BTEC HND in QUANTITY SURVEYING

Unit / Module Management Principals and Application

Assessment Assignment: Understanding of management principals and their


application to the Construction & Built Environment sector together with
its structures and activities.

Lecturer Mr.Kanchana Wimalasurendre

Student Name E.R.G.P.M RAJAPAKSHA ID KD/HNDQS/37/34

Date Handed Over 25/08/2015 Date Due 0 5/10/2015

Initial Submission Date Re-Submission


Date

Grading Criteria Met? Assessor Feedback


Atempted
Student to

Opportunity
Initially On
Tick if

Resubmission
P1.1

P1.2

P1.3

P2.1

P2.2

P2.3

P2.4

P2.5

P2.6

P3.1

P3.2

P3.3

P3.4

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
P3.5

P3.6

P4.1

P4.2

P4.3

P4.4

P4.5

M1

M2

M3

D1

D2

D3

Assessed By (Name):

Signature: Date:

Student Signature & Comments:

Important Information for Students

The criteria each task relates to are shown against that task where possible.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
Please note that plagiarism is treated as a serious offence and therefore the work you produce
must be individual and original although may work in groups in some instances (Please refer
to Student Handbook on Plagiarism & Cheating).

All sources of information must be referenced using Harvard referencing where a reference
list/Bibliography should be included at the end of the assignment.

Please note that the submission date given for this assignment is the final date that you can
hand over the assignment. A one week grace period maybe extended with prior approval
from the Program Manager Undergraduate.

Assignments returned to students for re-working must be re-submitted within 10 days


(Please refer to Student Handbook on Assignments Re-submission).

Failure to re-submit the previously marked assignment with the re-submitted


assignment will mean that results cannot be released for the respective unit.

Please read, follow and reference both the contents of the unit outline and the grading
criteria of the assignment before completing this assignment.

Plagiarism:

While research and discussion are an essential part of an assignment, the deliberate copying of
someone elses work or unacknowledged copying from printed or electronic sources is NOT
permitted. You may be subject to disciplinary procedure if you do this. You should sign this sheet
to show that you comply with these regulations.

Students Signature:E.R.G.P.M RAJAPAKSHA .. Date: .2015.09.10


Students Comments:

....

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

Internal Verifier Name: Ms. Kavitha Srikandarajah

Signature : S.Kavitha Date Verified : 20/08/2015

ASSIGNMENT- 01

A water plant project has been initiated in Rathnapura. The scope of the project is to construct of
a water plant in Rathnapura and Project aim is to supply safe drinking water for the people in
rural areas near Rathnapura.The project involves a significant amount of construction which
includes intake work, pumping, purification, storage work and pipework. Project duration is Six
years.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

Figure: 01 Sample Water Purification Plant (BioTrixton Kft)


The Design Build method using for this water purification project.

Contractors have to manage some new factors that are not their responsibilities based on the
traditional project approach such as design duty, quality of design, design management issues
and even authorities approval.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
You are one of contractor who is in the bidding stage. So the client asks you to prepare a
prequalification report to proof your managerial skills and how you going to involve with the
design and execution phase.

TASK 1

Prepare the report on following criteria,

(a) Defining and attributing three established definition of management and explaining the
principles and process of management. (P1.2), (P1.1)

(b) Explaining the motivational needs of individuals and groups you can take to control the
behavior, motivation and leadership performance of staff and laborers in this site. (P1.3)

(c) Describing how the techniques you can use to organize the site layout, resourcing,
accommodation contribute to the management of a project. (P3.1)

(d) Determining how quality standards and statutory compliance can be achieved for above
project. (P3.5)

(e) Describing other aspects of communication and liaison activity their need to be
organized and managed in a project. (P3.6)

(f) Explaining what constitute a contract and describe the main type of procurement
methods used by you to select subcontractors and evaluate the different methods of
Tendering.

