Handbooks of Agitator Installation, Operating and Maintenance

Client:

Item Number: Agitator


Jiangsu New Hongda Group Co., ltd

0 28
CLIENT:

PROJECT NAME:

Page:1 of 28
0
REV.

Security Instruction




Jiangsu New Hongda Group Co., Ltd. is specialized in
professional agitator production enterprise of the People's Republic of
China Light. All agitators are equipped with safety shield to prevent
possible personnel injury or equipment damage. Therefore, prior to
installation or maintenance please read this manual carefully. Any
negligence will cause unnecessary damage and casualties caused by
machinery

1. Agitator can not be used beyond original design

purpose.

2.

Do not change operation data (power, output

shaft speed, shaft length, impeller, etc.). Please consult to sales manager or aftersales

service department of manufacturer if customer must change operation data.

3.
Before lifting, check the connection of lift lock
and agitator whether it is firm. Lifting can not start until everything is ready.
4.

Do not connected to the

electrical power unless the agitator has been installed, and all components have been

installed, all fasteners have been tightened according to the requirements of this manual.

5.

1 28
CLIENT:

PROJECT NAME:

Page:2 of 28
0
REV.

Do not increase frequency inverter unless customer consult to sales manager


or aftersales service department of manufacturer about compatibility.
6. When agitator runs, do not contact

rotating components.

7. Do not run agitator before following

items check finishing:

Read the manual and execute


according to requirement of it;
All men and other equipment should not
keep away from rotating parts;
All power supply, liquid

supply, gas supply are connected according to standard and specifications;

All enclosures, covers are properly installed;


All removable parts are properly installed;
All motors of agitators must be earthing protected


Output shaft of agitator can be rotated freely by handsFor items missing or not defined in
the manual, much strict requirement shall be followed.

General Description

2 28
CLIENT:

PROJECT NAME:

Page:3 of 28
0
REV.

Agitators have two types , mainly pulley transmission, others by vertical - mounted gear reducer

drive .

Drive Type See Plan 1Plan 2;

1 ()

1 ReducerCouplings FrameConnecting Plate (Base Plate) Motor

()(The Following Drawing Only for Reference

and the Detailed Structure subject to existing equipment)

[
]

Plan 1

3 28
CLIENT:

PROJECT NAME:

Page:4 of 28
0
REV.

There is no other lubrication point except for gear-motor and frame.

For lubrication points of gear-motor or reducer, please see the enclosed documents

from equipment supplier. Lubrication point for frame is bearing-grease in the bearing seat.

Installation Preparation
1.1

NHD Check the equipment, It they are damaged in delivery, please

claim to forwarder and NHD.

1.2

Check parts of

every agitator whether they are complete. Drive unit (gear motor, couplings, and

frame) will be assembled and tested in shop. The agitator will be separated into

several parts for easy transportation. Shafts and blades will be packed respectively

after balance test, which will be assembled on site.

1.3

Check whether installation basis, mounting

height(mounting level to bottom), baffle, lifting hole conform with general

arrangement drawing.

4 28
CLIENT:

PROJECT NAME:

Page:5 of 28
0
REV.

Lifting and Installation

NHD

If lifting agitator is not in compliance with the
manual, it will result in accident. Please ensure thoroughly
understanding the content of the installation, operating and
maintenacewhich can guarantee the normal operation of equipment to
avoid any equipment damage and personal injury

2-1 General lifting Description:

a)

Do not lift agitator (shaft and blades) and drive unit together. Lift

them separately. (Lifting from one place to another)

b)When the

sling or sling lifting in a loose state, the operator should avoid a impact on machine by

sudden load;

c) Find the gravity center

for lifting to avoid eccentric load.;

d) In lifting the operator

should avoid damage to the surface paint, etc.

2-2

After agitators are lifted into vessel, it should be placed properly( in

vertical position or horizontal by support).

2-3

Before connecting agitator and transmission parts, we should pay attention to

5 28
CLIENT:

PROJECT NAME:

Page:6 of 28
0
REV.

check the transmission part is installed in place, and has passed inspection.

