You are on page 1of 100

PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

01.00.00 OBRAS PROVISIONALES


01.01.00 Cartel de indentificacin de Obra de 3.60 x 8.50 m.

01.02.00 Alquiler de Almacn y Oficina

02.00.00 PAVIMENTOS

02.01.00 TRABAJOS PRELIMINARES


02.01.01 Limpieza de Terreno Manual
Jr. Ricardo Palma

Jr. Abrahan Valdelomar

Jr. Jos Glvez

Av. Mariano Melgar

Jr. Pedro Ruz

02.01.02 Trazo, Nivel y Replanteo


Jr. Ricardo Palma

Jr. Abrahan Valdelomar

Jr. Jos Glvez

Av. Mariano Melgar

Jr. Pedro Ruz


PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

02.02.00 MOVIMIENTO DE TIERRAS


02.02.01 Corte con Maquinaria en terreno natural hasta H=1.00 m

02.02.02 Perfilado, Nivelacin y compactacin de la subrasante en zonas de corte


Jr. Ricardo Palma

Jr. Abrahan Valdelomar

Jr. Jos Glvez

Av. Mariano Melgar

Jr. Pedro Ruz

02.02.03 Mejoramiento de subrasante con over menor a 4" e=20cm


Jr. Ricardo Palma

Jr. Abrahan Valdelomar

Jr. Jos Glvez

Av. Mariano Melgar

Jr. Pedro Ruz

02.02.04 Base Granular e=20cm


Jr. Ricardo Palma
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

Jr. Abrahan Valdelomar

Jr. Jos Glvez

Av. Mariano Melgar

Jr. Pedro Ruz

02.03.00 CONCRETO SIMPLE


02.03.01 Losa de Rodadura, Concreto f'c = 210 Kg/cm2, e=0.20 m.
Jr. Ricardo Palma

Jr. Abrahan Valdelomar

Jr. Jos Glvez

Av. Mariano Melgar

Jr. Pedro Ruz

02.03.02 Concreto en Uas para Pavimento Rgido, Concreto f'c = 210 Kg/cm2
Jr. Ricardo Palma

cuadra 06
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

cuadra 07
0.50

Jr. Abrahan Valdelomar

0.40

cuadra 06
0.25

Jr. Jos Glvez

cuadra 06

Av. Mariano Melgar

cuadra 14

cuadra 15

cuadra 15
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

Jr. Pedro Ruz

cuadra 03

02.03.03 Encofrado y Desencofrado de Losa de Rodadura


Jr. Ricardo Palma

cuadra 06

cuadra 07

Jr. Abrahan Valdelomar

cuadra 06

Jr. Jos Glvez

cuadra 06

Av. Mariano Melgar

cuadra 14
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

cuadra 15

cuadra 16

Jr. Pedro Ruz

cuadra 03

02.03.04 Levantamiento de Buzones Existentes a nivel de rasante

BUZONES 7 AOS DE ANTIGEDAD


AV. MARIANO MELGAR
JR. PEDRO RUIZ
JR. ABRAHAN VALDELOMAR
JR. RICARDO PALMA

BUZONES 4 AOS DE ANTIGEDAD


JR. JOSE GALVEZ
MARIANO MELGAR - PEDRO RUIZ
JR- RICARDO PALMA

02.04.00 CURADO
02.04.01 Curado de Losa de Rodadura, durante 7 dias - 4 veces x dia

02.05.00 JUNTAS
02.05.01 Juntas de contraccin e=6mm
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

02.05.02 Juntas de contruccin de 3/4" c/ pasajuntas

AV. MARIANO MELGAR


C 14 - 15 - 16

JR. JOSE GALVEZ


C-4

JR. PEDRO RUIZ


C-5; C-4; C-3

JR. A. VALDELOMAR

JR. RICARDO PALMA

02.05.03 Juntas de contruccin de 3/4" sin pasajuntas en la interseccin de calles

INTERS. M- MELGAR - JOSE B. ALCEDO

INTERS. M. MELGAR - JOSE GALVEZ

INTERS. M. MELGAR - F. VILLARREAL

INTERS. M. MELGAR - PEDRO RUIZ

INTERS. PEDRO RUIZ - A. VALDELOMAR

INTERS. PEDRO RUIZ - RICARDO PALMA

INTERS. PEDRO RUIZ - AV. CHACHAPOYAS

INTERS. R. PALMA - F. VILLARREAL

INTERS. A. VALDELOMAR - F. VILLARREAL

02.05.04 Juntas asflticas en pavimentos h=20 cm, e=1"

M. MELGAR C-14
M. MELGAR C-15
M. MELGAR C-16
JOSE GALVEZ
PEDRO RUIZ C -5
PEDRO RUIZ C -4
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

