You are on page 1of 1

GL +6.

70
GL +6.50

LEGEND:
ELEVATION NORTH-WEST
PUMP MOTOR UNIT WITH VALVES SMP SAMPLING POINT
LIT LEVEL INDICATOR TRANSMITTER
BUTTERFLY VALVE
PIT PRESSURE INDICATOR TRANSMITTER
SHUT-OFF VALVE GENERAL FIT FLOW INDICATOR TRANSMITTER
CHECK VALVE LS LEVEL SWITCH, L (LOW), H (HIGH)
LI LEVEL INDICATOR
CONTROL VALVE, PCV, FCV PS PRESSURE SWITCH, L (LOW), H (HIGH)
F FLOW SENSOR AND TRANSMITTER PI PRESSURE INDICATOR
PIS PRESSURE INDICATOR SWITCH, L (LOW), H (HIGH)
CONTRACT LIMIT FC FLOW CONTROLLER
FS FLOW SWITCH, H (HIGH)
BATTERY LIMIT PC PRESSURE CONTROLLER

BALL VALVE LC LEVEL CONTROLLER


M WQM WATER QUALITY MONITORING
ELECTRICAL MOTOR
CL2IT RESIDUAL CHLORINE INDICATOR TRANSMITTER
pHIT pH INDICATOR TRANSMITTER
CIT CONTUCTIVITY INDICATOR TRANSMITTER
TIT TEMPERATURE INDICATOR TRANSMITTER
L.C. LOCKED CLOSED
L.O. LOCKED OPEN
GL GROUND LEVEL

REFERENCE DRAWINGS
DRAWING No.: DRAWING TITLE:
QP - 10 - Q - 605 AL LITH PUMPING STATION,YARD DRAWING
ELEVATION NORTH-EAST ELEVATION SOUTH-WEST QP - 10 - Q - 606 TYPICAL PUMPING STATION,GENERAL LAYOUT

ENGINEERS STAMP CONTRACTORS STAMP

CRANE
6.10
5.00

3.90
2.90

PUMP
HALL EMERGENCY
GENERATORROOM GL +6,70
GL +6,50
Cable Duct

PUMP
PLINTH

SECTION 1-1
0 ISSUE FOR TENDER PH OFNER 14.08.2008
AL GHALLAH PIPELINE DN 150
B ISSUE FOR DRAFT TENDER PH HARB 29.07.2008
GUMAYQAH PIPELINE DN 200
A ISSUE FOR ENGINEERING REPORT PH HARB 29.10.2007
AL WASQAH PIPELINE DN 200
PUMPING STATION INLET LINE DN 250
REV. DESCRIPTION DRAWN CHECKED DATE

SALINE WATER CONVERSION CORPORATION


KINGDOM OF SAUDI ARABIA
AL LITH
WATER TRANSMISSION SYSTEM

ILF CONSULTING ENGINEERS


SUBCONSULTANT

P H S AL LITH PUMPINGSTATION
GENERAL LAYOUT
VIEWS,SECTION

SCALE: DRAWING No.: SHEET REV.


1:100 QP- 10 - Q - 619 - 0