Design for Cathodic Protection (including CP Earthing, Feasibility report & Technical Proposal) GENERAL NOTES

1
Electrical equipment coding specification
Electrical cable tag coding specification

Earthing System Design


Lightning Protection System

Hazardous Area Classification


UPS sizing
Lighting Illumination Level

Lighting Layout
Earthing Layout
UPS room DB's layout
Battery room DB's layout

SC calc
Cable sizing calculation GENERAL NOTES
MSB 1
UPS room DB (Sub-DB)
UPS DB 2
3
Lighting DB

Cable schedule
Cable routing
Cable tray layout
Cable lead-in pipe

Cable connection list/ CP connection using Schematic

Electrical Load List


Single Line Diagram
DB's panel layout/GA

GA/Catalogue/Datasheet/Inspection test plan


Switchboard
ACDB
Sub-DBs
Electrical Power Cables
Cable Tray, Trunking and Accessories
Surge Protection
Earthing System
Lightning System
Lighting
UPS
Polarisation Cell / Spark Gap
MIJ

SAT
Power Cable Site Meggering Reports
Earthing System Resistance Test Report
Lightning Protection System Test Report
SAT / Switchboard Testing and Commissioning Report
UPS
CP Commissioning Report
MIJ Resistance test
TRU SAT
GENERAL NOTES:
CP design data see AS 2832.1 Appendix I.

GENERAL NOTES:
For existing MOVs, existing power cables will be disconnected and abandoned.
New power cables shall be laid on tray.
Cable tray route from SWROOM MSB to UPS room shall run on the west side wall of the station to north wall of the station
Outgoing cables from UPS room DBs shall run on cable tray. The trays shall run from water bath heater area (west)
along the existing facility till PRS and cut across the road to pig launcher area. Cables in pig launcher area will run on tray.
n to north wall of the station.
h heater area (west)
ncher area will run on tray.
GTP
TL1 length = 5.7 km
est #TS 12

TL5 length = 0.55 km


est #TS 2

Pipeline encased in concrete sleeve, each section less than 200m,


shall have Mg ribbons for the following CH location:
CH510 / 540 CH480
CH 3750 CH3780
CH 4280 CH4350
ISO 15589-1 Table 1 "3-laye
SA shall be installed at each TS; TS will be installed every 0.5km. yrs
ICCP shall be used for this GTP. mA/msq

Ask for design current density (5-years), how is it determined.


0.8
Ask for Author on the CP design document.
0.7

0.6
f(x) = 0.3791412522 ln
0.5 R = 0.863070323

0.4

0.3

0.2

0.1

0
10 20 30 40

GTPinput data_SA
Line no.
Outer Diameter = 0.7 m
Approx length = 5700 m
Grade of Steel =
Coating =
Design Pressure =
MAOP =
Crossing = m
Design life = 3 years
Current Density (bare steel) = 0.08 mA/m2
Coating breakdown = 5.1 %
Anode type =
Anode consumption = 1230 A.year/kg
One unit Anode net weight = 9.1 kg
Output current per anode = 0.049 A

cd
0.45
0.4
0.35
0.3
cd
0.25 Polynomial (cd)
0.2
0.15
0.1
0.05
0
0 10 20 30 40 50 60 70

pipe jack
location length (m)shaft ID (m) dwg Shaft-e Shaft-s
meranti crescent PI-DAL-0004 525 481
banyan dr 1.5 PI-DAL-0016 3768 3740
banyan ave PI-DAL-0018
soil resistivity
TS location
CP design

Author:
WT uses this value. The
50y design current
density unknown.

ISO 15589-1 Table 1 "3-layer epoxy polyethelene"


10 20 30 40 50
0.08 0.1 0.4 0.513333 0.673333
log eqn
y x
0.8 0.63438 50
0.7

0.6
f(x) = 0.3791412522 ln(x) - 0.0096937896
0.5 R = 0.863070323
Row 15
0.4
Logarithmic (Row
0.3 15)