PEDRO RUIZ C -3
A. VALDELOMAR C-6
RICARDO PALMA

02.06.00 ACERO LISO


02.06.01 Dowels transversales con acero liso de 3/4"

AV. MARIANO MELGAR

JR. JOSE GALVEZ

JR. F. VILLARREAL

JR. PEDRO RUIZ

JR. A. VALDELOMAR

JR. RICARDO PALMA

02.06.02 Barras de amarre longitudinal con acero corrugado de 3/4"

AV. MARIANO MELGAR


C-14
C-15
C-16

JR. JOSE GALVEZ


C-4

JR. F. VILLAREAL

JR . PEDRO RUIZ
C-5
C-4; C-3

JR. A VLADELOMAR
C-6

JR. RICARDO PALMA


C-6
C-7

02.07.00 SEALIZACION
02.07.01 SEALIZACION HORIZONTAL
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

02.07.01.01 Pintado de Franjas en Pavimento - Sealizacion

LINEA CONTINUA
AV. MARIANO MELGAR C.14
AV. MARIANO MELGAR C.15
AV. MARIANO MELGAR C.16
JR. JOSE GALVEZ C. 4
JR.PEDRO RUIZ 5
JR.PEDRO RUIZ 4
JR.PEDRO RUIZ 3
JR.ABRAHAM VALDELOMAR C.6
JR.RICARDO PALMA C.6
JR.RICARDO PALMA C.7

LINEAS DE PASO PEATONAL


AV. MARIANO MELGAR C.14
AV. MARIANO MELGAR C.15
AV. MARIANO MELGAR C.16
JR. JOSE GALVEZ C. 4
JR.PEDRO RUIZ 5
JR.PEDRO RUIZ 4
JR.PEDRO RUIZ 3
JR.ABRAHAM VALDELOMAR C.6
JR.RICARDO PALMA C.6
JR.RICARDO PALMA C.7

LINEA DE PARE
AV. MARIANO MELGAR C.14

AV. MARIANO MELGAR C.15

AV. MARIANO MELGAR C.16

JR. JOSE GALVEZ C. 4

JR.PEDRO RUIZ 5

JR.PEDRO RUIZ 4

JR.PEDRO RUIZ 3

JR.ABRAHAM VALDELOMAR C.6

JR.RICARDO PALMA C.6

JR.RICARDO PALMA C.7

FLECHAS DIRECCIONALES CON GIRO


AV. MARIANO MELGAR C.14
AV. MARIANO MELGAR C.15
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

AV. MARIANO MELGAR C.16


JR. JOSE GALVEZ C. 4
JR.PEDRO RUIZ 5
JR.PEDRO RUIZ 4
JR.PEDRO RUIZ 3
JR.ABRAHAM VALDELOMAR C.6
JR.RICARDO PALMA C.6
JR.RICARDO PALMA C.7

02.07.02 SEALIZACION VERTICAL


02.07.02.01 Sealizacin Preventiva de lado 0.60 x 0.60

AV. MARIANO MELGAR C.14


AV. MARIANO MELGAR C.15
AV. MARIANO MELGAR C.16
JR. JOSE GALVEZ C. 4
JR.PEDRO RUIZ 5
JR.PEDRO RUIZ 4
JR.PEDRO RUIZ 3
JR.ABRAHAM VALDELOMAR C.6
JR.RICARDO PALMA C.6
JR.RICARDO PALMA C.7

