UNIT GC3: HEALTH AND SAFETY PRACTICAL


APPLICATION

Student Name: Wasim Mohd Wasim

Student Number: 00346576

Date of Submission: 16th August 2016


APPENDIX 1

GC3 The Health and Safety Practical Application

Candidate and course provider declarations:

For completion by the candidate:

I declare that the work submitted for this practical application assessment ie. the completed observation sheets
and the report to management, is my own work. I recognise that contravention of this statement
constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice
policy.

Name (Print) Wasim Mohd Wasim

Signature

Date 16th august 2016

For completion by a course provider representative (e.g. internal practical assessor):

I declare that the work marked is identical to that received from the candidate. I recognise that contravention of
this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH
Malpractice policy.

Name (Print)

Signature

Date

For completion by the course providers internal practical assessor:

I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognise
that contravention of this statement constitutes malpractice and may result in my being subject to the penalties
set out in the NEBOSH Malpractice policy.

Name (Print)

Signature

Date

NB: This declaration must be completed in full, submitted and retained with the
candidates script. If this declaration is not submitted the candidates result may be
declared void.
APPENDIX 3
INTERNATIONAL GENERAL
CERTIFICATE Assessors marking sheet

GC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Date of practical application Name of assessor


Course provider Course provider
number name

Student number Student name

NEBOSH
Maximum
Assessors moderated
marks
Criteria available
marks awarded marks
(if different)

1 Completion of observation sheets

1.1 Range and number of hazards/good practice 15

Identification of suitable control measures and


1.2 timescales
15

2 Report - Introduction and Executive Summary

Introduction providing an overview of the chosen


2.1 area
5

2.2 Executive summary 5

3 Report - Main findings of the inspection

Quality of interpretation of findings and clear


3.1 references to strengths and weaknesses
15

Identification of possible breaches of international


3.2 standards
5

3.3 Persuasiveness / conciseness / technical content 10

4 Report - Conclusions and Recommendations

Clear and concise conclusions which are clearly


4.1 related to report findings and are effective in 15
convincing management to take action

Recommendations which present realistic actions to


4.2 improve health and safety in the chosen area
15

TOTAL MARKS 100


Outcome: PASS (60% or more) REFER (less than 60%)

Date assessed / /

Assessors signature

Date received by course provider / /

Date received by NEBOSH


(if applicable) / /

Assessors additional comments on the practical application:

ASSESSED BY (name in block letters)

The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested.

NEBOSH USE ONLY

NEBOSH Moderators comments:


APPENDIX 4

INTERNATIONAL GENERAL
CERTIFICATE Candidates observation
sheet
GC3 THE HEALTH AND
SAFETY PRACTICAL APPLICATION
Sheet number 01 of 15

Student name Wasim Mohd Wasim Student number 00346576

Place inspected Goodwill Costructions Date of inspection 10 / 08 / 2016

Observations Control measures Timescale


Hazards and consequences Immediate and longer-term actions

Observation No. 1: Welding Job Immidiate Action: Stop the work and
going on without work permit. arrange a Work Permit. Make safe
condition than statrt the work.
Consequences: This will lead to 15 days
accident like burn, fire and Explosion. Long Term Action: Arrange Training
and motivational programes for all
Welder and Helpers.
Impose Disciplinary actions.

Observation No. 2: Workers Immidiate Action: stop the work,


Holding Wet cement without personal provide PPEs,instruct the workers,
protective equipments. E.g, Gum start the work again.
boots, Hand Gloves etc.
Long Term Action: Training and
Consequences: Skin burn, Supervison to workers, Purchase and 20 dyas
Dermatatics, Eye irritation and issue of PPEs, Disciplinary action.
ingestion.

Observation No. 3: Observed pot Immidiate Action: Provide Signage,


holes around the site office and Barrication, and filling of Pot holes.
25 days
Entrance.
Long Term Action: Maintanance of
Consequences: Slip, Trip, Fall Cause Pot holes, inspection Schedule of pot
the injury, Like Cut, Brause, or holes.
fracture.
Observation No. 4: In Phase no.1, Immidiate Action: Stop the work,
Scaffold no.16, found that workers Provide fall arrester, instruct and warn
working without fall arreter. the workers.

