Professional Documents
Culture Documents
PT.SOLUSITUNAS AND
PRATAMA DESIGNDRAWING
PREPAREDBY
PT.CAKRAHEXASWADAYA
EXISTING
ROOFTOPPOLE12M
SITENAME : JAYASAKTI2
SITEID : JKJT0058
PROPOSED : INDOSAT
TOWERUPGRADE : NO
FOUNDATIONUPGRADE : NO
BUILDING : YES
05Januari2012
PT.SOLUSITUNASPRATAMAPROJECT
JKJT0058JAYASAKTI2_ROOFTOPPOLE12M
ANALYSISDESIGN
STRUCTUREANALYSISOF
ROOFTOPPOLE12M
JKJT0058JAYASAKTI2
PT.CAKRAHEXASWADAYA
05Januari2012
PT.SOLUSITUNASPRATAMAPROJECT
JKJT0058JAYASAKTI2_ROOFTOPPOLE12M
1 DESIGNCRITERIA
1.1 APPLICATIONSTANDARDANDSPECIFICATION
Allmaterials,fabricationandtestingshallconformtothelatestversionofthefollowing
standardsorequivalents.
1.Design :TIA/EIA222F
2.MemberStress :TIA/EIA222F
3.MaterialtobeUsed :ASTMStandardofequivalent
4.Fabricationmethode:AISCStandardorequivalent
1.2 MATERIAL
Standardmaterialsareusedinstructuralanalysisanddesign,giveninthefollowingtable:
1.3 LOADING
Thefollowingdefinitionsgivethemeaningofcertaintermsusedinthestructural
analysisanddesign:
A.DeadLoad[DL]
Verticalloadduetotheweightofallpermanentstructuralandnonstructural
components[appurtenances].
B.WindLoad[WL]
HorizontalloadreferstoTIA/EIA222FStructuralStandardsforSteelAntenna
TowersandAntennaSupportingStructures,wherewindforceappliedtoeach
sectionofthestructureshallbecalculatedfromtheequation:
F horizontalforceappliedtoasectionofthestructure[KN]
a/2*VZ2*[CF*AE+(CA*AA)],butnottoexceed 2*qZ*GH*AG
a densityoftheair[t.m3]
1.23E03
VZ exposurewindspeed[m.s1]
[2.58]1/2*VB for z 275.85m
1/7
VB*(z/10) for 275.85m> z 10.00m
VB for z< 10.00m
PT.CAKRAHEXASWADAYA
05Januari2012
PT.SOLUSITUNASPRATAMAPROJECT
JKJT0058JAYASAKTI2_ROOFTOPPOLE12M
VB basicwindspeedforthestructurelocation[m.s1]
z heightaboveaveragegroundleveltomidpointofpanelofthestructureand
appurtenances[m]
GH gustresponsefactorforfastestmilebasicwindspeed
CF structureforcecoefficientshallbedeterminedfromthestandard
AE theactualprojectedarea[m2]
C.LoadCombination[LC]
Thefollowingloadcombinationshallbeinvestigatedwhencalculatingthe
maximummemberstressesandstructurereaction.
1.4 STRUCTURALANALYSIS
1.Structureshallbeanalyzedasaspaceframeforlatticestructureandregardedaslinear
elasticbody.
2.Basicwindspeed27.78m/sor100km/h
3.Limitingvalueofeffectiveslendernessratio(kL/r)forcompressionmemberofthe
structureshallbeprefferablybe150forlegs,200forfacebracing,250forredundants
and300forhipbracing.
4.Maximumstressratioinmembersis1.00
5.Winddirectionareconsideredinstructuralanalysisanddesigntoproducedthemaximum
membersforceonthestructure.
