Telangana Solar Power Policy-2015 &

Net Metering for Roof Top Solar PV Systems

www.coronaenergy.co
The Telangana Solar Power Policy-2015
(01.06.2015)

Government of Telangana ( GoTS) through this policy aims at


creating an Enabling Environment for prospective Solar Power
Developers to harness substantial quantum of Solar Power in the
best possible manner.

Objective : To provide Competitive, Reliable Power supply to


consumers and to have sustainable Fuel Mix in long run.

1. Realize and Harness vast Solar Power Potential


2. Contribute to Long-term Energy Security & Sustainable Fuel
Mix.
3. To promote Public and Private Investment in Solar Power
generation.
4. Promote Decentralized and Distributed Generation.
5. Promote effective Energy Conservation.
www.coronaenergy.co
The Telangana Solar Power Policy-2015
(01.06.2015)
Subject Explanation
Applicability Solar Power Projects (PV+Thermal) & Roof Top Grid
Connect & Off Grid.

Solar Power Projects Projects set up For Sale of Power to DISCOMS.

Projects set up for Sale of Power to third parties within


State.

Projects set up for Captive Generation/Group


Captive(Funded and Owned by developers)
Solar Roof-Top
Projects. Grid Connect and Off Grid- Projects Funded and Owned.

Solar Parks Implementing Agency will be formed by Government

Off Grid Applications.

Any other Projects MNRE/ GoI Schemes www.coronaenergy.co


The Telangana Solar Power Policy-2015
(01.06.2015)

Subject Explanation
Benefits For availing benefits under this policy, Power generated from
any above modes has to be consumed within the state.
Solar Roof Top Net Metering OR Goss Metering- Choice of Customer
Projects(SRP) Single Phase: Max. 3 kWp, LT: Max. 56 kWp,
11kV/33kV: >56 kWp-1000kWp
Penetration limit 50%( 2015-16) and 60%(2016-17) of DTR Capacity-For LT
HT Consumers to match SPV capacity to DTR capacity.
Tariff-SRP (TSERC) Monthly Billing & Settlement- 25 year PPA
Gross Metering: @ Average Cost of Service to DISCOM
Net Metering: @ Average pooled Power Purchase cost.
Solar Pump sets Subsidy support & Gross Metering facility extension.

Off Grid Nodal Agency Responsible with DISCOMs

Time Limit Time limit as per the PPA or 2 years from the date of
application- whichever is early ( SPP & Solar Parks)
www.coronaenergy.co
The Telangana Solar Power Policy-2015
(01.06.2015)
Subject Explanation

For SPP & Solar Single window Clearance ( Solar Policy Cell).
Parks
Land Ceiling Exemption from Land ceiling act (SPP & SP) @ 5 Acres/MW
Exemption
Exemption of for Captive But chargeable for Third party Sale.
Wheeling & Transmission and Distribution losses applicable
Transmission charges
Power Scheduling 100% Banking -Captive/ Open Access/ for 12 months(Apr-
and banking Mar).
Banking charges @ 2% of energy delivered at drawl.
Deemed Energy Captive / Third party Sale Energy injected into Grid from
Banked. Synchronization date Open Access approval date.

Deemed Conversion Land for SPPs for sale to DISCOMS/Captive Use/Third Party
Sale/Solar Parks- Deemed to be converter to NA-Payment
www.coronaenergy.co
The Telangana Solar Power Policy-2015
(01.06.2015)

Subject Explanation

Deemed purchase by Unutilized banked energy-Average Pooled Purchase


DISCOMs Price determined by TSERC

Electricity Duty For SPP/Captive/Third part sales-Exemption


Exemption/ Waive Off For Manufacturing and Ancillaries of the Solar Power
Projects-Waive Off.
Cross Subsidy Exemption for 5 years- Third party sales within the
surcharge state.
Grid connectivity As per guidelines of
TSERC/SLDC/RLDC/TSTRANSCO
Supervision charges levied by DISCOM/TSTRANSCO Exempted.

www.coronaenergy.co
The Telangana Solar Power Policy-2015
(01.06.2015)

Subject Explanation

Time Line Technical Feasibility will be processed and closed in 30


days of receipt of Application by
DISCOMS/TSTRANSCO
Fees Development charge and layout fee & Permission (incl
bore well) from Gram Panchayat @ Rs. 25,000 per Acre.
VAT/SGST 100% refund for all inputs for Power plant for 5 years
by Commercial Tax Dept.
Stamp Duty Refund for land purchased for Solar Power Plants.

Pollution Control PCB Clearance is given within 1 week by TSPCB


Board Clearance
Factories Act Power Plants will be registered as factories (for the
purpose of labour) within 1 week
www.coronaenergy.co
The Telangana Solar Power Policy-2015
(01.06.2015)

Subject Explanation

Subsidy for Solar Roof Top Nodal Agency (NREDC) is responsible for co-
systems / Solar Pumps ordination with MNRE and Solar Policy Cell
(SPC)
Solar Policy Cell- for single All clearance & Approvals from DISCOMS
window clearance for /TSTRANCO.
Power Evacuation approval/Open Access.
Others- Panchayat /Municipality / Agricultural
land conversion.

Project Monitoring Secretary-Energy / CMD of TSTRANSCO/CMD-


Committee TSSPDCL-TSNPDCL/../2 Representatives of
Solar Power Developer.

www.coronaenergy.co
System Schematic- Net Metering

www.coronaenergy.co
System Schematic- Gross Metering

www.coronaenergy.co
Contact details:

Krishna Revankar: +91


9980525526
SOLAR CORONA ENERGY PVT.
LTD.
Email: