Professional Documents
Culture Documents
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
Air Filters Receiving, Storage, Handling See See See SATIP-K-001-08 Air Filtration Devices and Grease
2.4
and Preservation Remarks Remarks Filters
3.0 INSTALLATION
Air Moving / Cooling Equipment Duct / SAIC- SAIC- Saudi Aramco to be notified on start of this activity for
3.2
Pipe Connection Inspection K-4003 K-4003 H W every Unit
Page 1 of 4
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 6 COS 03/31/2012
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Air-Handling Unit (AHU) SATIP-K-001-02 30-Apr-13 HVAC
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
SAIC- SAIC-
3.6 Battery Room HVAC Requirements
K-4046 K-4046 H W
Condensate Drain lay-out SAIC- SAIC- Saudi Aramco to be notified on start of this activity for
3.7
Inspection K-4007 K-4007 H W every Unit
Page 2 of 4
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 6 COS 03/31/2012
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Air-Handling Unit (AHU) SATIP-K-001-02 30-Apr-13 HVAC
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
See See
3.9 HVAC Metal Duct System See SATIP-K-001-03 Metal Ducts
Remarks Remarks
See See
3.10 Air Filtration See SATIP-K-001-08 Air Filtration Devices
Remarks Remarks
4.0 PRE-COMMISSIONING
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may
1 adjust the levels of Saudi Aramco participation based upon the Contractors performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4 attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
Page 3 of 4
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 6 COS 03/31/2012
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Air-Handling Unit (AHU) SATIP-K-001-02 30-Apr-13 HVAC
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
LEGEND
H 100% Hold Point for QC Inspection or Test. R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
Page 4 of 4