Consequences: Workers could fall Long Term Action: Provide traning; 10 days
from height and could be suffer from Communicate the hazards in tool box
severe injury or death. talk or team briefing and mantioned in
risk assessment.

Observation No. 5: Workers are Immidiate Action: Instruct the


working in earth moving machinaries workers, provide information,
area. instruction, traning and supervison to
drivers and workers, discuss in tool box 25 dyas
talk.
Consequences: may Collision with
machinaries and lead to severe Long Term Action: Barrication,
injuries or death.
Signage, Designated pathways and
traffic routes, provide proper crossing
points.

Observation No. 6: Found that floor Immidiate Action: provide


opening is not barricated in Phase 2, information of floor opening to
Floor no. 1. peoples, barrication the area, assign 15 days
watch person for that area and make
sure no one is working there.
Consequences: Fall of person could Long Term Action: Provide Signage,
happen and peoples could suffer from and proper maintanace of it and
sever injuries information.
Observation No. 7: Found Enough Immidiate Action: Inform the Medical
Medicines are not available in First team to fullfil the Medicines.
Aid Box.
Long Term Action: Proper
Consequences: In case of injury or maintanance of First aid Box. 7 days
accident required medicines will not
be available leading to severe injuries
or death.

Observation No. 8: Loaded truck Immidiate Action: Call the driver and
wrongly parked in Phase no 1, Sectioninstruct trhe driver to park the vehicle
18. at assing place, Warn the driver.
30 days
Consequences: Collision with other Long Term Action: Take Disciplinary
vehicles or pedestrians, block of action, discuss in tool box talk, provide
emergency way. designated area.

Immidiate Action: Change to correct


Observation No. 9: In Diesel area, one, and make sure its place on correct
Phase 2, Found that wrong place.
extinguisher is installed.
Long Term Action: Proper 30 days
Consequences: In case of fire we are maintanance and proper schedule
not able to use it. This will lead to
inspection to check its work ability.
major fire.
Observation No. 10: found that Immidiate Action: Assing Watch
smoke detector not working in person who is competent in canteen
canteen area area to look for fire.

Consequences: In case of fire it will Long Term Action: Change detectors, 20 days
not detect the fire and lead to spread and proper, maintanance of detectors.
fo fire which will lead to loss of
properties and death or burn to
peoples.

Observation No. 11: At site found No Action


that Medical represtatives and N/A
Doctors are available
Maintain standard
Consequences: In case of accident or
injury they can treat the person and
could save the life of peoples.

Observation No. 12: Safe Working


Loads are displayed at Cranes. No Action
N/A
Consequences: Operators are aware
of working loads. Maintain standard
Observation No. 13: Found that Immidiate Action: Schedule proper
peoples are loading and unloading method of lifting, provide instruction
Cement bages without proper breakes and supervision.
and rest.
Long Term Action: trainig how to lift 15 dyas
Consequences: may Lead to Back a load/ dynamic lifting technique, make
ache or work realated upper lift sure peoples handling the load as per
disorder. there ability.

Immidiate Action: stop the vehicle,


Observation No. 14: Observed rash check driver competancy and warn the
driving at site. driver.

Consequences: Rash driving leads -to Long Term Action: Traing to drivers,
collision or overturning of vehicles, or provide posters to communicate the 30 days
could hit to pedestrians. hazard due to rash driving.

Observation No. 15: Observe that Immidiate Action: Provide proper


steel fabrication area contain lot of PPEs and proper house Keeping in
smoke. Working area to remove contaminates.
Consequences: Could suffer from Long Term Action: installed More 30 days
Eye Irritation, Temparary Breathing Dilute Ventilation System, Proper
Problem.
Cleaning of filters and proper
maintanance of System.
Observation No. 16: Observe that Immidiate Action: Stop the Activity,
Peoples Using portable grinder Saized the item and send it to
without guards. maintanance department.

Consequences: Entanglment, Long Term Action: Purchased of 15 days


Tripping, cut or impact to user. Guards, Pre use Check, inspection and
peridically maintanance and provide
training.

