Professional Documents
Culture Documents
COLUMN SCHEDULE COLUMN SCHEDULE 1. DRAWINGS SHALL NOT BE SCALED. FIGURED DIMENSIONS SHALL BE
FOLLOWED.
2.ALL DIMENSIONS ARE IN FEETS AND INCHES UNLESS OTHER WISE
COLUMN GROUND FLOOR FIRST FLOOR SECOND FLOOR COLUMN GROUND FLOOR FIRST FLOOR SECOND FLOOR MENTIONED.
NUMBERS (UP TO 1ST SLAB) (1ST TO 2ND SLAB) (2ND TO 3RD SLAB) NUMBERS (UP TO 1ST SLAB) (1ST TO 2ND SLAB) (2ND TO 3RD SLAB)
3.ALL DIMENSIONS TO BE CHECKED AND VERIFIED AT SITE.
4.ANY DISCREPANCY TO BE REPORTED TO THE CONSULTANT AND RESOLVED
T16 T12 T12 PRIOR TO THE COMMENCEMENT OF WORKS.
T20 T20 T20
T12
9" 9" 9"
2' 2' 2' 5.ANY MISSING DIMENSIONS OR DETAILS IN DRAWINGS MUST BE BROUGHT TO
C1 C11 THE NOTICE OF THE ENGINEER FOR CLARIFICATION.
1'-3"
1'-3"
1'-3"
9"
9"
9"
9"
9"
9"
IS UPTO PLINTH LEVEL 11. DESIGNED FOR GROUND + 3 FLOORS ONLY.
Steel: 8-T12
Steel: 10-T20 Steel: 10-T20 Steel: 10-T20
Ties: T8 @ 7" c/c Ties: T8 @ 7" c/c Ties: T8 @ 7" c/c Ties: T8 @ 7" c/c
T16 T16 T16
1'-3" 1'-3" 1'-3"
Development
BAR DIA
Length (Ld) (50 )
C3 #8
9"
9"
9"
16"
#10 20"
#12 24"
Steel: 8-T16 Steel: 8-T16 Steel: 8-T16
Ties: T8 @ 7" c/c Ties: T8 @ 7" c/c Ties: T8 @ 7" c/c #16 32"
#20 40"
9" 9" 9" #25 50"
T20 T20 T20
T16 T16 T16
C4,C5
2'
2'
2'
Steel: 8-T20+8-T16 Steel: 8-T20+8-T16 Steel: 8-T20+8-T16
Ties: T8 @ 7" c/c Ties: T8 @ 7" c/c Ties: T8 @ 7" c/c
9"
9"
Steel: 4-T16+4-T12 Steel: 4-T16+4-T12 Steel: 4-T16+4-T12
Ties: T8 @ 7" c/c Ties: T8 @ 7" c/c Ties: T8 @ 7" c/c
T16 T16 T12
9" T12 9" T12 9"
C8
1'-3"
1'-3"
1'-3"
Steel: 4-T16+4-T12 Steel: 4-T16+4-T12 Steel: 8-T12
Ties: T8 @ 7" c/c Ties: T8 @ 7" c/c Ties: T8 @ 7" c/c
PRADEEP.K
T20 T16 T16
T16 1'-3" 1'-3"
T12
1'-6"
P VISHNU SAI
C9,C10 MSc Structural Engineer(UK),AMIE
9"
9"
9"
EMAIL: pvs0096@gmail.com
PHONE: 9908044100
Steel: 4-T20+4-T16 Steel: 8-T16 Steel: 4-T16+4-T12
Ties: T8 @ 7" c/c Ties: T8 @ 7" c/c Ties: T8 @ 7" c/c MR. MADAN MOHAN
NOTE:
COLUMN REINFORCEMENT DETAILS
AT COLUMN-FOOTING & COLUMN-BEAM JUNCTIONS
STIRRUPS SPACING SHOULD @ 4" C/C UP TO 2'-0"
ON EITHER SIDE OF THE COLUMNS.