Professional Documents
Culture Documents
ESTUDIO HIDROLOGICO
Agosto, 2015
Perfil: Mejoramiento del Servicio de Agua para el Sistema de Riego en los Sectores Alpas, Cochas y Espachin
- Distrito de Cochas, Provincia de Ocros - Ancash
Contenido
1. GENERALIDADES ....................................................................................................... 3
2. HIDROLOGIA DEL PROYECTO.............................................................................. 15
Anlisis de Doble Masa ...................................................................................................... 18
Completacin y Extensin de La informacin .................................................................... 21
2.2 CAUDALES ............................................................................................................. 24
Anlisis De La Informacin Hidromtrica ......................................................................... 24
Anlisis De Consistencia De Informacin ......................................................................... 25
Anlisis de Persistencia .................................................................................................. 28
2.3 MAXIMAS AVENIDAS ............................................................................................ 31
3 FACTIBILIDAD HIDROLGICA DEL PROYECTO ............................................. 35
4. DEMANDA DE AGUA .............................................................................................. 41
4.1.1 ANLISIS DE LA OFERTA .................................................................................. 53
4.1.2 BALANCE OFERTA - DEMANDA ..................................................................... 54
6.- CONCLUSIONES Y RECOMENDACIONES ............................................................ 57
ANEXOS ............................................................................................................................... 58
1. GENERALIDADES
Carta Nacional del IGN escala 1:100,000 21i, 20j, 21h, 21i, 21j, 22h, 22i y
22j del rea de estudio.
Carta Topogrfica COFOPRI escala 1:25,000: 22j-III-SO, 22j-III-SE, 22j-III-NO,
22j-III-NE.
Ubicacin de puntos de las estructuras proyectadas empleando GPS.
1.1.3 Hidrografa.-
Fuente: Bocatoma
Este : 226,344.85 m.
Norte : 8,823,196.13 m.
Altitud : 507 m.s.n.m.
Hm = Ai*Hi/Ai
Donde:
Hm : Altura media de la cuenca
Hi : Altura media de cada rea parcial
Ai : rea parcial
Cuadro N 02:
Altitud media de la Cuenca
Altura Promedio
Cuenca
(msnm)
Pativilca 4,008.10
tc = 0.3*(L/S0.25)0.76
Donde:
Cuadro N 03:
Tiempo de Concentracin
Cuenca Tc (Hrs)
Pativilca 24.11
Factor de Forma
A
L A
Kf L 2
L L L .
Donde:
Kf = factor de forma
A =rea de la cuenca (Km2)
L = Longitud de mx. Recorrido de la cuenca (Km.)
Coeficiente de Compacidad
K = 0.28*P/A
Donde:
Kc= coeficiente de compacidad
P = permetro de la cuenca (Km)
A = rea de la cuenca (Km2)
En el presente estudio, los coeficientes de compacidad de 1 indican que las
sub-cuencas se asemejan a la forma oval-oblonga y oval-redonda
respectivamente.
Podra mencionarse que un factor de forma alto o un coeficiente de
compacidad cercana a 1 (cuenca circular), describen una cuenca que tiene
una respuesta de cuenca rpida y empinada. Contrariamente, un factor de
forma bajo o un coeficiente de compacidad mucho mayor que 1 describe una
cuenca con una respuesta de escorrenta retardado. Sin embargo muchos
Em=a*e/A
Donde:
Em= elevacin media (msnm)
e=elevacin media entre dos curvas de nivel consecutivo
a=rea entre las curvas de nivel (Km2)
A= rea total de la cuenca (Km2)
S=H/L
Donde:
Grado de ramificacin
Dd =L/A
Donde:
10
Es = A
4*Li
Donde:
Cuadro N 04
Resumen de caractersticas Fisiogrficas de la Cuenca Pativilca
Cuenca Pativilca
Parmetros Resultados Unidades
rea 4094.86 Km2
Permetro 488.44 Km
Kc 2.14
Ff 0.25
Grado de ramificacin 3.00
Dd 0.0310 Km/Km
Es 8.07 Km
Frecuencia rios 0.00024 Rios/Km
Hm 4008.10 m.s.n.m
Pendiente media 0.04 m/m
Longitud del Ro principal 126.80 Km
TC (Tiempo de
concentracin) 24.11 Hrs.
Fuente: Elaboracin propia
1.1.9 Climatologa
11
La cubierta vegetal est conformada por una vegetacin graminal de pradera alto
andina, algo dispersa y asociado con cactceas del gnero Opuntia.
La actividad agrcola se desarrolla en los lugares con terrenos aparentes y con
disponibilidad de agua para regar, as como se desarrolla una agricultura de
secano, mayormente con cebada, siendo este cultivo que caracteriza esta zona
de vida, que inclusive sirve para su identificacin.
Esta formacin ecolgica se ubica entre los 3,000 y 3,600 msnm, en el flanco
de la margen izquierda del ro Chilln, llegando inclusive hasta las lneas de
cumbre que limitan con la cuenca vecina del ro Rmac.
Espacialmente se ubica sobre la Zona de Vida matorral desrtico Montano
Bajo Subtropical. En este mbito no se dispone de ninguna estacin
hidrometeorolgica, por lo que tanto los valores de temperatura como de
precipitacin han sido estimadas de los Diagramas de Holdridge. Se estima que
la precipitacin vara entre 250 a 500 mm/ao y la temperatura vara de 6 a 12
C.
El relieve topogrfico es abrupto. El escenario edfico presenta suelos y rocas
con cobertura vegetal estacional, asociado a la presencias de lluvias que
ocurren en los meses de enero a abril.
Altitudinalmente ocupa de 2,800 hasta cerca de los 4,000 msnm con un relieve
topogrfico dominantemente empinado con escasas reas suaves. La
vegetacin natural est dominada por la familia de las gramneas, entre los que
destacan los gneros Poa, Stipa, Festuca, Calamagrostis y Eragrosti.
En esta zona de vida el promedio de precipitacin total anual vara entre 500
mm y 1 000 mm. La biotemperatura media anual vara entre 3C y 1.5C. Esta
zona se ubica entre 4 500 y 5 000 msnm.
Segn el Diagrama de Holdridge esta zona de vida tiene una
evapotranspiracin potencial que vara entre la octava (0,125) y la cuarta parte
(0,25) del promedio de precipitacin total por ao, es decir hay un claro exceso
12
En esta zona de vida el promedio de precipitacin total anual vara entre 500
mm y 1 000 mm. La biotemperatura media anual vara entre 3C y 1.5C. Esta
zona se ubica entre 4 500 y 5 000 msnm.
Segn el Diagrama de Holdridge esta zona de vida tiene una
evapotranspiracin potencial que vara entre la octava (0,125) y la cuarta parte
(0,25) del promedio de precipitacin total por ao, es decir hay un claro exceso
de disponibilidad hdrica entre lo que precipita y lo que evapora, hecho que
ubica esta zona de vida en la provincia de humedad superhmedo.
Est constituido por las partes ms altas de la cuenca, encima de los 5,000
metros sobre el nivel del mar, identificndose principalmente la Cordillera La
Viuda y la Cordillera de La Corte. Se estima que las precipitaciones estn
alrededor de los 100 mm al ao.
Fisiogrficamente este mbito es bastante abrupto y accidentado, con nieves
perpetuas que se incrementan en extensin durante los meses de verano. El
retroceso glacial ha creado tambin zonas totalmente escarpadas,
constituyndose como mbitos solo de atraccin turstica.
13
14
Generalidades:
Es muy importante la recoleccin, concentracin y manejo racional de la
informacin hidrometereolgica en cuanto se refiere a la calidad y cantidad.
Nombre de la Estacion Tipo Estado Este X Norte Y Altitud Distrito Provincia Departamento
1 Aco Meteorologica No funcionando 255531.76 8838405.46 3000 Carhuapampa Ocros Ancash
2 Ocros Meteorologica Funcionando 237196.31 8849336.67 3230 Ocros Ocros Ancash
3 Chiquian Meteorologica Funcionando 264396.07 8877192.80 3350 Chiquian Bolognesi Ancash
4 Mayorarca Meteorologica Funcionando 235175.92 8875143.06 3200 Cajacay Bolognesi Ancash
5 Chamana Meteorologica Funcionando 219643.06 8870526.19 2000 Colquioc Bolognesi Ancash
6 Congas Meteorologica No funcionando 233488.21 8856686.18 3065 Congas Ocros Ancash
7 Cajacay Meteorologica No funcionando 233334.9 8876973.71 2599 Cajacay Bolognesi Ancash
8 Paramonga Meteorologica Funcionando 195458.99 8819476.15 60 Pativilca Barranca Lima
9 Barranca Meteorologica No funcionando 199190.81 8810284.81 300 Barranca Barranca Lima
10 Otopongo Meteorologica No funcionando 20088.37 8825059.27 213 Pativilca Barranca Lima
11 Huayto Meteorologica No funcionando 210040.54 8821449.02 220 Pativilca Barranca Lima
12 Gorgor Meteorologica Funcionando 277478.66 8831178.64 3070 Gorgor Cajatambo Lima
13 Cajatambo Meteorologica Funcionando 282881.89 8842276.77 3350 Cajatambo Cajatambo Lima
15
ACO ANCASH OCROS CARHUAPAMPA PATIVILCA 77 14' 10 30' 3000 1963 - 1987 SENAMHI
CAJATAMBO LIMA CAJATAMBO CAJATAMBO PATIVILCA 76 59' 10 28' 3350 1964 - 2010 SENAMHI
CHIQUIAN ANCASH BOLOGNESI CHIQUIAN PATIVILCA 77 9' 10 9' 3350 1964 - 2010 SENAMHI
GORGOR LIMA CAJATAMBO GORGOR PATIVILCA 77 2' 10 34' 3070 1980 - 2010 SENAMHI
OCROS ANCASH OCROS OCROS PATIVILCA 77 24' 10 24' 3230 1965 - 2010 SENAMHI
PARAMONGA LIMA BARRANCA PATIVILCA PATIVILCA 77 47' 10 40' 60 1970 - 2008 SENAMHI
AMBAR LIMA HUAURA AMBAR SUPE 77 17' 10 45' 2100 1980 - 2010 SENAMHI
LAGUNA SURASACA LIMA OYON OYON HUAUARA 76 47' 10 31' 4400 1982 - 2010 SENAMHI
OYON LIMA OYON OYON HUAUARA 76 46' 10 40' 3641 1977 - 2010 SENAMHI
ANDAJES LIMA OYON ANDAJES HUAUARA 76 54' 10 47' 3950 1963 - 2010 SENAMHI
CONGAS ANCASH OCROS CONGAS FORTALEZA 77 26' 10 20' 3065 1963 - 1982 SENAMHI
MAYORARCA ANCASH BOLOGNESI CAJACAY FORTALEZA 77 25' 10 10' 3200 1980 - 2010 SENAMHI
HUALLANCA ANCASH BOLOGNESI HUALLANCA MARAON 76 57' 9 53' 3260 1963 - 1977 SENAMHI
Este anlisis es de suma importancia para que los datos elegidos sean
consistentes porque a partir de ellos se generaron datos de precipitacin en la
cuenca. Los pasos seguidos en el anlisis de la informacin de precipitacin
son los siguientes:
16
17
18
Consistencia en la Media
Consistencia en la Desviacin Estndar
Consistencia en la Media
H.a.: 1 2
0.05
1/ 2
1 1
Sd S p
n1 n2
n 1 S12 n2 1 S22
1/ 2
Sp 1
n1 n2 2
dnde: S d = desviacin estndar de los promedios
S p = desviacin estndar ponderada
Realizacin de la prueba T
19
Tc
X 1
X 2 1 2
Sd
dnde: 1 2 0 (por hiptesis); Tc es el estadstico T calculado. El valor
Tt (tabular) se calcula con: 0.05 y G.L. n1 n2 2
Conclusin
Si Tc Tt (95%) X1 X 2 (estadsticamente)
Si Tc Tt (95%) X1 X 2 (estadsticamente)
Prueba estadstica F
H.p.: 12 22
H.a.: 12 22
0.05
Calculo de " Fc "
S12 / 22 S12
Fc Si S12 S 22
S22 / 22 S22
S 22
Fc Si S 22 S12
S12
Hallar el valor de Ft en las tablas con:
= 0.05
G.L.N. = n1 1 (grados de libertad del numerador)
G.L.D. = n2 1 (grados de libertad del denominador)
Fc = Valor de F calculado
Ft = Valor de F tabular
Criterios de decisin
Fc Ft (95%) S1 S2
Si (estadsticamente)
Fc Ft (95%) S1 S2
Si
20
21
Precipitacin - Altitud
22
Siendo:
P = precipitacin media sobre la cuenca
Pi = precipitacin observada en la Estacin i
Ai = rea del polgono correspondiente a la Estacin i
A = rea total de la cuenca
n = nmero de estaciones pluviomtricas y/o pluviogrficas con influencia en
la cuenca
23
2.2 CAUDALES
Estacin Yanapampa
24
Este anlisis es de suma importancia para que los datos elegidos sean
consistentes porque a partir de ellos se generaran la disponibilidad hdrica
para el proyecto. Los pasos seguidos en el anlisis de la informacin de
precipitacin son los siguientes.
