You are on page 1of 16

APPENDIX 2A

Letters to LTA - Review of Main Contractor's Submission


KCTC Incoming Letters C & V Engineering Pte Ltd
S/No
KCTC REF Reply/Review
Date Received Subject Date Replied C & V Ref No.
No. Status

Method of Statement- Drain, Noted with


1 11-Nov-10 L0090 Culvert & Sump Construction Comments 1-Dec-10 5008

2 24-Nov-10 L0095 Material Submission - Noted 30-Nov-10 5001


Aluminium Rung

3 22-Nov-10 L0092 Monthly Progress Report for Noted 30-Nov-10 5002


October 2010

4 24-Nov-10 L0093 Submission of Trial Trench Noted 30-Nov-10 5004


Report

Submission of Endorsed Typical


5 24-Nov-10 L0097
Traffic Arrangement Plan
Noted 30-Nov-10 5005

6 29-Nov-10 L0099 Submission of Bored Piling Noted With


7-Dec-10 5009
Works Comments

Method of Statement- Ultimate Noted With


7 3-Dec-10 L0101 9-Dec-10 5010
Load Test of 800 Bore Pile Comments

Material Submission - Concrete Noted With


8 8-Dec-10 L0105
Curing & Touch up Products Comments
9-Dec-10 5011

Noted with
9 14-Dec-10 L0108 Material Submission - Skim Coat
Comments
17-Dec-10 5012

10 21-Dec-10 L0112 Method of statement for Bored Noted 22-Dec-10 5013


Piling Works

11 6-Jan-11 L0119 Submission for ULT test report Noted 12-Jan-11 5014

Resubmission of Proposed
12 8-Jan-11 L0122 Material- Concrete Curing & Noted 12-Jan-11 5015
Touch up Products

Resubmission of Proposed
13 8-Jan-11 L0123
Material- Skim Coat
Noted 12-Jan-11 5016

Resubmission for MOS for


14 8-Jan-11 L0121 Drain, Sump & Culvert Noted 12-Jan-11 5017
Construction (Rev 1)
Submission of Shop Drawing for
15 5-Jan-11 L0118 Cast in Situ RCU Drain @SL02 Ch Noted 14-Jan-11 5018
660-675

Submission of Temporary
Noted with
16 5-Jan-11 L0117 Slope Design Calculation for Comments
10-Jan-11 5019
BP Const. (Part 1)

Submission of Proposed
17 13-Jan-11 L0126 Messages on the Variable Noted 21-Jan-11 5020
Signboard

Submission of Dry
18 11-Jan-11 L0125 Density/Moisture Content Noted 21-Jan-11 5021
Relation ship & CBR test
report

Submission of Traffic Diversion


19 24-Jan-11 L0129
Plan for Part 1 Zone1
Noted 27-Jan-11 5022

20 21-Jan-11 L0129 Assessment of Ultmiate Load Noted with No


27-Jan-11 5023
Test Result Comments

Submission of Bored Piling Head Noted with No


21 26-Jan-11 L0134
Trimming Comments
27-Jan-11 5024

22 16-Feb-11 L0140 Material Submission-High Noted with No 23-Feb-11 5025


Ribbed Mesh Comments

Temporary Falsework & Noted with


23 17-Feb-11 L0141
Scaffolding Design Calculations Comments
23-Feb-11 5026

24 18-Feb-11 L0142 Material Submission- Milled Noted with No 23-Feb-11 5027


Waste as Sub-base material Comments

Method of Statement - Traffic Noted with No


25 18-Feb-11 L0142a
Diversion 1 Work Comments
23-Feb-11 5028

Submission of Instrumentation Noted with No


26 18-Feb-11 L0144
Monitoring Report 2 Comments
23-Feb-11 5029

Submission of Test Report of


Noted with No
27 18-Feb-11 L0143 Reinforcement Steel Bars (Part Comments 23-Feb-11 5030
1 Bored Piles)
Method of Statement for Pile
Noted with No
28 22-Feb-11 L0146 Integrity Test For Existing CBP Comments
23-Feb-11 5031
Wall
Method of Statement for Pile Noted with No
29 23-Feb-11 L0150
Integrity Test For Bored Pile Comments
23-Feb-11 5032

Method Of Statement for Plate Noted with


30 3-Mar-11 L0152
Bearing Test Comments
7-Mar-11 5033

Submission For Geotechnical


31 7-Mar-11 L0154 Instrumentation Monitoring Noted 16-Mar-11 5034
Report 3

Request for Decommission of


Noted with
32 11-Mar-11 L0157 Geotechnical Instruments at Comments
16-Mar-11 5035
Part 1 area

Method of Statement For


Noted with
33 11-Mar-11 L0158 Construction Joint Treatment For
Comments
16-Mar-11 5036
Portal Frame 2A

Submission of Documents for


34 14-Mar-11 L0159 Vehicular Impact Guardrail (Part Noted 22-Mar-11 5037
1)