(P4.1)

(g) Defining What constitute of a contract and briefly explain the right and obligations of
the main parties in relation to performance and stages of contract.(P4.2)
(h) Describing concepts of multi-disciplinary non-adversely working identified in the
Latham Report.(P4.3)

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
(i) Describing in outline the main markets, activities and services provided by the
construction and built environment sector.(P2.1)

(j) Describing roles and responsibilities of different professions, discipline within the
design construction and installation team and main cycle of work activity.(P2.2)

(k) Produce an organizational structures that incorporates examples and explanations can be
used for the selected site. (P2.3)

(l) Compare project based organizational structures can use for water supply project.(P2.4)

(m)Defining and explaining the purpose of mission statement,strategy,corporate planning,


policy and objectives.(P2.5)

(n) Discussing how the scale and size of the contracts influence business practice with in
the construction site.(P2.6)

(o) Determining the difference between estimated and actual cost and explain the
application of cost planning cost control, cash flow and monitoring of construction and

installation of work. (P3.3)

(p) Evaluating the concept of sharing Best Practice how it can be used to Bench Marking for
the organization.(P4.4)

(q) Evaluating how sustainable construction and environmental management and


conservation issues impact on the organization and operation of a project.(P4.5)

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

TASK 2

A schedule of the operations relating to the water supply project has been developed as follows.

Activity/Operations Durations

Mobilization 70 days

Pumping 502 days

Purification 400 days

Storage Work 1256 days

Pipe work 60 days

Operations and maintenance 30 days

Handing over 15 days

(a) Describing with examples what type of method of work plan, monitoring and progress
control you are going to use for this water supply project, draw diagrams and explain it

using Gantt charts, CPA and Prescience diagrams and LOB Techniques. (P3.2)

(b) Describing with examples the methods employed to plan, schedule and manage the
supply and utilization of resources for this water supply project.(P3.4)

Reference

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
Water Purification Plant (BioTrixton Kft) last accessed on 21/08/2013

http://biotrixtonkft.com/Our-Mission.php.

Grading Description

Indicative characteristics
Grade Descriptors Contextualised Evidence
In order to achieve The learners evidence shows:
To achieve the grade you will
a merit the learner
need to:
must:
M1 Identify and Effective judgments have been made An effective approach has been
apply strategies Complex problems with more than one applied to find appropriate
to find variable have been explored solutions in designing the
appropriate An effective approach to study and organization structure and
solutions research has been applied suggesting the way of
improving overall
productivity in Task 1 (k)
M2 Select/ Relevant theories and techniques have Applying appropriate
design and been applied technique to provide
apply A range of methods and techniques have the diagrams of project
appropriate been applied planning tools
methods/techn A range of sources of information has
been used
iques
The selection of methods
and techniques/sources has been
justified The design of
methods/techniques has been justified
Complex information/data has
been synthesised and processed
Appropriate learning
methods/techniques have been applied

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
M3 Present The appropriate structure and approach Present and communicate the
and has been used findings in Presentation
communicate Coherent, logical development of
appropriate principles/concepts for the intended
findings audience
A range of methods of presentation have
been used and technical language has
been accurately used
Communication has taken place in
familiar and unfamiliar contexts
The communication is appropriate for familiar
and unfamiliar audiences and appropriate
media have been used
Contextualised Evidence
Distinction
descriptors Indicative characteristics
In order to achieve The learners evidence shows:
To achieve the grade you will
a distinction the
need to:
learner must:
D1 Use critical Conclusions have been arrived at Evaluation of the situation and
reflection to through synthesis of ideas and have realistic improvements has
evaluate own been justified been proposed and Harvard
work and The validity of results has been evaluated
justify valid reference has been adopted.
using defined criteria
conclusions Self-criticism of approach has taken place
Realistic improvements have been proposed
against defined characteristics for success

D2 Take Autonomy/independence has Managing and organizing the


responsibility been demonstrated assignment activities to
for managing Substantial activities, projects complete and submit on due
and organizing or investigations have been date and recommendations of
planned, managed and organized
activities appropriate solutions.
Activities have been managed
The unforeseen has been accommodated
The importance of interdependence has
been recognized and achieved

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
D3 Demonstrate Ideas have been generated and decisions Ideas have been generated
convergent/lat taken based on these projects
eral/creative Self-evaluation has taken place modifying an organizational
thinking Convergent and lateral thinking have structure for this project.
been applied
Problems have been solved
Innovation and creative thought have
been applied
Receptiveness to new ideas is evident
Effective thinking has taken place in
unfamiliar contexts
Grading Matrix

Grad Assignment
e code
P1.1
P1.2
P1.3
P2.1
P2.2
P2.3
P2.4
P2.5
P2.6
P3.1
P3.2
P3.3
P3.4
P3.5
P3.6
P4.1
P4.2
P4.3
P4.4
P4.5
M1
M2

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
M3
D1
D2
D3

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

Management Principals and Application

NAME: E.R.G.P.M Rajapaksha

ID : KD/HNDQS/37/34

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

Acknowledgement

Firstly I would like to thanks MR Kanchana Wimalasurendre for giving me valuable advice and
guidelines. That really helped me to archive success in this assignment.