25
Prom.
Ao Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic
Anual
1960 112.42 149.99 113.30 74.61 35.56 22.01 17.71 16.49 17.65 25.72 28.84 29.27 53.63
1961 80.87 104.35 139.56 112.95 33.87 25.22 18.08 14.73 14.77 15.93 44.21 76.98 56.79
1962 104.01 126.52 209.00 92.38 33.33 25.24 18.32 16.36 16.11 17.38 25.16 31.92 59.64
1963 72.98 98.34 141.12 96.81 29.55 21.33 18.13 16.04 17.22 23.42 47.68 77.18 54.98
1964 48.19 80.01 106.63 85.11 42.48 26.21 19.57 16.74 16.11 21.36 32.50 25.81 43.39
1965 42.59 58.92 125.28 54.24 26.92 18.03 15.34 13.60 17.20 27.43 23.82 33.71 38.09
1966 66.44 57.26 63.22 38.10 27.35 15.91 14.16 13.91 15.63 33.97 27.25 38.95 34.34
1967 64.03 185.89 125.44 52.06 25.05 22.73 19.81 16.48 16.15 38.65 29.51 28.42 52.02
1968 41.83 46.40 60.30 33.62 22.23 16.57 13.41 13.08 15.77 25.10 33.05 32.62 29.50
1969 28.58 55.61 95.28 74.20 25.29 18.16 15.32 12.55 13.71 22.21 37.56 97.45 41.33
1970 135.79 74.86 87.10 84.11 52.44 35.27 27.21 24.09 28.92 31.18 43.26 63.05 57.27
1971 87.67 111.58 132.60 91.89 32.01 25.35 20.21 19.70 19.06 23.34 20.08 43.41 52.24
1972 77.41 81.05 172.64 83.06 44.97 24.57 18.00 18.17 21.13 22.52 24.84 44.94 52.78
1973 96.07 115.26 155.90 125.13 39.52 25.96 22.40 18.96 25.11 41.50 47.39 63.17 64.70
1974 87.51 139.12 137.19 68.52 30.23 21.84 19.55 20.03 20.70 22.64 21.96 34.49 51.98
1975 77.05 79.38 121.97 72.94 45.22 28.75 20.01 19.41 26.42 41.63 37.72 26.23 49.73
1976 52.74 97.56 89.13 80.20 52.17 25.92 21.38 18.16 17.89 17.70 19.26 21.56 42.81
1977 44.40 94.46 103.12 49.41 24.73 18.99 15.46 18.24 16.82 17.58 27.07 30.11 38.36
1978 49.67 120.87 97.50 55.77 24.57 13.23 11.77 12.03 12.68 14.83 27.70 39.03 39.97
1979 41.57 83.66 108.83 43.31 25.48 18.08 16.84 14.87 14.43 16.09 17.90 25.66 35.56
1980 58.58 62.16 48.51 43.37 16.42 13.13 11.18 10.06 11.62 26.34 26.28 49.34 31.42
1981 47.34 187.36 232.48 54.53 23.36 17.21 14.98 16.66 16.41 20.12 26.98 47.40 58.74
1982 89.32 119.36 67.11 43.61 22.02 16.60 12.92 12.56 13.57 20.29 39.53 87.77 45.39
1983 101.87 33.14 125.39 106.53 25.16 17.54 16.04 16.27 17.17 17.47 23.10 37.60 44.77
1984 43.61 246.48 177.58 85.67 38.87 21.30 19.69 17.13 18.65 21.44 19.83 31.44 61.81
1985 32.02 38.66 71.47 60.05 29.21 18.55 15.29 14.65 17.30 20.68 20.54 23.71 30.18
1986 62.80 51.36 84.96 77.42 39.19 18.82 14.58 12.39 18.25 17.92 20.07 24.23 36.83
1987 156.81 188.75 129.94 33.65 17.18 13.67 12.07 11.03 14.98 18.96 25.59 29.93 54.38
1988 43.28 187.35 61.68 57.27 36.58 16.75 12.05 13.70 17.15 19.66 17.02 28.68 42.60
1989 78.25 109.74 134.96 137.50 44.46 24.73 17.43 14.80 13.70 15.08 17.51 22.37 52.54
1990 26.58 30.04 64.77 34.81 18.94 12.14 10.24 9.24 9.37 29.94 43.50 20.10 25.81
1991 41.66 78.11 120.16 54.50 35.39 20.33 16.08 10.97 8.97 13.60 14.98 14.45 35.77
1992 31.69 17.59 66.94 40.50 14.98 12.28 11.13 11.28 10.50 14.15 16.60 17.96 22.13
1993 26.13 91.11 134.97 144.43 51.48 18.77 14.13 13.57 13.05 15.24 25.23 38.26 48.86
1994 56.10 136.07 112.27 87.03 33.48 21.57 19.03 19.16 19.07 20.34 22.13 27.66 47.83
1995 43.65 53.32 78.32 75.38 45.74 24.63 16.19 14.98 14.38 14.13 19.67 22.52 35.24
1996 48.26 60.29 74.73 72.76 28.92 20.29 16.54 15.09 14.73 14.38 16.54 20.41 33.58
1997 50.65 67.43 61.70 22.15 19.06 12.36 11.17 11.17 11.91 13.50 26.03 58.99 30.51
1998 80.77 101.61 100.26 71.84 45.77 29.40 27.25 23.75 24.30 27.48 27.30 20.87 48.38
1999 39.87 128.32 85.87 65.47 43.45 35.27 26.03 21.71 23.30 26.74 23.70 34.65 46.20
2000 42.59 98.68 103.13 70.77 49.79 26.89 22.74 14.16 12.73 18.68 15.57 33.74 42.46
2001 115.63 92.23 147.04 84.09 60.71 33.70 24.38 17.43 15.98 20.66 46.61 49.76 59.02
2002 40.07 70.59 98.28 75.23 30.80 21.04 17.95 16.14 13.70 20.99 37.07 47.39 40.77
2003 52.65 62.48 88.36 51.22 27.29 17.73 14.27 11.19 12.33 13.18 15.54 45.35 34.30
2004 29.00 59.15 43.78 36.03 17.62 12.78 10.73 9.90 10.84 21.94 35.27 42.18 27.44
2005 45.98 45.55 58.04 43.29 19.41 14.57 12.49 11.41 11.73 13.26 16.93 28.40 26.76
2006 35.54 57.32 74.52 77.31 27.83 18.32 12.91 10.90 13.28 18.19 28.87 45.42 35.03
2007 60.55 55.49 71.42 70.06 44.32 19.23 14.71 12.78 11.92 16.03 21.48 21.75 34.98
2008 53.80 57.51 53.97 52.10 23.75 16.03 13.12 11.69 11.32 17.82 22.18 30.34 30.30
2009 52.08 76.38 93.58 79.64 38.94 21.88 16.42 14.90 14.03 22.53 34.22 58.77 43.61
2010 56.86 61.98 72.11 57.61 29.63 17.46 14.94 13.56 12.55 14.53 23.40 53.30 35.66
Prom 61.88 91.90 104.38 69.30 32.80 20.67 16.69 15.06 15.93 21.28 27.18 38.80 42.99
Desvest 28.67 47.10 40.37 26.30 10.99 5.71 4.20 3.48 4.28 6.92 9.18 18.22 10.67
Mx 156.81 246.48 232.48 144.43 60.71 35.27 27.25 24.09 28.92 41.63 47.68 97.45 64.70
Mn 26.13 17.59 43.78 22.15 14.98 12.14 10.24 9.24 8.97 13.18 14.98 14.45 22.13
Fuente: Elaboracin Equipo Tcnico
26
Cuadro N 11
