.e. incompressible layer), this gives the elastic re-
sponse of the soil in an undrained situation, so in fact directly after applying the load;
additional horizontal deformations due to consolidation are not accounted for;
The thickness of the stiff top layer is not taken into account.
The horizontal distance of the pile to the boundaries of the surcharge load is limited to
6 times the thickness of the elastic layer.
Elasticity modulus
The Youngs modulus of the elastic layer can either be directly prescribed by the user or au-
tomatically estimated by D-S HEET P ILING from the average unit weight of the elastic layers.
D-S HEET P ILING determines the average unit weight avg of several soft layers using the fol-
lowing formula:
n
P
i hi
i=1
avg = (37.1)
H
where:
The elasticity modulus is then derived from the dry unit weight by linear interpolation in the
table below, according to De Leeuw & Timmermans.
Table 37.1: E-modulus vs. unit weight (De Leeuw & Timmermans)
E
[kN/m3 ] [kN/m2 ]
10 575
13 1000
18 1500
19 2800
h0
k= (37.2)
uh
where:
uh is the horizontal soil displacement calculated with De Leeuw tables (De Leeuw,
1963).
Figure 37.3: Lateral earth pressure and pile deformation by soil deformation
D-S HEET P ILING does not consider geometrical non-linearity while the prescribed soil displace-
ments are being applied. A normal force (such as the weight of a building supported by the
pile) will therefore not affect the bending moment during analysis of prescribed displacements.
Soil reaction
D-S HEET P ILING uses Equation 29.1 and Equation 29.2 to determine the active and passive
lateral pressures from the input of the lateral earth pressure coefficients. The soil stiffness is
determined from the input of the modulus of subgrade reaction. When performing single pile
calculations based upon soil displacements the user needs to take the effect of arching into
account by suitable modification of the earth pressure coefficients. Ka and K0 are usually
modeled as zero, whilst Kp needs to be determined specially:
In soil layers with soil displacements a calculation has to be made for the situation without
a pile. This calculation gives the soil displacements, U , and change in soil pressure ( )
on the location of the pile. The horizontal subgrade modulus can then be calculated in this
way: Khor = s 2 /U . In this formula s is the shell factor (in soft layers mostly 1.5).
Alternatively, the passive earth pressure coefficient, Kp can be calculated automatically by
selecting the Brinch-Hansen method (see section 37.2.1) in which case Ka and K0 will be
set to zero.
When calculating for piles loaded by soil displacements, the results of the calculation are
highly influenced by the soil displacements and the value of the horizontal subgrade modulus
in the displacing soil layers.
37.2.1 Brinch-Hansen
D-S HEET P ILING uses Equation 37.3 to determine the passive pressure against the pile ac-
cording to Brinch-Hansen (Brinch-Hansen and Christensen, 1961).
p = Kq v0 + Kc c, a = 0, n = 0 (37.3)
where:
Kq0 = e( 2 +)tan cos tan + e( 2 +)tan cos tan
h 4 2 i 4 2
0
Kc = e 2 ( + ) tan
cos tan + 1 cot
4 2
Kq = Kc K0 tan
Kc = Nc d c
d
c = 1.58 + 4.09 tan4
2
h i
tan
Nc = e tan + 1 cot
4 2
K0 = 1 sin for OCR = 1
Kq0 K0 sin
q =
sin 4 + 2
0
Kq Kq
K0
c = c 0 2 sin +
Kc Kc 4 2
D is the average depth at the middle of the layer [m].
As the pressure is a function of depth, the same soil material cannot be used in D-S HEET P ILING
at different depths. Instead, if the same soil type occurs at different depths then a copy of the
soil type needs to be made for each instance of the soil type. It is also recommended that
thick layers are split into two or more layers for better representation of the change in passive
pressure with depth.
37.2.2 Mnard
D-S HEET P ILING uses Equation 37.6 to determine the modulus of subgrade reaction according
to Mnard (Mnard, 1971). This method automatically takes the effect of arching into account.
( h i
1
1 3Em
1.3R0 2.65 rR0 + R if R R0
= (37.6)
kh 2R
4(2.65) +3
if R < R0
Em 18
where:
Berlin Walls. Berlin Walls are a combination of I-shaped piles, with horizontal planks
inserted in the upper part. If the bending stiffness of the planks is negligible then
direct output of the true bending moment of each pile can be produced. The Com-
bined Wall wizard (section 4.2.2) automatically converts the wall into the appropriate
D-S HEET P ILING model. For example, if the piles of a Berlin wall are positioned 3 m
center-to-center and the width of the flange is 0.4 m, for the upper part an acting width
of b = 3 m is used and the stiffness of a pile is divided by 3: EI = EIpile /3. For the
lower part with only piles, the width of the soil that acts on a single pile is b = 0.4, the
stiffness is divided to give EI = EIpile /0.4.
