SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 6 COS 03/31/2012

SATIP No. APPROVED DATE DISCIPLINE:


SAUDI ARAMCO TYPICAL INSPECTION PLAN
Air-Handling Unit (AHU) SATIP-K-001-02 30-Apr-13 HVAC
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW


Not Applicable
1.1

2.0 MATERIAL RECEIVING

AHU SAIC- SAIC-


2.1
Receiving Inspection K-4004 K-4004 H W Saudi Aramco to be notified on delivery of every unit

HVAC System Electrical,


See See
2.2 See SATIP-P-104-08 HVAC Equipment
Remarks Remarks
Instrumentation and Control
AHU
Handling, Storage and Preservation SAIC- SAIC-
2.3
K-4004 K-4004 H W Contractor QA/QC to perform Weekly Inspection
Inspection

Air Filters Receiving, Storage, Handling See See See SATIP-K-001-08 Air Filtration Devices and Grease
2.4
and Preservation Remarks Remarks Filters

3.0 INSTALLATION

SAIC- SAIC- Saudi Aramco to be notified on start of this activity for


3.1 AHU Inspection
K-4005 K-4005 H W every Unit

Air Moving / Cooling Equipment Duct / SAIC- SAIC- Saudi Aramco to be notified on start of this activity for
3.2
Pipe Connection Inspection K-4003 K-4003 H W every Unit

Essential Operating Facilities HVAC SAIC- SAIC-


3.3
requirements K-4006 K-4006 H W

Pressurized Building HVAC SAIC- SAIC-


3.4
Requirements K-4044 K-4044 H W

Communication Facilities HVAC SAIC- SAIC-


3.5
Requirements K-4045 K-4045 H W

Page 1 of 4
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 6 COS 03/31/2012
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Air-Handling Unit (AHU) SATIP-K-001-02 30-Apr-13 HVAC
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

SAIC- SAIC-
3.6 Battery Room HVAC Requirements
K-4046 K-4046 H W

Condensate Drain lay-out SAIC- SAIC- Saudi Aramco to be notified on start of this activity for
3.7
Inspection K-4007 K-4007 H W every Unit

Page 2 of 4
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 6 COS 03/31/2012
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Air-Handling Unit (AHU) SATIP-K-001-02 30-Apr-13 HVAC
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Thermoplastic and RTR Installation


See See
3.8 (used for Condensate Drain or as See SATIP-S-070-03 Thermoplastic and RTR piping
Remarks Remarks
applicable)

See See
3.9 HVAC Metal Duct System See SATIP-K-001-03 Metal Ducts
Remarks Remarks

See See
3.10 Air Filtration See SATIP-K-001-08 Air Filtration Devices
Remarks Remarks

HVAC System Electrical, See See


3.11 See SATIP-P-104-08 HVAC Equipment
Instrumentation and Control Remarks Remarks

4.0 PRE-COMMISSIONING

Testing & Pre-commissioning to be in accordance with


the manufacturer recommendations. However
Contractor shall be responsible to prepare and submit
4.1 Not applicable - See Remarks the required procedure and checklist based on the
manufacturer's recommendation and to be submitted
to PID at least one (1) month prior to start of the
activity.

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may
1 adjust the levels of Saudi Aramco participation based upon the Contractors performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4 attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

Page 3 of 4
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 6 COS 03/31/2012
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Air-Handling Unit (AHU) SATIP-K-001-02 30-Apr-13 HVAC
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

LEGEND
H 100% Hold Point for QC Inspection or Test. R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents

Page 4 of 4