02.08.00 ELIMINACION DE MATERIAL EXCEDENTE


02.08.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete

03.00.00 VEREDAS

03.01.00 TRABAJOS PRELIMINARES


03.01.01 Limpieza de Terreno Manual

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

JR.RICARDO PALMA C.6-B


JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

AV. MARIANO MELGAR C.14-A

AV. MARIANO MELGAR C.14-B

AV. MARIANO MELGAR C.15-A

AV. MARIANO MELGAR C.15-B

AV. MARIANO MELGAR C.16-A

AV. MARIANO MELGAR C.16-B

JR. JOSE GALVEZ C. 4-A

JR. JOSE GALVEZ C. 4-B

JR.PEDRO RUIZ 5-A

JR.PEDRO RUIZ 5-B

JR.PEDRO RUIZ 4-A

JR.PEDRO RUIZ 4-B

JR.PEDRO RUIZ 3-A

JR.PEDRO RUIZ 3-B

JR.ABRAHAM VALDELOMAR C.6-A

JR.ABRAHAM VALDELOMAR C.6-B

JR.RICARDO PALMA C.6-A


PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

JR.RICARDO PALMA C.6-B

JR.RICARDO PALMA C.7-A

JR.RICARDO PALMA C.7-B

03.01.02 Trazo, Nivel y Replanteo

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

AV. MARIANO MELGAR C.14-A

AV. MARIANO MELGAR C.14-B

AV. MARIANO MELGAR C.15-A

AV. MARIANO MELGAR C.15-B

AV. MARIANO MELGAR C.16-A

AV. MARIANO MELGAR C.16-B


PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

JR. JOSE GALVEZ C. 4-A

JR. JOSE GALVEZ C. 4-B

JR.PEDRO RUIZ 5-A

JR.PEDRO RUIZ 5-B

JR.PEDRO RUIZ 4-A

JR.PEDRO RUIZ 4-B

JR.PEDRO RUIZ 3-A

JR.PEDRO RUIZ 3-B

JR.ABRAHAM VALDELOMAR C.6-A

JR.ABRAHAM VALDELOMAR C.6-B

JR.RICARDO PALMA C.6-A

JR.RICARDO PALMA C.6-B

JR.RICARDO PALMA C.7-A

JR.RICARDO PALMA C.7-B

03.01.03 Demolicin de Vereda existente de concreto simple

CA. MARIANO MELGAR CUADRA 14


Lado Izquierdo (A1)
Lado Derecho (A2 + A3 + A4)
A2
A3
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

A4

CA. MARIANO MELGAR CUADRA 15


Lado Izquierdo (A12 +A13)
A12
A13
Lado Derecho (A14 + A15)
A14
A15

CA. MARIANO MELGAR CUADRA 16


Lado Izquierdo (A16)
Lado Derecho (A17)

CA. JOSE GALVEZ CUADRA 4


Lado Izquierdo (A5 +A6 +A7)
A5
A6
A7

Lado Derecho (A8 +A9 +A10 +A11)


A8
A9
A10
A11

CA. PEDRO RUIZ CUADRA 3


Lado Izquierdo (A37 + A38)
A37
A38
Lado Derecho (A39)
A39

CA. PEDRO RUIZ CUADRA 4


Lado Izquierdo (A28)
Lado Derecho (A29 + A430)
A29
A30

CA. PEDRO RUIZ CUADRA 5


Lado Izquierdo (A19 +A20 + A21 )
A19
A20
A21
Lado Derecho (A22 )
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

CA. ABRAHAM VALDEROMAR CUADRA 6


Lado Izquierdo (A26 +A27)
A26
A27
Lado Derecho (A25)

CA. RICARDO PALMA CUADRA 6


Lado Izquierdo (A33)
Lado Derecho (A31 +A32)
A31
A32

CA. RICARDO PALMA CUADRA 7


Lado Izquierdo (A36)
Lado Derecho (A34 + A35)
A34
A35

03.01.04 Demolicin de Vereda existente de concreto simple con una H= 1.00 m

CA. MARIANO MELGAR CUADRA 16


Lado Derecho (A18)

Lado Derecho (A23 + A24 )