Observation No. 17: Observed that Immidiate Action: Temporary signage


Barrication installed in phase 1, floor or notice stating the condition of
2nd are highlt corrodated. barrication, Assing watch person till the
time new barrications are not installed.
Consequences: It may be breake and
fall of person may happen which will Long Term Action: Proper checking
lead to severe accident, injury or the barrication which going to istalled,
death. 15 days
proper maintanance and inspection of
barrication.
Observation No. 18: Found unknow Immidiate Action: Barricate the drum,
chemical drum in store room without installed notice of NOT TO TOUCH.
Matarial safety data sheet.

Consequences: It will lead to Burn of Long Term Action: Isolate the drum; 15 days
skin, Eye irritation, or sever illness or Send it to chemical Deoarment for
bodily harm. identification, for future check the
chemical before receiving.

Observation No. 19: Observed trhat Immidiate Action: Stop the activity,
Excavator no 23th has diesel leakage. Seized the keys, and sen the excavator 20 dyas
for mainatance.
Consequences: Can cause vehicle on
fire, and explosion may be happen. Long Term Action: Provison of
checklist, provison of pre-use check,
proper maintanance and inspection.

Observation No. 20: Observed that


in canteen area Food Waste are Immidiate Action: Remove waste
littering. from the canteen, instruct the peaole to
put the wast in dust bin. 30 days
Consequences: Littering items and
food wast will helps to born of Long Term Action: Provide proper
mosquitto which will lead to malariya wast collection area, Hire the 3rd party
nad other illness. house keeping.
Observation No. 21: Observed that Immidiate Action: stop the activity,
Enviornment of store room is too hot. provide rest to worker, and provide
proper breakes. 30 days
Consequences: It may Cause Fatigue
and stress and lead to lake of Long Term Action: Schedule proper
concentrate will lead to accident. routine and breaks of workers, Installed
big windows for natural ventilation.

Observation No. 22: Observed that Immidiate Action: Provide Temporary


Toilets facilities are insufficient. movable toilet facilities.
30 days
Consequences: It will Create Long Term Action: Costruction of
uneasiness while working and lack of permanent Toilets, and proper cleaning
concentrate will lead to accident. and maintanance of toilets.

Observation No. 23: Observe that


Bench top circular saw machine is Immidiate Action: Stop the activity,
making lot of noise. Provide ear plugs.
20 days
Consequences: Temparary Ringing Long Term Action: Periodically
or loss of hearing capacity if exposure maintanance and proper inspection,
is for short term, permanent ringing or Training to operator.
loss of hearing if exposure is for long
term.
Observation No. 24: Observe that Immidiate Action: Stop the activity,
drilling cable frays. Seize the item, and Change the cable.
20 days
Consequences: People may suffer Long Term Action: Proper inspection
from, Burn, shock, arcing, fire and and periodically mantanance, Training
explosion. to operator.

Observation No. 25: Observe that


stair rails are missing in Plase 1st, 2nd Immidiate Action: Provide signage,
floor. Provide temporary Railling. 15 days

Consequences: Fall hazard could be Long Term Action: Install permanent


happen due to missing rails and railling, schedule proper inspection and
people may injured minor or severe. periodically maintanance of all stair
rails.

Observation No. 26: Observe that Immidiate Action: Assing Watch


excavated area is not barricated. person, Install temporaray barrication.
20 days
Consequences: Fall of person, Long Term Action: Provide permanent
Matarial, Vechicle could be happen Barrication, Proper inspection and
and could be injuried to worker. Who periodical maintatnce of barrication,
are working in it? damage to vehicles training to people and vehicles drivers.
and materials.
APPENDIX 5
INTERNATIONAL GENERAL
CERTIFICATE
UNIT GC3 THE HEALTH AND
SAFETY PRACTICAL APPLICAITON

Student number 00346576


Location St. Angelos Road, Airoli, Thane, Maharashtra Date of review 10 / 02 /2017

Introduction including overview of area inspected and activities taking place

This Inspection is carried out at GoodWill Construction A mall Costruction site which is
located at ST. Angelos Road, Airoli, Thane district, Maharashtra state, India on 10 th August 2016.
This site consists of a two building with huge basement for parking with a garden.