I would also wish to acknowledge the support given to me by my parents. And Im really
grateful to all of them who helped me to complete this assignment.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

Contents
Important Information for Students ................................................................................................3

TASK 1............................................................................................................................................6

TASK 2............................................................................................................................................8

Grading Description.........................................................................................................................9

Executive summery........................................................................................................................16

Introduction....................................................................................................................................17

(a) Defining and attributing three established definition of management and explaining the
principles and process of management. (P1.2), (P1.1)..................................................................20

(b) Explaining the motivational needs of individuals and groups you can take to control the
behavior, motivation and leadership performance of staff and laborers in this site. (P1.3)..........23

(c) Describing how the techniques you can use to organize the site layout, resourcing,
accommodation contribute to the management of a project. (P3.1)..............................................27

(d) Determining how quality standards and statutory compliance can be achieved for above
project. (P3.5)................................................................................................................................29

(e) Describing other aspects of communication and liaison activity their need to be organized and
managed in a project. (P3.6)..........................................................................................................30

(f)Explaining what constitute a contract and describe the main type of procurement methods used
by you to select subcontractors and evaluate the different methods of Tendering. (P4.1)............31

(h) Describing concepts of multi-disciplinary non-adversely working identified in the Latham


Report.(P4.3)..................................................................................................................................35

(i)Describing in outline the main markets, activities and services provided by the construction
and built environment sector.(P2.1)...............................................................................................36

(j)Describing roles and responsibilities of different professions, discipline within the design
construction and installation team and main cycle of work activity.(P2.2)...................................38

(k) Produce an organizational structures that incorporates examples and explanations can be used
for the selected site. (P2.3).............................................................................................................41

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
(l) Compare project based organizational structures can use for water supply project.(P2.4)......42

(m)Defining and explaining the purpose of mission statement,strategy,corporate planning, policy


and objectives.(P2.5)......................................................................................................................43

(n) Discussing how the scale and size of the contracts influence business practice with in the
construction site.(P2.6)..................................................................................................................44

(o) Determining the difference between estimated and actual cost and explain the application of
cost planning cost control, cash flow and monitoring of construction and installation of work.
(P3.3)..............................................................................................................................................45

(p) Evaluating the concept of sharing Best Practice how it can be used to Bench Marking for the
organization.(P4.4).........................................................................................................................47

(q) Evaluating how sustainable construction and environmental management and conservation
issues impact on the organization and operation of a project.(P4.5).............................................49

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
Executive summery.

I complete this assignment as a part of my higher national diploma. This assignment based on
management principles and applications. Modern world construction industry is very big sector
of organization. When managing and organizing these kind of business knowledge about the
management is very important. This assignments covered a basic knowledge about the
managing an organization.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

Introduction.

In this assignment covered the basics of the management in the organization. From the definition
of the management to managing workers, cost and time this assignment covered hole area.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

(a) Defining and attributing three established definition of management and explaining the
principles and process of management. (P1.2), (P1.1)

Management can simply defined as the organization and coordination of the activities of a
business order to achieve defined objectives. There are many basic functions for management.

Planning
Organizing
Staffing
Leading
Controlling the organization
Re arrangements
Creaking the progress

There are many established definitions for the Management.

Mary parker Follett definition for management

The art of the getting things done through people her ideas are contradictory to the idea
of specific management as she believed that managers and subordinates should fully
collaborate. Power is central to her idea. Power is created and organized by organization, and
according to power Follet used the term integration to refer to no coercive power-sharing
based on the use of her concept of power with rather than power over[ CITATION Mar15 \l
1033 ] in this definition there formulated three main principles.

Authority and responsibility need to provide for the persons in the organization, then they
can complete organization tasks and it helps to motivate them.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
People should manage their responsibility on the basis of evidence and should integrate
this effectively with the functions of others. [ CITATION Mar15 \l 1033 ]

Authority flows from an entitlement to exercise power, which is based upon legitimate
authority. [ CITATION Mar15 \l 1033 ]

Frenchman Foyol definition for management

According to his idea management consists on seven functions.

o Planning
o Organizing
o Leading
o Coordination
o Controlling
o Staffing
o Motivation

Planning: when running the organization need to have a better plan. Plan can be based on future
or present work schedule for the organization.

