Challenges Faced by Industrialists
According to a U.S. Department of Energy report, the amount of fuel used to generate
steam for heating and manufacturing processes in 3 major industries is more than 5.3
million Btu annually. The energy savings potential for were estimated to exceed 12%
for each of the three industries.
This power point shall be used with the permission of SteamPro Conservation Sdn Bhd and is not meant for public usage or circulation.
Monday, June 4, 12
Challenges Faced by Industrialists
This power point shall be used with the permission of SteamPro Conservation Sdn Bhd and is not meant for public usage or circulation.
Monday, June 4, 12
SteamPro Condensate Removal Device (SP-CRD)
This power point shall be used with the permission of SteamPro Conservation Sdn Bhd and is not meant for public usage or circulation.
Monday, June 4, 12
How
Steampro
Pro-Energy?
Monday, June 4, 12
Damage
failure
in
mechanical
parts
Incur
loss
of
opera4ng
eciency
Increase
demand
on
maintenance
sta
7
Monday, June 4, 12
How
Steampro
Pro-Energy?
Monday, June 4, 12
How SteamPro - CRD Works?
It uses nozzle to remove condensate.
Based on the principle of Multi-Phase-Flow.
10
Monday, June 4, 12
How SteamPro - CRD Works?
It uses nozzle to remove condensate.
Based on the principle of Multi-Phase-Flow.
11
Monday, June 4, 12
At
Oil
Renery
Site
12
Monday, June 4, 12
(1) Immediate Reduction in Steam Loss:
Steam Loss Test at Samsung., Ltd Korea
This power point shall be used with the permission of SteamPro Conservation Sdn Bhd and is not meant for public usage or circulation.
Monday, June 4, 12
BEFORE
&
AFTER
CRD
AT
SAMSUNG
CO.,
KOREA
14
Monday, June 4, 12
SP Optimal & Consistent Process Temperature Increases
Productivity Yield
SP VS Steam Traps
200
180
SteamPro
Process Temperature C
160
Optimal and steady
140 Steam Trap Process Temperature
Fluctuating Process Temperature
120
100
80
60
40
20
0
1 2 3 4 5 6 7 8 9 10
Process Hour
15
Monday, June 4, 12
(1) Permanent Steam Energy Savings
Monday, June 4, 12
Why SteamPro Conservation works better than conventional
steam trap and the competitors
SP (CRD) VS Steam Trap
Live Online Inspection & Testing Very Difficult To Diagnose, Locate and Rectify
Problems
Rarely Required Maintenance Expensive Repair Kits or Replacement, Timely Install
Monday, June 4, 12
Advantages
With
SteamPro
SP Optimal & Consistent Process Temperature
Increases Productivity Yield
SteamPro sustainable savings over time
Easy Maintenance
Longer Life Spend
Reduce Global warming Effect
Saving Life
And many advantages
18
Monday, June 4, 12
Easy
Maintenance
19
Monday, June 4, 12
Step 1:
Close the inlet and outlet valve of the CRD
20
Monday, June 4, 12
Step 2:
Open the Side Cap using adjustable wrench #38mm
21
Monday, June 4, 12
Step 3:
Remove the blocked nozzle using socket wrench #11mm
22
Monday, June 4, 12
Step 4:
Replace with a new nozzle.
23
Monday, June 4, 12
Step 5:
Close the Side Cap
24
Monday, June 4, 12
Step 6:
Open the inlet and outlet valve
25
Monday, June 4, 12
Changing
Nozzle
in
a
minute
26
Monday, June 4, 12
Side
Openable
Cap
for
Easy
Maintenance
27
Monday, June 4, 12
What
Customer
Talk
About
SP.
28
Monday, June 4, 12
Reduce
pollu4on
resulted
from
lesser
fuel
burning
and
ash
steam.
Savings
on
Boilers
Maintenance
cost.
Savings
on
replacement
parts.
98%
condensates
(clean
/
dis4ll
hot
water)
back
to
boilers,
therefore
less
build
up
sludge,
resul4ng
longer
boilers
life
span.
Less
frequency
of
boiler
blow
down,
hence
further
fuel
water
&
water
chemical
cost
savings.
Savings
on
Energy:
es4mate
around
10%
-
35%
less
boiler
fuel,
boiler
feed
water
&
water
chemical.
29
Monday, June 4, 12
SteamPro Condensate Recovery Unit (SP-CRU)
This power point shall be used with the permission of SteamPro Conservation Sdn Bhd and is not meant for public usage or circulation.
Monday, June 4, 12
How
Steampro
Pro-Energy?
170oC
Conven&onal
Trap
90-100oC
180oC 80-100oC
90-100oC
31
Monday, June 4, 12
How
Steampro
Pro-Energy?
170oC
165oC
160oC
32
Monday, June 4, 12
How
Steampro
Pro-Energy?
33
Monday, June 4, 12
How
Steampro
Pro-Energy?
STEAMPRO
SYSTEM
Outgoing
from
Boiler:
180oC
Returning
to
Boiler:
160oC
Add
Temp:
20oC
Required
Temp:
180oC
CONVENTIONAL
SYSTEM
Outgoing
from
Boiler:
180oC
Returning
to
Boiler:
80oC
Add
Temp:
100oC
33
Monday, June 4, 12
How
Steampro
Pro-Energy?
STEAMPRO
SYSTEM
Outgoing
from
Boiler:
180oC
Returning
to
Boiler:
160oC
Add
Temp:
20oC
Required
Temp:
180oC
CONVENTIONAL
SYSTEM
Outgoing
from
Boiler:
180oC
80 C
o
33
Monday, June 4, 12
This power point shall be used with the permission of SteamPro Conservation Sdn Bhd and is not meant for public usage or circulation.
