SITE TEST REPORT Date :
Legend Contractors name: Advance Customer:
CSD Energy Company (AECC) NG-SA
Contract No. :
Name of substation: 115/13.8KV Khafji Substation - 5 31131152/00
Page 1 of 2
FUSE SUPERVISION RELAY RXBA4
Make: Equip. No.: Dwg. Ref.: Record No.:

1. GENERAL DATA AND INFORMATION:

Panel No. Designation


Make ABB Type RXBA4
Serial No. Aux. Voltage 125V DC
Model No. RK 428 004-AA No. of Contacts 4NO

2. MECHANICAL CHECKS AND VISUAL INSPECTION.

ITEM DESCRIPTION REMARKS


1. Inspect for any physical damage or defects.
2. Verify connections as per approved drawing.
3. Check tightness of all connections
4. Check Apparatus list.

3. ELECTRICAL TEST.

a) FUNCTION TESTS:

ITEM DESCRIPTION REMARKS


1. Case earthing checked.
2. Indication & All contact checked.
Relay operates for loss of any two or one phase
3.
voltage.

b) OPERATING VALUE, VOLTAGE DIFFERENCE

PHASE OPERATING VALUE OF U1 OPERATING VALUE OF U2


WITH U2 = 0 WITH U1 = 0 LIMITS - VOLTS
PICK UP DROP OFF PICK UP DROP OFF DROP
PICK UP
VOLTS VOLTS VOLTS VOLTS OFF

A > 20 >4
B
> 20 >4
C
> 20 >4

DATE:
TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
SITE TEST REPORT Date :
Contractors name: Advance Customer:
Energy Company (AECC) NG-SA
Contract No. :
Name of substation: 115/13.8KV Khafji Substation - 5 31131152/00
Page 2 of 2
FUSE SUPERVISION RELAY RXBA4
Make: Equip. No.: Dwg. Ref.: Record No.:

c) OPERATING TIME:

PHASE OPERATING TIME


LIMITS Time(ms)
PICK UP (ms) DROP OFF (ms) PICK UP (ms) DROP OFF (ms)

8 25
A
B 8 25

C 8 25

4. TEST EQUIPMENT USED:

No. Test Equipment Serial Number Calibration date Calibration due date

DATE:
TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________