You are on page 1of 8

Project Spreadsheets to BS 8110 REINFORCED CONCRETE COUNCIL

Client Advisory Group Made by Date Page


Location 2nd Floor slab rmw 08-Aug-2017 119
RIBBED SLAB DESIGN to BS 8110:1997 using table 3.12 coef Checked Revision Job No
Originated from RCC92.xls on CD 1999 BCA for RCC chg prelim R68

LOCATION Suppor from grid A to grid F STATUS


VALID DESIGN
DIMENSIONS MATERIALS
N of spans N 5 rib width mm 150 fcu N/mm 35 gc = 1.50
Max Span m 7.200 rib centres mm 750 fy N/mm 460 gs = 1.05
depth o/a, h mm 300 Side slope 1 in 10 fyv N/mm 250 Density kN/m 24.0
topping depth, mm 100 h agg mm 20 (Normal weight concrete)
Top steel in spans ? Y op cover (to links) mm 35
Min No of bars per rib 2 /S cover (to links) mm 25
Use Links? Y (Y)es, (N)o or (M)inimal

LOADING
Self Wt kN/m 4.00
+ Dead kN/m 1.50
Total Dead, gk kN/m 5.50
Imposed qk kN/m 5.00 A F A F
Design load, n = kN/m 15.70 Geometry and Loading Indicative Bending Moment Diagram

BENDING END END FIRST INT INTERIOR INTERNAL BS8110


SUPPORTS (A & F) SPANS SUPPORTS SPANS SUPPORTS Reference
Width solid from CL 150 --- 500 --- 500
M kNm/m 32.6 61.1 70.0 51.3 51.3 Table 3.12
d mm 254 259 249 261 249
As mm 231 425 507 354 371 Fig 3.3
As' mm 0 0 0 0 0 Fig 3.3
DEFLECTION
L/d Max 39.894 35.466 3.4.6.3

Actual L/d 27.799 OK 27.586 OK 3.4.5.1

As auto increased by 17.8% As auto increased by 12.6%


TENSION REINFORCEMENT
mm 10 20 20 16 20
No 3 Top+3T10 2 Btm 2 Top+2T10 2 Btm 2 Top+2T10
As prov mm 471 628 785 402 785
= % 0.247 1.427 0.421 0.906 0.421
COMPRESSION ZONE REINFORCEMENT
20 8 12 8 10 mm
No 2 Btm 2 Top 2 Btm 2 Top 2 Btm
As' prov mm 628 101 226 101 157
= % 1.455 0.228 0.534 0.227 0.371

RIB SHEAR OUTER SUPT FIRST INT SUPT INT SUPT


V kN/rib 37.2 45.0 36.5 Table 3.12
v N/mm 0.863 1.063 0.863 Eqn 3
vc N/mm 0.897 0.908 0.908 NOMINAL Table 3.8
Link 6 6 6 6
@ mm 175 175 175 175
REACTIONS
Dead kN/m 18.23 43.59 39.63 solid weight included
Imposed kN/m 16.56 39.60 36.00
Ultimate kN/m 52.01 124.38 113.08 Table 3.12

OUTPUT/SUMMARY
END END FIRST INT INTERIOR INTERNAL
PROVIDE SUPPORTS SPANS SUPPORTS SPANS SUPPORTS
MAIN STEEL 3T10 /rib 2T8 T 2T20 /rib 2T8 T 2T20 /rib
+ 3T10 T + 2T10 T + 2T10 T
Nominal B 2T20 B Nominal B 2T16 B Nominal B
LINKS 2R6 @ 175 2R6 @ 175 2R6 @ 175 2R6 @ 175 2R6 @ 175
from edge of solid for 875 for 175

CHECKS BAR SINGLE BAR SHEAR GLOBAL


& COVER LAYERS SPACING DEFLECTION LINKS STATUS
Project Spreadsheets to BS 8110 REINFORCED CONCRETE COUNCIL
Client Advisory Group Made by Date Page
Location 2nd Floor slab from grids A to F rmw 08-Aug-2017 121
RIBBED SLAB DESIGN to BS 8110:1997 using table 3.12 coef Checked Revision Job No
Originated from RCC92.xls on CD 1999 BCA for RCC chg prelim R68