A23
A24

03.02.00 MOVIMIENTO DE TIERRAS


03.02.01 Corte manual de terreno

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

JR.RICARDO PALMA C.6-A


JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

03.02.02 Nivelacion y Apisonado en Veredas

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

03.02.03 Relleno Compactado C/ Material de prestamo (Afirmado) para base de vereda

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

JR.RICARDO PALMA C.6-B


JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

03.03.00 CONCRETO SIMPLE


03.03.01 Concreto f'c=175 Kg/cm2 en veredas, acabado frot., inc. brua.

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

03.03.02 Concreto f'c=175 Kg/cm2 en rampas

AV. MARIANO MELGAR C.14-A

AV. MARIANO MELGAR C.14-B

AV. MARIANO MELGAR C.15-A

AV. MARIANO MELGAR C.15-B

AV. MARIANO MELGAR C.16-A

AV. MARIANO MELGAR C.16-B

JR. JOSE GALVEZ C. 4-A


PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

JR. JOSE GALVEZ C. 4-B

JR.PEDRO RUIZ 5-A

JR.PEDRO RUIZ 5-B

JR.PEDRO RUIZ 4-A

JR.PEDRO RUIZ 4-B

JR.PEDRO RUIZ 3-A

JR.PEDRO RUIZ 3-B

JR.ABRAHAM VALDELOMAR C.6-A

JR.ABRAHAM VALDELOMAR C.6-B

JR.RICARDO PALMA C.6-A

JR.RICARDO PALMA C.6-B

JR.RICARDO PALMA C.7-A

JR.RICARDO PALMA C.7-B

03.03.03 Encofrado, descencofrado de Vereda.

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

JR. JOSE GALVEZ C. 4-B


JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

AV. MARIANO MELGAR C.14-A

AV. MARIANO MELGAR C.14-B

AV. MARIANO MELGAR C.15-A

AV. MARIANO MELGAR C.15-B

AV. MARIANO MELGAR C.16-A


AV. MARIANO MELGAR C.16-B

JR.PEDRO RUIZ 5-A


JR.PEDRO RUIZ 5-B
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

JR.PEDRO RUIZ 4-A

JR.PEDRO RUIZ 4-B

JR.PEDRO RUIZ 3-A

JR.PEDRO RUIZ 3-B

JR. JOSE GALVEZ C. 4-A


JR. JOSE GALVEZ C. 4-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B

03.04.00 JUNTAS Y BRUADO


03.04.01 Junta de dilatacin 1" x 4" de concreto asfltico a 3.0 m

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

03.04.02 Bruado de veredas

AV. MARIANO MELGAR C.14-A

AV. MARIANO MELGAR C.14-B


AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A

JR. JOSE GALVEZ C. 4-B


PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

JR.PEDRO RUIZ 5-A

JR.PEDRO RUIZ 5-B


JR.PEDRO RUIZ 4-A

JR.PEDRO RUIZ 4-B


JR.PEDRO RUIZ 3-A

JR.PEDRO RUIZ 3-B

JR.ABRAHAM VALDELOMAR C.6-A

JR.ABRAHAM VALDELOMAR C.6-B

JR.RICARDO PALMA C.6-A

JR.RICARDO PALMA C.6-B


JR.RICARDO PALMA C.7-A

JR.RICARDO PALMA C.7-B

MARTILLOS EN OCHAVOS
INTERS. M- MELGAR - JOSE B. ALCEDO

INTERS. M. MELGAR - JOSE GALVEZ

INTERS. M. MELGAR - F. VILLARREAL

INTERS. M. MELGAR - PEDRO RUIZ

INTERS. PEDRO RUIZ - A. VALDELOMAR

INTERS. PEDRO RUIZ - RICARDO PALMA

INTERS. PEDRO RUIZ - AV. CHACHAPOYAS

INTERS. R. PALMA - F. VILLARREAL

INTERS. A. VALDELOMAR - F. VILLARREAL


PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

03.04.03 Bruado de rampas

AV. MARIANO MELGAR C.14-A

AV. MARIANO MELGAR C.14-B

AV. MARIANO MELGAR C.15-A

AV. MARIANO MELGAR C.15-B

AV. MARIANO MELGAR C.16-A

AV. MARIANO MELGAR C.16-B

JR. JOSE GALVEZ C. 4-A

JR. JOSE GALVEZ C. 4-B

JR.PEDRO RUIZ 5-A

JR.PEDRO RUIZ 5-B

JR.PEDRO RUIZ 4-A

JR.PEDRO RUIZ 4-B

JR.PEDRO RUIZ 3-A

JR.PEDRO RUIZ 3-B

JR.ABRAHAM VALDELOMAR C.6-A

JR.ABRAHAM VALDELOMAR C.6-B

JR.RICARDO PALMA C.6-A

JR.RICARDO PALMA C.6-B


PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

JR.RICARDO PALMA C.7-A

JR.RICARDO PALMA C.7-B

03.05.00 CURADO
03.05.01 Curado de vereda con arena fina , durante 7 dias - 4 veces x da

03.06.00 SUMINISTRO Y COLOCACION DE CAJAS PARA AGUA Y DESAGUE


03.06.01 Suministro y colocacin de encimado de cajas para agua
LOTES EN TOTAL

03.06.02 Suministro y colocacin de encimado de cajas para desague


LOTES EN TOTAL

03.07.00 ELIMINACION DE MATERIAL EXCEDENTE


03.07.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete

04.00.00 SARDINEL

04.01.00 TRABAJOS PRELIMINARES


04.01.01 Limpieza de Terreno Manual

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

JR.PEDRO RUIZ 3-B


JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

04.01.02 Trazo, Nivel y Replanteo

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