6.Theallowabledisplacementoflateral,swayandtwistshallbedesignat22.40m/sor
80.64km/hservicewindspeedasfollows,
Sway =1.000degree
Twist =1.000degree
Lateral =H/100
PT.CAKRAHEXASWADAYA
05Januari2012
PT.SOLUSITUNASPRATAMAPROJECT
GENERALANALYSISSUMMARY
SiteID= JKJT0058
SiteNamev= JAYASAKTI2
TypeSite= ROOFTOP
TowerHeight= 12 M (Pole)
TOWERASSESSMENT
ExistingStructure Strengthening
Description
ExistingLoading UpdateLoading UpdateLoading
MAXIMUMSTRESSRATIO(WindSpeed100km/hours,27.78m/s)
Leg(1.00) OK! 0.786 OK! OK!
Support(1.00) OK! 0.418 OK! OK!
TWIST,SWAY&DISPLACEMENT(OperationalWindSpeed80.64km/hours,22.40m/s)
BUILDINGASSESSMENT
Description Actual Comparison Capacity Status
ExistingBeam(+) 37.035 < 40.42 OK
ExistingBeam() 35.574 < 40.42 OK
ExistingSlab 1.593 > 1.00 NOTOK
StrengtheningSlab 0.680 < 1.00 OK
RECOMMENDATION
Poleisstrengthenoughtoresistexistingandadditionalanntennaload.
BuildingisNOTstrongenough,needtobestrengthened.
PT.CAKRAHEXASWADAYA
05Januari2012
PT.SOLUSITUNASPRATAMAPROJECT
APPENDIX1
Calculationofexistingpolewithupdatedloading
JKJT0058JAYASAKTI2
PT.CAKRAHEXASWADAYA
05Januari2012
PT. Cakra Hexa Swadaya
Job: POLE 12M Jaya_Sakti #1 5 Jan 2012
POLE 12M STP 03:26 PM
ANALYZED BY CAKRA HEXA SWADAYA
X
Y
theta: 340 phi: 20
MStower [V6.02.008 ] D:\project\PT. SOLUSI TUNAS PRATAMA\JKJT0058 JAYA SAKTI\Analysis Pole\POLE 12M Jaya_Sakti #1
PT. Cakra Hexa Swadaya
Job: POLE 12M Jaya_Sakti #1 5 Jan 2012
POLE 12M STP 03:29 PM
ANALYZED BY CAKRA HEXA SWADAYA
X
Y
theta: 340 phi: 20
MStower [V6.02.008 ] D:\project\PT. SOLUSI TUNAS PRATAMA\JKJT0058 JAYA SAKTI\Analysis Pole\POLE 12M Jaya_Sakti #1
PT. Cakra Hexa Swadaya Page 1 of 1
5 Jan 2012
3:29 PM
D:\project\PT.
MStower [V6.02.008
SOLUSI
] TUNAS PRATAMA\JKJT0058 JAYA SAKTI\Analysis Pole\POLE 12M Jaya_Sakti #1.td
PT. Cakra Hexa Swadaya Page 1 of 2
5 Jan 2012
3:30 PM
MStower
D:\project\PT.
[V6.02.008SOLUSI
] TUNAS PRATAMA\JKJT0058 JAYA SAKTI\Analysis Pole\POLE 12M Jaya_Sakti #1.twr
PT. Cakra Hexa Swadaya Page 2 of 2
5 Jan 2012
3:30 PM
MStower
D:\project\PT.
[V6.02.008SOLUSI
] TUNAS PRATAMA\JKJT0058 JAYA SAKTI\Analysis Pole\POLE 12M Jaya_Sakti #1.twr
PT. Cakra Hexa Swadaya Page 1 of 4
Job: POLE 12M Jaya_Sakti #1 5 Jan 2012
POLE 12M STP 3:30 PM
ANALYZED BY CAKRA HEXA SWADAYA
L O A D C A S E S
MStower
D:\project\PT.
