CASE STUDY: Integrated casing-while-drilling operation achieves 72 ft/h on-bottom ROP for Ecopetrol, Colombia
15 3.0
2,617,128
12.0
10.1 2,144,477
10 2.0
Cost, USD
Time, d
5 1.0
0 0
AFE Actual AFE Actual
The integrated casing-while-drilling solution saved Ecopetrol 1.9 days and USD 472,651 by effectively stabilizing the hole and improving ROP.
The 12-in hole section was successfully drilled from 1,083-ft [330-m] MD to TD at 7,545ft
[2,300m]MD. Lost circulation was experienced at 3,093-ft [943-m] MD with losses continuing for
the next 1,600 ft [488 m]. However, the plastering effect of TDDirect CD service cured the losses
and circulation was regained. The 6,462-ft MD section set a record for the longest hole section
ever drilled with TDDirect CD service in Colombia. Schlumberger also documented several areas
for improvement in future wells. As a result of this success, Ecopetrol plans to use this integrated
solution in its next well.