Proposed Material - Hilti Hit - HY


35 17-Mar-11 L0161
150 (Hybrid Adhesive)
Noted 22-Mar-11 5038

Revised Method Statement for


36 30-Mar-11 L0168
Plate Bearing Test
Noted 31-Mar-11 5039

Temporary Falsework &


37 30-Mar-11 L0167 Scaffolding Design Noted 31-Mar-11 5040
Calculations

Submission of Fortnightly
Interpritative Geotechnical
38 31-Mar-11 L0169
Instrumentation Monitoring
Noted 7-Apr-11 5041
Report 04

Submission of Artworks For


39 31-Mar-11 L0170
Informatory Signages
Noted 7-Apr-11 5042
Traffic Diversion For Part 1 Zone 2
40 3-Apr-11 L0172 & Part 1 Intermediate Road Noted 7-Apr-11 5043
Opening Traffic Plan

Submission of Documents &


41 8-Apr-11 L0179 Samples of Reflective Noted 15-Apr-11 5044
Sheeting Used For Signages

Method Of Statement For


42 12-Apr-11 L0182 Installation Of P1 Aluminium Noted 15-Apr-11 5045
Vehicular Parapet Railing

Method Of Statement For


43 13-Apr-11 L0183
Working Load Test (PDA)
Noted 15-Apr-11 5046

Submission Of Fortnightly
Interpritative Geotechnical
44 25-Apr-11 L0195
Instrumentation Monitoring
Noted 29-Apr-11 5047
Report 06

Submission of QP(D) Assessment


Noted with No
45 25-Apr-11 L0197 Report On Plate Bearing Test
Comments
24-May-11 5048
Results

Submission of QP(D) Assessment Noted with No


46 24-May-11 L0196 Report On Integrity Test Result
Comments
24-May-11 5049
for Bored Pile "P17"

Submission of Cube Analysis


47 24-May-11 L0175 Reports for the Month of January Noted with No 24-May-11 5050
Comments
& February 2011

Method of Statement for Noted with No


48 28-Jun-11 L0206 Temporary Lane Closure (Part 2 -
Comments
28-Jun-11 5051
PIE Centre Median)

Radar Survey Report For Existing Noted with No


49 28-Jun-11 L0202A
CBP Wall Comments
28-Jun-11 5052

Monthly Progress Report for May Noted with No


50 28-Jun-11 L0208
2011 Comments
30-Jun-11 5053

Submission of Documents For


51 28-Jun-11 L0207
Micropiling works
No Comments 30-Jun-11 5054

Proposed Material - Multifix MF-


52 28-Jun-11 L0209
EX2 360ML High Strength Epoxy
No Comments 1-Jul-11 5055
Method of Statement For The Noted with
53 2-Jul-11 L0213
Construction of Fascia Wall Comments
5-Jul-11 5056

Submission of Fortnightly
Interpretative Instrument Noted with No
54 1-Jul-11 L0212
Monitoring Report & Comments
12-Jul-11 5057
Decommissioning of Monitoring

Submission of Documents For Noted with No


55 8-Jul-11 L0218
Micropiling works (Rev 1) Comments
12-Jul-11 5058

Method of Statement for Noted with No


56 12-Jul-11 L0219 Labboratory Tensile Test
Comments
23-Jul-11 5059
(Micropiling)

Test Reports & Shop Drawing For Noted with No


57 4-Aug-11 L0225
Type A Railing Comments
22-Aug-11 5060

Fortnightly Interpretative
Noted with No
58 5-Aug-11 L0226 Instrument Monitoring Report
Comments
22-Aug-11 5061
No2 at Part 2. CBP Wall

Fortnightly Interpretative
Noted with No
59 15-Aug-11 L0230 Instrument Monitoring Report
Comments
22-Aug-11 5062
No3 at Part 2. CBP Wall

PIT Test To Replace Sonic Logging Noted with No


60 15-Aug-11 L0231
And Sonic Coring Test Comments
29-Aug-11 5063

Proposal Of Lifting & Concreting Noted with No


61 21-Sep-11 L0243
Operations Using Lorry Crane Comments
23-Sep-11 5064

Proposed Method of Statement


for Hacking of CBP wall For the Noted with No
62 22-Sep-11 L0245
Construction of Type 1 & 2 Portal Comments
10-Oct-11 5065
Frame
Method Of Statement For Noted with No
63 10-Oct-11 L0251
Working Load Test (PDA) Comments
14-Oct-11 5066

Fortnightly Interpretative
Instrument Monitoring Report Noted with No
64 26-Sep-11 L0247
No4 & 5 at Part 2. Changi North Comments
14-Oct-11 5067
Cresent CBP Wall

Proposed Method of Statement


for Hacking of CBP wall For the Noted with No
65 22-Sep-11 L0245
Construction of Type 1 & 2 Portal Comments
21-Oct-11 5068
Frame