Combined walls. The Combined Wall wizard (section 4.2.2) automatically converts
a combined wall, which is made from a combination of regular sheet piling parts with
tubular piles, into the appropriate D-S HEET P ILING model. For instance, for piles posi-
tioned 3 m center-to-center, with an outer diameter of 0.8 m with the sheet piling parts
contributing to the bending stiffness: For the upper part, an acting width of b = 3 m is
used, and the stiffness of the section is divided by 3: EI = EIsection /3. For the lower
part with only piles, the acting width is b = 0.8 m and the pile stiffness is again by the
acting width: EI = EIpile /0.8
A simplified way to deal with the effects of arching is, given a certain pile width bpile , to
assume an equivalent soil width beq . Then the passive lateral earth pressure coefficient and
the modulus of subgrade reaction per running meter should be multiplied by the shell factor
beq
b
, and active lateral earth pressure coefficient should be divided by this factor (Figure 38.1).
pile
p = K*p v
k*
p = Kp v
k
a = Ka v
a = K*a v
The resulting equations for the soil pressure (per unit area) are:
beq
s= (38.1)
bpile
Kp = s Kp (38.2)
k = s k (38.3)
Ka
Ka = (38.4)
s
The shell factor s is a user defined input value in the Soil Materials window (see section 4.3.2).
D-S HEET P ILING modifies automatically the passive and active earth pressure coefficients Kp
and Ka according to Equation 38.2 and Equation 38.4 respectively and the modulus of sub-
grade reaction according to Equation 38.3.
Note: The vertical balance cannot be calculated correctly under combined walls. It is not pos-
sible to indicate CPT resistances for both toe levels. The calculation only takes into account
the lower toe resistance, the upper toe resistance is neglected.
There are various approximation methods available which take account of the load distribution.
The method outlined below is very common.
1
q' = q 1+2d
load
surface level
l + 2d d
l
b
45o
sheet piling
The influence of a top load q (with constant dimensions b l) on the sheet pile wall can be
calculated in the following way:
The top load is assumed to be distributed over an angle of 45 from the front of the load
(see Figure 38.2, left). This produces the following load formula:
l
q0 = q (38.5)
l + 2d
The load q calculated in this way is then entered as being applied over the distance
between d and d + b behind the wall (see Figure 38.2, right). The influence of this load
can now be calculated using D-S HEET P ILING.
sheet piling
load q
d1
l3 l2 l1
d2
d3
ln
q'n = q
q'2 ln + 2dn
q'1
q'3
Figure 38.3: Calculated load (bottom) for a load shape that is not constant (top)
This method can also be used if the load in the direction perpendicular to the wall is indeed
constant, but it extends so far away from the wall that division into a number of sub-loads is
more economical. It must always be assumed that load distribution starts from the side that is
closest to the sheet piling.
The presence of this impermeable layer of concrete maintains the water level below it. How-
ever, if the water table on the other side of the sheet pile wall is higher than the floor of the
pit then the water pressures on the excavated side will not start at zero at the water level, and
the floor will experience uplift. The concrete floor will need to be piled in order to resist this
uplift force. These effects can be modeled in different ways. One of the methods is described
below, and consists of the following steps:
The underwater concrete is modeled as a soil layer. This means that the concrete is
considered as a system of vertically unlinked elasto-plastic springs, in the same way as
other soil layers. Fixed values should be used for the characteristics of the soil layer.
The water pressure against the bottom of the underwater concrete can be modeled in the
following way:
The soil water table is set at the level of the bottom of the concrete floor.
A uniform load acting on the top of the concrete layer is entered, with a size equal to
the direct water pressure under the floor. This load represents the forces acting on the
floor from the floors piles.
For all soil layers under the floor, an excess pore water pressure is entered which is the
same as the top load. This causes the water pressure distribution to be correct.
d = n = 0 is used for the concrete, assuming that the uplift forces on the floor and
the weight of the floor are transmitted to piles and therefore do not act on the soil layer
directly below the concrete.
See chapter 13 for a detailed tutorial example of the application of this method.
