Electrical equipment coding specification
Electrical cable tag coding specification
Lighting Layout
Earthing Layout
UPS room DB's layout
Battery room DB's layout
SC calc
Cable sizing calculation GENERAL NOTES
MSB 1
UPS room DB (Sub-DB)
UPS DB 2
3
Lighting DB
Cable schedule
Cable routing
Cable tray layout
Cable lead-in pipe
SAT
Power Cable Site Meggering Reports
Earthing System Resistance Test Report
Lightning Protection System Test Report
SAT / Switchboard Testing and Commissioning Report
UPS
CP Commissioning Report
MIJ Resistance test
TRU SAT
GENERAL NOTES:
CP design data see AS 2832.1 Appendix I.
GENERAL NOTES:
For existing MOVs, existing power cables will be disconnected and abandoned.
New power cables shall be laid on tray.
Cable tray route from SWROOM MSB to UPS room shall run on the west side wall of the station to north wall of the station
Outgoing cables from UPS room DBs shall run on cable tray. The trays shall run from water bath heater area (west)
along the existing facility till PRS and cut across the road to pig launcher area. Cables in pig launcher area will run on tray.
n to north wall of the station.
h heater area (west)
ncher area will run on tray.
GTP
TL1 length = 5.7 km
est #TS 12
0.6
f(x) = 0.3791412522 ln
0.5 R = 0.863070323
0.4
0.3
0.2
0.1
0
10 20 30 40
GTPinput data_SA
Line no.
Outer Diameter = 0.7 m
Approx length = 5700 m
Grade of Steel =
Coating =
Design Pressure =
MAOP =
Crossing = m
Design life = 3 years
Current Density (bare steel) = 0.08 mA/m2
Coating breakdown = 5.1 %
Anode type =
Anode consumption = 1230 A.year/kg
One unit Anode net weight = 9.1 kg
Output current per anode = 0.049 A
cd
0.45
0.4
0.35
0.3
cd
0.25 Polynomial (cd)
0.2
0.15
0.1
0.05
0
0 10 20 30 40 50 60 70
pipe jack
location length (m)shaft ID (m) dwg Shaft-e Shaft-s
meranti crescent PI-DAL-0004 525 481
banyan dr 1.5 PI-DAL-0016 3768 3740
banyan ave PI-DAL-0018
soil resistivity
TS location
CP design
Author:
WT uses this value. The
50y design current
density unknown.
0.6
f(x) = 0.3791412522 ln(x) - 0.0096937896
0.5 R = 0.863070323
Row 15
0.4
Logarithmic (Row
0.3 15)
0.2
0.1
0
10 20 30 40 50
GTPinput data_ICCP
Line no.
Outer Diameter = 0.7
Approx length = 5700
Grade of Steel =
Coating =
Design Pressure =
MAOP =
Crossing =
Design life = 50
Current Density (bare steel) = 0.6
Coating breakdown = 5.1
Anode type =
Anode consumption = 1230
One unit Anode net weight = 9.1
Output current per anode = 0.049
y cd
10 0.08
20 0.1
30 0.4
m
m
m
years
mA/m2
%
A.year/kg
kg
A
Spare DB
Current carrying capacity for 1x 4C x16mmsq XLPE/SWA/LSHF/FRT, installation method multi core installed in suspended flo
Appendix B1.8 current carrying capacity table), 75 A
Tambient factor @ 40deg C 0.91 VD 2.5 mV/A/m
Grouping factor 1 %VD* 4.32 %
Current carrying capacity after factor 68.25 A
Author:
No. of cct 1 70A is obtained based on the need for UPS
UPS load includes 2X RUNNING MOVs and I
the spare DB can cater for the additional loa
current carrying capacity of the installed inc
UPS load However, spare DB is not economical to use
old-PIG2 MOV 700 scenario 1. Hence, a power cable shall be la
main DB and distribute to other sub-DBs.
old-PIG2 MOV 300
old-PIG2 MOV 700
old-PIG2 MOV 300 kVA 1
old-WBH MOV 600 V 230
old-WBH MOV 600 I 5.434783
old-WBH MOV 600
new - TJ MOV 600
new - TJ MOV 300
new-PIG1 MOV 700
new-PIG1 MOV 300
new-PIG1 MOV 700 10 A Scenario1:
new-PIG1 MOV 300 - Only maximum of 2 (two) MOVs can operate at
new-PIG1 MOV 700 10 A one time.
- Spare DB will be used to distribute power to
new-PIG1 MOV 300 UPS and Lighting DB2. The spare DB available
new-PIG1 MOV 600 maximum demand is 40A.
I&C 30 A - Disadvantage: Need to lay two cables from
main switchroom.
Spare DB 70 A
UPS
Lighting DB2 20 A
Maximum demand of 33.7A of phase L1 for Lighting DB. Could be 13A only.
