Inputs

End-of-the-horizon
Product WIP
requirements
P1 1000 P1 P2 P3 P4
P2 2000 M1 0 0 0 0
P3 3000 M2 30 100 40 10
P4 2500 M3 50 200 60 20
M4 20 750 15 35
M5 40 1300 80 30

Output
Pieces to Produce
P1 P2 P3 P4
M1 860 0 2805 2405
M2 890 0 2845 2415
M3 940 0 2905 2435
M4 960 700 2920 2470
M5 1000 2000 3000 2500
Input
Output from Question 1 (linked to previous sheet) Production Rate (no. of pieces per hour)
Pieces to Produce
P1 P2 P3 P4 P1 P2 P3
M1 860 0 2805 2405 M1 2 2 2
M2 890 0 2845 2415 M2 2 2 2
M3 940 0 2905 2435 M3 2 2 2
M4 960 700 2920 2470 M4 2 2 2
M5 1000 2000 3000 2500 M5 2 2 2

Output
Hours Required
P1 P2 P3 P4 Total
M1 430 0 1402.5 1202.5 3035
M2 445 0 1422.5 1207.5 3075
M3 470 0 1452.5 1217.5 3140
M4 480 350 1460 1235 3525
M5 500 1000 1500 1250 4250
Total 2325 1350 7237.5 6112.5 17025
eces per hour)

P4
2
2
2
2
2
Input
Output from Q 2(Linked From Q 2) Shift Duration
P1 P2 P3 P4 Total
M1 430 0 1402.5 1202.5 3035 Machine
M2 445 0 1422.5 1207.5 3075 M1
M3 470 0 1452.5 1217.5 3140 M2
M4 480 350 1460 1235 3525 M3
M5 500 1000 1500 1250 4250 M4
Total 2325 1350 7237.5 6112.5 17025 M5

Output
No. of shifts People
M1 380 760
M2 385 1540
M3 393 1965
M4 441 2646
M5 532 3724
Total 2131 10635
8

Number of people per shift


2
4
5
6
7
Input
No. of shifts
M1 380 Planning Horizon 400
M2 385
M3 393
M4 441
M5 532
Total 2131

Output
Number of Shifts
1 2 3
M1 20 210 273
M2 15 207 271
M3 7 203 269
M4 -41 179 253
M5 -132 134 222