CIVIL BABA INFRA CONSULTANTS PVT. LTD. CICPL/D1012/DES/REP/ 2017
LVUP/001 PROJECT: Six Laning of NH-8 from Km 494+410 to Km 509+550 in the State of Gujarat Prepared Checked By Rev. on EPC mode under NHDP Phase V By STRUCTURE: Design Calculation for LVUP. A.K. V.P. R1 19 CON GY -2.43 0.12 ***********************20% of longitudinal force 32 CON GX 1.95 0.225831 29 CON GX 0.81 0.841666 25 CON GX 0.49 0.724999 22 CON GX 0.49 0.8625 19 CON GX 0.49 0.12 LOAD 13 40T MEMBER LOAD 20 CON GY -4.11 0.354167 17 CON GY -8.79 0.2 ***********************20% of longitudinal force 20 CON GX 0.82 0.354167 17 CON GX 1.76 0.2 LOAD 14 40T MEMBER LOAD 32 CON GY -9.29 0.125831 29 CON GY -4.11 0.741666 ***********************20% of longitudinal force 32 CON GX 1.86 0.125831 29 CON GX 1.86 0.741666 LOAD 15 70R MEMBER LOAD 26 CON GY -2.46 0.779166 24 CON GY -3.49 0.770833 23 CON GY -3.49 0.416667 20 CON GY -3.49 0.554167 17 CON GY -7.22 0.2 ***********************20% of longitudinal force 26 CON GX 0.49 0.779166 24 CON GX 0.7 0.770833 23 CON GX 0.7 0.416667 20 CON GX 0.7 0.554167 17 CON GX 1.44 0.2 LOAD 16 70R MEMBER LOAD 28 CON GY -2.46 0.887499 26 CON GY -3.49 0.879166 25 CON GY -3.49 0.525 22 CON GY -3.49 0.6625 21 CON GY -3.49 0.308333 ***********************20% of longitudinal force 28 CON GX 0.49 0.887499 26 CON GX 0.7 0.879166 25 CON GX 0.7 0.525 22 CON GX 0.7 0.6625 21 CON GX 0.7 0.308333 PERFORM ANALYSIS FINISH