For EX:Row - Base - Overhead - Description -- From row --To row - Credit
10 - B000 Material
20 A100 Material OH 10 C03
Step 2
Now select the first row "10" and click on BASE on the left side
In the Base from cost elements select 400010 as cost element to 400010 to cost
element which forms the base CE
Step 3
Now select the Row no "20" and double click on Overhead rate under dialog structure
Enter valid from and To date and define overhead % and also input the percentage
also for the overhead type 2 give the %
Step 4
Now select the row "20" click on Credit under Dialog Structure.
enter the valid to date and the cost element and the respective cost center