Organizing: for run the organization or business there need to be applied a proper organizing in
every part. Need to organize a better managerial positions for run the organization. Its helps to
run the organization smoothly.

Leading: people in the organization need to be direct to archive the organization goals.

Coordination: coordination is very important part in an organization. Coordination between all


parties in the organization is very important for achieve the goals in the organizations.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
Controlling: within an organization there are many things are need to control. Human resource
and financial things are major. If control work did not done properly organization might failed.

Strafing: in organization there are need to be appointed many positions to continue the
organization properly. Directors, managers as well as other staff members. Need to be appointed
to archive the goals of the organizations within the right time.

Motivation: motivation is major part of an organization to run the organization day to day works.
When Workers and other staff members are fed up with doing their work load in every day they
need a free time to spend their time with family members and washed up their brains. Motivation
can be done using a different methods. It helps to improve the accuracy of the works the
organization done.

Lawrence A Appley definition for the management.

Management is the development of people and not the direction of things

According to his idea he mainly consider about the persons who worked in the organization.
Human resources management is very important thing in the organization. Motivational things
are need to provide them to improve the work they done.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

(b) Explaining the motivational needs of individuals and groups you can take to control the
behavior, motivation and leadership performance of staff and laborers in this site. (P1.3)

Motivation is a important thing when running the organization. Without motivation the
productivity of the organization can be fallen down. Motivation can be done in different
methods. Staff motivation is the major thing in the organization motivation.

Staff motivation can be defined as like this,

Give people what they really want most from work. The more you are able to provide what they
want, the more you should expect what you really want, mainly: productivity, quality and
services[ CITATION twy88 \l 1033 ]

According to that definition productivity, quality and service will improved when motivation
things are happened.

There are two established theories to motivation the staff and organization. Mainly,

Abraham Maslows theory


Fredrick Herzberg theory

Abraham Maslows theory

There are two type of motivation.

i. Intrinsic motivation
ii. Extrinsic motivation

Intrinsic motivation

In this method give the people to do their own enjoying work like playing music instrument or
reading book to free their stress without forcing to do that work.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
Extrinsic motivation

In this method give a reason for the people to do motivational things. The reason can be giving
rewords or avoid a penalty. Matter of fact they releasing their stress by doing that motivational
things.

Maslows produced a hierarchy for introduced his motivation idea to people. Mainly that
hierarchy includes what needs for the motivations.

Physiological needs
Safety needs
Social needs
Esteem needs
Self-actualization needs

0-1 Maslow hierarchy

Physiological needs

There some metabolic requirements for the workers. Air, water and foods are at least
requirements for do their jobs without facing any trouble. Also need protection from the
environment effects like rain and heavy sun light. If they resaved them they feel safety for do
their jobs properly, if not it reduced the productivity of the organization.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
Safety needs

Safety is important element for staff in the organization. Safety need to provide in different areas.

Personal security
Financial security
Health and well-being security
Safety against accident and illness
Job security

According to this given scenario, workers can be face danger situations when constructing those
buildings. So safety equipments and insurances need to be provide them. Job security is a major
part in safety needs. Assurance need to be provide them for confirming the job. Monthly
salaries are need to pied the workers without any delay it improves the trust about the employer.

Esteem needs

When working in an organization workers need to respect other managerial peoples. When it
happen automatically others are respect workers. To run the organization without rising any
problem respect to others and respect from others is very important.

Self-actualizations

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
When controlling these type of construction works, workers are need to be properly trained
for particular job. As an organization special training courses need to provide to the all staff
members. It improved the productivity and the quality of the work done by the organization.

After completing the given task all staff members should have some appreciation from their
senior staff members. Appreciation is very important to motivate the staff. Promotions and
salary increments are also need to be provided to the staff members within a proper schedule.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

(c) Describing how the techniques you can use to organize the site layout, resourcing,
accommodation contribute to the management of a project. (P3.1)

Before commencing a construction project site investigation is need to be carried out. In this site

investigation client can identified the resources already located inside the site. Data gathered in

site investigation is very important when producing the site layout plan. Identifying the site

location what are the buried services soil states and bearing capacities of the land is very

important when preparing the BOQ. Some works are need to be done for start the project. Those

are called preliminary works.