04.02.00 MOVIMIENTO DE TIERRAS


04.02.01 Excavacion de sardineles hasta h=60 cm

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

JR.RICARDO PALMA C.6-B


JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

04.03.00 CONCRETO SIMPLE


04.03.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

04.03.02 Encofrado y Desencofrado

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

04.03.03 Acero Corrugado 3/8", fy=4200 kg/cm2

04.03.04 Relleno de Juntas de Dilatacin con concreto asfaltico 1"x2" m en sardinel

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

04.03.05 Tarrajeo pulido en sardineles

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

04.03.06 Curado de sardinel con arena fina, durante 7 dias - 4 veces x da

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

04.04.00 ELIMINACION DE MATERIAL EXCEDENTE


04.04.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete

05.00.00 CUNETAS RECTANGULARES

05.01.00 TRABAJOS PRELIMINARES


05.01.00 Limpieza de Terreno Manual

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
UNION DE AV. M.M. C 14-A Y B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
UNION DE AV. M.M. C 15 -A Y B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
UNION DE AV. M.M. C 16 -A Y B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
UNION DE AV.J.G. C 4 -A Y B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
UNION DE JR.PEDRO RUIZ 4-A Y 5-A
UNION DE JR.PEDRO RUIZ 4-B Y 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

JR.PEDRO RUIZ 3-A


JR.PEDRO RUIZ 3-B
UNION DE JR.PEDRO RUIZ 4-A Y 3-A
UNION DE JR.PEDRO RUIZ 4-B Y 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
UNION JR.ABRAHAM VALDELOMAR C.6-A Y B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
UNION JR.RICARDO PAL,A C.7-A Y B

05.02.00 Trazo, Nivel y Replanteo

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
UNION DE AV. M.M. C 14-A Y B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
UNION DE AV. M.M. C 15 -A Y B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
UNION DE AV. M.M. C 16 -A Y B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
UNION DE AV.J.G. C 4 -A Y B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
UNION DE JR.PEDRO RUIZ 4-A Y 5-A
UNION DE JR.PEDRO RUIZ 4-B Y 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
UNION DE JR.PEDRO RUIZ 4-A Y 3-A
UNION DE JR.PEDRO RUIZ 4-B Y 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
UNION JR.ABRAHAM VALDELOMAR C.6-A Y B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
UNION JR.RICARDO PAL,A C.7-A Y B

05.02.00 MOVIMIENTO DE TIERRAS


05.02.01 Excavacion de cunetas rectangulares hasta h=60 cm

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

UNION DE AV. M.M. C 14-A Y B


AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
UNION DE AV. M.M. C 15 -A Y B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
UNION DE AV. M.M. C 16 -A Y B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
UNION DE AV.J.G. C 4 -A Y B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
UNION DE JR.PEDRO RUIZ 4-A Y 5-A
UNION DE JR.PEDRO RUIZ 4-B Y 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
UNION DE JR.PEDRO RUIZ 4-A Y 3-A
UNION DE JR.PEDRO RUIZ 4-B Y 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
UNION JR.ABRAHAM VALDELOMAR C.6-A Y B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
UNION JR.RICARDO PAL,A C.7-A Y B

05.03.00 CONCRETO SIMPLE


05.03.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
UNION DE AV. M.M. C 14-A Y B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
UNION DE AV. M.M. C 15 -A Y B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
UNION DE AV. M.M. C 16 -A Y B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
UNION DE AV.J.G. C 4 -A Y B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
UNION DE JR.PEDRO RUIZ 4-A Y 5-A
UNION DE JR.PEDRO RUIZ 4-B Y 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

UNION DE JR.PEDRO RUIZ 4-A Y 3-A


UNION DE JR.PEDRO RUIZ 4-B Y 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
UNION JR.ABRAHAM VALDELOMAR C.6-A Y B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
UNION JR.RICARDO PAL,A C.7-A Y B

