EXPEDIENTE TCNICO DE SALDO DE OBRA

PLANILLA DE METRADOS
OBRA :MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN CARLOS

UBICACIN : JOSE LEONARDO ORTIZ - CHICLAYO - LAMBAYEQUE Fecha: Octubre-2016


Sub Proyecto : REPOSICION DE PAVIMENTOS

DIMENSIONES
ITEM DESCRIPCION UND ELEMENTO CANT. PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
1.0.0 TRABAJOS PRELIMINARES
1.1.0 TRAZO, NIVELACION Y REPLANTEO M 4,568.84
RED DE AGUA POTABLE Husares de Junn 1.00 97.60 0.60 58.56 37,598.00
1.00 96.60 0.60 57.96
Espaa 1.00 94.50 0.60 56.70
1.00 96.50 0.60 57.90
1.00 115.80 0.60 69.48
1.00 115.50 0.60 69.30
Huascar 1.00 96.80 0.60 58.08
1.00 96.50 0.60 57.90
Atahualpa 1.00 96.00 0.60 57.60
1.00 96.50 0.60 57.90
Constitucin 1.00 21.00 0.60 12.60
Augusto B. Legua 1.00 56.50 0.60 33.90
1.00 56.10 0.60 33.66
1.00 55.80 0.60 33.48
1.00 55.60 0.60 33.36
1.00 57.00 0.60 34.20
1.00 55.80 0.60 33.48
1.00 15.60 0.60 9.36
1.00 48.20 0.60 28.92
1.00 56.80 0.60 34.08
1.00 46.20 0.60 27.72
1.00 42.00 0.60 25.20
El Dorado 1.00 55.50 0.60 33.30
1.00 56.00 0.60 33.60
1.00 55.00 0.60 33.00
1.00 57.20 0.60 34.32
1.00 55.80 0.60 33.48
Augusto B. Legua 1.00 38.00 0.60 22.80
Amrica 1.00 96.50 0.60 57.90
1.00 99.00 0.60 59.40
1.00 116.00 0.60 69.60
Democracia 1.00 55.40 0.60 33.24 852.60
1.00 55.60 0.60 33.36

Pgina 1
EXPEDIENTE TCNICO DE SALDO DE OBRA

PLANILLA DE METRADOS
OBRA :MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN CARLOS

UBICACIN : JOSE LEONARDO ORTIZ - CHICLAYO - LAMBAYEQUE Fecha: Octubre-2016


Sub Proyecto : REPOSICION DE PAVIMENTOS

DIMENSIONES
ITEM DESCRIPCION UND ELEMENTO CANT. PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
RED DE ALCANTARILLADO BALTA 1.00 56.00 1.00 56.00
1.00 50.00 1.00 50.00
1.00 45.00 1.00 45.00
HUASCAR 1.00 48.00 1.00 48.00
1.00 48.00 1.00 48.00
ATAHUALPA 1.00 48.00 1.00 48.00
1.00 49.00 1.00 49.00
LEGUIA 1.00 45.00 1.00 45.00
1.00 56.50 1.00 56.50
1.00 60.00 1.00 60.00
1.00 59.50 1.00 59.50
1.00 56.50 1.00 56.50
1.00 56.00 1.00 56.00
1.00 56.00 1.00 56.00
1.00 56.00 1.00 56.00
1.00 57.00 1.00 57.00
1.00 47.00 1.00 47.00
1.00 46.00 1.00 46.00
DEMOCRACIA SUB CO 1.00 37.00 1.00 37.00
1.00 9.00 1.00 9.00
1.00 37.00 1.00 37.00
1.00 11.00 1.00 11.00
1.00 37.00 1.00 37.00
1.00 11.00 1.00 11.00
1.00 37.00 1.00 37.00
1.00 11.00 1.00 11.00
1.00 37.00 1.00 37.00
1.00 11.00 1.00 11.00
1.00 37.00 1.00 37.00
1.00 11.00 1.00 11.00
1.00 37.00 1.00 37.00
1.00 11.00 1.00 11.00
DEMOCRACIA COLECT 1.00 60.00 1.00 60.00
1.00 53.00 1.00 53.00
1.00 59.00 1.00 59.00

