You are on page 1of 44

ZAPATA CONECTADA

Esquema en planta:
Lmite de
Propieda
d Zapata exterior Zapata interior

b1
B1 C-1 Viga de Cimentacin C-2
a1 a2

L1 L2

L3

Esquema en elevacin:

P1, M1 P2, M2

Viga de Cimentacin

e
L'1

DATOS:
Zapata
f'c= 210.0 Kg/cm2
Acero Columna
fy= 4200.0 Kg/cm2 f'c=
Suelo a1=
Df = 2.50 m b 1=
gt= 1.8 Tn/m3 D=
qa = 15.0 Tn/m3
S/C = 0.0 Tn/m3
L= 6.65 m
C-1 C-2
P1D = 40.0 Tn P2D =
P1L = 26.0 Tn P2L =
MD= -11.0 Tn MD=
MV= -5.5 Tn MV=
****

1.- DIMENSIONAMIENTO DE LA ZAPATA EXTERIOR( Az = S*T )


=(_(1+%))/()_=0.9_
qm = qa - gt*ht - gc*hc - s/c
qm = 11.4

( (1+) _(1+%))/
((0.7+)(0.3+2))=0.9

resolviendo la ecuacion tenemos


m= 1.52 m

L1 = 2.22 =
B1 = 3.34 =

C-2
II. Suelo:
Gt = 15.00 T/m2
% = 15.00%

III. Columna:
0.9 = Tipo :
((1+%))/ Columna Interior
()
= D = 0.60 m

IV.( (2+2)Diseo en Planta:


_(1+%))/
((0.3+2)(0.3+2))=0.9

^2=^2

resolviendo la ecuacion tenemos

m= 1.56 m

L2 = 3.65 m =
B2 = 3.65 m =

verificando por cargas de gravedad


M1
0.1*P1 0.1*P2
P1
DETERMINACION DE R1 ;R2

R1

e= 1.15 m
= 1/(11)

R1 = 92.9 Tn
= 2/(22)

Gt =

Gt =
= 2/(22)

AUMENTAMOS LA SECCION DE LA C-2

L'2 = 3.80 m
B'2 = 3.80 m

Gt =

DETERMINAR "d" POR PUNZONAMIENTO


HALLAMOS "Gu" :

COMBINACIN Pu1 Pu2


1.4M + 1.7V 100.20 158.20

Crticos = 100.20 158.20

PUNZONAMIENTO

_ = 0.53(_^ ) _

_ = _
(_0)

A0 = (0.7+d)*(0.3+d)
B0 = 2*(0.7+d/2+0.3+d/2) =2*d+2

*Vc = 0.85*0.53*RAIZ(210)*10*(2d+2)*d..(1)

Vu = 15.43*(2.6*3.4-(0.7+d)*(0.3+d))..(2)

resolviendo las ecuacion (1) y (2)

d= 0.57 m = 0.60 m

VERIFICACION POR CORTE DEBIDO A LA FLEXION

columna 1
Vu=(1.9)

Vc=0.850.53(210)103.40.50

Vu<Vc

Vu = 79.9 Tn

*Vc= 148.8 Tn

OK..!

B= 3.80 m

Vu=/2(+0.3/2)

Vc=0.850.53(210)1020.50

Vu<Vc
Vu<Vc

L= 3.00 m

Mu=(1)
Vu = 28.5 Tn
/2

Ku=(10^5)/
*Vc= 117.5 Tn
(100^2)
OK..!
=

DISEO POR FLEXION


As=100
asumiendo ancho tributario de
b= 1.00 m
Lv = 2.3

Mu = 32.72 Tn-m

Ku = 9.09 0.0021

As = 12.6 cm2 Mu=(1)/2


As min= 0.0018*b*h
As min= 10.8 cm2

utilizar= Ku=(10^5)/
5/8" = 2.00
(100^2)
separacion
S= 0.16 m =

As=100
24 5/8" @

DIRECCION LARGA

asumiendo ancho tributario de


b= 1.00 m
Lv = 1.75

Mu = 18.94 Tn-m

Ku = 5.26

As = 7.8 cm2
As min= 0.0018*b*h
As min= 10.8 cm2
utilizar= 5/8" =
separacion
S= 0.19 m

5/8" @ 0.19 m

COLUMNA 2

_ = 0.53(_^ ) _

_ = _
(_0)

A0 = (0.53+d)*(0.53+d)
B0 = 2*(0.53+d/2+0.53+d/2) =2*d+2.12

*Vc = 0.85*0.53*RAIZ(210)*10*(2d+2.12)*d..(1)
Vu = Gu*(3.65*3.65-(0.53+d)*(0.53+d))..(2)

resolviendo las ecuacion (1) y (2)


Vu=/2(+0.53/2
d)
= 0.75 m = 0.75 m

VERIFICACION POR CORTE DEBIDO A LA FLEXION


Vc=0.850.53(210)102.650.60
23.5 Tn

Vu<Vc

Mu=(
1)/2
23.5 Tn
Ku=(10^5)/
(100^2)
Vu = 41.6 Tn =

As=100

*Vc= 186.1 Tn

OK..!