0.2

0.1

0
10 20 30 40 50

GTPinput data_ICCP
Line no.
Outer Diameter = 0.7
Approx length = 5700
Grade of Steel =
Coating =
Design Pressure =
MAOP =
Crossing =
Design life = 50
Current Density (bare steel) = 0.6
Coating breakdown = 5.1
Anode type =
Anode consumption = 1230
One unit Anode net weight = 9.1
Output current per anode = 0.049

y cd
10 0.08
20 0.1
30 0.4

Sleeve length (m) Remarks


44
28 pipe sleeve ID is changed from 1.5m to 1m because of PUB pipes crossing on top, space constraint in
soil resistivity
TS location

m
m

m
years
mA/m2
%
A.year/kg
kg
A

g on top, space constraint in civil


(existing) BYN MSB L1 L2 L3
Existing max demand is estimated @ 128 A
MCCB rating 150 AT / 400 AF

Spare DB
Current carrying capacity for 1x 4C x16mmsq XLPE/SWA/LSHF/FRT, installation method multi core installed in suspended flo
Appendix B1.8 current carrying capacity table), 75 A
Tambient factor @ 40deg C 0.91 VD 2.5 mV/A/m
Grouping factor 1 %VD* 4.32 %
Current carrying capacity after factor 68.25 A
Author:
No. of cct 1 70A is obtained based on the need for UPS
UPS load includes 2X RUNNING MOVs and I
the spare DB can cater for the additional loa
current carrying capacity of the installed inc
UPS load However, spare DB is not economical to use
old-PIG2 MOV 700 scenario 1. Hence, a power cable shall be la
main DB and distribute to other sub-DBs.
old-PIG2 MOV 300
old-PIG2 MOV 700
old-PIG2 MOV 300 kVA 1
old-WBH MOV 600 V 230
old-WBH MOV 600 I 5.434783
old-WBH MOV 600
new - TJ MOV 600
new - TJ MOV 300
new-PIG1 MOV 700
new-PIG1 MOV 300
new-PIG1 MOV 700 10 A Scenario1:
new-PIG1 MOV 300 - Only maximum of 2 (two) MOVs can operate at
new-PIG1 MOV 700 10 A one time.
- Spare DB will be used to distribute power to
new-PIG1 MOV 300 UPS and Lighting DB2. The spare DB available
new-PIG1 MOV 600 maximum demand is 40A.
I&C 30 A - Disadvantage: Need to lay two cables from
main switchroom.

Spare DB 70 A
UPS
Lighting DB2 20 A

(BYN existing) lighting DB


Loads on each phase
L1 L2 L3
6x 2x36W XP FLUOR (OTS) 7x 2x36W XP FLUOR (OTS) 2X400W XP FL
5x 2x36W XP FLUOR (PIG) 6x 2x36W XP FLUOR (FILTER) 6x 2x36W XP FLUOR (WBH)
1x 2x36W E FLUOR + 1 ExitL (OTS2X 13A SSO (Panel R) 4x 2x36W FLUOR (Panel R)
2X 13A XP SSO (OTS) 7X SSO (CCTV) 1x 2x36W XP FLUOR (MOV INLET)
1X E FLUOR (OTS) spare spare
spare spare spare
3x HL (CCTV) 3x HL (CCTV) spare
spare 5X FL (STN PERI) 5X FL (STN PERI)
spare 6x ST. L 6x ST. L
Maximum demand
Equipment L1 L2 L3
Lighting XP (2x36W) 4.382609 3.443478 3.443478
Lighting E (2x 36W)
Lighting E XP (2x 36W)
HL (CCTV) (500W) 6.521739
13A XP SSO 22.75 22.75
CCTV SSO (3.5W) 0.045652 0.045652
Normal Fluor (2x36W) 1.565217 1.565217
400W XP FL 3.478261
ST L (150W) 3.913043 3.913043

TOTAL (A) 33.7 31.71739 12.4

Maximum demand of 33.7A of phase L1 for Lighting DB. Could be 13A only.

(BYN existing) Metering DB


Loads on each phase
L1 L2 L3
DBDC01/1 DBDC01/2 DBDC01/3
CCTV Sys panel Security RTU SCADA RTU
FIDS CP sys panel FAP
Batt charg AC1 AC2

Maximum demand
Equipment L1 L2 L3
DBDC01 5 3 3
CCTV Sys panel 4.347826
FIDS 4.347826
CP sys panel 4.347826
FAP 2.173913
Security RTU 4.347826
SCADA RTU 2.173913
Batt charger 4.347826
AC1 10.5
AC2 10.5

TOTAL (A) 18.04348 20.02174 20.02174

Maximum demand of 20A of phase L2 for Metering DB.