The overall area of the site consist of seven acres of land. The half construction of mall is
totally completed. The project is totally divided in two phases and the work is now statrted in
phase two. Which consisit of 5th floor the phase one is allocated for food and beverages, cloth
market, Daily products, Shops, super market, show rooms of expensive watches and shops of
antic items etc. However phase two is designing and constructing such a ways for offices,
consultant, big companies Head offices, further we found that doors and fabrication works of
windows and tiles work is started.

The Areas inspected on the site are:


Cement Plant
Heavy Machinaries used at construction site
Steel Favbication yard
Scaffold and building
Excavated are
Site office area
Store Room
Electrical substation
Welfare Facilities

There are many hazards found like Machine hazard, Excavation hazard, Vehicle hazard, fire
hazard, unsafe office premises and steel and wood dust hazard.

There are about three contracting companies working togher with 13th staff of Good will
Construction and around 150 workers with contractors are employes on the project. Two staff
from project consultants are permantly stationed on the construction site

.
APPENDIX 5
INTERNATIONAL GENERAL
CERTIFICATE
UNIT GC3 THE HEALTH AND
SAFETY PRACTICAL APPLICAITON

Student number 00346576


Location St. Angelos Road, Airoli, Thane, Maharashtra Date of review 10 / 02 /2017

Executive Summary

Organization had to pay attention of nine main areas Highlithed in the report to improve there
Health and safety statndard. The given below points in order of priorities and importance.
Recommendation with time scale and approximate cost are recommented in the report.

1. Not using Permit to work:

Training to workers should be given to let them know the imporatnce of permit to work.
Positive culture should be developed in the organization. To improve morale and beheviour of
work force.

2. Not using Personal Protective Equipments:

Workers should be aware the consequences of not using PPE; s and proper tarinig should
provide to create positive culture in the organization.

3. People Moving in Earth moving Machinaries area:

Peoples should be aware about the walkways and traffice routes. Awarnes should created by
posters in the site. Signage and Construction of designated walkways and crossing points.

4. Insufficent Medicine in the first aid box:

Its a employers responsibalitry to take care of the workers, The employer should provide
enough medicine in the first aid box to avaid complication at the time of accident and should
properly maintain it.

5. Lot of Smoke in Steel Fabrication Area:

Workers should protect from smoke which could casue illness or disease to workers. More
Dilute Ventilation system should instlled to remove smoke and should maintain and inspect
dilute system as per the schedule.

6. Food waste is littering in trhe canteen area:

Health and hygien is the main concern at the work plance littering item will generate the
mosquitto that will lead to malariya and ather illness. So proper Housekeeping should be
done, and hire the 3rd party house keeping and provide common waste collection point.

7. Inadequate Ventilation in the store Room:

The store room temparature should be workable and proper natural ventilation should
provided by constructing big windows for natural ventilation in the store room.
8. Insufficient Toilet Facilities.

Its the duty of employer to provide at the site found that insufficent toilets, so employer
should arrange movable temporary toilets and should maintain in good condition, and should
construct the permanat toilets at the site.

9. Missing stair Rails:

Movement of people withing the organization should safe, and proper railing should provided
to avoid accident.
APPENDIX 5
INTERNATIONAL GENERAL
CERTIFICATE
UNIT GC3 THE HEALTH AND
SAFETY PRACTICAL APPLICAITON

Student number 00346576

Location St. Angelos Road, Airoli, Thane, Maharashtra Date of review 10 /02 /2017

Main findings of the inspection

From Observation No: 01


Workers not using Work Permit

Permit to work is an important document which required, before starting of any high risk
activity. As it required to control it through Work permit because it can casue harm or injury to
people and fire and explosion.

In the company found that work permit not following so it can cause harm and loss or
fire and explosion and not taking permit is poor culture so organization should train the worker and
provide information of importance of permit. This is breached of factory act 1948.