Pgina 2
EXPEDIENTE TCNICO DE SALDO DE OBRA

PLANILLA DE METRADOS
OBRA :MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN CARLOS

UBICACIN : JOSE LEONARDO ORTIZ - CHICLAYO - LAMBAYEQUE Fecha: Octubre-2016


Sub Proyecto : REPOSICION DE PAVIMENTOS

DIMENSIONES
ITEM DESCRIPCION UND ELEMENTO CANT. PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
1.00 56.00 1.00 56.00
1.00 56.00 1.00 56.00
1.00 55.00 1.00 55.00
1.00 57.00 1.00 57.00
1.00 56.00 1.00 56.00
COLONIAJE Y BALTA 1.00 55.00 1.00 55.00
PROCERES 1.00 42.00 1.00 42.00
1.00 43.00 1.00 43.00
CONQUISTA 1.00 49.00 1.00 49.00
INCANATO 1.00 47.00 1.00 47.00
AYACUCHO 1.00 47.00 1.00 47.00
HUSARES DE JUNIN 1.00 48.00 1.00 48.00
1.00 48.00 1.00 48.00
1.00 48.00 1.00 48.00
HUASCAR 1.00 48.00 1.00 48.00
1.00 48.00 1.00 48.00
1.00 48.00 1.00 48.00
ATAHUALPA 1.00 50.00 1.00 50.00
1.00 48.00 1.00 48.00
1.00 47.00 1.00 47.00
N DE AYLLON 1.00 53.00 1.00 53.00
1.00 48.00 1.00 48.00
1.00 47.00 1.00 47.00
ESPAA 1.00 48.00 1.00 48.00
1.00 47.00 1.00 47.00
1.00 49.00 1.00 49.00
1.00 49.00 1.00 49.00
AMERICA 1.00 50.00 1.00 50.00
1.00 57.00 1.00 57.00
1.00 10.00 1.00 10.00
1.00 52.00 1.00 52.00
1.00 49.00 1.00 49.00
1.00 39.00 1.00 39.00
1.00 38.00 1.00 38.00
1.00 11.00 1.00 11.00

Pgina 3
EXPEDIENTE TCNICO DE SALDO DE OBRA

PLANILLA DE METRADOS
OBRA :MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN CARLOS

UBICACIN : JOSE LEONARDO ORTIZ - CHICLAYO - LAMBAYEQUE Fecha: Octubre-2016


Sub Proyecto : REPOSICION DE PAVIMENTOS

DIMENSIONES
ITEM DESCRIPCION UND ELEMENTO CANT. PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
COLECTOR AMERICA 1.00 48.00 1.00 48.00
1.00 47.00 1.00 47.00

Pgina 4
EXPEDIENTE TCNICO DE SALDO DE OBRA

PLANILLA DE METRADOS
OBRA :MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN CARLOS

UBICACIN : JOSE LEONARDO ORTIZ - CHICLAYO - LAMBAYEQUE Fecha: Octubre-2016


Sub Proyecto : REPOSICION DE PAVIMENTOS

DIMENSIONES
ITEM DESCRIPCION UND ELEMENTO CANT. PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
2.0.0 MOVIMIENTO DE TIERRAS
2.1.0 EXCAVACION MASIVA CON MAQUINARIA M 170.52
1.00 111.00 0.60 0.20 13.32
1.00 786.00 1.00 0.20 157.20
2.2.0 ELIMINACION DE MATERIAL EXCEDENTE Dist. Min. = 5.0Km M 170.52 1.25 213.15 213.15