05.03.02 Acero Corrugado 3/8", fy=4200 kg/cm2

05.03.03 Encofrado y Desencofrado

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
UNION DE AV. M.M. C 14-A Y B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
UNION DE AV. M.M. C 15 -A Y B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
UNION DE AV. M.M. C 16 -A Y B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
UNION DE AV.J.G. C 4 -A Y B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
UNION DE JR.PEDRO RUIZ 4-A Y 5-A
UNION DE JR.PEDRO RUIZ 4-B Y 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
UNION DE JR.PEDRO RUIZ 4-A Y 3-A
UNION DE JR.PEDRO RUIZ 4-B Y 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
UNION JR.ABRAHAM VALDELOMAR C.6-A Y B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
UNION JR.RICARDO PAL,A C.7-A Y B

05.03.04 Tarrajeo pulido en Canaletas

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

UNION DE AV. M.M. C 14-A Y B


AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
UNION DE AV. M.M. C 15 -A Y B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
UNION DE AV. M.M. C 16 -A Y B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
UNION DE AV.J.G. C 4 -A Y B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
UNION DE JR.PEDRO RUIZ 4-A Y 5-A
UNION DE JR.PEDRO RUIZ 4-B Y 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
UNION DE JR.PEDRO RUIZ 4-A Y 3-A
UNION DE JR.PEDRO RUIZ 4-B Y 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
UNION JR.ABRAHAM VALDELOMAR C.6-A Y B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
UNION JR.RICARDO PAL,A C.7-A Y B

05.03.05 Curado de sardinel y canaletas, durante 7 dias - 4 veces x da

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
UNION DE AV. M.M. C 14-A Y B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
UNION DE AV. M.M. C 15 -A Y B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
UNION DE AV. M.M. C 16 -A Y B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
UNION DE AV.J.G. C 4 -A Y B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
UNION DE JR.PEDRO RUIZ 4-A Y 5-A
UNION DE JR.PEDRO RUIZ 4-B Y 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
UNION DE JR.PEDRO RUIZ 4-A Y 3-A
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

UNION DE JR.PEDRO RUIZ 4-B Y 3-B


JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
UNION JR.ABRAHAM VALDELOMAR C.6-A Y B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
UNION JR.RICARDO PAL,A C.7-A Y B

05.03.06 Tapas de concreto para Cunetas Rectangulares

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
UNION DE AV. M.M. C 14-A Y B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
UNION DE AV. M.M. C 15 -A Y B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
UNION DE AV. M.M. C 16 -A Y B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
UNION DE AV.J.G. C 4 -A Y B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
UNION DE JR.PEDRO RUIZ 4-A Y 5-A
UNION DE JR.PEDRO RUIZ 4-B Y 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
UNION DE JR.PEDRO RUIZ 4-A Y 3-A
UNION DE JR.PEDRO RUIZ 4-B Y 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
UNION JR.ABRAHAM VALDELOMAR C.6-A Y B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
UNION JR.RICARDO PAL,A C.7-A Y B