Normally in natural land some materials are can be found on the site. Suitable soil type, suitable

top soils, woods, water, aggregates are can be found on site. So when managing the site materials

those on site materials are can used for save the finance of the project. When allocating the

budget for materials client can save the money. But when using those materials for the project

need to be careful. Because those materials are not in the required quality for the construction.

Accommodations are comes under the welfare works. Dressing rooms, praying rooms, lunch

rooms, canteens and temporary offices and rest rooms are need to provide the staff members.

When allocating the budget for these works, those are need to add in preliminary works.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

(d) Determining how quality standards and statutory compliance can be achieved for above
project. (P3.5)

This project is a drinking water supply project. So the quality of supplying water is need to in
good quality in very areas. From the start to the end purification process should need to highly
monitor by skilled engineers.

Using water source should be in good average quality. Water source need to be protect by
natural courses. Animal works, human works are some of them. If rain water using for this water
project those water should collect separately because the acid level of the rain water different
comparing to the river or lake water. Purifying unites are should capable for purify those
different water types. So complete those works contractor should hired specified an engineers.

Water purifying unit is the heart of this project. So those equipments are need to be properly
installed. When procuring those equipments special instructions required specified people.
When appointing the subcontractors should hired a pre-qualified specialized contractors for these
type of projects.

Water is a human right. So the water suppliers should got the responsibility of the quality of the
water. So the contractors should obtain the permission for used that selected water source for
distribute the people. Purified water samples are need to test by laboratory and should confirmed
its ready to drink.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

(e) Describing other aspects of communication and liaison activity their need to be organized
and managed in a project. (P3.6)

This is a drinking water supplying project. So some government approvals are need to obtain.

Mainly municipal council of the area permission is required to star this construction. To get that
report client should provide set of documents to the council.

Environmental report

Water sources approvals

Approvals for the project site.

Environmental report is necessary report in now a days. Before the starting a construction project
this report should provide to the government authorities. To get the permission that project
should low of environment effects.

Water source used for the project is need to clearly identified and get the permissions from the
authorities. Using water is suitable for the drinking and purification. Selected sources can be
used every time in the year.

Selected site should be located in suitable place. Disturbance should in less level to the near
houses and other assets from the project and construction work.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

(f)Explaining what constitute a contract and describe the main type of procurement
methods used by you to select subcontractors and evaluate the different methods of
Tendering. (P4.1)

Contracts are used in very industry in modern world. Contracts are some sort of agreement
signed between two or more parties. Their some main elements for the contracts.

Offer

Acceptance

Consideration

Legality

Offer and acceptance

There are two or more parties involved with a contracts. All parties are join to the contract
looking for financial profit. So all parties should fulfilled their requirements. If someone issued
an offer the other party accept that offer to complete the contract.

Consideration

Consideration is what each party gives to the other as the agreed price for the others promises.
Usually the consideration is the payment of money but it need not be; it can be anything of value
including the promise not to do something, or to refrain from exercising some right.
[ CITATION sma15 \l 1033 ]

Legality

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
Signing contracts are done for financial business. So these agreements have proper legality
because the money is involving with contracts.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
There are types of contracts used in construction industry as well in business.
Fixed priced and lump sum contracts
Cost reimbursable contracts
Time and material contracts
Unit price contracts

Procuring can be defined as the where you satisfied goods and services to the
organization/project. Procuring can be done in their methods. Those are purchasing, outsourcing
and collaborative procurement.

Outsourcing

Out sourcing is buying goods and services to the organization from the outside supplier. There
are many advantages in this outsourcing method.

To reduce both fixed and recurrent cost

To allow the client organization to focus on its core business

To access skills and technologies

To provide flexibility

To increase accountability. [ CITATION wim15 \l 1033 ]

Collaborative contracts

Collaborative procuring is buying goods and services to the organization joining with another
organization. In this method both two parties got the benefits from the contract.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

There are three types of tendering methods commonly used in construction industry.