3.0.0 REPOSICION DE VIAS


3.1.0 REPOSICION DE PAVIMENTO RIGIDO F'C=210 Kg/cm
3.1.1 MEJORAMIENTO SUB RASANTE PIEDRA MEDIANA (e = 0.10m) M Husares de Junn 1.00 97.60 0.60 58.56 2,016.98
Husares de Junn 1.00 96.60 0.60 57.96
Espaa 1.00 94.50 0.60 56.70
1.00 96.50 0.60 57.90
1.00 115.80 0.60 69.48
1.00 115.50 0.60 69.30
Huascar 1.00 96.80 0.60 58.08
1.00 96.50 0.60 57.90
Atahualpa 1.00 96.00 0.60 57.60
1.00 96.50 0.60 57.90
Constitucin 1.00 21.00 0.60 12.60
PROCERES 1.00 42.00 1.00 42.00
1.00 43.00 1.00 43.00
CONQUISTA 1.00 49.00 1.00 49.00
INCANATO 1.00 47.00 1.00 47.00
AYACUCHO 1.00 47.00 1.00 47.00
HUSARES DE JUNIN 1.00 48.00 1.00 48.00
1.00 48.00 1.00 48.00
1.00 48.00 1.00 48.00
HUASCAR 1.00 48.00 1.00 48.00
1.00 48.00 1.00 48.00
1.00 48.00 1.00 48.00
ATAHUALPA 1.00 50.00 1.00 50.00
1.00 48.00 1.00 48.00
1.00 47.00 1.00 47.00
N DE AYLLON 1.00 53.00 1.00 53.00
1.00 48.00 1.00 48.00
1.00 47.00 1.00 47.00
ESPAA 1.00 48.00 1.00 48.00
1.00 47.00 1.00 47.00
1.00 49.00 1.00 49.00
1.00 49.00 1.00 49.00

Pgina 5
EXPEDIENTE TCNICO DE SALDO DE OBRA

PLANILLA DE METRADOS
OBRA :MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN CARLOS

UBICACIN : JOSE LEONARDO ORTIZ - CHICLAYO - LAMBAYEQUE Fecha: Octubre-2016


Sub Proyecto : REPOSICION DE PAVIMENTOS

DIMENSIONES
ITEM DESCRIPCION UND ELEMENTO CANT. PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
AMERICA 1.00 50.00 1.00 50.00
1.00 57.00 1.00 57.00
1.00 10.00 1.00 10.00
1.00 52.00 1.00 52.00
1.00 49.00 1.00 49.00
1.00 39.00 1.00 39.00
1.00 38.00 1.00 38.00
1.00 11.00 1.00 11.00
COLECTOR AMERICA 1.00 48.00 1.00 48.00
1.00 47.00 1.00 47.00
3.1.2 SUB BASE CON ARENA FINA, e = 0.10m M 2016.98 2,016.98
3.1.3 BASE CON MATERIAL GRANULAR e=0.20m M 2016.98 2,016.98
3.1.4 VACIADO DE LOSAS DE CONCRETO PREMEZCLADO f'c=210 Kg/cm2 M 2016.98 2,016.98
3.2.0 REPOSICION DE PAVIMENTO FLEXIBLE EN CALIENTE e = 2"
3.2.1 MEJORAMIENTO SUB RASANTE PIEDRA MEDIANA (e = 0.15m) M 0.00 2,551.86
Augusto B. Legua 1.00 56.50 0.60 33.90
1.00 56.10 0.60 33.66
1.00 55.80 0.60 33.48
1.00 55.60 0.60 33.36
1.00 57.00 0.60 34.20
1.00 55.80 0.60 33.48
1.00 15.60 0.60 9.36
1.00 48.20 0.60 28.92
1.00 56.80 0.60 34.08
1.00 46.20 0.60 27.72
1.00 42.00 0.60 25.20
El Dorado 1.00 55.50 0.60 33.30
1.00 56.00 0.60 33.60
1.00 55.00 0.60 33.00
1.00 57.20 0.60 34.32
1.00 55.80 0.60 33.48
Augusto B. Legua 1.00 38.00 0.60 22.80
Amrica 1.00 96.50 0.60 57.90
1.00 99.00 0.60 59.40
1.00 116.00 0.60 69.60
Democracia 1.00 55.40 0.60 33.24
1.00 55.60 0.60 33.36

Pgina 6
EXPEDIENTE TCNICO DE SALDO DE OBRA

PLANILLA DE METRADOS
OBRA :MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN CARLOS