(Revised) BYN MSB


Loads A
WBH panel 1 6.5
WBH panel 2 6.5
WBH panel 3 6.5
LPDB 33.7
Metering DB 20.02174
Motor hoist 2.165064
63A XP SSO 0
13A XP SSO 0
16A XP SSO 16
New Sub-DB 40

TOTAL (A) 131.3868 ok!

New Sub-DB
Loads A
UPS DB 20
Lighting DB 2 20
TOTAL 40

UPS DB
Loads on each phase
L1 L2
SCADA RTU2
Flow metering panel
MOV1 (DN700) 8 8
MOV2 (DN700) 8 8
MOV3 (DN700) 8 8
MOV4 (DN600) 5 5
MOV5 (DN600) 5 5
MOV6 (DN300) 3 3
MOV7 (DN300) 3 3
MOV8 (DN300) 3 3
MOV9 (DN300) 3 3
PIG - MOV1 (DN700) 8 8
PIG - BYMOV1 (DN300) 3 3
PIG - MOV2 (DN700) 8 8
PIG - BYMOV2 (DN300) 3 3
WBH - MOV1 (DN600) 5 5
WBH - MOV2 (DN600) 5 5
WBH - MOV3 (DN600) 5 5

TOTAL (A) 16 16

Maximum demand of 20A per phase for UPS DB.

New Lighting DB
Maximum demand of 20A per phase for UPS Lighting DB.
Month days kWh kW A
8 31 1444 5.822581 10.50521
9 30 1268 5.283333 9.532294
10 31 1312 5.290323 9.544904
11 30 1356 5.65 10.19384
12 31 1356 5.467742 9.865007
1 31 1312 5.290323 9.544904
re installed in suspended floor (Taisin ref method D in

length 115.2

ed based on the need for UPS load and new lighting load.
udes 2X RUNNING MOVs and I&C loads. This is to check if
can cater for the additional loads. 70A is the approx of
ng capacity of the installed incoming cable of the spare DB.
re DB is not economical to use on the perspective of
ence, a power cable shall be laid from MSB to UPS room
distribute to other sub-DBs.

kW 5.14
V 400
pf 0.8
I 9.273689

(MOV INLET)
L3 kW load factor
4 0.5 0.7 0.35
4 0.5 0.7 0.35
8 3.2 0.2 0.64
8 3.2 0.2 0.64
8 3.2 0.2 0.64
5 3 0.2 0.6
5 3 0.2 0.6
3 0.81 0.2 0.162
3 0.81 0.2 0.162
3 0.81 0.2 0.162
3 0.81 0.2 0.162
8 3.2 0.2 0.64
3 0.81 0.2 0.162
8 3.2 0.2 0.64
3 0.81 0.2 0.162
5 3 0.2 0.6
5 3 0.2 0.6
5 3 0.2 0.6
7.872
24 11.36259
17 20 MCCB (inclusive of contigency of 50%)

Lighting
SSO
AC1 5
AC2 5
ontigency of 50%)
Banyan OTS MSB Voltage Absorbed load (kW) Load rating (kW)
Tag Load description
WBH Panel 1 400 3.5 3.5
WBH Panel 2 400 3.5 3.5
WBH Panel 3 400 3.5 3.5
L&SP DB 400 6.454287 9.22041
DB-AC-01 Metering DB 400 9.8287 10.92078
Motor Hoist 400 0.9 1.5
63A XP SSO 400 3.491814 34.91814
16A XP SSO 230 0.368 3.68
16A XP SSO 230 0.368 3.68
16A XP SSO 230 0.368 3.68
DB-UPSRMUPS Room DB 400 41.30086 45.88985
DB-AC-02 Spare DB 400 1.5 7.5
Spare 1 400 - -
Spare 2 400 - -
Spare 3 230 - -
Spare 4 230 - -
Spare 5 230 - -
Spare 6 230 - -
- -
- -
- -

L&SP DB Voltage Absorbed load (kW) Load rating (kW)


