DOCUMENT NO: DATE: Aug-

CIVIL BABA INFRA CONSULTANTS PVT. LTD. CICPL/D1012/DES/REP/ 2017


LVUP/001
PROJECT: Six Laning of NH-8 from Km 494+410 to Km 509+550 in the State of Gujarat Prepared Checked By Rev.
on EPC mode under NHDP Phase V By
STRUCTURE: Design Calculation for LVUP. A.K. V.P. R1
19 CON GY -2.43 0.12
***********************20% of longitudinal force
32 CON GX 1.95 0.225831
29 CON GX 0.81 0.841666
25 CON GX 0.49 0.724999
22 CON GX 0.49 0.8625
19 CON GX 0.49 0.12
LOAD 13 40T
MEMBER LOAD
20 CON GY -4.11 0.354167
17 CON GY -8.79 0.2
***********************20% of longitudinal force
20 CON GX 0.82 0.354167
17 CON GX 1.76 0.2
LOAD 14 40T
MEMBER LOAD
32 CON GY -9.29 0.125831
29 CON GY -4.11 0.741666
***********************20% of longitudinal force
32 CON GX 1.86 0.125831
29 CON GX 1.86 0.741666
LOAD 15 70R
MEMBER LOAD
26 CON GY -2.46 0.779166
24 CON GY -3.49 0.770833
23 CON GY -3.49 0.416667
20 CON GY -3.49 0.554167
17 CON GY -7.22 0.2
***********************20% of longitudinal force
26 CON GX 0.49 0.779166
24 CON GX 0.7 0.770833
23 CON GX 0.7 0.416667
20 CON GX 0.7 0.554167
17 CON GX 1.44 0.2
LOAD 16 70R
MEMBER LOAD
28 CON GY -2.46 0.887499
26 CON GY -3.49 0.879166
25 CON GY -3.49 0.525
22 CON GY -3.49 0.6625
21 CON GY -3.49 0.308333
***********************20% of longitudinal force
28 CON GX 0.49 0.887499
26 CON GX 0.7 0.879166
25 CON GX 0.7 0.525
22 CON GX 0.7 0.6625
21 CON GX 0.7 0.308333
PERFORM ANALYSIS
FINISH