BIKANER DIVISION-ENGINEERING/NORTH WESTERN RLY

TENDER DOCUMENT
Tender No: E-71-2017-18 Closing Date/Time: 24/07/2017 15:00

DRM/Engineering acting for and on behalf of The President of India invites E-Tenders against Tender No E-71-2017-18 Closing Date/Time
24/07/2017 15:00 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only. Manual offers are not allowed
against this tender, and any such manual offer received shall be ignored.

Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only payment
modes available ON IREPS portal LIKE net banking, debit card, credit card etc. Manual payments through Demand draft, Banker cheque, Deposit
receipts, FDR etc. are not allowed.

1. NIT HEADER

Contract Type Works


Name of Work Provision of boundary wall to prevent encroachment at MHRG under ADEN/Bhiwani.
Tender Type Open Bidding System Single Packet System
Tender Closing Date Time 24/07/2017 15:00 Date Time Of Uploading Tender 16/06/2017 15:02
Pre-Bid Required No Pre-Bid Query Date Time Not Applicable
Advertised Value 1725283.93 Tendering Section EAST
Bidding Style Single Rate for Tender Bidding Unit Above/Below/Par
Earnest Money (Rs.) 34510.00 Validity of Offer ( Days) 90
Tender Doc. Cost (Rs.) 2000.00 Period of Completion 4 Months
Bidding Start Date 10/07/2017

2. SCHEDULE

S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Schedule A-USSOR-2010 1725283.93
Please see Item Breakup for details. 338613.00 12.01 379280.42
1
Item Description:- All items of Plain concrete and RCC Work appearing in chapter 3 & 4 of USSOR- 2010 ( Amended up to date )
Please see Item Breakup for details. 942256.60 12.01 1055421.62
2
Item Description:- All items of Brick work appearing in chapter 5 of USSOR- 2010 ( Amended up to date )
Please see Item Breakup for details. 259424.95 12.01 290581.89
3
Item Description:- All items of all other chapters of USSOR- 2010 appearing in other than above shown chapters ( Amended up to date )

3. ITEM BREAKUP

Schedule Schedule A-USSOR-2010


Item- 1 All items of Plain concrete and RCC Work appearing in chapter 3 & 4 of USSOR- 2010 ( Amended up to date )
S No. Item No Description of Item Unit Qty Rate Amount
Providing and laying in position cement concrete of specified proportion excluding cost
of cement, centering and shuttering - All works upto Plinth level :
1 031013 1:4:8 (1 cement : 4 sand : 8 graded stone aggregate 40mm nominal size) cum 60.00 1315.13 78907.80
Providing and laying cement concrete, up to plinth in retaining walls, walls (any
thickness) including attached plasters, columns, pillars, posts, struts, buttresses,
string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window
sills, fillets etc, excluding the cost of cement and of shuttering, centering.
2 031023 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 20mm nominal size) cum 10.00 1682.52 16825.20
Supply and using cement at worksite :
3 033061 OPC 43 grade Tonne 48.00 5060.00 242880.00
Total 338613.00
Item- 2 All items of Brick work appearing in chapter 5 of USSOR- 2010 ( Amended up to date )
S No. Item No Description of Item Unit Qty Rate Amount
Brick work with non-modular (FPS) bricks of class designation 7.5 in foundation and
plinth in :
1 051018 Cement mortar 1:6 (1 cement : 6 coarse sand) cum 420.00 2150.23 903096.60
2 051040 Extra over item 051010 & 051020 for brick work in superstructure beyond plinth level cum 250.00 156.64 39160.00
upto floor two level :
Total 942256.60
Item- 3 All items of all other chapters of USSOR- 2010 appearing in other than above shown chapters ( Amended up to date )
S No. Item No Description of Item Unit Qty Rate Amount
Earth work in excavation as per approved drawings and dumping at embankment site
or spoil heap, within railway land, including 50m lead and 1.5m lift, the lead to be
measured from the centre of gravity of excavation to centre of gravity of spoil heap:
the lift to be measured from natural ground level and paid for in layers of 1.5m each,
including incidental work, as per specifications-in
1 011011 All kinds of soils cum 275.00 95.85 26358.75
2 012010 Extra over item 011010 for excavation in foundations for buildings and bridges to cum 275.00 10.10 2777.50
cover dressing to neat dimension and plumbing sides etc. Note : Dressing under this
item is payable for the total quantity of excavation in foundation and not partly
3 012040 Filling, watering and ramming earth in 15 cm layers in floors and foundations with cum 95.00 21.90 2080.50
surplus earth from foundations including 50m lead and 1.5m lift

Pa g e 1 o f 2 Ru n Da te Time: 16 /0 6 /2 0 17 15 :0 3:16
BIKANER DIVISION-ENGINEERING/NORTH WESTERN RLY
TENDER DOCUMENT
Tender No: E-71-2017-18 Closing Date/Time: 24/07/2017 15:00

12 mm cement plaster of mix -


4 111042 1:6 (1cement: 6coarse sand) Sqm 2130.00 66.45 141538.50
5 115110 Finishing walls with water proofing cement paint of required shade two or more coats Sqm 2130.00 40.69 86669.70
on new work applied @ 3.84 Kg/10 sqm
Total 259424.95

4. ELIGIBILITY CONDITIONS

5. COMPLIANCE

General Instructions

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Notes- 1.The cost of the work & quantities shown above are rough and are for guidance only. The quantities
given above are subject to change according to needs of the Railway and variation thereof to any extent will
not be the basis of any claims against Railway. 2. The work shall be carried out as per N.W.Rly.Standard
Specification (Amended up to date). 3.The rates should be inclusive of all labour and materials, taxes, lead,
lift, loading, unloading, sales tax etc. Nothing extra payment other than the accepted rates will be made in any
1 No No Not Allowed
circumstances. 4.The contract shall be Governed by General Condition of Contract and Instructions to the
Tenderers 2014 (Amended up to date). 5. All Tools and plants and mechanical equipments as required to
execute the work shall be arranged by the contractor. 6. The Schedule items are based on USSOR 2010 of
N.W.Rly. 7. Any amendment in USSOR 2010 shall binding on the tenderer and no claim shall be entertained
on this account.
Contractor/ suppliers/ service providers/ parties shall registered their firms under GSTIN (GST Identification
2 No No Not Allowed
Number).

Undertakings

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
1 I/ We have visited the works site and I / We am / are aware of the site conditions. No No Not Allowed

6. Documents attached with tender

S.No. Document Name Document Description


1 Generalcondition12.06.172017-18.pdf General condition

Signed By: LAL CHAND SUTHAR

Designation : DENeast

Pa g e 2 o f 2 Ru n Da te Time: 16 /0 6 /2 0 17 15 :0 3:16