Tag Load description
7 No. 2x36W XP FLUOR (OTS) 230 0.5313 0.5313
7 No. 2x36W XP FLUOR (OTS) 230 0.5313 0.5313
2 No. 400W XP Flood light (OTS) 230 0.92 0.92
3 No. 2x36W FLUOR & 1 No. E ligt (SWRM) 230 0.3036 0.3036
6 No. 2x36W XP FLUOR (FILTER) 230 0.4554 0.4554
6 No. 2x36W XP FLUOR (WBH) 230 0.4554 0.4554
9 No. 2x36W XP FLUOR (PIG) 230 0.6831 0.6831
2 No. 2x36W XP FLUOR (MOV) 230 0.1518 0.1518
6 No. 2x36W XP FLUOR (WBH) 230 0.4554 0.4554
1 No. 2x8W Exit light (SWRM) 230 0.016 0.016
2 No. 2x36W E (XP)FLUOR (OTS) 230 0.1518 0.1518
2 No. 13A XP SSO (OTS) 230 5.98 5.98
2 No. 13A Twin SSO (SWRM) 230 11.96 11.96
7 No. CCTV SSO 230 0.0395 0.0395
3 No. 500W CCTV Halogen spotlight 230 1.5 1.5
3 No. 500W CCTV Halogen spotlight 230 1.5 1.5
5 No. 400W floodlight 230 2.3 2.3
5 No. 400W floodlight 230 2.3 2.3
7 No. 250W st light 230 2.898 2.898
6 No. 250W st light 230 2.484 2.484
Spare1 230
Spare2 230
Spare3 230
Spare4 230
Spare5 230
Spare6 230
Spare7 230

Metering DB Voltage Absorbed load (kW) Load rating (kW)


Tag Load description
SCADA RTU 230 0.69 0.69
SCADA RTU 230 0.69 0.69
Security RTU 230 0.46 0.46
CCTV system panel (DVR) 230 0.09 0.09
CP transducer 230 0.07 0.07
Battery charger unit 230 1.1 1.1
Fire alarm panel 230 0.45 0.5
FIDS 230 0.063 0.07
Air conditioner 1 230 2.24 5.6
Air conditioner 2 230 2.96 7.4
DB-DC-01 230 0.43 0.43
DB-DC-01 230 1.1 1.1
Spare1 230 0 0
Spare2 230 0 0
Spare3 230 0 0
Spare4 230 0 0

Spare DB Voltage Absorbed load (kW) Load rating (kW)


Tag Load description
UPS 400 24.29259 40.48765
DB-UPSRMUPS Room L&SP DB 400 27.53391 45.88985
UPS Voltage Absorbed load (kW) Load rating (kW)
Tag Load description
S25-50 DN700 L120-190 U/G MOV near gate 400 4.112 5.14
S25-50A DN300IQ20 bypass 400 0.648 0.81
S25-51 DN700 L120-190 PIG MOV 400 4.112 5.14
S25-51A DN300IQ20 bypass PIG MOV 400 0.648 0.81
S25-73 DN600 IQ 40 WBH MOV 400 2.352 2.94
S25-75 DN600 IQ 40 WBH MOV 400 2.352 2.94
S25-77 DN600 IQ 40 WBH MOV 400 2.352 2.94
S25-1 DN600 IQ40F25B4 TJ MOV 400 2.592 3.24
S25-1A DN300 IQ20F14B4 bypass TJ MOV 400 0.648 0.81
S25-86 DN700 IQ40F25B4 Interlink MOV 400 2.592 3.24
S25-86A DN300 IQ20F14B4 bypass interlink 400 0.648 0.81
S25-85 DN700 IQ40F25B4 U/G MOV 400 2.592 3.24
S25-85A DN300 IQ20F14B4 bypass U/G MOV 400 0.648 0.81
S25-96 DN700 IQ40F25B4 U/G MOV 400 2.592 3.24
S25-96A DN300 IQ20F14B4 bypass U/G MOV 400 0.648 0.81
S25-97 DN600 IQ40F25B4 U/G Interlink MOV 400 2.592 3.24
SCADA RTU 400 0.69 0.69
DC DB panel 400 1.5 1.5
Fire alarm panel 400 0.5 0.5

DB-UPSRM-01 Voltage Absorbed load (kW) Load rating (kW)