Caudales promedio, mximos y mnimos en el ro Pativilca (m3/s)
Detalle ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC PROM
Prom 61.88 91.90 104.38 69.30 32.80 20.67 16.69 15.06 15.93 21.28 27.18 38.80 42.99
Desvest 28.67 47.10 40.37 26.30 10.99 5.71 4.20 3.48 4.28 6.92 9.18 18.22 10.67
Mx 156.81 246.48 232.48 144.43 60.71 35.27 27.25 24.09 28.92 41.63 47.68 97.45 64.70
Mn 26.13 17.59 43.78 22.15 14.98 12.14 10.24 9.24 8.97 13.18 14.98 14.45 22.13
Fuente: Elaboracin Equipo Tcnico
Cuadro N 12
Oferta Promedio de Agua en el ro Pativilca
Prom /
Unidad Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic
Total
Caudal (m3/s) 61.88 91.90 104.38 69.30 32.80 20.67 16.69 15.06 15.93 21.28 27.18 38.80 42.99
Volumen /hm3) 165.73 222.31 279.57 179.62 87.85 53.58 44.71 40.32 41.28 57.00 70.44 103.92 1,346.35
Fuente: Elaboracin Equipo Tcnico
27
Anlisis de Persistencia
Persistencia Caudal
(%) ( m3/s )
100 8.97
95 12.28
90 13.70
80 16.42
70 18.82
60 22.21
50 27.21
40 35.54
30 47.40
20 66.44
10 95.28
5 125.13
0 246.48
28
Prom /
Persistencia Unidad Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic
Total
Caudal (m3/s) 52.65 80.01 98.28 70.77 30.23 19.23 16.08 14.80 15.63 20.29 25.23 33.71 39.74
50%
Volumen (hm3) 141.01 193.57 263.23 183.43 80.97 49.84 43.08 39.63 40.51 54.36 65.40 90.29 1,245.31
Caudal (m3/s) 42.59 57.51 71.47 51.22 24.73 16.75 13.41 12.39 12.73 16.03 20.07 25.81 30.39
75%
Volumen (hm3) 114.08 139.13 191.42 132.77 66.23 43.41 35.92 33.18 33.00 42.94 52.01 69.14 953.22
Caudal (m3/s) 27.78 31.90 51.79 33.64 16.88 12.33 10.97 9.99 10.05 13.40 15.56 19.24 21.13
95%
Volumen (hm3) 74.40 77.18 138.70 87.19 45.20 31.96 29.38 26.76 26.04 35.89 40.32 51.54 664.56
Prom /
Unidad Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic
Total
Caudal (m3/s) 42.59 57.51 71.47 51.22 24.73 16.75 13.41 12.39 12.73 16.03 20.07 25.81 30.39
Volumen (hm3) 114.08 139.13 191.42 132.77 66.23 43.41 35.92 33.18 33.00 42.94 52.01 69.14 953.22
EN M3 m3/seg
Mes
Cabecera Estacin Cabecera Estacin
bloque aforo bloque aforo
Agosto 1665000.00 1699000.00 0.6216 0.6343
Septiembre 1677000.00 1711000.00 0.6470 0.6601
Octubre 2183000.00 2228000.00 0.8150 0.8318
29
30
31
PARAMETROS ESTADISTICOS
Media (QX) Desv. Estandar Coef. Asimetria Coef. Variacion
QX SX CS Cv
214.543 102.031 0.848 0.476
QY SY CSY CvY
5.260 0.475 -0.029 0.090
32
Perfil: Mejoramiento del Servicio de Agua para el Sistema de Riego en los Sectores Alpas, Cochas y
Parametros Estadisticos
Espachin - Distrito de Cochas, Provincia de Ocros - Ancash
Campo Normal
N = 47.00
QX = 214.54
SX = 102.03
CS = 0.85
Cv = 0.48
Campo Transformado
QY = 5.26
SY = 0.47
CSY = -0.03
CvY = 0.09
K = F(1-1/TR)
K = F 0.98
K = 2.05
QESP = Exp (QY + K SY)
QESP = 510.19
Iintervalo de Confianza
417.38 623.63
Intervalo de confianza
TR (Aos) Probabilidad F(1-1/TR) K=Z QESP
(-) (+)
2 0.5000 0.5000 0.0000 192.50 157.48 235.30
5 0.2000 0.8000 0.8416 287.01 234.80 350.82
10 0.1000 0.9000 1.2816 353.65 289.32 432.28
25 0.0400 0.9600 1.7507 441.84 361.47 540.08
50 0.0200 0.9800 2.0537 510.19 417.38 623.63
75 0.0133 0.9867 2.2164 551.12 450.87 673.66
100 0.0100 0.9900 2.3263 580.65 475.03 709.76
150 0.0067 0.9933 2.4747 623.02 509.69 761.55
200 0.0050 0.9950 2.5758 653.64 534.74 798.98
300 0.0033 0.9967 2.7131 697.63 570.73 852.74
400 0.0025 0.9975 2.8070 729.45 596.76 891.64
500 0.0020 0.9980 2.8782 754.49 617.25 922.25
1000 0.0010 0.9990 3.0902 834.38 682.61 1,019.91
33
Parametros Estadisticos
Campo Normal
N = 47.00
CS = 0.85
Cv = 0.48
Campo Transformado
QY = 5.26
SY = 0.47
CSY = -0.03
K = F(1-1/TR)
K = F 0.9800
Z = 2.05
Z2-1= 3.22
Z3-6Z= -3.66
CS/6 = 0.00
KT = 2.038
QESP = Exp(QY + KT SY)
QESP = 506.41
Iintervalo de Confianza
414.73 618.37
Factor de Frecuencia
KT = Z + (Z2-1) (CS/ 6) + (1/3) (Z3 - 6Z) (CS/ 6)2 - (Z2-1) (CS/ 6)3 + Z (CS/ 6)4+ (1/3) (CS/ 6)5
Intervalo de confianza
TR (Aos) Probabilidad Z KT QESP (-) (+)
2 0.5000 0.0000 0.0049 192.94 172.18 216.21
5 0.2000 0.8416 0.8430 287.20 251.54 327.91
10 0.1000 1.2816 1.2784 353.12 302.87 411.70
25 0.0400 1.7507 1.7406 439.74 367.09 526.76
50 0.0200 2.0537 2.0381 506.41 414.73 618.37
75 0.0133 2.2164 2.1974 546.17 442.54 674.07
100 0.0100 2.3263 2.3049 574.78 462.32 714.60
150 0.0067 2.4747 2.4499 615.71 490.30 773.20
200 0.0050 2.5758 2.5485 645.22 510.26 815.87
300 0.0033 2.7131 2.6822 687.49 538.56 877.60
400 0.0025 2.8070 2.7737 717.99 558.79 922.55
500 0.0020 2.8782 2.8429 741.96 574.58 958.10
1000 0.0010 3.0902 3.0488 818.14 624.18 1,072.39
34
Generalidades:
El presente tem, tiene como objetivo principal, dimensionar los alcances del
proyecto de riego, basados en la disponibilidad de los recursos hdricos que
permitan garantizar un nivel adecuado para satisfacer las demandas de agua
para el riego de las reas agrcolas.