DIRECCION LARGA

b= 1.00 m
Lv = 1.63 m

Mu = 16.52 Tn-m

Pu1 Pu2
Ku = 2.94

As = 8.3 cm2
As min= 0.0018*b*h
As min= R1 13.5 cm2 R2

utilizar= 5/8" =

separacion
S= As(-)
0.15 m
:
=(^ 1)/726 5/8" @
b/2
DISEOhDE LA VIGA DE CIMENTACION

IV.- Diseo de la viga de cimentacin:


b

e= 1.15 m L'1 = 5.50 m

R1 = 141.02 Tn R2 =

Predimensionamiento:
M(-)=

Montaje As(+) = As(-)/3

h= 0.79
R1 R2
h= 1.20 m Diseo
d= 1.13 m
b= 0.40
b= 0.40 m Diseo
D.F.C
40.8 Tn
_=_/_ (-)
^2
(+)
100.2 Tn

D.M.F:

115.23 Tn-m

()=(0.7(^ ))/ (-)


e= 1.15 m L'1 = 5.50 m

M (-) = 115.23 Tn-m

Clculo del acero en flexin:

Ku = 22.56 Cumple..!!!

pho Ku (Kg/cm2)
0.900% Vc=0.850.53(^
30.410 )10
0.634% 22.560 -----> As = 28.65 cm2 Acero superior
Vc=
0.920% 31.000
As = 9.55 cm2 Acero inferior
Vu=Vc+Vs

As (min) = 10.92 cm2


S=(
)/
As(-)
5.10 cm2
utilizar= 1" =

numero de Smax/2
varillas # varillas = 6
6 Varillas 1"

As(+)
utilizar= 1" =
numero de varillas # varillas = 2

2 Varillas

DISEO POR CORTANTE

29.5 Tn 58" @ 0.16m


Vu = 40.8 Tn
8" @ 0.16m

Vs = 13.3 Tn

utilizar= 3/8" = 0.71 cm2

S= 51 cm

57 cm

utilizar= 3/8" = 0.71

separacion 58" @ 0.20m


S= 57.00 m

usar 3/8" 4
@ 1" 51 cm
2 1"

38" 1@0.05m; R@ 0.50m

2 1"
B2

P2, M2

210.0 Kg/cm2
30.0 cm
70.0 cm
60.0 cm
C-2
62.0 Tn
42.0 Tn
-12.5 Tn
-7.0 Tn

3.00 m
3.80 m
a= 0.53 m

3.80 m
3.80 m

M2
M2
0.1*P2
P2

P1 = 66.0 Tn
R2
P2 = 104.0 Tn
M1 = -16.5 Tn
M2 = -19.5 Tn

L'1 = 5.50 m

R2 = 94.1 Tn

8.2 Tn <= qm = 11.4 OK!

6.5 Tn <= Gt = 11.4 Tn OK!

6.5 Tn <= Gt = 11.4 Tn OK!


M1 M2 R1 R2 G1 G2
-24.75 -29.40 141.02 143.22 12.37 9.92

-24.75 -29.40 Crticos = 12.37 9.92


18.6 Tn
cm

0.16 m
0.0013

2.00 cm
0.0011

2.00 cm

0.15 m

143.22 Tn

As(+) = As(-)/3
5.10 cm2

1"

0.16m
0.16m

58" @ 0.15m

cm
58"

2 1"

5m; R@ 0.50m

1"
COMPARACION DE RESULTADOS

RESULTADOS HOJA EXCEL

58" @ 0.16m

58"
5
8" @ 0.20m

C-1 C-2

L1 3.00 m B1 3.80 m
B1 3.80 m L1 3.80 m

d= 0.75

----- EN LA HOJA EXCEL TAMBIEN CUMPLE CON LA PRESION DEL TERRENO

----- CALCULO DEL PERALTE POR PUNZONAMIENTO ( ING BEDON)

-----

58" @ 0.16m
58" @ 0.16m

58"
5
8" @ 0.20m

4 1"
2 1"

38" 1@0.05m; R@ 0.50m

2 1"

LOS VALORES HALLADOS EN EL SAFE COMO EN LA HOJA DE CALCULO DIFIEREN DE DE MAN


58" @ 0.15m

58"
58" @ 0.15m

58"

DIFIEREN DE DE MANERA MINIMA.


RESULTADOS SAFE

C-1 C-2

L1 3.00 m B1
B1 3.80 m L1

d= 0.85

CONTROL DE PRESION DEL TERRENO Gt= 15.0 Tn/m3


CONTROL DE PUNZONAMIENTO
EL PROGRAMA SAFE NO ARROJA VALORES PARA EL PUNZONAMIENTO (N/C) CUANDO SE TI
CONSIDERA QUE EL PUNZONAMIENTO (PENETRA) ES TOMADO POR LA VIGA Y NO POR LA L
DESFAVORABLES SI ES EL CASO

- REFUERZO
MOMENTO ACTUANTE EN AL VIGA

ACERO LONGITUDINAL EN LA VIGA


ACERTO TRANVERSAL EN LA VIGA
3.80 m
3.80 m

CUMPLE