Open tendering method

Selective tendering method

Negotiated tendering method

Open tendering method

In this method employer advertised the project to tender in public media. Then contractors can
get the set of tender documents and filled their own rates and hand over them in the employer.
Sometimes employer request a money deposit for these tender documents. If the contractors not
filled their tender documents properly or their rates higher than the client expected those
documents are rejected. So sometimes some contractors are waste their time in this tendering
method.

Selective tendering method

In this method client listed down a well-known contractors which suitable for the project and
inform them to send a qualification report of their company for this particular project. In this
method client can save his time because number of requested tenders are low comparing to open
tendering method. This is the most suitable method for this water project. Because this is a
special project not only the building construction. There are some machineries are need to
be installed.so pre-qualified contractors are suitable for this construction for do this job in
best quality.

Negotiated tendering method

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
In Negotiated tendering method employer already selected the contractor for the project and
request a rate list for the project. This method is specially used in special project with tight
deadlines and emergency works.

(g) Defining What constitute of a contract and briefly explain the right and obligations of
the main parties in relation to performance and stages of contract.(P4.2)

Employer/ client got the full authorities to select a contractor to the project. Employer have the
authority to inspect the site during the construction and giving advice and the check the quality
of the work. If the contractor do not work a promised quality client can legal decisions against
the contractor.

Client is also need to provide all drawings when starting the project. Allocating a sufficient time
also need to done by the client to protect the quality of the project.

Contractor should get all drawings before commencing the project. And main contractor got the
authority for appointing other sub-contractors of his own risk. Contractor should provide the
labors and equipments to the project according to the clients payments.

Contractor should protect the drawings not giving that anyone without any permissions from the
client. Contractor try to done the project according to clients quality and the time if any
disturbance not happen. If any extra work or variations happen contractor should get the
permissions from the client to do the job.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

(h) Describing concepts of multi-disciplinary non-adversely working identified in the


Latham Report.(P4.3)

This report is written by Sir Michel Latham in 1994 for the construction works. According to

Lathams idea to complete the construction project team work is very important. Team members

can be client, contractor, sub-contractor and other parties.

In better team work communication between the team members are very important. All

problems arising during the construction work should discuss between the team members. When

discussing those problems between the team members they can select the best solution for the

problem. When working as a team the risk also delegate in between the team members.

When working as a team it helps to save the time. Avoid the unwonted works in project and

necessary woks not includes in the drawings and construct them on time to help for save the

time. In construction industry time is directly affects to the money or profits. If the construction

delayed to finish it can be loss for the contractor also client as well.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

(i)Describing in outline the main markets, activities and services provided by the construction
and built environment sector.(P2.1)

In modern day construction industry is very wide. They are supplying wide range of goods and
services to the market. Man power, materials, equipments and consultancy service.

Construction services

General contractor

Construction manager

Design building, preconstruction, constructability analysis

Building information modeling (BMI) services

Engineering

Planning

Project management

Construction management

Real state and consultancy services.

Man power.

In construction industry without man power projects cant run. Man power can divide unskilled
and semi-skilled workers, skilled workers, and technical and management persons.

Non skilled or semi-skilled labors/ workers are used for general site works. They havent any
professional qualifications for construction industry. They work on their experience.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
Skilled workers are have qualifications for construction works and the experience bit higher than
other non-skilled and semi-skilled workers.

Technical and managements persons are very important for construction project. Engineers,
architectures, designers and managers are done the designing and managing part in the
construction project.

Martials and equipments.

Modern construction industry is very complex. So the using materials and equipments are also
complex comparing to past time. With the sustainability concepts, construction materials are
change totally different situations. There are range of products and materials for the construction
industry so contractors can finished their works without any delays. Modern equipments and
machines are developed to save and done the work less craftsman ship. Its improved the quality
of the construction work.

Consultancy services
Using consultancy services is helped to do the project in good quality for the client. Consultants
are giving advices for the project and how the technology used for the project. Site surveying and
estimating are also main jobs they done.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

(j)Describing roles and responsibilities of different professions, discipline within the design
construction and installation team and main cycle of work activity.(P2.2)

In every project there are many roles are involving with the construction project. Each and every
person got their own responsibility in the project or organization. From the design stage till
handing over the project to client different type of professions are involved to succeed the
project.