Tag Load description
UPS 400 24.29259 40.48765
Air-cond1 400 6.3 7
Air-cond2 400 7 7
Battery ventilation fan1 400 0.2 0.2
Battery ventilation fan2 400 0.2 0.2
3 no. 13A Twin SSO 230 3.588 17.94
3 no. 2x36W FLUOR (UPS RM) + 1 no. E L 230 0.3036 0.3036
3 no. 2x36W FLUOR (BATT RM) + 1 no. E L 230 0.3036 0.3036
2 No. 2x8W Exit light (UPS + BATT RM) 230 0.032 0.032
Load/diversity factorEfficiency PF Consumed load
kW kVA
1 1 0.9 3.5 3.888889
1 1 0.9 3.5 3.888889
1 1 0.9 3.5 3.888889
0.7 0.9 0.8 7.17143 8.964288
0.9 0.9 0.9 10.92078 12.1342
0.6 0.9 0.8 1 1.25
0.1 0.9 0.8 3.879794 4.849742 63 34.91814
0.1 0.9 0.8 0.408889 0.511111 16 3.68
0.1 0.9 0.8 0.408889 0.511111 16 3.68
0.1 0.9 0.8 0.408889 0.511111 16 3.68
0.9 0.9 0.8 45.88985 57.36231
0.2 0.9 0.8 1.666667 2.083333
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Total 82.25518 99.84387 ( 144.1122 A )

Main incoming MCCB AT 150 A

Load/diversity factorEfficiency PF Consumed load


kW kVA A kW
1 1 0.9 0.5313 0.590333 0.33 0.0759
1 1 0.9 0.5313 0.590333 0.33 0.0759
1 1 0.9 0.92 1.022222 2 0.46
1 1 0.9 0.3036 0.337333 0.33 0.0759
1 1 0.9 0.4554 0.506 0.33 0.0759
1 1 0.9 0.4554 0.506 0.33 0.0759
1 1 0.9 0.6831 0.759 0.33 0.0759
1 1 0.9 0.1518 0.168667 0.33 0.0759
1 1 0.9 0.4554 0.506 0.33 0.0759
1 1 0.9 0.016 0.017778 0.016
1 1 0.9 0.1518 0.168667 0.33 0.0759
1 1 0.9 5.98 6.644444 13 2.99
1 1 0.9 11.96 13.28889 26 5.98
1 1 0.9 0.0395 0.043889
1 1 0.9 1.5 1.666667 0.5
1 1 0.9 1.5 1.666667 0.5
1 1 0.9 2.3 2.555556 2 0.46
1 1 0.9 2.3 2.555556 2 0.46
1 1 0.9 2.898 3.22 1.8 0.414
1 1 0.9 2.484 2.76 1.8 0.414

Total 35.6166 39.574 ( 57.12015 A )


9.22041 3.766067 ( 5.435849 A )

Adjusted load 100% 3.0555 3.395 MCCB 40 AT


50% 0.1518 0.168667
30% 4.29525 0.1518
10% 1.71786 0.0506
9.22041 3.766067

Load/diversity factorEfficiency PF Consumed load


kW kVA
1 1 0.9 0.69 0.766667
1 1 0.9 0.69 0.766667
1 1 0.9 0.46 0.511111
1 1 0.9 0.09 0.1
1 1 0.9 0.07 0.077778
1 1 0.9 1.1 1.222222
0.9 1 0.9 0.45 0.5
0.9 1 0.9 0.063 0.07
0.4 0.9 0.8 2.488889 3.111111
0.4 0.9 0.8 3.288889 4.111111
1 1 0.9 0.43 0.477778
1 1 0.9 1.1 1.222222
1 1 0.9 0 0
1 1 0.9 0 0
1 1 0.9 0 0
1 1 0.9 0 0
Total 10.92078 12.93667 ( 18.67247 A )
40 AT