UBICACIN : JOSE LEONARDO ORTIZ - CHICLAYO - LAMBAYEQUE Fecha: Octubre-2016


Sub Proyecto : REPOSICION DE PAVIMENTOS

DIMENSIONES
ITEM DESCRIPCION UND ELEMENTO CANT. PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
BALTA 1.00 56.00 1.00 56.00
1.00 50.00 1.00 50.00
1.00 45.00 1.00 45.00
HUASCAR 1.00 48.00 1.00 48.00
1.00 48.00 1.00 48.00
ATAHUALPA 1.00 48.00 1.00 48.00
1.00 49.00 1.00 49.00
LEGUIA 1.00 45.00 1.00 45.00
1.00 56.50 1.00 56.50
1.00 60.00 1.00 60.00
1.00 59.50 1.00 59.50
1.00 56.50 1.00 56.50
1.00 56.00 1.00 56.00
1.00 56.00 1.00 56.00
1.00 56.00 1.00 56.00
1.00 57.00 1.00 57.00
1.00 47.00 1.00 47.00
1.00 46.00 1.00 46.00
DEMOCRACIA SUB CO 1.00 37.00 1.00 37.00
1.00 9.00 1.00 9.00
1.00 37.00 1.00 37.00
1.00 11.00 1.00 11.00
1.00 37.00 1.00 37.00
1.00 11.00 1.00 11.00
1.00 37.00 1.00 37.00
1.00 11.00 1.00 11.00
1.00 37.00 1.00 37.00
1.00 11.00 1.00 11.00
1.00 37.00 1.00 37.00
1.00 11.00 1.00 11.00
1.00 37.00 1.00 37.00
1.00 11.00 1.00 11.00
DEMOCRACIA COLECT 1.00 60.00 1.00 60.00
1.00 53.00 1.00 53.00
1.00 59.00 1.00 59.00

Pgina 7
EXPEDIENTE TCNICO DE SALDO DE OBRA

PLANILLA DE METRADOS
OBRA :MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN CARLOS

UBICACIN : JOSE LEONARDO ORTIZ - CHICLAYO - LAMBAYEQUE Fecha: Octubre-2016


Sub Proyecto : REPOSICION DE PAVIMENTOS

DIMENSIONES
ITEM DESCRIPCION UND ELEMENTO CANT. PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
1.00 56.00 1.00 56.00
1.00 56.00 1.00 56.00
1.00 55.00 1.00 55.00
1.00 57.00 1.00 57.00
1.00 56.00 1.00 56.00
COLONIAJE Y BALTA 1.00 55.00 1.00 55.00
3.2.2 SUB BASE CON ARENA FINA, e = 0.20m M 2,551.86
3.2.3 BASE CON MATERIAL GRANULAR e = 0.25m M 2,551.86
3.2.4 IMPRIMACION M 2,551.86
3.2.5 MEZCLA ASFALTICA EN CALIENTE M 2,551.86

Pgina 8
PRESUPUESTO
MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO Y CONEXIONES
OBRA :
DOMICILIARIAS DE LA URB. SAN CARLOS
UBICACIN : JOSE LEONARDO ORTIZ - CHICLAYO - LAMBAYEQUE
Sub Proyecto : REPOSICION DE PAVIMENTOS FECHA: Aug-17

ITEM DESCRIPCION UND METRADO PRECIO (S/) SUBTOTAL

REPOSICION DE PAVIMENTOS

1.0.0 TRABAJOS PRELIMINARES

1.1.0 TRAZO, NIVELACION Y REPLANTEO M 852.60 0.27 231.91

2.0.0 MOVIMIENTO DE TIERRAS

2.1.0 EXCAVACION MASIVA CON MAQUINARIA M 170.52 4.90 836.23

2.2.0 ELIMINACION DE MATERIAL EXCEDENTE Dist. Min. = 5.0Km M 213.15 6.33 1,348.81

3.0.0 REPOSICION DE VIAS

3.2.0 REPOSICION DE PAVIMENTO FLEXIBLE EN CALIENTE e = 2"

3.2.1 MEJORAMIENTO SUB RASANTE PIEDRA MEDIANA (e = 0.15m) M 852.60 8.84 7,536.98

3.2.2 SUB BASE CON ARENA FINA, e = 0.20m M 852.60 7.47 6,370.63

3.2.3 BASE CON MATERIAL GRANULAR e = 0.25m M 852.60 11.30 9,637.79

3.2.4 IMPRIMACION M 852.60 4.44 3,785.54

3.2.5 MEZCLA ASFALTICA EN CALIENTE M 852.60 28.48 24,282.05

COSTO DIRECTO S/.54,029.94