Project Sponsors

Project directors

Executive committee

Project manager

Project accountant

Team leader

Communicational specialist

Technical architect

Trainer

Auditors

Quality managers

Project sponsors

Project sponsor always the client. Client can be a privet sector organization or single person.
Sometimes government organizations are acting as client for fulfilled their requirements.
Providing the capitals to the project and monitoring the procedure of the project and giving ideas
and designs are the main works done by the client/sponsor.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
Sometimes supporting sponsors can be found in government organizations. Because local
governments are launching some project co-operate with foreign countries and organizations. So
that foreign countries and organizations are acting as a supporting sponsors.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
Project directors

The person with the genuine executive authority over the project[ CITATION com13 \l
1033 ]

Project director has the full power for the got the decisions for the project according to the
clients planes. All works in the project director need to monitor clearly. Because project
director need to responsible person for that.

Executive committee

Executive committee is the board of directors. They got the decisions for development for the
organization. These persons are representative all the Executive authoritys in the organization.

Project manager

This is the person who carried the construction project to success. Project manager inspected all
day to day works and finished the work in good quality. Project manager is responsible for the
complete the project within the time frame and best quality.

Project accountant

Project accountant is very important person for manage the project or organization finance. In
construction project salaries for the contractors, sub-contractors, money for the materials are
providing by the project accountant without any delay. Time is very important in construction
project. If any delay occurred mistake of the accountant, contractor or client can lose their
money.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
Team leader

Mainly in construction projects, labors are need to allocated do different work in same time. So
the labors and other officers are need to divide into groups. Groups want a leader to controlled
them and direct them into complete the work in give time frame. Motivation is also done by the
team leader to get the best performance from the team members.

Communicational specialist

Communication specialist is very important for the construction project. Important messages are
need to deliver among the workers in an organization. In construction project special
communication system need to be applied. Between the labors to top managerial persons are
properly communicate for run the project smoothly and on time.

Architect

Architecture who is the person design the structure considering about the appearance and
architectural aspects in construction project.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

(k) Produce an organizational structures that incorporates examples and explanations can be
used for the selected site. (P2.3)

Client/owner

Project manager

Project engineer

Designer/Architecture Service engineers/Consultants

Safety officers Quantity surveyor Technical officers Project Accountant

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

(l) Compare project based organizational structures can use for water supply project.(P2.4)

There are many types of organizational structures can use for the construction project.

Functional structure is one of the common usage of organizational structure used in construction

projects. In this structure top person is the client of the project or an organization. Under the

client there are managers and the consultants are situated. Under consultant and engineers other

subordinate workers, T.Os, safety officers and super visors are situated.

Using this structure is suitable for this kind of project. Client get the all decisions using the

consultant ideas. Engineers and other officers are carry out the work according to the consultant

inspection. So everyone work under control to the client. And the risk level is also reduced when

delegating the responsibilities.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

(m)Defining and explaining the purpose of mission statement,strategy,corporate planning,


policy and objectives.(P2.5)

Modern day all organizations have mission and vision state. In vision and mission state includes
their targets and objectives that they looking archived in certain time period. They indicate the
mission and vision states in the organization allow to see that and understand what they working
for.

All members are worked under organization, they should have a one goal. They should work as a
team for archive that goal. So its improved the organization productivity and understand
between the staff members. There limits and abilities. Vision and mission state also improved
the motivation of the staff members.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

(n) Discussing how the scale and size of the contracts influence business practice with in the
construction site.(P2.6)

In a construction project scale and the size of the project is very important. When designing the

project client need to clearly identify the purpose of the project and what is the main parts in the

project and give the priority to them. If it is not clearly identified the objective of the projective

client should waste his money and time.

When allocating the budget for each and every item client or consultant should pay lot of

attention. When allocating the budget client should allocate sufficient money to priority works.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

(o) Determining the difference between estimated and actual cost and explain the
application of cost planning cost control, cash flow and monitoring of construction and
installation of work. (P3.3)

In construction project finance management is very important. In the tendering stage client side
consultant prepared an estimate/approximate budget for the construction. This estimate is done
by various methods.

Approximate quantities method

Unit method

Superficial method

Cube method, those are the main estimating method commonly used in construction
industry.

Approximate quantities method

In this method, When calculate an approximate cost for the substructure of the building
foundation type and materials are selected by the designer already. So required material
quantities can be calculated according the design and then can calculated the cost for the
materials for the sub structure of the building. Using same technique can calculate the cost for
the super structure of the building. This estimate method is based on the contractor or designers
experience. Most commonly and more accurate method for estimating.