Calculo de la ETPo
35
ETP ETP
Mes
(mm/dia) (mm)
b. Precipitacin efectiva
La precipitacin efectiva en esta parte del valle es cero.
Precipitacin
Mes
Efectiva (mm)
ENE 0.00
FEB 0.00
MAR 0.00
ABR 0.00
MAY 0.00
36
JUN 0.00
JUL 0.00
AGO 0.00
SET 0.00
OCT 0.00
NOV 0.00
DIC 0.00
A. SITUACIN ACTUAL
En el sistema de riego La Vega Otopongo, el rea actual que se encuentra
con riego es de 1021.25 has, que viene a ser el 77.15% de rea total (1323.81
has).
Las reas en descanso por falta de agua son de 335.85 has, es de decir el
22.85% del rea total.
CUADRO N 21: AREAS BAJO RIEGO-SITUACION ACTUAL
Como campaa base, los cultivos predominantes son: Maz amarillo duro
con 361.00 has (35.35%), Caa de azcar con 326.78 has (32.00%), aj
pprika con 121.84 has (11.93%), y otros cultivos como: Papa blanca,
maracuy, frijol y cebolla.
En la segunda campaa tenemos el Maz amarillo duro con 210.25 has
(62.60%) y seguido del aji paprika, cebolla y frijol en menores cantidades,
El coeficiente de uso de suelo es de 1.38.
37
(Ha)
Maz amarillo duro 361 361
Maz amarillo duro 2da
210.25
campaa
Maracuy 55.45 55.45
Cebolla 29.5 29.5
Coeficientes de Cultivo
Cultivo Base rea (Ha)
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
Maz Amarillo Duro 361.00 0.50 0.75 1.10 0.85 0.75
Maz Amarillo Duro
210.25 0.50 0.75 1.10 0.85 0.75
(2da campaa)
Maracuy 55.45 0.65 0.65 0.65 0.70 0.70 0.70 0.70 0.70 0.65 0.65 0.65
0.65
Cebolla 29.50 0.70 0.84 0.90 1.05 0.65
Cebolla (2da
27.54 0.70 0.84 0.90 1.05 0.65
campaa)
Frijol 46.05 0.45 0.80 1.15 1.05 0.70
Frijol (2da campaa) 21.51 0.45 0.80 1.15 1.05 0.70
Papa Blanca 80.65 0.75 0.95 0.85 0.75
0.97
Caa de Azcar 326.78 1.15 1.12 1.00 0.95 0.90 0.85 0.75 0.60 0.85 0.9 1
0.55
Aj Paprika 121.84 0.65 0.25 0.75 1.15 1.10 0.90
Aj Paprika (2da
76.55 0.75 1.00 1.10 1.05 0.65
campaa) 0.25
Kc promedio 0.96 0.78 0.87 0.96 0.87 0.73 0.54 0.71 0.99 0.90 0.84
0.91
rea Irrigada (Ha) 1,021.27 533.57 486.32 718.08 718.08 718 691 691 1021 1021 1,021.27 1,021.27 1,021.27
B. Sin Proyecto.
38
39
Coeficientes de Cultivo
Cultivo Base Area (Ha)
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
Maiz Amarillo Duro 461.00 461.00 461.00 461.00 461.00 461.00
Maiz Amarillo Duro (2da
285.25 285.25 285.25 285.25 285.25 285.25
campaa)
Maracuya 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45
Cebolla 29.50 29.50 29.50 29.50 29.50 29.50
Cebolla (2da campaa) 27.54 27.54 27.54 27.54 27.54 27.54
Frijol 129.24 129.24 129.24 129.24 129.24 129.24
Fijol (2da campaa) 35.00 35.00 35.00 35.00 35.00 35.00
Papa Blanca 90.65 90.65 90.65 90.65 90.65 90.65
Caa de Azucar 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78
Aji Paprika 123.84 123.84 123.84 123.84 123.84 123.84 123.84
Aji Paprika (2da campaa) 87.15 87.15 87.15 87.15 87.15 87.15 87.15
rea Irrigada (Ha) 1,323.81 862.81 862.81 1146.09 1229.65 1105.82 1105.82 1105.82 1254.03 1128.38 1070.73 1323.81 1323.81
C. Con Proyecto.
Coeficientes de Cultivo
Cultivo Base Area (Ha)
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
Maiz Amarillo Duro 461.00 461.00 461.00 461.00 461.00 461.00
Maiz Amarillo Duro (2da
285.25 285.25 285.25 285.25 285.25 285.25
campaa)
Maracuya 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45
Cebolla 29.50 29.50 29.50 29.50 29.50 29.50
Cebolla (2da campaa) 27.54 27.54 27.54 27.54 27.54 27.54
Frijol 129.24 129.24 129.24 129.24 129.24 129.24
Fijol (2da campaa) 35.00 35.00 35.00 35.00 35.00 35.00
Papa Blanca 90.65 90.65 90.65 90.65 90.65 90.65
Caa de Azucar 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78
Aji Paprika 123.84 123.84 123.84 123.84 123.84 123.84 123.84
Aji Paprika (2da campaa) 87.15 87.15 87.15 87.15 87.15 87.15 87.15
rea Irrigada (Ha) 1,323.81 862.81 862.81 1146.09 1229.65 1105.82 1105.82 1105.82 1254.03 1128.38 1070.73 1323.81 1323.81
4. DEMANDA DE AGUA
A. SITUACION ACTUAL
a) Cedula de cultivo y kc
b) Eficiencia de Riego
Eficiencia de conduccin.
