You are on page 1of 6

RESUME Construction Supervisor Piping (SAE-ENGINEERING)

Gede Andi Dipayadnya


andi.dipayadnya@yahoo.co.id ; +62-817332080

(06-May-1977; Indonesian; Male)

CAREER OBJECTIVE

Looking for a challenging and demanding position as Construction Supervisor of Piping and Mechanical, which
enables me to exploit my background education/skill, and offer my experience of piping and mechanical to your
reputable Company.

EXECUTIVE SUMMARY

Bachelor degree in Ocean Engineering from ITS-Surabaya (www.its.ac.id)


Having more than 10 years of offshore experience in oil and gas industry, especially in construction
engineering, including piping/vessel maintenance and repair, process plants equipment installation,
fabrication and installation of marine structural, pre-commissioning & commissioning.
Ability to estimate, design, schedule and oversee all phase of piping and construction project with excellent
knowledge of industrial piping and plant operations.
Good Planning, organizing and problem solving skills with advanced supervisory ability.
Deep knowledge of safety procedures, construction methods, and ability to coordinate sub-contractor labor
supervision.
Extreme focus on safety of all workers, with strong safety leadership skills.

EDUCATION

1995-2000: Sepuluh Nopember Institute of Technology (ITS) Surabaya-East Java

Majoring: OceanEngineering (GPA 2.95 of 4.00)

1992-1995: Senior High School SMAN 1 Singaraja-BALI

Majoring A1 (Physics science),GPA 55.75 of 60.00

SKILLS & EXPERTISE

Language Skill : - Bahasa (mother tongue)


- English (TOEFL score: 530)
Computer Literacy:
-Office application: OS. Windows, Ms. Word, Ms. Excel, Ms. PowerPoint, Ms. Project
- Drawing: Auto CAD 2D
- Project ManagementSoftware: Primavera P6, MS Project 2013
- Piping stress analysis : CAESAR II-2016
- Structural analysis : SAP2000 R15
- E-mail, internet and web browsing application

andi.dipayadnya@yahoo.co.id Page 1
RESUME Construction Supervisor Piping (SAE-ENGINEERING)

Knowledge of : PFD, P&IDs, Orthographic and Isometrics Drawing, pipe stress analysis, pipe hanger and pipe
support design, equipment drawing, process plant lay out, piping welding procedure, Piping maintenance and
repair, vessel maintenance and repair, Tie ins welding, HSE in construction project, scaffolding job, confined
space job supervisory, Lifting and rigging activity, piping and construction jobs supervisory, HSE awareness
and commitment, construction of oil and gas facilities,
Familiar Code and Standard: ASME B31.3, API 570, API 510, ASME SEC. VIII, ASME SEC. IX, and ASME SEC V
(NDT),
Holding certificate of defensive driving, scaffolding inspector, confined space job supervisory, sea survival,
overhead crane operator, etc.

WORKING EXPERIENCE

Feb 2013-NOW Total E&P Indonesie, Handil Field, Mahakam Block, East Kalimantan

Well Connection Project Supervisor (Piping/Mechanical Scope)

To prepare for site preparation dredging, lifting activity for installation of conductor pile and well head
platform installation prior arrival of drilling rig.
To review drawing issued by Company, such as piping plan and lay out, isometric drawing, structural drawing,
well platform drawing, then to perform site visit to check if any obstruction or problem found on site.
To submit drawing revision, in case of found any obstruction/modification while piping/structure installations,
as per approval by Balikpapan Office.
To prepare work permit and man power required for the project with consideration to work load, time
allowance, construction methods and any possibility of unusual circumstances.
To supervise piling and platform installation activity, transfer piping spool and other materials, all lifting
activity which performed by crane barge, as well as to prepare lifting operation plan (LOP) and the calculation.
To manage all aspects of piping and structural construction job, including supervising and coordinating all
preparation, modification/fabrication and testing for piping system components as per applicable code,
drawing and COMPANYs requirements.
To ensure that all contractors man power comply with all aspects of HSE (health, safety and environment)
policy, work site regulations, procedures of work permit, as per requested by Company.
To supervise welding activity and any other hot job activity (grinding and cutting, etc), ensure all employees
follow health and safety procedure, using proper PPE as per requirements. All welding activity done as per
valid WPS.
To coordinate with QA/QC department for setup and prepare NDT activities, hydrotest .
To coordinate with Commissioning team for pre-commissioning and commisioning activity, including leak test
activity, site check for as-built drawing.
To coordinate with contractor representatives for issuing of work punch list (as per, recommendations from
Commisioning team), as built drawing.
To ensure that construction hazards and risks are fully considered and any appropriate mitigation actions are
implemented, as per guidance by JRA (job risk assessment) and work permit requirements.
To endorse daily progress report and time sheets, then reported to hierarcy along with detailing of the work
progress, contractorspersonnel, and other related items which identified in the scope of work.
To perform safety talk and last minute of risk assesment to all of contractors employee, encourage them
regarding safety/HSE, safe working practices, and commitment for ZERO LTI.

