Professional Documents
Culture Documents
1
Experiences creating COBie data
for Asset Management
2
Power Station Longitudinal Section
3
Pressure Vessel Sections
4
Asset Data metrics
2 Power Stations
- Hartlepool
- Heysham 1
4 Pressure Vessels, each with:
- 17 Levels
- 385 Spaces
- 17 Types
- 5,625 components
- 695 systems (wires)
- 7,750 URL search query links
- 24,500 attributes
Inspection Data:
- 25,000 photos, 75 Gbytes
- 7,500 inspection records
5
COBie Spreadsheet generated model +
annotation IFC model
6
LOD = bounding box
7
Object substitution -
Generic to Specific library objects
8
Object substitution -
Generic to Specific library objects
9
LOD Detailed object geometry
10
Viewing completed Asset Data model
11
IFC Viewer Asset Data
12
Anchor Peg data
13
Inspection Photo -
in 4Projects Extranet
14
COBie Data embedded into a PDF report
15
IFC COBie data opened in PDF file
16
Viewing COBie Asset Data
17
List of photos taken of Anchor Socket
in 4Projects Extranet
18
From COBie asset data to
Inspection Photo
19
P21+
Repeatable Rooms
20
COBie data in repeatable rooms model
21
Room Data Sheet derived from COBie data
22
P21+
Mental Health
Repeatable Rooms
23
Functional Single Bedroom Type 1
24
Architectural Layout
25
Furniture in repeatable room
26
MEP systems in repeatable room
27
Federated repeatable room model
Solibri Model Viewer
28
Object properties Wash Hand Basin
29
Object properties Ball Valve
30
Quality of data in COBie Spreadsheet
Facility:
- Not properly defined.
Floor:
- Multiple Level names defined for a single storey.
Space:
- Spaces are not classified.
- Components are not always related to a space.
Type:
- Type Names are not unique.
- Hardly any Types have a classification.
- Type Properties are not consistently defined.
Component:
- Components dont always reference a valid Type name.
System:
- Not all systems are classified.
- Some Systems dont have a system name defined.
- Some Component Names in a system dont exist in the Component sheet.
Attribute:
- Attribute names are specific each BIM Library provider or Revit Family definition.
31
P21+ Wrightington Phase 1 Hospital
EIRs
What we asked for.
32
BIM Task Group BIM Trial Project
P21+ Wrightington Phase 1
33
Data required - MEP Systems
Item in MEP
O&M added
identified by the WWL project
COBie data
Contractor
Designer
(Stage 4)
(Stage 6)
Trust.
(Stage 6)
by MEP
at
LV Distribution
Switchgear
Energy Meters X Meter data to be
attributed to item that is
being metered
Generators X
UPS Installations
IPS Installations
Auto Transfer
Switches
Lifts X X X Who will model the
lifts?
Lighting and
Emergency Lighting
Boilers
Clorifiers
Ventilation & Air
Conditioning Systems
a. AHU
b. Fan Coil Units
c. Fan Convectors X
d. Split Systems X
e. Variable X
Refrigerant Flow
Systems (VRF)
f. Chillers
g. Heat Recovery X
Units
h. Out Door Units X
Medical Gas Need to check what
Installations MEP model plant items
are modelled.
34
Data required - MEP System - Types
2D DWG Drawing
2D PDF Drawing
COBie UK-2012
Documentation
RVT model
Level of Detail
IFC Model
Major Items of plant
Description COBie information requirements
Spaces Arch Room, Revit Arch Rooms and MEP Spaces defined
MEP spaces
HV Distribution:
Sub Station X
Transformer X
RMU X
LV Distribution:
LV Switch Boards X
LV Panel Boards
LV Distribution Boards
Metering:
Meters Meter data to be attributed to item that is
being metered
Earthing & Bonding:
Main Earth Terminal (MET)
Earth Reference Terminal (ERT)
Generation:
Generator X
Fuel Store X
UPS Installations
IPS Installations
Auto Transfer Switch (ATS)
Lighting Installations:
General Fluorescent Luminaires
35
Classification Tables to be used
36
37
38
39
What we got..
