MEDIAN
1,209 MCM
Simulated and Expected Droughts
1930 1940 1950 1960 1970 1980 1990 2000 2010 2020 2030 2040
NEXT droughts
LAST droughts
period
period
2013-2014
62% of Average
WATER WATER
RESOURCES DEMAND
Integration:
National water grid
Total sewage collection and reuse
Semiannual operational plan
Preservation and Recovery
constraints
Sea Water Desalination
In accordance with the Government decisions since 2001
large scale seawater desalination facilities are being built:
Production (127)
since 12/09 Hadera
Completed facilities
Ashkelon -BOT 120 MCM/Y (VID)
Palmachim -BOO 90MCM/Y (Via Maris)
Production Hadera- BOT 127 MCM/Y (H2ID)
since 8/13 Sorek BOT 150 MCM/Y (SDL)
(150)
Production Sorek
since 6/07 Under Construction
(90) Ashdod 100 MCM/Y (TK Mekorot)
Palmachim
Mekorot Develop. (100)
Expected Production Ashdod
2015 Another 50 MCM facility in planning
Operation
beginning
August 2005
Production
capacity 120
MCM/Year
Palmachim Desalination plant
Construction
beginning
January 2005
Operation
beginning
January 2005
Operation
capacity 90
MCM/Year
Hadera Desalination plant
Construction
beginning
June 2007
Operation
beginning
December
2009
Production
capacity 127
MCM/Year
Soreq Desalination plant
Construction
beginning
January 2011
Operation
beginning
August 2013
Production
capacity 150
MCM/Year
Ashdod Desalination plant
Construction
beginning June
2011
Operation will
start at mid
2015
Planned
production 100
MCM/Year
Seawater Desalination
coagulant
Antiscalant
SW LIFT STATION DUAL MEDIA
FLOCCULATION
NaOH
FILTRATION 1600M2
SBS
288,000 / 576,000
M3/DAY
BACKWASH
TANK
CLEAR WELL
VFD
SEAWATER
H2SO4
RE HARDENING
IX SOFTENING
78,000 M3/DAY
M
CALCITE REAR END
PERMEATE
IX
TO CLIENT
PASS 1 SWRO
NaOH
6 TRAINS 113,760 M3/DAY
PASS 2/3
3 TRAINS 75,000
M3/DAY
16
R.O. Membrane
17
Desalination Water Quality
* As CaCO3
Environmental Aspects
Western
Line
Hadera Barkai
Cule
Sorek
Western
Hafetz Line
Haim
Ashdod
Ketziot Shizafon