andi.dipayadnya@yahoo.co.id Page 2
RESUME Construction Supervisor Piping (SAE-ENGINEERING)

To make a close working relationship with site planner and construction superintendent for planning of four
weeks look ahead activity related to construction job, in accordance with the overall planning schedule.

Achievements

a. Zero LTI
b. ON time performance for well connection activity, 2013 -2016
c. Total completion of more than 15 wells (oil and gas), in the last 3 years
d. Winner of Safety Talk Campaign in 2013
e. Appointed as I Care leader for Handil Site in 2016

June 2008-Jan 2013 TOTAL E&P INDONESIE, Handil Field, Mahakam Block, East Kalimantan

Senior Construction Supervisor - Piping & Mechanical

To plan, manage and supervise all mechanical and piping construction activities to ensure all the works are
carried out as per COMPANY specification and schedule, Installation of piping system, tanks and steel
structures by using plan/engineering drawing, isometric drawing, and P&IDs.
To plan and manage piping tie-ins schedule and shut down activities, including to review procedure , isolation
list and method, drawing, fabrication, spool and installation/welding activity.
To check ISOs drawing, release for pre-fabrication spool based on the priority and material availability.
To review P&IDs, piping plan, isometrics and equipment drawing for each job item as per planning.
To supervise maintenance and repair/replacement activity of piping and structural, including pipe support,
platform structure, valves, as per job scope and COMPANY standards.
To play an active role in ensuring that all COMPANY HSE goals are achieved and always to promote safety
behavior among all co-workers and sub ordinates, and to exceed COMPANY HSE goals where possible.
To actively supervise the contractors (EPC) piping construction activities to ensure that all construction
activities (piping, mechanical and structural) is planned and executed as per job scope, schedule, cost and
resources, with respect of safety, quality, health and environment.
To supervise vessel or tank repair activity, both internal and external, including confined space activity. To
ensure that contractors (EPC) perform their job as per COMPANY standards, industrial code, WPS and
completed as per schedule, but still within the HSE requirements.
To co-ordinate with another entity such as Pipeline Integrity Team for pigging project, to ensure that piping
construction for pigging activity is built into the approved design and in line with construction priorities.
To advise and support Construction Superintendent in solving technical issues related to construction job in
the area of my responsibility.
To review WPS from Inspection Department, and ensured that contractors welder performing their job as per
requirements.
To co-ordinate with inspection team (QA/QC) for witnessing all field piping test, including hydro test, dye
penetrant, UT and any other NDT which required by the COMPANY.
To review all site work, work progress report and to prepare the punch list for the contractor.
To issue Work Completion Report.

Achievements

andi.dipayadnya@yahoo.co.id Page 3
RESUME Construction Supervisor Piping (SAE-ENGINEERING)

a. Zero LTI
b. No incident, accident reported during major Shutdown activity at Handil Processing Area , 2009-2012
c. Completion of modification and upgrading brownfield facilities at Handil Field