38.4 Difference in pressure heads on both sides of the sheet pile wall
In addition to a soil-retaining function, sheet pile walls also often have a water-retaining func-
tion. In this case, the water pressure on both sides of the sheet piling will be different. The
difference in water pressure gives rise to a water flow under the toe of the sheet piling.
This flow affects the pressure against the sheet piling in two ways:
The water flow changes the water pressure that is directed immediately against the wall.
Because of this, the pressure on the side of the wall with the highest water pressure will
decrease, while the pressure on the other side will increase. At the toe of the wall, the
pressure difference is zero.
Due to the change in the water pressures, the effective stress in the soil mass around
the wall also changes. This will cause the effective stress against both sides of the wall
to change.
sheet piling
p2 - p1
d2
hydrostatic pressure
d1
w1 w2
hydrostatic pressure
p1 p2
In general, the approximation methods described below will be sufficient. For cases with a
major difference in water pressure, or for very critical cases, a flow calculation should be
performed using a specialized flow program, such as Deltares Systems MSeep.
A pore water under-pressure is entered on the side with the highest pressure:
0.7 h
w = Y2 (38.6)
d2 + d1 d2
On the other side, an excess pore water pressure is entered in accordance with:
0.7 h
w = + Y1 (38.7)
d1 + d1 d2
where:
It should be noted that when using this method, a minor difference in water pressure remains
at the toe.
di 1
wi = h w P di (38.8)
ki k i
where:
Figure 38.5 is a diagram of the pressure in a stratified soil, as calculated using the equation
given above.
d1, k1
hydrostatic
pressure
d3, k3 d2, k2
flow
A contiguous bored-pile wall can be modeled in D-S HEET P ILING by inputting an equivalent
stiffness of:
D4
EI = Epile (38.9)
64 d
D3
EI = Epile (38.10)
64
They can be modeled in D-S HEET P ILING by inputting an equivalent stiffness of:
D4
EI = (6 sin 4 + 8 sin 2 12) Epile (38.11)
384 d
and an equivalent section of:
D2
S= ( + sin 2 2) (38.12)
4d
with: = arccos (d/D)
In case of reinforced concrete piles, Equation 38.9 and Equation 38.11 given above must be
adapted to take the reinforcement effect into account.
D3
EI = Econcrete + Isteel (Esteel Econcrete ) (38.13)
64
For spaced pile wall:
1 D4
EI = Econcrete + Isteel (Esteel Econcrete ) (38.14)
d 64
For secant bored-pile wall:
D4
EI = (6 sin 4 + 8 sin 2 12) Econcrete
384 d
+ Isteel (Esteel Econcrete ) (38.15)
where:
The densification or generation of excess pore pressures is calculated from the shear strain
amplitude and the number of loading cycles. The used model is the so called C/L model. The
propagation of vibrations is calculated using a stress attenuation formulation. Dissipation of
excess pore pressures is calculated with a standard consolidation equation with both vertical
and radial dissipation. For a more detailed description of the modeling reference is made to
the literature (Meijers and Tol, Juli 2010) (Meijers, december 2007).
For the calculation of the densification an axial symmetric geometry is used. The dimensions
are among others determined by the cross section area
The program calculates the situation for installation of the sheet piles. For the situation of
removal it is taken that the densification at the not-excavated site amounts 20% of the densi-
fication during installation. With this the settlements during removal and the total settlement
are calculated. The used expressions are:
Please be aware that for the excavated and back-filled site the settlements during removal are
not predicted with the present implementation of the model.
39.2 Parameters
The model uses a large number of parameters. In the implementation in D-S HEET P ILING, one
part of them is fixed parameters whereas the other part is user-defined parameters.
The other soil parameters are derived from a correlation with the relative density.
Installation speed 2 m/min (in this parameters also the effect of multiple sheet piles on
the densification is accounted for);
Minimum and maximum porosity (nmin = 0.33 and nmax = 0.45);
Ratio angle of interface friction and angle of internal friction (/ = 1 is used);
Parameter for the stress attenuation with distance (n = -1 is used).
The benchmarks are subdivided into five separate groups as described below.
Group 1 Benchmarks from literature (exact solution) Simple benchmarks for which
an exact analytical result is available from literature.
Group 3 Benchmarks from spread sheets Benchmarks which test program features
specific to D-S HEET P ILING.
Group 4 Benchmarks generated by D-S HEET P ILING Benchmarks for which the ref-
erence results are generated using D-S HEET P ILING.