Proposed Method of Statement Noted with No


66 24-Oct-11 L0260 for Manufacturing Of Precast
Comments
4-Nov-11 5069
Beam

Submission of G55 & G60 Trial Noted with No


67 28-Oct-11 L0264
Mix Concrete Cube Test Results Comments
11-Nov-11 5070

Proposed Concreting Sequence


68 L0253 for Type 1,2 Portal Frame & PSPC Noted with No 11-Nov-11 5071
Comments
Bridges

PIT Test Report For Micropile no. Noted with No


69 27-Oct-11 L0262a
19 Comments
11-Nov-11 5072

Submission of Shop Drawings for Noted with No


70 2-Nov-11 L0267
PSPC Beams Comments
11-Nov-11 5073

Submission of Method Of
Noted with No
71 8-Nov-11 L0268 Statement for the Build up of
Comments
11-Nov-11 5074
Bored Pile P26

72 8-Nov-11 L0269 PIT Test Report for Bore Pile No. 6 Noted with No 11-Nov-11 5075
Comments
Cube Summary Reports (April Noted with
73 15-Nov-11 L0266
2011 to September 2011) Comments
15-Nov-11 5076

Cube Summary Reports (October Noted with No


74 15-Dec-11 L0280
2011) Comments
16-Dec-11 5077

Noted with No
75 15-Dec-11 L0278 Cube Test Reports For Micropiles
Comments
16-Dec-11 5078

Tensile, Bend & Rebend Test Noted with No


76 15-Dec-11 L0281 Reports For Rebars Samples
Comments
16-Dec-11 5079
(Decking Works)

Tension Load Test Report for T40


Noted with
77 16-Dec-11 L0279 MCC Position Coupler & Control
Comments
17-Dec-11 5080
Bar (micropiling Works)

Construction Drawings For Bridge Noted with No


78 18-Dec-11 L0272
Pier Falsework Comments
19-Dec-11 5081

Revised G30 Cube Summary Noted with


79 16-Dec-11 L0283
Reports (September 2011) Comments
21-Dec-11 5082

Bore Piling Records (Part 2 Noted with No


80 16-Dec-11 L0284
Works) Comments
21-Dec-11 5083

Cube Summary Reports Noted with No


81 18-Jan-12 L0289
(November 2011) Comments
19-Jan-12 5084

Monthly Progress Reports Noted with No


82 17-Jan-12 L0291
(November & December 2011) Comments
25-Jan-12 5085
Noted with No
83 20-Dec-11 L0285 Pot Bearing Design
Comments
26-Jan-12 5086

Method Statement for Beam Noted with No


84 15-Dec-11 L0282
Launching Comments
26-Jan-12 5087

Design Matter at U-Turn Slip 01 Noted with No


85 30-Jan-12 L0294
Ch 640 Comments
3-Feb-12 5088

Proposed Rectification Method Noted with


81 4-Feb-12 L0295 4-Feb-12 5089
for PSPC Beam Cracked Edges Comments

PDA Test Report For Bore Pile No Noted with No


82 4-Feb-12 L0296
BP2 Comments
10-Feb-12 5090

Fortnightly Interpretative
Instrument Monitoring Report Noted with No
83 4-Feb-12 L0297
No 6-11 at Part 2. Changi North Comments
10-Feb-12 5091
Cresent CBP Wall

Noted with No
84 1-Mar-12 L0305 Signboard Shop Drawing
Comments
21-Mar-12 5095
Propose to use boom lift as
Platform for the Parapet Wall Noted with No
85 9-Apr-12 L0316
Construction from Gridline A1 to Comments
13-Apr-12 5096
A2

Design Calculation of Circular Noted with


86 10-Apr-12 L0317
Shaft Shoring for Sewer Manhole Comments
13-Apr-12 5097

Propose to use boom lift as


Platform for the Parapet Wall Noted with No
87 27-Apr-12 L0324
Construction from Gridline A1 to Comments 31-May-12 5100
A2

Method Statement on Temporary


shaft construction & site Noted with No
88 10-May-12 L0326
utilization plan at Manhole 7 &8 Comments 16-May-12 5098
(Sewer Diversion)

Propose Planting of T20-150


Starter Bars with 180mm
embedment depth to replace the Noted with
89 23-May-12 L0328
misaligned parapet wall starter Comments 28-May-12 5099
bars which were cast at SLIP01_L
CH 295.5-298

Propose Conbextra STD as the Noted with No


90 2-Jun-12 L0329 Grout Bedding Material for P1
Comments 6-Jun-12 5101
Railing

Construction Drawings For


91 27-Jun-12 L0330 Standard Details for Signboard on 5102
Parapet Wall
APPENDIX 3A Continued
Letters to LTA - Review of Main Contractor's Submission
CJC Incoming Letters C & V Consultants
S/No
Date Received CJC REF Reply/Revie Date
Subject
No. w Status Replied
& V Consultants

C & V Ref No.

You might also like