41
Cuadro 4.05
Clculo de las perdidas por infiltracin Canal de Conduccin.
Caudal Caudal de
Progresiva Progresiva Longitud Perdida
ITEM inicial salida
inicio (m) final (m) (m) (m3/s)
(m3/s) (m3/s)
1 0+000 0+500 1.284 0.50 0.009 1.275
2 0+500 1+000 1.265 0.50 0.011 1.255
3 1+000 1+500 1.255 0.50 0.010 1.245
4 1+500 2+000 1.230 0.50 0.011 1.220
5 2+000 2+500 1.220 0.50 0.004 1.216
6 2+500 3+000 1.208 0.50 0.004 1.204
7 3+000 3+500 1.204 0.50 0.005 1.199
8 3+500 4+000 1.184 0.50 0.005 1.180
9 4+000 4+500 1.160 0.50 0.004 1.157
10 4+500 5+000 1.127 0.50 0.004 1.123
11 5+000 5+500 1.123 0.50 0.012 1.111
12 5+500 6+000 1.111 0.50 0.010 1.101
13 6+000 6+500 1.101 0.50 0.010 1.091
14 6+500 7+000 1.051 0.50 0.011 1.041
15 7+000 7+500 1.021 0.50 0.004 1.017
16 7+500 8+000 1.007 0.50 0.004 1.003
17 8+000 8+500 0.973 0.50 0.004 0.969
18 8+500 9+000 0.929 0.50 0.004 0.925
19 9+000 9+728 0.905 0.73 0.006 0.899
Perdidas (0+000 9+728 Km): (1-Qf)/Qi
Perdidas: (1+000 9+728 Km): (1-0.899)/1.284 = 30%.
Eficiencia de conduccin: 70%.
Eficiencia de distribucin.
Eficiencia de aplicacin.
42
Eficiencia de riego.
Cuadro 4.06
Eficiencia de riego situacin actual
Conduccin Distribucin Aplicacin Total
43
Cuadro 4.07
Cdula de cultivos y KC situacin actual
Coeficientes de Cultivo
Cultivo Base rea (Ha)
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
Maz Amarillo Duro 361.00 0.50 0.75 1.10 0.85 0.75
Maz Amarillo Duro (2da
210.25 0.50 0.75 1.10 0.85 0.75
campaa)
Maracuy 55.45 0.65 0.65 0.65 0.65 0.70 0.70 0.70 0.70 0.70 0.65 0.65 0.65
Cebolla 29.50 0.70 0.84 0.90 1.05 0.65
Cebolla (2da campaa) 27.54 0.70 0.84 0.90 1.05 0.65
Frijol 46.05 0.45 0.80 1.15 1.05 0.70
Frijol (2da campaa) 21.51 0.45 0.80 1.15 1.05 0.70
Papa Blanca 80.65 0.75 0.97 0.95 0.85 0.75
Caa de Azcar 326.78 1.15 1.12 1.00 0.95 0.90 0.85 0.75 0.60 0.55 0.85 0.9 1
Aj Paprika 121.84 0.65 0.25 0.75 1.15 1.10 0.90
Aj Paprika (2da campaa) 76.55 0.25 0.75 1.00 1.10 1.05 0.65
Kc promedio 0.96 0.91 0.78 0.87 0.96 0.87 0.73 0.54 0.71 0.99 0.90 0.84
rea Irrigada (Ha) 1,021.27 533.57 486.32 718.08 718.08 718 691 691 1021 1021 1,021.27 1,021.27 1,021.27
Fuente: Elaboracin Propia.
44
Cuadro 4.09
Clculo de la demanda situacin actual
Demanda DEMANDA TOTAL DE
Precipitacin
ETP ETP Kc ETA rea Neta de Eficiencia AGUA
Mes Efectiva
(mm/da) (mm) prom (mm) (Has.) Agua Riego
(mm) (m3) lt/seg.
(mm/ha/mes)
ENE 4.31 133.6 0.96 127.8 533.57 0.0 127.8 18.2% 3,746,268 1,398.70
FEB 4.51 126.3 0.91 115.4 486.32 0.0 115.4 18.2% 3,082,780 1,274.30
MAR 4.58 142.0 0.78 110.7 718.08 0.0 110.7 18.2% 4,367,231 1,630.54
ABR 3.16 94.8 0.87 82.8 718.08 0.0 82.8 18.2% 3,265,096 1,259.68
MAY 1.50 46.6 0.96 44.9 718.08 0.0 44.9 18.2% 1,772,786 661.88
JUN 1.89 56.6 0.87 49.0 690.54 0.0 49.0 18.2% 1,859,218 717.29
JUL 1.77 55.0 0.73 40.2 690.54 0.0 40.2 18.2% 1,524,677 569.25
AGO 1.90 58.8 0.54 31.2 1021.27 0.0 31.2 18.2% 1,753,500 654.68
SET 2.38 71.4 0.71 50.6 1021.27 0.0 50.6 18.2% 2,840,772 1,095.98
OCT 2.81 87.0 0.99 86.0 1021.27 0.0 86.0 18.2% 4,823,647 1,800.94
NOV 3.37 101.1 0.90 91.0 1021.27 0.0 91.0 18.2% 5,104,400 1,969.29
DIC 3.63 112.5 0.84 94.2 1021.27 0.0 94.2 18.2% 5,287,188 1,974.01
Total (m3): 39,427,563
Fuente: Elaboracin Propia.
Cuadro 4.10
Clculo de la demanda Situacin Actual
45
a) Cedula de cultivo y kc
Cuadro 4.10
Cedula de Cultivo Situacin sin Proyecto
Kc promedio 1.11 1.06 0.81 0.78 0.93 0.89 0.79 0.60 0.65 0.94 0.77 0.85
rea
Irrigada 1,323.81 862.81 862.81 1146.09 1229.65 1106 1106 1106 1254 1128 1070.73 1323.81 1323.81
(Ha)
Fuente: Elaboracin Propia.
