Architectural Works Schedule

1st Month
S/N Description
1st 2nd
Basement
1 Structural Ponding at Wet Areas
2 Application of Water Proofing at Wet Areas
3 Water Ponding Test at Wet Areas
4 Floor Screeding
5 Internal Wall Plastering
6 Interwall Wall Plastering (Ejector Pit)
7 Installation of Drywall Framing
8 Installation of Staircase Railing Post (Glass Railing)
9 Installation of Staircase Railing (Mild Steel)
10 Fixing of M&E Services at Drywall
11 Installation of Drywall Partition
12 Installation of Door Sub-Frame
13 Fixing of M&E Services at Ceiling (Plumbing)
14 Fixing of M&E Services at Ceiling (Sanitary)
15 Fixing of M&E Services at Ceiling (MV)
16 Fixing of M&E Services at Ceiling (Aircon Pipe)
17 Fixing of M&E Services at Ceiling (RWDP)
18 Fixing of M&E Services at Ceiling (Electrical)
19 T&C
20 Installation of Ceiling Grid
21 Installation of Ceiling Board
22 Installation of Tiles & Skirting
23 Installation of Ejector Pit Cat Ladder
24 Installation of U Hook & Chain
25 Painting 1st Coating
26 Installation of Vanity Cabinet
27 Installation of Solid Surface
28 Instsallsation of Ejector Pit Pump
29 Installation of Timber Thread
30 Installation of Shower Screen
31 Installation of Railing (Glass Railing)
32 Installation of Staircase Handrail
33 Sanding and final varnishing of timber thread
34 Installation of Timber Door & Ironmongery
35 Installation of Bi-fold Doors
36 Final Painting Works
37 Final touch up of Timber Doors & Frame
38 Installation of Mirror
39 Installation of Bathroom Accessories
40 Cleaning of Basement
First Storey
1 Structural Ponding at Wet Areas
2 Application of Water Proofing at Wet Areas
3 Water Ponding Test at Wet Areas
4 Installation of Aluminum Door & Window Frame
5 Installation of Staircase Stringer
6 Floor Screeding
7 Laying of ALC Block
8 Installation of Aluminum Skirting
9 Internal Wall Plastering
10 Installation of Aluminum Door & Window
11 Installation of Drywall Framing
12 Fixing of M&E Services at Drywall
13 Installation of Drywall Partition
14 Installation of Timber Door Sub-Frame
15 Fixing of M&E Services at Ceiling (Plumbing)
16 Fixing of M&E Services at Ceiling (Sanitary)
17 Fixing of M&E Services at Ceiling (MV)
18 Fixing of M&E Services at Ceiling (Aircon Pipe)
19 Fixing of M&E Services at Ceiling (RWDP)
20 Fixing of M&E Services at Ceiling (Electrrical)
21 T&C
22 Installation of Ceiling Grid
23 Installation of Ceiling Board
24 Installation of Staircase Railing Post (Glass Railing)
25 Installation of Staircase Railing (Mild Steel)
26 Installation of Marble
27 Painting 1st Coating
28 Installation of Vanity & Kitchen Cabinet
29 Installation of Solid Surface
30 Installation of Shower Screen
31 Installation of Timber Thread & Flooring
32 Installation of Railing (Glass Railing)
33 Installation of Staircase Handrail
34 Sanding and Final Varnishing of Timber Thread
35 Installation of Wardrobe
36 Installation of Kitchen Cabinet
37 Installation of Timber Door & Ironmongery
38 Installation of Bi-fold Doors
39 Final Painting Works
40 Final touch up of Timber Doors & Frame
41 Installation of Kitchen Sink
42 Installation of Kitchen Appliances
43 Installation of Mirror
44 Installation of Bathroom Accessories
45 Cleaning of First Storey

Second Storey
1 Structural Ponding at Wet Areas
2 Application of Water Proofing at Wet Areas
3 Water Ponding Test at Wet Areas
4 Installation of Aluminum Door & Window Frame
5 Installation of Staircase Stringer
6 Installation of Aluminum Door & Window
7 Installation of Master Bath Vanity Counter Frame
8 Installation of Master Bath Floor & Wall Marble
9 Floor Screeding
10 Installation of Staircase Railing Post (Glass Railing)
11 Installation of Staircasse Railing (Mild Steel)
12 Internal Wall Plastering
13 Installation of Drywall Framing
14 Fixing of M&E Services at Drywall
15 Installation of Drywall Partition
16 Installation of Timber Door Sub-Frame
17 Fixing of M&E Services at Ceiling (Plumbing)
18 Fixing of M&E Services at Ceiling (Sanitary)
19 Fixing of M&E Services at Ceiling (MV)
20 Fixing of M&E Services at Ceiling (Aircon Pipe)
21 Fixing of M&E Services at Ceiling (RWDP)
22 Fixing of M&E Services at Ceiling (Electrrical)
23 Installation of Ceiling Grid
24 Installation of Ceiling Board
25 Installation of Aluminum Trellis at Master Bath
26 Painting 1st Coating
27 Installation of Vanity
28 Installation of Solid Surface
29 Installation of Shower Screen
30 Installation of Glass Partition U Channel at Master's Bedroom
31 Installation of Timber Thread & Flooring
32 Installation of Staircase Railing (Glass)
33 Installation of Staircase Handrail
34 Sanding and Final Varnishing of Timber Thread
35 Installation of Wardrobe
36 Installation of Glass Partition at Master's Bedroom
37 Installation of Timber Door & Ironmongery
38 Final Painting Works
39 Final touch up of Timber Doors & Frame
40 Installation of Mirror
41 Installation of Bathroom Accessories
42 Cleaning of Second Storey
Attic Storey
1 Structural Ponding at Wet Areas
2 Application of Water Proofing at Wet Areas
3 Water Ponding Test at Wet Areas
4 Installation of Aluminum Door & Window Frame
5 Installation of Aluminum Door & Window
6 Installation of Staircase Railing Post (Glass Railing)
7 Installation of Staircase Railing (Mild Steel)
8 Floor Screeding
9 Internal Wall Plastering
10 Installation of Drywall Framing
11 Fixing of M&E Services at Drywall
12 Installation of Drywall Partition
13 Installation of Timber Door Sub-Frame
14 Installation of Extruded Board at Open Terrace
15 Installation of Open Terrace Tiles
16 Fixing of M&E Services at Ceiling (Plumbing)
17 Fixing of M&E Services at Ceiling (Sanitary)
18 Fixing of M&E Services at Ceiling (MV)
19 Fixing of M&E Services at Ceiling (Aircon Pipe)
20 Fixing of M&E Services at Ceiling (RWDP)
21 Fixing of M&E Services at Ceiling (Electrrical)
22 Installation of Ceiling Grid
23 Installation of Ceiling Board
24 Installation of PV Panel
25 Installation of Vent Pipe
26 Painting 1st Coating
27 Installation of Shower Screen
28 Installation of Timber Flooring
29 Installation of Railing (Glass Railing)
30 Installation of Staircase Handrail
31 Sanding and Final Varnishing of Timber Flooring
32 Installation of Wardrobe
33 Installation of Timber Door & Ironmongery
34 Final Painting Works
35 Final touch up of Timber Doors & Frame
36 Installation of Mirror
37 Installation of Bathroom Accessories
38 Cleaning of Attic Storey

Parquet floor laying


Grinding and polishing of marble
Grinding and varnishing of parquet
Skylight
roofing
1st Month 2nd Month
2nd 3rd 4th 5th 6th 7th 8th
3rd Month 4th Month
8th 9th 10th 11th 12th 13th 14th
4th Month
14th 15th 16th