END END FIRST INT INTERIOR INTERNAL BS 8110


DEFLECTION SUPPORTS SPANS SUPPORTS SPANS SUPPORTS Reference
fs N/mm 234.2 207.4 143.4 270.1 90.0 Eqn 8
Base ratio 20.80 20.80 3.4.6.3/4
Tens Mod 1.791 1.593 Table 3.10
Comp Mod 1.071 1.070 Table 3.11
Perm L/d 39.894 35.466 3.4.6.3
Actual L/d 27.799 ok 27.586 ok 3.4.5.1
As req increasedby 17.8% 12.6%

RIB SHEAR
END FIRST INT INTERNAL
SUPPORTS SUPPORTS SUPPORTS
Factor 0.46 0.6 0.5 Table 3.12
V max kN/m 52.01 67.85 56.54 -=-
V rib kN/m 37.24 44.99 36.51
v N/mm 0.8625 1.0630 0.8626 Eqn 3
vc N/mm 0.8975 0.9080 0.9080 NOMINAL Table 3.8
(v-vc)bv N/mm 68.0 68.0 68.0 68.0 Table 3.7
Link ok 6 ok 6 ok 6 ok 6 3.12.7.1
@ mm 191 187 187 196 Spacing
adjust to mm 175 175 175 175 Spacing
for mm 0 795 75 --- from solid
adjust to mm 0 875 175 --- from solid
As Dist ok 130.8 ok 121.8 ok 121.8 ok 125.4 OK 3.4.5.5

As' Dist ok 0 ok 0 ok 0 ok 0 OK 3.12.7.2


Project Spreadsheets to BS 8110
Location 2nd Floor slab
RIBBED SLAB DESIGN to BS 8110:1997 using table 3.12 coefficients
Made by rmw Job No R68

Originated from RCC92.xls on CD 1999 BCA for RCC Date 8-Aug-17

APPROXIMATE WEIGHT of REINFORCEMENT (mesh excluded)

No Of No Type Dia Length Unit Wt Weight


TOP STEEL

End support 2 3 T 10 2025 0.617 7.5


2 3 T 10 2025 0.617 7.5
End span 2 2 T 8 4225 0.395 6.7
First Int support 2 2 T 20 3600 2.466 35.5
2 2 T 10 3600 0.617 8.9
Internal span 3 2 T 8 4225 0.395 10.0
Internal support 2 2 T 20 3600 2.466 35.5
2 2 T 10 3600 0.617 8.9

BOTTOM STEEL

End support 2 2 T 20 1175 2.466 11.6


End span 2 2 T 20 6850 2.466 67.6
First Int support 2 2 T 10 1125 0.617 2.8
Internal span 3 2 T 16 6850 1.578 64.9
Internal support 2 2 T 10 1125 0.617 2.8

LINKS

End span 2 7 R 6 825 0.222 2.6


2 31 R 6 825 0.222 11.4
Internal span 3 4 R 6 825 0.222 2.2
3 32 R 6 825 0.222 17.6

SUMMARY Density = 11.2 kg/mApprox. total reinf. per rib (kg) 303.7
Project Spreadsheets to BS 8110
Location 2nd Floor slab
RIBBED SLAB DESIGN to BS 8110:1997 using table 3.12 coefficients GRAPH DATA I Made by rmw Job No R68
Originated from RCC92.xls on CD 1999 BCA for RCC Date 8-Aug-17

LOADING DIAGRAM
Support 1 2 3 4 5 6 7 8 9 gk = 5.50 gk = 5.50 kN/m
Distance 0 0 7.2 14.4 21.6 28.8 36 36 36 36 36 qk = 5.00 qk = 5.00 kN/m
Dead 0 5.00 5 5 5 5 5 0 0 0 0
Imposed 5 6.50 6.5 6.5 6.5 6.5 6.5 5 5 5 5
Base 0 0 0 0 0 0 0 0 0 0 0
1 2 3 4 5 6 7 8 9
Grids 0 0 7.2 7.2 14.4 14.4 21.6 21.6 28.8 28.8 36 36 36 36 36 36 36 36
-1.3 0 -1.3 0.00 -1.3 0 -1.3 0 -1.3 0 -1.3 0 -1.3 0 -1.3 0 -1.3 0