Monday, June 4, 12
(1) Immediate Reduction in Steam Loss:
at Amcor Adelaide, Australia (Corrugators)
This power point shall be used with the permission of SteamPro Conservation Sdn Bhd and is not meant for public usage or circulation.
Monday, June 4, 12
Before
&
A>er
at
Adelaide,
Australia
36
Monday, June 4, 12
(1) Immediate Reduction in Steam Loss:
at Zero Spot Laundry, Singapore.
This power point shall be used with the permission of SteamPro Conservation Sdn Bhd and is not meant for public usage or circulation.
Monday, June 4, 12
Before
&
A>er
at
Zero
Spot
Laundry,
Singapore
38
Monday, June 4, 12
SteamPro Installations
Hycare International, Thailand
n Before installation of
SteamPro Device
n Problem: Losing Much
Steam
n After Replacement of
SteamPro Device
n Solution: Immediate Reduction
in Steam Loss
39
Monday, June 4, 12
(1) Immediate Reduction in Steam Loss:
Steam Loss Test Results at other Industries
% of Detected
Customer Name Industry
Steam Loss
Acidchem International Sdn Bhd Oleo Chemical 25.35%
Nibong Tebal Paper Mill Sdn Bhd Pulp & Paper 17.46%
This power point shall be used with the permission of SteamPro Conservation Sdn Bhd and is not meant for public usage or circulation.
Monday, June 4, 12
Our
customers
says..
We
would
like
to
acknowledge
that
SteamPro
and
its
Total
Service
Team
has
show
professionalismhigh
level
of
technical
know-how,
relaIng
to
customizing
a
system
to
our
specic
needs..
Monday, June 4, 12
Immediate Benefits of SteamPro-Full System
This power point shall be used with the permission of SteamPro Conservation Sdn Bhd and is not meant for public usage or circulation.
Monday, June 4, 12
SteamPro Exceptional Track Records:
Payback
% of Fuel Period
No. Customer: Country Industry SP System
Savings
(in Month)
Perak &
Rubber Full
2 Penang, 22.00% 4.5
Gloves System
Malaysia
Mapa Gloves,
a Hutchinson Group
company
SP-CRU
3 Oman Power Plant 18.00% 5.5
AES Electric Power Only
Desalinization Plant
SP-CRD
4 Oman Refinery 10.00% 10.0
Only
Oman Refineries
Petrochemicals Company
This power point shall be used with the permission of SteamPro Conservation Sdn Bhd and is not meant for public usage or circulation.
Monday, June 4, 12
SteamPro Exceptional Track Records:
Payback
SP % of Fuel Period
No. Customer: Country Industry
System Savings
(in Month)
Full 14.00%
5 Singapore Laundry 7.1
System 20.00%
Zero Spot Laundry Services
Pte Ltd
Full
6 Singapore Laundry 15.00% 10.0
System
Singapore Corporation of
Rehabilitative Enterprises
Melaka &
SP-CRD
7 Perak Corrugated 12.00% 8.3
Only
Malaysia
Ornapaper Industry (M)
Sdn Bhd
This power point shall be used with the permission of SteamPro Conservation Sdn Bhd and is not meant for public usage or circulation.
Monday, June 4, 12
Tes;monial
Golden
Fron;er
45
Monday, June 4, 12
Tes;monial
-
Hycare
46
Monday, June 4, 12
Tes;monial
Ornapaper
Perak
47
Monday, June 4, 12
TesImonial
Ornapaper
Melaka
48
Monday, June 4, 12
Tes;monial
-
Kimberly-Clark
(SSMT)
49
Monday, June 4, 12
APP
Group
of
Company
50
Monday, June 4, 12
APP
Group
of
Company
51
Monday, June 4, 12
Interna;onal
Company
in
Thailand
Full
conversion
of
SP-CRD
+
CRU
System
for
20
Produc4on
Line
&
buy
2
units
brand
new
SteamPro
10
&
15-Ton-Bio-Mass
Boilers.
52
Monday, June 4, 12
Industries that SteamPro Serve
Oil & Gas Power Plant Food & Beverage Oleo Chemical
Monday, June 4, 12
Why & How SteamPro is Unique?
SP Customizes To Meet Customers Specific Needs
Survey
SteamPro configures
Report & Proposal
for every Customers
Specific Factory set-up, in Installation
54
Monday, June 4, 12
5YEAR PRODUCT
GUARANTEE
SteamProunconditionally guarantees its condensate removal device against defects in material and workmanship,
orice wear, wire draw and damage by corrosive materials for a period of 5 years while it is the property of
the original purchaser. If such defects or damages occur within 5 years, SteamPro will replace said unit(s) free
of charge. This warranty covers the condensate removal device only, not the blowdown valve or any other parts
of the SteamPro assembly. This warranty applies to normal use and not to intentional damage or unreasonable
use. It does not cover units only, not for labour, material or any other costs related to installing them.
SteamPro will exchange and resize, free of charge except for shipping, any purchased units that must
be replaced due to steam system modications, expansion or process changes. Should units needed
exceed the number originally purchased, the excess will be charged to the customer at then current
January 3, 2011
DATE STEAMPRO
55
Monday, June 4, 12
Pro-ENERGY,
Pro-GREEN,
Pro-PEOPLE
Monday, June 4, 12
SteamPro Deliver
sustainable energy savings which will give
your company a competitive edge against
similar operators in your industry who do not
employ SteamPros system.
69% of US Companies
have Corporate Green
Programs (up 54
percent in 2010).
.By Citola Blog
This power point shall be used with the permission of SteamPro Conservation Sdn Bhd and is not meant for public usage or circulation.
Monday, June 4, 12
Pro-ENERGY,
Pro-GREEN,
Pro-PEOPLE
Monday, June 4, 12