You are on page 1of 1

NOTES:

TYPICAL CROSS SECTION FOR ROADS AND TRAFFIC AREAS TYPICAL SITUATION FOR 1. MAINTENANCE ROADS SHALL BE PROVIDED WITH BUNDFILL AND
CROSSING DRAINAGE BOXES AND CONDUITS. BERMS AND SLOPE OPEN DRAINAGE
INSIDE STATION AREAS SIDEWALKS AND ACCES TO SHAFTS/STRUCTURES SHALL BE CONSTRUCTED ON DOWNSIDES OF UPHILLS ALONG THE PIPELINE. ON
1:25 STEEP ROADS AND ON SECTIONS LIABLE FOR EROSIONS, PORTLAND CEMENT
CONCRETE PAVEMENT SHALL BE CONSTRUCTED ALONG WITH NECESSARY
SIDEWALKS (PRECAST CONCRETE SIDE DRAINAGE AND CROSSING DRAINAGE STRUCTURES AND OUTFALLS.
CL SLABS) TO ALL ACCESS DOORS
3000 3000 1500 2. ALL DIMENSIONS ARE IN MILLIMETERS (EXCEPT ELEVATION ARE IN METERS).
OF BUILDINGS, STRUCTURES AND
SHAFTS (WIDTH = 1m).
ROADWAY SIDEWALK
IF REQUIRED OTHERWISE
GRAVEL UP TO CURBSTONE

DETAIL "A"
FGL = 0.00 (Typical) 1,5%
2% FRL 2%

LEGEND:
VALVE SHAFT OR
FRL = FINISHED ROAD LEVEL
EQUIPMENT SHAFT
FGL = FINISHED GROUND LEVEL

WEARING COURSE ( t=40mm ) PRECAST CONCRETE SLABS ( 45/45/5 ) DETAIL "A"


TACK COATING ( 0,30kg/m\U+00B2 ) MORTAR BED ( 20mm )
1:10
BITUMINOUS BASE COURSE ( t=100mm, 250kg/m\U+00B2 ) SUBBASE ( t>350mm ) Ev2 > 120 MN/m\U+00B2
PRIME COATING ( 0,30kg/m\U+00B2 ) SUBGRADE, Ev2 > 45 MN/m\U+00B2
SUBBASE ( t>350mm ) Ev2 > 120 MN/m\U+00B2
SUBGRADE, Ev2 > 45 MN/m\U+00B2

TYPICAL CROSS SECTION FOR ACCESS ROADS REFERENCE DRAWINGS


DRAWING No.: DRAWING TITLE:
1:25
CL
1000 3000 3000 1000 1000 LEAN CONCRETE
100 150 100
SHOULDER ROADWAY SHOULDER DRAINAGE
CHANNEL

PRECAST CONCRETE CURBSTONES


2% FRL AROUND GRAVELLED AREAS
1:10 GRAVEL
ENGINEER'S STAMP CONTRACTOR'S STAMP

RIP-RAP IN CEMENT MORTAR BED

WEARING COURSE ( t=40mm )


TACK COATING ( 0,30kg/m\U+00B2 ) MAINTENANCE ROAD (SEE NOTE 1)
BITUMINOUS BASE COURSE ( t=100mm, 250kg/m\U+00B2 ) 1:25
PRIME COATING ( 0,30kg/m\U+00B2 ) CL
1750 1750 LEAN CONCRETE
SUBBASE ( t>350mm ) Ev2 > 120 MN/m\U+00B2
100 80 100
SUBGRADE, Ev2 > 45 MN/m\U+00B2 ROADWAY
CROSSING
DRAINAGE
FGL = 0.00
TYPICAL CROSS SECTION FOR GRAVEL AREAS
1:25
250mm THICK LAYER OF WELL GRADED SAND-GRAVEL MIXTURE
FGL = 0.00 (SAND CONTENT 0-2mm - 20%, GRAVEL CONTENT >2mm - 35-80%, SILT CONTENT max. 11%
max. GRAIN SIZE 70mm, COMPACTED TO 95% PROCTOR DENSITY)
(ALTERNATIVE: CEMENT CONCRETE PAVEMENT ON STEEP ROADS AND ON SECTIONS LIABLE
50mm THICK LAYER OF 5 - 20mm CRUSHED STONE (STABILIZED) FOR EROSION) 0 Issue for Tender BR Ofner 12.08.2008
B Issue for Draft Tender BR Ofner 25.07.2008

SUBGRADE, Ev2 > 45 MN/m\U+00B2 A Issue for Engineering Report BR HARB 10.12.2007
REV. DESCRIPTION DRAWN CHECKED DATE

SALINE WATER CONVERSION CORPORATION


KINGDOM OF SAUDI ARABIA

GRAVEL SURFACING FOR NOT PAVED STATION AREA AL LITH


SCALE 1:10
WATER TRANSMISSION SYSTEM

MIN. 50 ILF CONSULTING ENGINEERS


CONSULTING
MIN. 100 ENGINEERS

Subconsultant: DRAWING TITLE:

50mm THICK LAYER OF 20mm CRUSHED STONE (STABILIZED)


COMPACTED GRAVEL BASE MIN. THICKNESS 100mm TYPICAL CROSS SECTION FOR
SUBGRADE Ev2 > 45 MN/m\U+00B2
P H S
ROADS AND TRAFFIC AREAS

DRAWING SHEET REV.


0.5 0 0.5 1 1.5 2 2.5 3 SCALE:
No.:
METRES 1:25, 1:10 QP10 - Q- 611 - 0

You might also like