BM DIAGRAM
Support 1 End 2 Mid 3 Mid
Local X 0 0 0.72 1.44 2.16 2.88 3.6 4.32 5.04 5.76 6.48 0 0.72 1.44 2.16 2.88 3.6 4.32 5.04 5.76 6.48 0 0.72 1.44 2.16 2.88 3.6
Global X 0 0 0.72 1.44 2.16 2.88 3.6 4.32 5.04 5.76 6.48 7.2 7.92 8.64 9.36 10.08 10.8 11.52 12.24 12.96 13.68 14.4 15.12 15.84 16.56 17.28 18
Base 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Moment 0 16.283 -14.98 -38.102 -53.082 -59.921 -58.619 -49.174 -31.589 -5.8619 28.007 70.017 31.507 1.1398 -21.086 -35.171 -41.114 -38.916 -28.577 -10.095 16.527 51.291 14.655 -13.84 -34.194 -46.406 -50.477
36.637 65.132 85.485 97.698 101.77 97.6975 85.485 65.132 36.637
B Labels A to grid 2
M Labels 32.566 61.061 70.017 51.291 51.291 51.291
Grids 0 0 7.2 7.2 14.4 14.4 21.6 21.6 28.8 28.8 36 36 36 36 36 36 36 36
-59.921 77.018 -59.921 77.018 -59.921 77.0182 -59.921 77.018 -59.921 77.018 -59.921 77.018 -59.921 77.018 -59.921 77.018 -59.921 77.018
Project Spreadsheets to BS 8110 Project
Location 2nd Floor slab Location
RIBBED SLAB DESIGN to BS 8110:1997 using table 3.12 coefficients GRAPH DATA II Made by rmw Job No R68
Originated from RCC92.xls on CD 1999 BCA for RCC Date 8-Aug-17

4 Mid 5 End 6
4.32 5.04 5.76 6.48 0 0.72 1.44 2.16 2.88 3.6 4.32 5.04 5.76 6.48 0 0.72 1.44 2.16 2.88 3.6 4.32 5.04 5.76 6.48 0 0 0 0 0
18.72 19.44 20.16 20.88 21.6 22.32 23.04 23.76 24.48 25.2 25.92 26.64 27.36 28.08 28.8 29.52 30.24 30.96 31.68 32.4 33.12 33.84 34.56 35.28 36 36 36 36 36
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
-46.406 -34.194 -13.84 14.655 51.291 16.527 -10.095 -28.577 -38.916 -41.114 -35.171 -21.086 1.1398 31.507 70.017 28.007 -5.8619 -31.589 -49.174 -58.619 -59.921 -53.082 -38.102 -14.98 16.283 0 0 0 0

0 0 3
51.291 51.291 70.017 61.061 32.566
Spreadsheets to BS 8110
2nd Floor slab
RIBBED SLAB DESIGN to BS 8110:1997 using table 3.12 coefficients GRAPH DATA III Made by rmw Job No R68
Originated from RCC92.xls on CD 1999 BCA for RCC Date 8-Aug-17

0 7 0 8 0 9
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 4
Disclaimer
All advice or information from the British Cement Association and/or Reinforced Concrete
Council is intended for those who will evaluate the significance and limitations of its contents
and take responsibility for its use and application. No liability (including that for negligence)
for any loss resulting from such advice or information is accepted by the BCA, RCC or their
subcontractors, suppliers or advisors. Users should note that all BCA software and
publications are subject to revision from time to time and should therefore ensure that they
are in possession of the latest version.

This spreadsheet should be used in compliance with the accompanying publication


'Spreadsheets for concrete design to BS 8110 and EC2' available from British Cement
Association, Telford Avenue, Crowthorne, Berkshire RG45 6YS.

Status of spreadsheet
Public release version.

Revision history RCC92 Ribbed Slabs (Tables)

Date Version Action


First public release.
03-Aug-99 RCC92 v1.0
Includes b version comments
Reinforced Concrete
ations of its contents
that for negligence)
he BCA, RCC or their
BCA software and
ore ensure that they

panying publication
rom British Cement

Size (kB)
203

You might also like