Load/diversity factorEfficiency PF Consumed load


kW kVA
0.6 0.95 0.8 25.57115 31.96393
0.6 0.95 0.8 28.98306 36.22883
Total 54.55421 68.19276 ( 98.42777 A )
63 AT
Load/diversity factorEfficiency PF Consumed load
kW kVA
0.8 0.85 0.85 4.837647 5.691349 6.982542
0.8 0.85 0.85 0.762353 0.896886 1.100362
0.8 0.85 0.85 4.837647 5.691349 6.982542
0.8 0.85 0.85 0.762353 0.896886 1.100362
0.8 0.85 0.85 2.767059 3.255363 3.993905
0.8 0.85 0.85 2.767059 3.255363 3.993905
0.8 0.85 0.85 2.767059 3.255363 3.993905
0.8 0.85 0.85 3.049412 3.587543 4.401447
0.8 0.85 0.85 0.762353 0.896886 1.100362
0.8 0.85 0.85 3.049412 3.587543 4.401447
0.8 0.85 0.85 0.762353 0.896886 1.100362
0.8 0.85 0.85 3.049412 3.587543 4.401447
0.8 0.85 0.85 0.762353 0.896886 1.100362
0.8 0.85 0.85 3.049412 3.587543 4.401447
0.8 0.85 0.85 0.762353 0.896886 1.100362
0.8 0.85 0.85 3.049412 3.587543 4.401447
1 1 0.9 0.69 0.766667
1 1 0.9 1.5 1.666667
1 1 0.9 0.5 0.555556
Total 40.48765 47.45671 ( 68.49786 A ) Actual connected
18.96294 22.13353 ( 31.94699 A ) Isolation of selected MOVs
10.57706 12.26778 ( 17.70702 A ) Isolation of 2 MOVs + I&C

22.75553 26.56023 ( 38.33639 A ) Contingency 20%

80 AT
Adjusted load 100% 18.96294 22.13353
50%
30%
10%
18.96294 22.13353

Load/diversity factorEfficiency PF Consumed load


kW kVA
0.6 0.95 0.8 25.57115 31.96393
0.9 0.85 0.85 7.411765 8.719723
0.9 0.85 0.85 8.235294 9.688581
1 0.9 0.85 0.222222 0.261438
1 0.9 0.85 0.222222 0.261438
0.2 1 0.9 3.588 3.986667
1 1 0.9 0.3036 0.337333
1 1 0.9 0.3036 0.337333
1 1 0.9 0.032 0.035556
Total 45.88985 55.592 ( 80.24014 A )
80 AT
Actual connected
Isolation of selected MOVs + I&C
Isolation of 2 MOVs + I&C

Contingency 20%
Size 4C x 16mmsq
overall diameter 26.3 mm
CCC 75 A method D direct buried / ducting in gnd
VD 2.5 mV/A/m

Size 4C x 25mmsq
overall diameter 31.9 mm
CCC 115 A 104.65 A
VD 18.35697 V Zc 1.15
4.589242 L 115.2
AS 3008 Eqn (4.3)
[QUT - Lightning protection]

I 30 kA
Z 100 ohm
Vcg 1500 kV

[AS 2832.1 - Clause 4.4]


[AS 4853- Clause 8]
Engineering Design
Design Report for Cathodic Protection (including Feasibility report (soil resistivity) & Technical Proposal)
CP Earthing
CP test point location layout
CP test point installation details (both sacrificial anodes and ICCP system)
ICCP transformer rectifier unit schematic diagram
CP deep anodes ground bed installation details

Electrical equipment coding (as per existing station, as per existing station, list will add-on for new items)
Electrical cable tag coding (as per existing station, list will add-on for new items)

Earthing System Design


Lightning Protection System

Hazardous Area Classification


UPS sizing
Lighting Illumination Level

Lighting Layout
Earthing Layout
UPS room DB's layout
Battery room DB's layout

Short-Circuit calculation
Cable sizing calculation

Cable schedule
Cable routing
Cable tray layout
Cable lead-in pipe

Electrical Load List


Single Line Diagram
DB's panel layout/General Arrangement (including bill of materials)

Catalogue/Datasheet/Inspection test plan


Switchboard (components catalogue)
ACDB (components catalogue)
Sub-DBs (components catalogue)
Electrical Power Cables
Cable Tray, Trunking and Accessories
Surge Protection
Earthing System
Lightning System
Lighting
UPS (include UPS schematics, battery sizing, operating manuals, UPS and battery enclosure/housing details)
Polarisation Cell / Spark Gap
MIJ

SAT
Power Cable Site Meggering
Earthing System Resistance Test Report
Lightning Protection System Test Report
Switchboards Testing and Commissioning Report
UPS
CP Commissioning Report
MIJ Resistance test
CP Transformer Rectifier Unit SAT

After installation monitoring


CP Close potential survey and DCVG test
3-Monthly Pipe Potential (CP) Readings
CP system key plan
using details)