[V6.02.008SOLUSI
] TUNAS PRATAMA\JKJT0058 JAYA SAKTI\Analysis Pole\POLE 12M Jaya_Sakti #1.rpt
PT. Cakra Hexa Swadaya Page 2 of 4
Job: POLE 12M Jaya_Sakti #1 5 Jan 2012
POLE 12M STP 3:30 PM
ANALYZED BY CAKRA HEXA SWADAYA
L O A D C A S E S
MStower
D:\project\PT.
[V6.02.008SOLUSI
] TUNAS PRATAMA\JKJT0058 JAYA SAKTI\Analysis Pole\POLE 12M Jaya_Sakti #1.rpt
PT. Cakra Hexa Swadaya Page 3 of 4
Job: POLE 12M Jaya_Sakti #1 5 Jan 2012
POLE 12M STP 3:30 PM
ANALYZED BY CAKRA HEXA SWADAYA
L O A D C A S E S
MStower
D:\project\PT.
[V6.02.008SOLUSI
] TUNAS PRATAMA\JKJT0058 JAYA SAKTI\Analysis Pole\POLE 12M Jaya_Sakti #1.rpt
PT. Cakra Hexa Swadaya Page 4 of 4
Job: POLE 12M Jaya_Sakti #1 5 Jan 2012
POLE 12M STP 3:30 PM
ANALYZED BY CAKRA HEXA SWADAYA
MStower
D:\project\PT.
[V6.02.008SOLUSI
] TUNAS PRATAMA\JKJT0058 JAYA SAKTI\Analysis Pole\POLE 12M Jaya_Sakti #1.rpt
PT. Cakra Hexa Swadaya Page 1 of 1
Job: POLE 12M Jaya_Sakti #1 5 Jan 2012
POLE 12M STP 3:31 PM
ANALYZED BY CAKRA HEXA SWADAYA
I N P U T / A N A L Y S I S R E P O R T
N O D E D I S P L A C E M E N T S
MStower
D:\project\PT.
[V6.02.008SOLUSI
] TUNAS PRATAMA\JKJT0058 JAYA SAKTI\Analysis Pole\POLE 12M Jaya_Sakti #1.p1
PT.SOLUSITUNASPRATAMAPROJECT
APPENDIX2
Calculationofexistingbuildingwithupdatedloading
JKJT0058JAYASAKTI2
PT.CAKRAHEXASWADAYA
05Januari2012
PT.SOLUSITUNASPRATAMAPROJECT
JKJT0058JAYASAKTI2_ROOFTOPPOLE12M
1 CODEREFFERENCE
a.ASTM(AmericanSocietyforTestingMaterials)
b.JIS(JapanIndustrialStandard)
c.TIA/EIA222F
d.AISCASD(AmericanInstituteofSteelConstruction)
e.AWS(AmericanWeldingSociety)
f.ACI(AmericanConcreteInstitute)
g.SNI0328472002
2 MATERIAL
Standardmaterialsareusedinstructuralanalysisanddesign,giveninthefollowingtable:
3 LOADING
Thefollowingdefinitionsgivethemeaningofcertaintermsusedinthestructural
analysisanddesign:
A.DeadLoad[DL]
DeadLoaddueto:
a.EquipmentLoad600kg/m2
b.Wall250kg/m2
c.Concrete2400kg/m3
B.LiveLoad[LL]
LiveLoaddueto:
a.RoofFloor100kg/m2(NormalCondition)
b.Floor250kg/m2(foranotherfloor)
C.WindLoad[WL]
SupportReactionbaseonanalysisofthetowerstructure
D.LoadCombination[LC]
Thefollowingloadcombinationshallbeinvestigatedwhencalculatingthe
maximummemberstressesandstructurereaction.