Oct. 2005-May 2008 TOTAL E&P Indonesie, Balikpapan

CraneBarge & Construction Barge Supervisor

To supervise all crane barge operation, including cargo transfer operation/lifting/loading and back loading
(piping equipment, gin pole, platform, etc), piling/construction activity and dredging activity.
To prepare and to advise Barge Master regarding anchor handling operation (anchor pattern), and sequence
of the job, avoid any critical area such as river crossing pipelines, live facilities, and oil&gas installation.
To perform inspection regularly all of lifting/rigging equipment such as sling, shackle, wire, personal basket,
and any other lifting equipment as per standard (color coded) and all of marine spreads as supporting units
(tug boat, AHT, hopper barge) to ensure the safety of the marine operation.
To monitor HSE implementation on all aspect of crane barge activity, as per contract policy from the
COMPANY and issued anomaly report if found any discrepancy.
To prepare work permit (both hot and cold, depending on kind of job to be done), attending daily work permit
meeting.
To prepare lifting opration plan (LOP) and SWL calculation for lifting activity, advising to Barge Master if
necessary.
To perform safety talk and risk assessment before entering new site/location or when performing new job
with additional risk)
To prepare and to plan for daily activity of crane barge as per 4 weeks looks ahead plan from site office; avoid
any no activity time, which considered as loss time for crane barge.
To report to site office regarding project progress every morning and estimation of time remaining for current
project.

JULY 2005-SEPT.2005 PT. PelayaranMeratus, HEAD OFFICE-Surabaya

Port Captain (acting)

To control ships performance by minimizing off-hires and port stays, collecting data and analyze.
To control ships working hours and ships productivity, loading/discharging rate, always considering ship
particular.
To make any necessary co-ordination with branch office if any operational problem occurred, assist branch to
solve the problem.
To assist Operation Manager for collecting operational data such as ships performance, productivity, TRV,
giving input or advice to operation manager regarding ships optimizing plan.

JUNE 2004-JUNE 2005 PT. PelayaranMeratus, HEAD OFFICE-Surabaya

Head of Cargo Claim & Insurance Department

andi.dipayadnya@yahoo.co.id Page 4
RESUME Construction Supervisor Piping (SAE-ENGINEERING)

To process any claim received and makes correspondence to claimant in order to settle claim, persuade
claimant to minimize claim reimbursement.
To prepare monthly report to management about recapitulation of claim reimbursement and making any
necessary coordination with other department in order to minimize any potentials claim in the future
(management review)

Nov.2002-May 2004 PT. PelayaranMeratus, Palembang Branch Office

Owner Representative (O/R)

To deliver objective and targets sets by Head Office Surabaya


To maintain good relationship with local customer and set up high standard of service according to COMPANY
definition.
To assist stevedoring company and Master for handling and stowage of cargo, in order to optimize ships
capacity.
To monitor and review local agent performance, in term of ships serviceability.

FEB 2001-NOV.2002 PT. PelayaranMeratus, HEAD OFFICE-Surabaya

Project Officer for Oldendorffs Project

To act as coordinating person for Oldendorffs project in monitoring Oldendorffs cargoes from POL until POD,
and make sure that all procedures and cargoes documentation were followed.
To make coordination and correspondence with local agent and Oldendorffs representative in Indonesia
during the operation, starting from receiving cargo at out port until delivering at JakartaPort.

COURSE AND TRAINING

Time Subject of Training Held by

May 2016 MOOC-OIL and GAS IFP school France

Nov 2015 Big Marine Training Total E&P Indonesie

Nov 2015 Basic Lifting and Rigging Total E&P Indonesie

April 2015 Confined Space Training ALKON & DISNAKER

June 2014 Defensive Driving Training Bima Nusantara, Balikpapan

andi.dipayadnya@yahoo.co.id Page 5
RESUME Construction Supervisor Piping (SAE-ENGINEERING)

May 2013 Basic Lifting Workshop Total E&P Indonesie

Oct 2012 Scaffolding Inspector Pusdiklat Migas Cepu

Marc 2012 Overhead Lifting Pusdiklat Migas Cepu

April 2009 Risk Awareness & Prevention Total E&P Indonesie

April 2009 Basic Fire Fighting Total E&P Indonesie

March 2009 Sea Survival & Off-shore Emergency Procedure IndosafePratama, Balikpapan

Feb 2009 CTA (Cause Tree Analysis) Total E&P Indonesie

Jan 2009 Posture and Gesture Total E&P Indonesie

March 2008 Basic First Aid Total E&P Indonesie

Jan 2008 CSAT Training (contractor supervisory ability) Sucofindo

Sept. 2007 Work Permit Procedure (Re-fresh) Total E&P Indonesie

Oct. 2005 HSE in OIL & GAS INDUSTRY Total E&P Indonesie

REFERENCES

References available upon request.

andi.dipayadnya@yahoo.co.id Page 6

You might also like