46
Cuadro 4.10
reas de Cultivo Situacin sin Proyecto
b) Eficiencia de riego
Cuadro 4.11
Eficiencia de riego sin proyecto
47
Cuadro 4.14
Clculo de la demanda sin proyecto
Demanda DEMANDA TOTAL DE
Precipitacin
ETP ETP Kc ETA rea Neta de Eficiencia AGUA
Mes Efectiva
(mm/da) (mm) prom (mm) (Has.) Agua Riego
(mm) (m3) lt/seg.
(mm/ha/mes)
ENE 4.31 133.6 1.11 148.9 862.81 0.0 148.9 25.0% 5,133,778 1,917
FEB 4.51 126.3 1.06 133.9 862.81 0.0 133.9 25.0% 4,616,684 1,908
MAR 4.58 142.0 0.81 114.5 1146.09 0.0 114.5 25.0% 5,245,978 1,959
ABR 3.16 94.8 0.78 73.8 1229.65 0.0 73.8 25.0% 3,627,850 1,400
MAY 1.50 46.6 0.93 43.4 1105.82 0.0 43.4 25.0% 1,919,667 717
JUN 1.89 56.6 0.89 50.3 1105.82 0.0 50.3 25.0% 2,223,905 858
JUL 1.77 55.0 0.79 43.5 1105.82 0.0 43.5 25.0% 1,920,761 717
AGO 1.90 58.8 0.60 35.4 1254.03 0.0 35.4 25.0% 1,773,576 662
SET 2.38 71.4 0.65 46.2 1128.38 0.0 46.2 25.0% 2,083,362 804
OCT 2.81 87.0 0.94 82.1 1070.73 0.0 82.1 25.0% 3,511,963 1,311
NOV 3.37 101.1 0.77 77.4 1323.81 0.0 77.4 25.0% 4,096,888 1,581
DIC 3.63 112.5 0.85 96.0 1323.81 0.0 96.0 25.0% 5,078,535 1,896
Total (m3): 41,232,948
Fuente: Elaboracin Propia
Cuadro 4.14
Clculo de la demanda sin proyecto
a) Cedula de cultivo y kc
La cdula de cultivo considerada con proyecto son las 1,323.81 has que
cuentan con licencia de agua por la Autoridad Local de aguas Barranca.
Los cultivos propuestas son aquellos que tienen gran demanda en el
mercado local y regional; proyectndose instalar adems una segunda
campaa de 515.59 ha, al contar con agua permanente todo el ao en el
canal.
b) Eficiencia de riego
Cuadro 4.11
Eficiencia de riego con proyecto
49
a. Cedula de cultivo y kc
La cdula de cultivo considerada con proyecto son las 1,323.81 has que
cuentan con licencia de agua por la Autoridad Local de aguas Barranca.
Los cultivos propuestas son aquellos que tienen gran demanda en el
mercado local y regional; proyectndose instalar adems una segunda
campaa de 515.59 ha, al contar con agua permanente todo el ao en el
canal.
b. Eficiencia de riego
Eficiencia de conduccin. Se ha determinado la eficiencia de
conduccin en la situacin con proyecto, teniendo en cuenta el
revestimiento del canal con concreto, seccin trapezoidal, desde la
progresiva 0+000 al 9+728. La eficiencia de conduccin se ha
considerado en 97.00%.
Cuadro 4.11
Eficiencia de riego con proyecto
Distribuci
Conduccin n aplicacin total
97.00% 76.00% 55.00% 40.5%
Fuente: Elaboracin Propia
50
Coeficientes de Cultivo
Cultivo Base rea (Ha)
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
Maz Amarillo Duro 461.00 461.00 461.00 461.00 461.00 461.00
Maz Amarillo Duro (2da
285.25 285.25 285.25 285.25 285.25 285.25
campaa)
Maracuy 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45 55.45
Cebolla 29.50 29.50 29.50 29.50 29.50 29.50
Cebolla (2da campaa) 27.54 27.54 27.54 27.54 27.54 27.54
Frijol 129.24 129.24 129.24 129.24 129.24 129.24
Frijol (2da campaa) 35.00 35.00 35.00 35.00 35.00 35.00
Papa Blanca 90.65 90.65 90.65 90.65 90.65 90.65
Caa de Azcar 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78 524.78
Aj Paprika 123.84 123.84 123.84 123.84 123.84 123.84 123.84
Aj Paprika (2da campaa) 87.15 87.15 87.15 87.15 87.15 87.15 87.15
rea Irrigada (Ha) 1,323.81 862.81 862.81 1,146.09 1,229.65 1,105.82 1,105.82 1,105.82 1,254.03 1,128.38 1,070.73 1,323.81 1,323.81
Fuente: Elaboracin Propia
51
Cuadro 4.14
Clculo de la demanda con proyecto
Cuadro 4.15
Clculo de la demanda con proyecto
Cuadro 4.01
Volumen de agua asignado mediante RM N 034-AG-GRL.DRA/ADTRB.
