You are on page 1of 16

Direct Production or Collective order Scenario Overview

(Author: N. Mohan Raj, Infosys Chennai )

Introduction:

This White paper explains briefly on the scenario of direct production or collective order
concept. Basically, collective order is the technical term used for the Direct Production scenario.

Main objective of the document is to explain the basic concept of collective order with Business
examples as well as sap Process flow. Best attempt has been made to explain key settings,
advantages, Disadvantages & Limitations of collective order. I would also update versions based
on feedback and comments of SDN experts and consultants on this topic accordingly in future.

Collective order or direct Production can be carried out for Discrete Manufacturing or PP-PI.
However this document limits to Discrete Manufacturing only.

Applies to: ECC 6.0, Sap R/3 4.6

Need for Direct production or Collective order:

If subassemblies are produced directly for superior orders within a production process, without
physically entering the warehouse, then it is useful to have direct production via collective
orders.

Example:

1. Joining of Left door & Right door assembly in a car

2. Fitting of Front & rear wheel assembly in cycle or Bike

Direct Production:

Direct production is the special type of production where components are directly produced for
the higher-level assembly, without Stocked @ warehouse as normal and no goods receipt or
goods issue postings are made for components that are produced directly.

The system flags a direct production segment for the components to be produced directly in
the MRP list and the stock/requirements list. When the planned order for the finished product
is converted into a production order, the system also converts all planned orders for lower-level
components to be produced directly into production orders.

The system adapts planned orders for direct production to changes in date and quantity in the
higher-level assembly, even if they are firmed, so that the collective order remains consistent.
Collective order:

Collective order is a network where planned orders or production orders are linked to each
another over several production levels. Each order in the collective order has its own order
number. The components for which separate production orders are created in the collective
order are called directly produced components.

Business scenario:

Let us understand Business scenarios where collective order or Direct Production scenario is
used before briefing the sap process flow.

In Our professional life, we used to get below items from our Company or in any events

a) Ball pen or Mug or Bottle embedded with Company name

b) Wrist watch or wall clock with company logo & name

c) Wallet or Bag or Sun glass embedded with Company or sponsor

If the manufacturer uses exclusive components for producing above finished product where he
wants to control production with linkage of header & child orders with no intermediate stock
transfer to warehouse, then Collective order process will be helpful.

Above examples are just for explanation purpose of collective order in a better way but it is not
limited .You can use Collective order concept in general where components has to be issued
only to Superior orders instead of warehouse as unrestricted stock .

Sap Process Flow of Collective order:

A. A. Configuration:
B. A.1 Order Type Setting:

IMG path:

Production > Shop Floor control > Master data > order > Define order Types

Tcode: OPJH
If this indicator is set , then it means
there are automatic goods movements between the production orders in a collective order.
When the goods movement is posted, costs are credited from the subordinate order& costs are
debited to the superior order.

A.2. Special Procurement Key:

IMG path:

Production > Material requirement planning > Master data > Define special procurement type

Case study:

Let us take manufacturing of Ball Pen, a simple example for the scenario of collective order
processing.
Product structure:

1 Ball Pen (Finished Product)

1.1 Pen casing ( Halb)

1.1.1 Refill for Pen casing (ROH)

1.2 Pen Cap (Halb)

1.2.1 Slug for Pen cap (ROH)

Master Data:

1. Multi level BOM for Ball Pen & Routing

TCODE: CS12

2. Material Master:

2.1 Header Material MRP views:

TCODE: MM02
2.2 Child Material MRP views:

TCODE: MM03
Production planning & Control Cycle :

Collective order can be created by below 3 methods

1. Directly Production order with Header Material using T Code : CO01

2. Create Planned order ( Tcode : MD11) for Header & Convert into Production order (Tcode
:CO40)

3. PIR -> MRP > Planned order to Production order.

Let us illustrate by Method 3 with Full cycle of Material Planning & Shop Floor Execution.

Material Planning:

i. creation of Planned Independent requirement (MD61 ):


ii. MRP RUN (MD02) :

I. iii Stock Requirement List (MD04) :

A. Stock requirement list for Header Material & child material :

Planned order for Header material & child material are created for the balance required qty
(17)
*** You can notice Description Direct Production & Dep req for Header material .

I. iv .Order Report:

If we execute order report, we can see linkage of planned order as a network in below screen shot .

I. v. Planned order :

Here is the advantage of collective order concept. Subordinate planned orders are linked to
superior header order which can be seen in assignment tab of below screen shot of child
planned orders.

TCODE: MD13
I. vi. Conversion of planned order to production order :

Refer stock requirement list below once planned order of header material is converted

Shop Floor Execution:

Real Benefits of collective order concept starts here. Mark *** highlights its advantage

I. Creation of collective production order (CO03) :

When we click read collective order button, system will display collective order network @
created stage as below.
Note : Collective orders represent different levels of the production process together as an
integrated whole network. Each level represents a prod order.

*** Refer assignment linkage of subordinate order to Leading /superior order below

I. ii. Scheduling of collective production order (CO02) :

***If we schedule header superior order, it automatically schedule total network of collective
order.
iii. Releasing of collective production order (CO02) :

*** Releasing the superior order results in release of all child orders in network. Header order
receives RLNE status Release in Network.

I. iv. Changing collective production order (CO02) :

*** We can change header order Quantity or Scheduling Date or both which will gets
drilldown to entire network below. Read PP master data function for header order is allowed.

Note: Below case, we have changed order qty from 17 to 15 which got drilled down.
I. Confirmation of collective production order (CO15 or CO11n) :

Confirmation of child order @ order level or operation level will result in direct Good issue
to header order. Stock of subordinate order will not be available in warehouse .Instead; child
component is directly produced for Header order.

Note that leading order will get below status when there is confirmation or goods movement in
network.

1.1. CFCO Confirmation in collective order

1.2. GMCO Goods movements in collective order

*** Check warehouse stock for the direct components which is nil. TCODE: MB52
*** Check Material document for the direct components which shows GI for order (261)
TCODE: MB51

vi.Final confirmation of leading order :


I. vii. GR of collective production order (MB31) :

Refer FInal material document & Stock overview


This concludes the complete cycle of direct production via collective order

Limitations:

We have limitation to create collective order if components are belongs to below set

Co Product or By product
Alternative item of strategy 2 or usage probability 0
Either Discontinued or Follow up or Intra Material

Moreover, Collective order cannot be created Via SAP APO.

Exception settings:

If you want to restrict direct production for a particular BOM, then you enter this in the
respective BOM item. This entry overwrites the entry in the material master. or
You can use the indicator No direct production in the explosion key to switch off the
direct production for individual BOMs.

TCODE: CS02
Conclusion:

In general , Direct production is aimed at doing Major sap business functions


such as Creation ,Release ,scheduling ,costing for Finished product ,assembly & components
within a BOM structure jointly or collectively.

Even though direct production or collective order has its unique benefits, it has a negative
impact of Material flow & stock inventory indirectly. Collective order will not consider below
points

Plant warehouse stock of direct components.


Anonymous Dependent requirements are not considered.