From Observation No: 02


Workers holding wet cement without PPEs

Using proper ppes Help to prevent illness or injuries casue due to exposure of hazardous
matarial, Process or procedure however found that people holding the wet cement without require
PPEs (Gum boot, Hand gloves etc).

SO organization should provide proper ppes to the workers and should train the workers
how to use it. It will improve the culture and protect bthe workers from physical harm like, skin
burn, eye irritation, darmatatics, because wet cement is corrosive.
This is breached of building and other construction workers act 1996.(BOCW)

From Observation No: 05


People moving in earth moving machanaries area:

The construction site proper routes layout which peoples should follow to avid any
accident. However at site found that people are moving it earth moving machineries area

The activity is dangerous so organization should make safe layout, crossing points,
designated walk ways to peoples ans should train tham both peoples and drivers should installed
barrication, signage to make awarness at work site.
This is breached of building and other construction workers act 1996.(BOCW)
From Observation No: 07
Enough medicines are not avialable in first aid box:

First aid facility should avialable to every work place to prevant severe injury and to save laife
however found that enough medicines are not avialable in first aid box so at the time of accident
essential and primery help will not available.

The organisation should maintain the first aid box all time full and if not so need to arrenge
required one. Proper inspectionm should carryout of medicines so missing medicine will be
purchased again and life of the employee could be safe at the time of accident. According to
factory act 1948 section 45 enough medicines should available.

From Observation No: 15


Steel fabrication areas contain lot of smoke:

Proper vantilation should be avialable to work easily otherwise will cause fatige and stress. In
fabrication area found that dilute vantilation provided is not safficient and smoke can cause eye
irritation, temporarely breathing problem, fatigue and stress.

Organisation should provide two more dilute systems to remove the smoke from work place
and filter should clean time to time and proper inspection and pridically maintainance should be
the dilute system. As per ILO-C-155 article 16-2 proper ventilation should provided.

From Observation No: 20


In canteen area food waste littering:

Health and hygeyne in an important issue in work place. Proper welfare facilities and good
hygien protect peoplr at work site from any illness. However in canteen area found that food waste
is littering, which is a source of mosquitos, which is futher source of malaria and other illness.

In organisation they should out source the house keeping who going to tekacare of it and should
provide common waste collection point and should instruct the people. It is a breach of law
factory act 1948 section 46.

From Observation No: 21


Environment of store room area found too hot:

Environment of working area should always calm and shold be good ventilated to work.
However fpound that store room area is too hot. It will creat uneasyness, fatiuge and stress the
will lead to accident.

Organisation should provide more ventilation point they should construt big windows for natural
ventilation and provide frequent breaks and work schedule of worker. According to building and
other construction act 1996 proper windows should provided to maintain the working
temperature.
From Observation No: 22
Observe that toilet facilities are insafficient:

Welfare faciliteis are the important point of discusion in which toilet facilities, changing rooms
and many more comes. However found that as compare to number of workers, toilets are less at
site. Which is creating uneasyness in the working crowd and workers are loosing consentration
that will lead to accident.

The organisation should arrenge mobile toilets for time being. However permanent toilte faciliteis
should be constructed atr site and cleaning and maintenance of toilets should carry out. It is a
breaches of law factory act 1948.

From Observation No: 25


Stair rails are missing in phase 01 second floor:

Railing place an important role to prevent fall hazard however found that in phase 01 second
floor stair railling are missing which could cause fall hazard to people working there which creates
severe injuries or minor injuries to people.

Railing should provide at missing point and railing should be inspected properly and periodically
maintenance should carryout to take care of it. It should keep maintain in good condition to ues for
workers or people. According to building and other construction act 1996 proper guards and
stair railing should provided.
APPENDIX 5
INTERNATIONAL GENERAL
CERTIFICATE
UNIT GC3 THE HEALTH AND
SAFETY PRACTICAL APPLICAITON

Student number 00346576

Location St. Angelos Road, Airoli, Thane, Maharashtra Date of review 10 /02 /2017

Conclusion

The construction site revealed that there are good safety cultures at some aspects, like
medical doctors and representatives were available, So at the time of accident workers life could
be saved and first aid would be provided professionally. Further found thjat safe working load were
displayed on all heavy earth moving machineries which will helps the operator , not to lift the
overload which will prevent lot of accident like fall of load, overturning of machineries , fall of load
on the peoples etc. However there are also some hazards like permit to work for welding and hot
work not taken which shows the bad or poor safety culture at the organization, Which may cause
the severe accident like fire or explosion, further found that workers are not using the personal
proitective equipment when handling the wet cement that will lead to dermatitis, skin burn, eye
irritation or skin irritation.