Group 5 Benchmarks compared with other programs Benchmarks for which the
results of D-S HEET P ILING are compared with the results of other programs.
The number of benchmarks in group 1 will probably remain the same in the future. The reason
for this is that they are very simple, using only the most basic features of the program.
The number of benchmarks in group 2 may grow in the future. The benchmarks in this chapter
are well documented in literature. There are no exact solutions available for these problems,
however in the literature estimated results are available. When verifying the program, the
results should be close to the results found in the literature.
The number of benchmarks in groups 3, 4 and 5 will grow as new versions of the program are
released. These benchmarks are designed so that (new) features specific to the program can
be verified. The benchmarks are kept as simple as possible so that only one specific feature
is verified from one benchmark to the next.
As much as software developers would wish they could, it is impossible to prove the correct-
ness of any non-trivial program. Re-calculating all the benchmarks in this report, and making
sure the results are as they should be, proves to some degree that the program works as it
should. Nevertheless, there will always be combinations of input values that will cause the
program to crash or to produce wrong results. Hopefully by using the verification procedure
the number of ways this can occur will be limited.
The benchmarks are all described in detail in the Verification Report available in the installa-
tion directory of the program.
The input files can be found on CD-ROM or can be downloaded from our website:
www.deltaressystems.com.
CUR, 2005. Publikatie 166: Damwanconstructies. 4e druk (Design Guide Sheet Piling, in
Dutch) .
De Leeuw, E. H., 1963. Tabellen ter bepaling van horizontale spanningen en verplaatsingen
in een homogene elastische laag van eindige dikte. Laboratorium voor Grondmechanica,
Delft (The Netherlands). SE-58-IX-b.
Harderwijk and NVAF/PSW, 2002. Schadevrij installeren van stalen damwand in Nederland.
.
Jky, J., 1948. Minimum value of earth pressure. Proc. 2nd Int. Conf. Soil Mech. Found.
Eng. I, Rotterdam.
Janbu, N., L. Bjerrum and B. Kjaernsli, 1956. Veiledning ved lsing av fundamenteringsopp-
gaver (Soil mechanics applied to some engineering problems). Norwegian Geotechnical
Institute Publ. 16. Oslo.
Ktter, F., 1903. Die Bestimmung des Druckes an gekrmmten Gleitflchen. Sitzungsbericht
Kn. Preu. Ak. d. Wissenschaften, Berlin.
Kranz, E., 1953. ber die Verankerung von Spundwnden. Verlag Wilhelm Ernst & Sohn.
Meijers, P., december 2007. Settlement during vibratory sheet piling Dissertatie TU Delft. .
Meijers, P. and A. F. v. Tol, Juli 2010. Voorspelling maaiveldzakking door het in en uittrillen
van damwanden. GEOtechniek pages 40-45.
Mnard, L., 1971. Mthode gnrale de calcul d'un rideau ou d'un pieu sollicit horizon-
talement en fonction des rsultats pressiomtriques. Sols-soils VI: 22-23. Mnard, L., Et.
Al.
NBN-EN, january 2011. NBN-EN 1997-1 ANB:2011 Ontw (Belgian Design Code). Eurocode
7: Geotechnisch ontwerp Deel 1: Algemne regels (National Annex of Eurocode 7:
Geotechnical design Part 1: General rules), 1st edition, Draft.
NEN, 2006. NEN 6740:2006. Geotechniek - TGB 1990 - Basiseisen en belastingen (Geotech-
nics - TGB 1990 - Basic requirements and loads), in Dutch.
NEN, 2012. NEN 9997-1+C1:2012 (nl). Geotechnisch ontwerp van constructies - Deel 1:
Algemene regels (Geotechnical design of structures - Part 1: General rules), in Dutch.
NEN, september 2009. NEN 9997-1:2009 Ontw (Dutch Design Code). Geotechnisch ontwerp
van constructies - Samenstelling van NEN-EN 1997-1, NEN-EN 1997-1/NB Nationale bi-
jlage en NEN 9097-1 Aanvullingsnorm bij NEN-EN 1997-1 (Geotechnical design of struc-
tures - Composition of NEN-EN 1997-1 and NEN-EN 1997-1/NB national annex and NEN
9097-1 complementary standard to NEN-EN 1997-1), Draft.
NEN-EN, March 2005. NEN-EN 1997-1:2005 (Dutch Design Code). Eurocode 7: Geotech-
nisch ontwerp Deel 1: Algemne regels (Eurocode 7 - Geotechnical design, Part 1: Gen-
eral rules).