40
4Projects 3G 4BIM (BIM Manger)
41
4Projects 4BIM
42
4Projects 4BIM
Riser model component selection
43
4Project 4BIM
Riser model component properties
44
Further IFC post processing needed -
Perl script
45
4Projects 3G 4BIM (BIM Manger)
COBie Spreadsheet support
46
4Project 4BIM
Model Federation
47
4Project 4BIM
Model Federation select models
48
4Projects 4BIM - Model Viewer
Architectural Model
49
4Projects 4BIM - Model Viewer
MEP Designers Model
50
4Projects 4BIM - Model Viewer
MEP sub contractor Models
51
4Projects 4BIM COBie Checker
52
4Projects 4BIM COBie Federation
53
4Projects 4BIM COBie Spreadsheets
54
4Projects COBie Spreadsheet
Instruction sheet
55
4Projects COBie Spreadsheet
Contact sheet
56
4Projects COBie Spreadsheet
Facility sheet
57
4Projects COBie Spreadsheet
Floor sheet
58
4Projects COBie Spreadsheet
Space sheet
59
4Projects COBie Spreadsheet
Zone sheet
60
4Projects COBie Spreadsheet
Type sheet
61
4Projects COBie Spreadsheet
Component sheet
62
4Projects COBie Spreadsheet
System sheet
63
4Projects COBie Spreadsheet
Attribute sheet
64
Solibri Model Checker
65
Solibri Model Checker - Federated models
66
Solibri Model Checker - Federated models
(without walls)
67
Solibri Model Checker - Federated models
(without slabs/roofs)
68
Solibri Model Checker - Federated models
MEP
69
Solibri Model Checker - Federated models
MEP
70
Solibri Model Checker - Federated models
only MEP Designer
71
Solibri Model Checker - Federated models
only COBie asset data
72
Solibri Model Checker - Federated models
COBie asset data without spaces
73
Solibri Model Checker - Federated models
COBie asset data without spaces
74
Solibri Model Checker - Federated models
Riser Model only COBie asset data
75
Solibri Model Checker - Federated models
Riser Model full model
76
Solibri Model Checker - Federated models
MEP Model full model
77
Solibri Model Checker - Federated models
MEP Model full model
78
Solibri Model Checker COBie Extensions:
COBie Platform
COBie UK Resources
79
Solibri COBie Spreadsheet
Instruction sheet
80
Solibri COBie Spreadsheet
Contact sheet
81
Solibri COBie Spreadsheet
Facility sheet
82
Solibri COBie Spreadsheet
Floor sheet
83
Solibri COBie Spreadsheet
Space sheet
84
Solibri COBie Spreadsheet
Zone sheet
85
Solibri COBie Spreadsheet
Type sheet
86
Solibri COBie Spreadsheet
Component sheet
87
Solibri COBie Spreadsheet
System sheet
88
Solibri COBie Spreadsheet
Attribute sheet
89
Next Steps
90
Issues
91
IFC COBie
Trial 3
92
Trial 3 Handover using COBie
to FM providers
Aim:
- To ascertain if asset management systems can import and export
COBie data.
- In other words:
-Can the COBie spreadsheet data be imported into these asset
management systems?
-Then, subsequently exported again as COBie data, defining, for
example, a maintenance regime or a spares list?
Can the Asset Management System access any documents that are
referenced in the COBie data?
94
IFC COBie
Trial 4
95
Back to basics Trial 4
using Simple COBie data requirements
It is often found that the expected COBie data is not delivered in a COBie
Spreadsheet. This leads to significant efforts to post-process COBie data to
meet the EIRs, which could be done:
- By hand crafting a COBie Spreadsheet.
- By using model checking tools to identify issues and make corrections (fill in the information
gaps) to provide compliant COBie data.
There are a number of reasons for this:
- The BIM system was not able to support some aspects of the asset data requirements.
- The BIM system did not export the asset data into the IFC file, as expected.
- The mapping between an IFC file and a COBie spreadsheet are not adequately supported.
- The COBie data requirements outlined in BS1192-4:2014 are not met, for example:
- Classification is missing
- Unique names are not provided for Types.
- Etc.
Objectives
- Carry out a number of very simple trials to establish where COBie asset data is missing or lost
during the process of creating a COBie Spreadsheet, from a 3D model, to exporting an IFC and
finally creating a COBie Spreadsheet.
96
Trial 4 - Details
98
Tier2Tier
UK Government: Innovate UK project
Logical and system architecture diagrams showing the systems touch-points with
PAS1192:2 processes
99
Questions
100