DAILY INSPECTION REPORT

CLIENT.

PROJECT.

DRG.TITLE.
IDENTITY
OF INSPECTION. PROJECT No.

Sr. No. ACTIVITY. DESCRIPTION. DRAWING NO.

1 MARKING BASE PLATE

2 CUTTING BASE PLATE

3 DRILLING BASE PLATE

4 CUTTING FLANGE

5 DRILLING FLANGE

6 CUTTING WEB

7 DRILLING WEB

8 CUTTING TOP PLATE

9 DRILLING TOP PLATE

10 TACKING FIT UP

THICKNESS
SPATTER

DISTORTION
11 WELDING
GRINDING

OTHERS

QUALITY

DPT
12 N D T.
UT / RT / MPI

SIZE

13 FINAL INSPECTION BASE TO HOOD

ALIGNMENT

14 HYDROTEST _

15 SANDBLASTING MICRON

16 RED OXIDE MICRON

17 OTHERS

QA/QC INSPECTOR. QA/QC TPI

NAME. Saeed Anwar NAME.

DESIGNATION. QA/QC INSPECTOR. DESIGNATION.

DATED. DATED.
Doc No: QA/QC-FRM-60

Rev: 00
DAILY INSPECTION REPORT
Report No : 01

Page : 1 of 1

QA/QC DEPARTMENT.

DATED

CONTRACTOR

QTY.

DRAWING NO. REMARKS.


QA/QC TPI APPROVED BY.

NAME. NAME.

DESIGNATION. DESIGNATION.

DATED. DATED.
c No: QA/QC-FRM-60

v: 00

port No : 01

ge : 1 of 1

/QC DEPARTMENT.

REMARKS.
APPROVED BY.