a.1.4DL
b.1.2DL+1.6LL
c.1.2DL+1.0LL+WL
PT.CAKRAHEXASWADAYA
05Januari2012
ETABS PT. Cakra Hexa Swadaya
SITEID
SITE ID = JKJT0058
SITENAME = JAYASAKTI2
POSITION = BUILDINGRELATEDTOBTS
As'
h h
d d
As
b b
POSITIVEMOMENT NEGATIVEMOMENT
CrossSectionDimensions
DepthofBeam h 400 mm 400 mm
WidthofBeam b 250 mm 250 mm
Cover d' 40 mm 40 mm
ReinforcementData
Numberoflayers n 2 2
Firstlayerbars(1)
NumberofBars(1) nb1 3 pcs 3 pcs
BarsDiameter(1) d1 13 mm 13 mm
Secondlayerbars(2)
NumberofBars(2) nb1 0 pcs 0 pcs
BarsDiameter(2) d1 13 mm 13 mm
StirrupsDiameter ds 10 mm 10 mm
Spacing s 200 mm 200 mm
Material
YieldStressMainBar fy 400 MPa 400 MPa
YieldStressSecondaryBar fs 240 MPa 240 MPa
ConcreteStrength fc' 14.244 MPa 14.244 MPa
ReductionFactorofBending 0.8 0.8
ReductionFactorofBending 0.75 0.75
Clearspacingbetweentwolayers 13 mm 13 mm
StrengthCapacity
AreaofOneBar(1) A1 132.73 mm2 132.73 mm2
AreaofOneBar(2) A2 132.73 mm2 132.73 mm2
TotalAreaofReinforcementBars A 398.20 mm2 398.20 mm2
REINFORCEDCONCRETECAPACITYOFRECTANGULARBEAM
SITEID
SITE ID = JKJT0058
SITENAME = JAYASAKTI2
POSITION = BUILDINGRELATEDTOBTS
Checklimitsforreinforcement 95.50 mm 95.50 mm
(basedon7.6,ACI31899)
Requirementspacingbetweenbars OK OK
MaximumSteelRatio
Maximum Steel Ratio max 1.16%
1 16% 1.16%
1 16%
SteelRatioislessthanMaximum OK OK
30
20
10
M x ( k N m)
0 1
-40 -30 -20 -10 0 10 20 30
-10
-20
-30
COLUMN FORCES BASE STRUCTURE ANALYSIS SOFTWARE
40 M y ( k N m)
30
20
10
M x ( k N m)
0
-40 -30 -20 -10 0 10 20 30
-10
-20
-30
-40
P = 171
171.36
36 k N
40 M y ( k N m)
30
20
3
10
M x ( k N m)
0
-40 -30 -20 -10 0 10 20 30
-10
10
-20
-30
-40
P = 127.69 k N
ETABS PT. Cakra Hexa Swadaya
0. 1. 1. 1. 1.
-7.00 -6.00 -5.00 -4.00 -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00
-8.40 -7.20 -6.00 -4.80 -3.60 -2.40 -1.20 0.00 1.20 2.40 3.60 4.80 6.00 7.20
Slab Analysis
hslab 120mm
bslab 1000mm
d 20mm
bar 10mm
d' 95 mm
kgf
f'c 0.83 225
2
cm
fy 240MPa
1.4MPa
min 0.5
fy
min 0.0029
2
Asmin 277.083 mm
dbar 10mm
s bar 250mm
1000mm 1
nbar trunc
s bar
nbar 5
2
As nbar dbar
4
2
As 392.699 mm
Asmin fy
a
0.85 f'c bslab
a 4.272 mm
a
Mnslab 0.85 Asmin fy d'
2 Ultimate moment base on structure analyze
AnalyzedbyPT.CakraHexaSwadaya
Jaya Sakti 2
wf 100mm
nply 1
Af nply tf wf
fyf 4300MPa
Asmin fy Af fyf
acomb
0.85 f'c bslab
acomb 8.885 mm
a acomb
Mntotal 0.85Asmin fy d' 0.85Af fyf hslab
2 2
Mntotal 12.303 kN m
AnalyzedbyPT.CakraHexaSwadaya