2-4 Blade installation

2-5

NHD

When the blade and shaft need to be assembled on site, lift them

into vessel and assembled them in vessel -- please refer to NHD Agitator

Installation Drawings (Appendix 1 ) to ensure that the installation direction is

consistent with the shaft orientation and marks on the blade surfaces is consistent

with marks on assembly location of shafts and then the fastener should be given the

spot welding after tightening,;


Transmission device should mount
on a high rigid basis. Install carefully to avoid any losses and injury.

6 28
CLIENT:

PROJECT NAME:

Page:7 of 28
0
REV.

Start-up
3-1 Before start up, make a careful

check as following

0.1mm

8mm Check installation of agitator(Drive units levelness

should not more than 0.1mm, and shaft end radial tolerance should be within 8mm by manual

rotating shaft)

Rotate the fan at

motor end by hand and check whether agitator can rotate freely;

Check whether motor is

earthing connected according to motor specification;

Whether actual

rotating direction conforms with arrow direction (See installation drawing)

//

Check gear motor and fill lubricant/grease (as per reducer manual) .

3-2 Before feed-in to tank

NHD First point run NHD

agitator several minutes in the empty tank, check whether there is any abnormal noise;

No non-load running with high speed

running agitator

Test run with water;

Empty

tank and confirm that all installation is OK and all fasteners should be firm.
7 28
CLIENT:

PROJECT NAME:

Page:8 of 28
0
REV.

3-3 Run with feed-in material

Do start motor when impeller is


buried and blocked;
Check whether motor and reducer can run well.

If there

is abnormal condition(such as abnormal vibration, noise), it should stop agitator. Do not

continue run or restart before fault is settled.

8 28
CLIENT:

PROJECT NAME:

Page:9 of 28
0
REV.

Preservation and Store


4-1 For long term stored agitator(not

installed)

It must be

prevented from rust or distortion of shaft and blade by improper store.

Motor storage, please see motor manual.

NHD

NHD

agitators are surface treated for anticorrosion. Stainless steel parts are passivated and carbon steel

flanges are treated with antirust agent, but the valid period is limited.

Check

regularly to prevent from unnecessary losses by improper

4-2 Preservation of installed agitator

Maintenance of gear motor refers to

enclosed suppliers document.

Restart agitator

Replace grease in reducer

Remove all covers;

Rotate agitator shaft to check

whether it can rotate freely;

9 28
CLIENT:

PROJECT NAME:

Page:10 of 28
0
REV.

Recommended tightening torque of bolts

All fasteners should be evenly tightened. If they are not properly tightened,

alternating load by vibration or flow counterforce will result in loose of fasteners.

5-1

Torque for bolting of shaft and blade, please see the following table. Torque for

other metric bolts tightening in table 2. They are the average value not absolute in

table 3, for reference.

5-2

Unless otherwise noted, please refer

to table2. Torque wrench must be used to ensure torque correct.

10 28
CLIENT:

PROJECT NAME:

Page:11 of 28
0
REV.

Table 2
8.8
Recommended torque for Grade 8.8
TorqueN.m


Size
Lubricated Standard Bolt Non-lubricated Standard Bolt
M5 5.6 6.4
M6 9.5 10.9
M7 16 18
M8 23 26
M10 46 52
M12 79 91
M14 126 145
M16 197 227
M18 271 312
M20 385 443
M22 524 602
M24 665 765
M27 973 1119
M30 1322 1520
M33 1799 2069
M36 2310 2657
M39 2990 3438
M42 3698 4252

All bolts should be coated

with oil, grease or anti-locked material.

11 28
CLIENT:

PROJECT NAME:

Page:12 of 28
0
REV.

Maintenance
6-1 Maintenance of

motor, reducer or gear-motor, please refer to suppliers instruction document.

6-2 Periodic check

12 28
CLIENT:

PROJECT NAME:

Page:13 of 28
0
REV.

JIANGSU NEW HONGDA GROUP CO., LTD


:
ADD.:DAINAN TOWN, XINGHUA CITY, JIANGSU
TEL0523-83781169 83787008 FAX0523-83781911
CODE225721WEBhttp://www.chiannhd.com
E-MAILnhd@chinanhd.com

13 28

You might also like