Maximum demand
Equipment L1 L2 L3
DBDC01 5 3 3
CCTV Sys panel 4.347826
FIDS 4.347826
CP sys panel 4.347826
FAP 2.173913
Security RTU 4.347826
SCADA RTU 2.173913
Batt charger 4.347826
AC1 10.5
AC2 10.5
New Sub-DB
Loads A
UPS DB 20
Lighting DB 2 20
TOTAL 40
UPS DB
Loads on each phase
L1 L2
SCADA RTU2
Flow metering panel
MOV1 (DN700) 8 8
MOV2 (DN700) 8 8
MOV3 (DN700) 8 8
MOV4 (DN600) 5 5
MOV5 (DN600) 5 5
MOV6 (DN300) 3 3
MOV7 (DN300) 3 3
MOV8 (DN300) 3 3
MOV9 (DN300) 3 3
PIG - MOV1 (DN700) 8 8
PIG - BYMOV1 (DN300) 3 3
PIG - MOV2 (DN700) 8 8
PIG - BYMOV2 (DN300) 3 3
WBH - MOV1 (DN600) 5 5
WBH - MOV2 (DN600) 5 5
WBH - MOV3 (DN600) 5 5
TOTAL (A) 16 16
New Lighting DB
Maximum demand of 20A per phase for UPS Lighting DB.
Month days kWh kW A
8 31 1444 5.822581 10.50521
9 30 1268 5.283333 9.532294
10 31 1312 5.290323 9.544904
11 30 1356 5.65 10.19384
12 31 1356 5.467742 9.865007
1 31 1312 5.290323 9.544904
re installed in suspended floor (Taisin ref method D in
length 115.2
ed based on the need for UPS load and new lighting load.
udes 2X RUNNING MOVs and I&C loads. This is to check if
can cater for the additional loads. 70A is the approx of
ng capacity of the installed incoming cable of the spare DB.
re DB is not economical to use on the perspective of
ence, a power cable shall be laid from MSB to UPS room
distribute to other sub-DBs.
kW 5.14
V 400
pf 0.8
I 9.273689
(MOV INLET)
L3 kW load factor
4 0.5 0.7 0.35
4 0.5 0.7 0.35
8 3.2 0.2 0.64
8 3.2 0.2 0.64
8 3.2 0.2 0.64
5 3 0.2 0.6
5 3 0.2 0.6
3 0.81 0.2 0.162
3 0.81 0.2 0.162
3 0.81 0.2 0.162
3 0.81 0.2 0.162
8 3.2 0.2 0.64
3 0.81 0.2 0.162
8 3.2 0.2 0.64
3 0.81 0.2 0.162
5 3 0.2 0.6
5 3 0.2 0.6
5 3 0.2 0.6
7.872
24 11.36259
17 20 MCCB (inclusive of contigency of 50%)
Lighting
SSO
AC1 5
AC2 5
ontigency of 50%)
Banyan OTS MSB Voltage Absorbed load (kW) Load rating (kW)
Tag Load description
WBH Panel 1 400 3.5 3.5
WBH Panel 2 400 3.5 3.5
WBH Panel 3 400 3.5 3.5
L&SP DB 400 6.454287 9.22041
DB-AC-01 Metering DB 400 9.8287 10.92078
Motor Hoist 400 0.9 1.5
63A XP SSO 400 3.491814 34.91814
16A XP SSO 230 0.368 3.68
16A XP SSO 230 0.368 3.68
16A XP SSO 230 0.368 3.68
DB-UPSRMUPS Room DB 400 41.30086 45.88985
DB-AC-02 Spare DB 400 1.5 7.5
Spare 1 400 - -
Spare 2 400 - -
Spare 3 230 - -
Spare 4 230 - -
Spare 5 230 - -
Spare 6 230 - -
- -
- -
- -
80 AT
Adjusted load 100% 18.96294 22.13353
50%
30%
10%
18.96294 22.13353
Contingency 20%
Size 4C x 16mmsq
overall diameter 26.3 mm
CCC 75 A method D direct buried / ducting in gnd
VD 2.5 mV/A/m
Size 4C x 25mmsq
overall diameter 31.9 mm
CCC 115 A 104.65 A
VD 18.35697 V Zc 1.15
4.589242 L 115.2
AS 3008 Eqn (4.3)
[QUT - Lightning protection]
I 30 kA
Z 100 ohm
Vcg 1500 kV
Electrical equipment coding (as per existing station, as per existing station, list will add-on for new items)
Electrical cable tag coding (as per existing station, list will add-on for new items)
Lighting Layout
Earthing Layout
UPS room DB's layout
Battery room DB's layout
Short-Circuit calculation
Cable sizing calculation
Cable schedule
Cable routing
Cable tray layout
Cable lead-in pipe
SAT
Power Cable Site Meggering
Earthing System Resistance Test Report
Lightning Protection System Test Report
Switchboards Testing and Commissioning Report
UPS
CP Commissioning Report
MIJ Resistance test
CP Transformer Rectifier Unit SAT