EN m3 m3/seg
Mes
Cabecera bloque Estacin aforo Cabecera bloque Estacin aforo
Cuadro 4.17
Balance Oferta Demanda Situacin Actual
Vol. Demanda
3 3
MES Q oferta (m ) Vol. Oferta (m ) (m3) Balance (m3)
ENE 0.622 3,329,000 3,746,268 -417,268
FEB 0.693 2,908,000 3,082,780 -174,780
MAR 0.815 2,970,000 4,367,231 -1,397,231
ABR 0.983 2,263,000 3,265,096 -1,002,096
MAY 1.173 2,012,000 1,772,786 239,214
JUN 1.284 1,968,000 1,859,218 108,782
JUL 1.086 1,740,000 1,524,677 215,323
AGO 1.109 1,665,000 1,753,500 -88,500
SET 0.873 1,677,000 2,840,772 -1,163,772
OCT 0.751 2,183,000 4,823,647 -2,640,647
NOV 0.759 2,547,000 5,104,400 -2,557,400
DIC 0.650 3,143,000 5,287,188 -2,144,188
Total (m3) 28,405,000 39,427,563
Fuente: Elaboracin Propia
Grfico 4.02
Balance con asignacin de volmenes Resolucin ALA. Situacin Actual
54
Cuadro 4.20
Balance Oferta Demanda Sin Proyecto en m3/mes
Q oferta Demanda
MES (m3) Vol. Oferta (m3) (m3) Balance (m3)
ENE 0.622 3,329,000 5,133,778 -1,804,778
FEB 0.693 2,908,000 4,616,684 -1,708,684
MAR 0.815 2,970,000 5,245,978 -2,275,978
ABR 0.983 2,263,000 3,627,850 -1,364,850
MAY 1.173 2,012,000 1,919,667 92,333
JUN 1.284 1,968,000 2,223,905 -255,905
JUL 1.086 1,740,000 1,920,761 -180,761
AGO 1.109 1,665,000 1,773,576 -108,576
SET 0.873 1,677,000 2,083,362 -406,362
OCT 0.751 2,183,000 3,511,963 -1,328,963
NOV 0.759 2,547,000 4,096,888 -1,549,888
DIC 0.650 3,143,000 5,078,535 -1,935,535
Total (m3) 28,405,000 41,232,948
Fuente: Elaboracin Propia
Grfico 4.02
Balance con asignacin de volmenes Resolucin ALA. Sin Proyecto
55
Cuadro 4.20
Balance Oferta Demanda Con Proyecto en m3/mes
Q oferta Demanda
MES Vol. Oferta (m3) Balance (m3)
(m3) (m3)
ENE 1.240 3,329,000 3,322,954 6,046
FEB 1.240 2,908,000 2,849,418 58,582
MAR 1.240 2,970,000 2,964,618 5,382
ABR 1.240 2,263,000 2,239,110 23,890
MAY 1.240 2,012,000 1,184,819 827,181
JUN 1.240 1,968,000 1,372,595 595,405
JUL 1.240 1,740,000 1,185,494 554,506
AGO 1.240 1,665,000 1,094,652 570,348
SET 1.240 1,677,000 1,285,852 391,148
OCT 1.240 2,183,000 2,167,584 15,416
NOV 1.240 2,547,000 2,528,600 18,400
DIC 1.240 3,143,000 3,134,473 8,527
28,405,000 25,330,169
Fuente: Elaboracin Propia.
Grfico 4.04
Balance con asignacin de volmenes Resolucin ALA. Con Proyecto
56
Los cultivos a instalar en las reas de riego corresponden a Maz Amarillo Duro,
Maracuy, Cebolla, frijol, papa blanca, caa de azcar y aj paprika (segn
recomendacin del estudio Agrologico).
El canal de conduccin hacia los sectores de riego ser diseado para un caudal de
1.25 m3/s.
57
ANEXOS
58
59
Persistncia al 95%
ENERO FEBRERO
160.00 250.00
140.00
200.00
120.00
100.00 150.00
80.00
100.00
60.00
40.00 50.00 31.90
20.00 27.78
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
MARZO ABRIL
140.00
200.00 120.00
100.00
150.00
80.00
100.00 60.00
40.00
50.00
51.79 20.00 33.64
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
MAYO JUNIO
70.00 40.00
60.00 35.00
50.00 30.00
25.00
40.00
20.00
30.00
15.00
20.00
10.00 12.33
10.00 16.88
5.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
JULIO AGOSTO
30.00 30.00
25.00 25.00
20.00 20.00
15.00 15.00
10.00 10.00
10.97 9.99
5.00 5.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
SETIEMBRE OCTUBRE
30.00 50.00
45.00
25.00 40.00
35.00
20.00
30.00
15.00 25.00
20.00
10.00 15.00
10.05
10.00 13.40
5.00
5.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
NOVIEMBRE DICIEMBRE
50.00 100.00
45.00 90.00
40.00 80.00
35.00 70.00
30.00 60.00
25.00 50.00
20.00 40.00
15.00 30.00
10.00 15.56
20.00
5.00 10.00 19.24
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
60
40.00 45.72
50.00
20.00 31.76
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
MARZO ABRIL
140.00
200.00 120.00
100.00
150.00
80.00
100.00 60.00
40.00
50.00 36.44
60.58 20.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
MAYO JUNIO
70.00 40.00
60.00 35.00
30.00
50.00
25.00
40.00
20.00
30.00
15.00
20.00 10.00 13.15
18.96
10.00 5.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
JULIO AGOSTO
30.00 30.00
25.00 25.00
20.00 20.00
15.00 15.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
SETIEMBRE OCTUBRE
30.00 50.00
45.00
25.00
40.00
20.00 35.00
30.00
15.00 25.00
20.00
10.00 15.00
11.38
5.00 10.00 14.13
5.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
NOVIEMBRE DICIEMBRE
50.00 100.00
45.00 90.00
40.00 80.00
35.00 70.00
30.00 60.00
25.00 50.00
20.00 40.00
15.00 30.00
16.67
10.00 20.00
21.01
5.00 10.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
Persistncia al 75%
61
MARZO ABRIL
140.00
200.00 120.00
100.00
150.00
80.00
100.00 60.00
40.00 51.22
50.00 71.47
20.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
MAYO JUNIO
70.00 40.00
60.00 35.00
30.00
50.00
25.00
40.00
20.00
30.00
15.00 16.75
20.00 24.73 10.00
10.00 5.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
JULIO AGOSTO
30.00 30.00
25.00 25.00
20.00 20.00
15.00 15.00
5.00 5.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
SETIEMBRE OCTUBRE
30.00 50.00
45.00
25.00 40.00
20.00 35.00
30.00
15.00 25.00
20.00
10.00 12.73 15.00
16.03
5.00 10.00
5.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
NOVIEMBRE DICIEMBRE
50.00 100.00
45.00 90.00
40.00 80.00
35.00 70.00
30.00 60.00
25.00 50.00
20.00 40.00
15.00 20.07 30.00
10.00 20.00 25.81
5.00 10.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
Persistncia al 50%
62
MARZO ABRIL
140.00
200.00 120.00
100.00
150.00
80.00
100.00 60.00 70.77
98.28
40.00
50.00
20.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
MAYO JUNIO
70.00 40.00
60.00 35.00
30.00
50.00
25.00
40.00
20.00
30.00 19.23
30.23 15.00
20.00 10.00
10.00 5.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
JULIO AGOSTO
30.00 30.00
25.00 25.00
20.00 20.00
15.00 15.00
16.08 14.80
10.00 10.00
5.00 5.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
SETIEMBRE OCTUBRE
30.00 50.00
45.00
25.00 40.00
20.00 35.00
30.00
15.00 25.00
15.63 20.00
10.00 15.00 20.29
5.00 10.00
5.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
NOVIEMBRE DICIEMBRE
50.00 100.00
45.00 90.00
40.00 80.00
35.00 70.00
30.00 60.00
25.00 50.00
20.00 25.23 40.00
15.00 30.00
33.71
10.00 20.00
5.00 10.00
0.00 0.00
0.00 0.20 0.40 0.60 0.80 1.00 0.00 0.20 0.40 0.60 0.80 1.00
63
64