Peoples are moving in earth moving machineries are due to which they may come in
contact of machineries and sever or minor injuries could happen or also possibility of death due to
collision which heavy machineries, than inspected the canteen area found that food waste is
littering in eating area which is source of lot of illness, littering items will helps the mosquito to born
and that will be source of malaria and other illness. Further inspected the store room of the site
found that store room is too hot and working environment ius not at all workable which will lead to
lake of concentration , fatigue and stress to worker and that all condition leading to accident.

Check the toilet facilities available and also verifies the numbers of workers working there,
found that enough toilets facilities are not available. Then inspected the stair railing of the site,
found in some places railing is not provided which could lead to fall hazards and workers could
suffer from minor or sever injuries. Due to all this condition further check the First Aid Box found
that enough medicines are not available in first aid box and at the time of accident first will not be
provided properly which will lead to severe injury or possible death, but this could be prevented by
filling the first aid box with proper medicines.

The outcome of the report is the organization has many breaches of health and safety
standards and many acts, If the organization follow the same practice the managing director of the
organization have to face prosecution and need to pat fines. There are employees working at the
site so they may face to civil action and compensation which will increase the insurance premium.
If organization losses their reputation due to accidents, the company will not get further projects.
By introducing the recommendation within the time scal in the report, The Company could
get benefits from a safe and healthier environment and also accident free working environment for
their employees. It can also improve staff moral and get a more productive work force.
APPENDIX 5
INTERNATIONAL GENERAL
CERTIFICATE
UNIT GC3 THE HEALTH AND
SAFETY PRACTICAL APPLICAITON

Student number 00346576


Location St. Angelos Road, Airoli, Thane, Maharash Date of review 10 /02 /2017

Recommendations:
Recommendation Likely resource implications Priority Review date
Training to staff for Estimated cost INR 25000/- for High 25/02/2017
permit to work. trainers and arrangements.

Provide personal Estimated cost INR 15000/- for High 10/03/2017


protective equipments purchasing of PPEs and
and train them how to use training arrangements.
it, and maintain them in
good condition.

Peoples moving in earth Estimated cost INR 75000/- for High 05/03/2017
moving machineries area, barricading, signage and making
should provide training, of designated pathways and
installed barricading, crossing points.
signage and designated
pathways and crossing
points
Enough medicines are not Estimated cost INR 2000/- for High 17/02/2017
available in First aid box, purchasing and maintenance of
purchasing of required first aid box.
medicines, and proper
maintenance of first aid
box.

Ventilation in steel Estimated cost INR 80000/- for High 10/03/2017


fabrication area is not installing the system and
sufficient, so provided cleaning of filters and
more Dilute Ventilation maintenance of dilute systems.
system and proper
cleaning of filters and
schedule. maintenance of
dilute systems
In canteen area food Estimated cost INR 30000/- Per 10/03/2017
waste is littering, so need month for hiring a 3rd party for High
to hire a 3rd party for Housekeeping.
Housekeeping.

Store Room found too Estimated cost INR 50000/- for High 10/30/2017
hot, so need to construct constructing big windows for
big windows for natural natural ventilation.
ventilation.
Toilets facilities at site are Estimated cost INR 25000/- for High 10/30/2017
insufficient, so need to provide temporary movable
provide temporary toilets as well as construction of
movable toilets and permanent toilets and proper
construction of permanent cleaning and maintenance of
toilets and proper toilets.
cleaning and maintenance
of toilets.

Stair Rails are missing at Estimated cost INR 9000/- for High 25/02/2017
phase 1st, 2nd floor, Installation of stair railing and
Installation of stair railing proper inspection and
and proper inspection and periodically maintenance of it.
periodically maintenance.
.