Unit method

The unit method is a single price rate method based upon the cost per functional unit of the
building, a function unit being,[ CITATION wic151 \l 1033 ]

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
These type of method is suitable for the who specialized in same category building
contractors.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
Approximate estimation gave the nearest cost of the proposed construction project.
Actual cost means the exact cost need to allocate to the construction. After finishing the
construction according to the accounts it shows how much money did spend by the client for the
construction.

Cost planning
Cost planning is very important for the construction project. Cost plan is generally prepared by
quantity surveyor. Cost planning is done by using different documents.

Initial cost appraisal

Element cost planning

Approximate quantities cost plan

Pre tender estimate

Tender pricing document

Contract sum analysis

Final accounts

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

(p) Evaluating the concept of sharing Best Practice how it can be used to Bench Marking for the
organization.(P4.4)

Construction industry institute introduced the some techniques for the best practice for the
organization.

Front End Planning


Alignment
Constructability
Materials Management
Planning for Startup
Team Building
Partnering
Quality management
Bench marking
Risk assessment

According to the CII every project need plan from the start to the end for run the organization
smoothly. If organization got a best plan for the particular project, they can complete the
work without any errors. So the plan is the body of a project.

Management part for the project is very important. If they have a better plan for the project
but they did not manage the sources of the organization and the project they will lose.
Management is very important when running the project. Human resources, materials and
natural resources are need to be manage in project.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
Risk assessment is also one of main element. Risk assessment is also need to carry out from
beginning the project.

Bench marking also important same as others. When running the organization managers done
some works to improve the productivity and motivate. . They measured with other units,
organizations and projects with ongoing projects and giving motivational advices to the staff.
It helps to improve the productivity.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

(q) Evaluating how sustainable construction and environmental management and


conservation issues impact on the organization and operation of a project.(P4.5)

In modern day construction industry sustainability concept is very popular. Sustainable


constructions reduced the environment pollutions and it helps to save the occupants health as
well. Not also to the occupants, sustainable constructions are helped to protect the world from
environmental issues. When planning an organization or constructing a building those are need
to planed not only focusing profits plans are need to an environmental safe projects.

Sustainable constructions are mostly done by using recyclable materials. It reduced the damage
happen to the environment. Using sustainable materials initial cost can be high but after
demolition the building the client can use those materials again to a new project or can soled
them for the market to earn money. It can be bonus for the organization.

Applying the method in to organizations it can helps to promote their organization among other
same category organizations. As an example, Sri Lankan educational institutes are promoting
their institute as a GREEN UNIVERSITY. So they can fought with other privet sector
universities. Sustainable concept helps to save environment as well earn profits the organization.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

In constructions projects plan for the construction is need to prepared environmental friendly
method. Construction plan should be prepared to minimize the environment pollution. Reducing
the cutting trees and vegetations helps to protect the site air clarity and it improving the site
appearance using green color. When constructing a factory waste materials and waste water
should not to be dump in the natural rivers and water sources. There also some government rules
and regulations are there for prevent those kind activitys. So the organizations are legally
bonded with those rules and regulations. If the organization not worked according to those rules
organization can be faced some legal issues.

As an example, in Sri Lanka COCA-COLA Company dump their waste water in the natural
water sources. Then the government stop their operations in Sri Lanka. So they reduced their
profits and add a black mark to their brand name.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING
TASK 2

(a) Describing with examples what type of method of work plan, monitoring and progress control
you are going to use for this water supply project, draw diagrams and explain it using Gantt charts,
CPA and Prescience diagrams and LOB Techniques. (P3.2)

(b) Describing with examples the methods employed to plan, schedule and manage the supply and
utilization of resources for this water supply project.(P3.4)

When controlling the project is very easy to use computer softwares. Mainly in projects used
Microsoft project software. In that software have types of charts includes.
Grant chart
Network diagram
Is commonly used in project software.

When managing the staff members in construction project need to be properly manage them. If
not some safety issues can be occurred.

When installing the machines for the project, those are need to install according to plan. Firstly
installed the main work machines. Supplying Martials is also very important. Materials are also
need to transport to the site when the project need that Martials. If not the project can be delayed.

Management Principles & Applications Assignment 01 International College of


Business and Technology
BTEC HND in QUANTITY SURVEYING

Management Principles & Applications Assignment 01 International College of


Business and Technology