1. Types of bridge Rail Over Bridge
2. Overall Width of bridge 13.00 mts
3. Clear Carriagway 12.10 mts
4. R.C.C. Crush Barrier 0.45 m on either side
5. Total length of ROB with
approaches excluding railway
portion
Gudhiyari side Gondwara side
i. Viaduct (Girder) - 115 m (5 i. Viaduct (Girder) - 138 m
span of 23m) ii. Abutment - 4.0 m
ii. Abutment - 4.00 m iii. Retaining wall - 109.0m
iii. Retaining wall - 94 iv. P.C.C. - 30.0 m
iv. P.C.C. -
6. Foundation level
i. Abutment A1 & A2 R.L. 92.94 M.
ii. Pier P1 to P4 R.L. 93.13 M
iii. Pier P5 to P8 R.L. 92.47 M
iv. Retaining wall Gondwara side avg. R.L. 95.70 M
v. Retaining wall gudhiyari side avg. R.L. 97.45 M
3. Normal Consistency 32 %
6. Soundness of cement 1 mm
Cement:- 1. 10 100%
2. 4.75 97.97%
3. 2.36 94.47%
4. 1.18 77.07%
5. 0.6 50.70%
6. 0.3 8.50%
7. 0.15 0.10%
Test of Aggregate:-
Coarse Aggregate :-
20 mm 1. Specific Gravity 2.760