05.04.00 ELIMINACION DE MATERIAL EXCEDENTE


05.04.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete

06.00.00 MURO DE CONTENCION


06.01.00 TRABAJOS PRELIMINARES
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

06.01.01 Limpieza de Terreno Manual

AV. MARIANO MELGAR C.16-A

JR. JOSE GALVEZ C. 4-A

06.01.02 Trazo, Nivel y Replanteo

AV. MARIANO MELGAR C.16-A

JR. JOSE GALVEZ C. 4-A

06.02.00 MOVIMIENTO DE TIERRAS


06.02.01 Corte de Terreno Manual para Muro de Contencin

MARIANO MELGAR CDA 16


LADO IZQUIERDO
MURO H=1.00M
JR.JOSE GALVEZ
LADO IZQUIERDO

06.02.02 Relleno con material de prstamo en Muro de Contencin

MARIANO MELGAR CDA 16


LADO IZQUIERDO
MURO H=1.00M
JR.JOSE GALVEZ
LADO IZQUIERDO

06.03.00 CONCRETO SIMPLE


06.03.01 Solado 1:10; C:A e = 4"

MARIANO MELGAR CDA 16


LADO IZQUIERDO
MURO H=1.00M
JR.JOSE GALVEZ
LADO IZQUIERDO

06.04.00 CONCRETO ARMADO


06.04.01 Encofrado y Desencofrado de Muro de contencin

MARIANO MELGAR CDA 16


LADO IZQUIERDO
MURO H=1.00M
JR.JOSE GALVEZ
LADO IZQUIERDO
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

06.04.02 ACERO CORRUGADO, fy = 4200 Kg/cm2 -Muro de Contencion

06.04.03 Concreto f'c = 210 Kg/cm2 en muro de contencin

MARIANO MELGAR CDA 16


LADO IZQUIERDO
MURO H=1.00M
MURO H=1.00M
JR.JOSE GALVEZ
LADO IZQUIERDO

06.05.00 JUNTAS
06.05.01 Juntas de Dilatacin en Muro y Losa Inferior con water stop 6" cada 9.00 m.

06.06.00 ELIMINACION DE MATERIAL EXCEDENTE


06.06.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete

07.00.00 AREAS VERDES


07.01.00 Corte superficial para jardineras hasta 0.20 m

07.02.00 Acarreo de material excedente dp <=50 m

07.03.00 Suministro y colocacin de tierra agricola h=0.20 m

07.04.00 Sembrado de grass

AV. MARIANO MELGAR


C-14 -A
C-14 -A
C-14 - B
C-14 - B

C-15 - A
C-15 - A
C-15 - B
C-15 - B

C-16 - A
C-16 - A
C-16 - B
C-16 - B
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

JR. JOSE GALVEZ


C-4 - A
C-4 - A
C-4 - B
C-4 - B

JR. PEDRO RUIZ


C-5 - A
C-5 - A
C-5 - B
C-5 - B

C-4 - A
C-4 - A
C-4 - B
C-4 - B

C-3 - A
C-3 - A
C-3 - B
C-3 - B

JR. A. VALDELOMAR
C-6 - A
C-6 - A
C-6 - B
C-6 - B

JR. RICARDO PALMA


C-6 - A
C-6 - A
C-6 - B
C-6 - B

C-7 - A
C-7 - A
C-7 - B
C-7 - B

07.05.00 Arborizacion con plantones

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
PLANILLA DE METRAD

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA -

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN

JR.PEDRO RUIZ 5-B


JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

07.06.00 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete


Acarreo de material excedente

08.00.00 VARIOS

08.01.00 Limpieza final de obra


LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO

und 1.00 1.00 1.00 1.00

mes 1.00 1.00 1.00 4.00

m2 1.00 1.00 6007.37


1.00 Area = 494.92 494.92
1.00 Area = 459.13 459.13

1.00 Area = 482.96 482.96


1.00

1.00 Area = 492.09 492.09


1.00

1.00 Area = 727.07 727.07


1.00 Area = 754.20 754.20
Area = 784.23 784.23

1.00 Area = 488.53 488.53


1.00 Area = 650.80 650.80
Area = 673.44 673.44

m2 1.00 1.00 6007.37


1.00 Area = 494.92 494.92
1.00 Area = 459.13 459.13

1.00 Area = 482.96 482.96


1.00

1.00 Area = 492.09 492.09


1.00

1.00 Area = 727.07 727.07


1.00 Area = 754.20 754.20
Area = 784.23 784.23

1.00 Area = 488.53 488.53


1.00 Area = 650.80 650.80
Area = 673.44 673.44
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO

m3 1.00 1.00 7282.14

1.00 1.00 7282.14 7282.14

m2 1.00 1.00 6007.37


1.00 Area = 494.92 494.92
1.00 Area = 459.13 459.13

1.00 Area = 482.96 482.96


1.00

1.00 Area = 492.09 492.09


1.00

1.00 Area = 727.07 727.07


1.00 Area = 754.20 754.20
Area = 784.23 784.23

1.00 Area = 488.53 488.53


1.00 Area = 650.80 650.80
Area = 673.44 673.44

m2 1.00 6007.37
1.00 Area = 494.92 494.92
1.00 Area = 459.13 459.13

1.00 Area = 482.96 482.96


1.00

1.00 Area = 492.09 492.09


1.00

1.00 Area = 727.07 727.07


1.00 Area = 754.20 754.20
Area = 784.23 784.23

1.00 Area = 488.53 488.53


1.00 Area = 650.80 650.80
Area = 673.44 673.44

m2 1.00 6007.37
1.00 Area = 494.92 494.92
1.00 Area = 459.13 459.13
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO

1.00 Area = 482.96 482.96


1.00

1.00 Area = 492.09 492.09


1.00

1.00 Area = 727.07 727.07


1.00 Area = 754.20 754.20
Area = 784.23 784.23

1.00 Area = 488.53 488.53


1.00 Area = 650.80 650.80
Area = 673.44 673.44

m2 1.00 6007.37
1.00 Area = 494.92 494.92
1.00 Area = 459.13 459.13

1.00 Area = 482.96 482.96


1.00

1.00 Area = 492.09 492.09


1.00

1.00 Area = 727.07 727.07


1.00 Area = 754.20 754.20
Area = 784.23 784.23

1.00 Area = 488.53 488.53


1.00 Area = 650.80 650.80
Area = 673.44 673.44

m3 1.00 263.26
0.38 0.40 0.15 1755.06 263.26
1.00 7.68
1.00 76.32
1.00 8.10
1.00 7.68
1.00 76.60
1.00 8.10

1.00 8.09
1.00 77.59
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
1.00 8.03
77.91

1.00 7.85
1.00 74.30
1.00 7.85
1.00 8.02
1.00 7.74
1.00 74.79
1.00 8.14
1.00 7.69
1.00 1.27
1.00 0.86

1.00 7.86
1.00 75.72
1.00 7.85
1.00 8.31
1.00 75.39
1.00 7.84

1.00 7.85
1.00 72.67
1.00 7.75
1.00 72.73
1.00 7.86

1.00 7.64
1.00 75.89
1.00 7.87
1.00 75.72
1.00 7.93

1.00 7.80
1.00 71.29
1.00 7.78
1.00 7.78
1.00 7.88
1.00 71.57
1.00 7.92
1.00 7.74
1.00 1.58
1.00 2.36
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO

1.00 7.83
1.00 75.56
1.00 7.85
1.00 75.14
1.00 76.50
1.00 76.75
1.00 79.40
1.00 80.84

m2 1.00 3504.61

1.00 76.32 76.32


1.00 76.60 76.60

1.00 77.59 77.59


1.00 77.91 77.91

1.00 177.93 177.93


30.00 2.00 6.00 360.00

1.00 74.30 74.30


1.00 74.79 74.79

30.00 1.00 6.00 180.00

1.00 75.72 75.72


1.00 75.39 75.39

30.00 1.00 6.00 180.00

1.00 72.67 72.67


1.00 72.73 72.73
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO

1.00 75.89 75.89


1.00 75.72 75.72

1.00 71.29 71.29


1.00 71.57 71.57

30.00 3.00 6.00 540.00

1.00 75.56 75.56

1.00 75.14 75.14


1.00 76.50 76.50
1.00 76.75 76.75
1.00 79.40 79.40
1.00 80.84 80.84

30.00 3.00 6.00 540.00

und 14.00

3.00 3.00
4.00 4.00
2.00 2.00
1.00 1.00

2.00 2.00
1.00 1.00
1.00 1.00

m2 1.00 6007.37
1.00 6007.37 6007.37

m 1.00 1.00 2292.49

1.00 1372.80 1372.80

1.00 919.69 919.69


LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
m 1.00 1.00 254.40

12.00 7.20 86.40

4.00 6.00 24.00

14.00 6.00 84.00

3.00 6.00 18.00

7.00 6.00 42.00

m 1.00 1.00 418.62

2.00 13.27 26.54

4.00 12.33 49.32


2.00 6.00 12.00

4.00 12.08 48.32


2.00 6.00 12.00

4.00 13.23 52.92


2.00 7.20 14.40

4.00 12.82 51.28


2.00 6.00 12.00

4.00 13.00 52.00


2.00 6.00 12.00

2.00 12.39 24.78

2.00 11.69 23.38

2.00 13.84 27.68

m 1.00 1.00 1902.45

Repeciticiones N de veces
1.00 217.77 217.77
1.00 200.42 200.42
1.00 209.11 209.11
1.00 182.16 182.16
1.00 192.80 192.80
1.00 170.16 170.16
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
1.00 200.27 200.27
1.00 188.57 188.57
1.00 182.13 182.13
1.00 159.06 159.06

m 1.00 1.00 1372.80


Repeciticiones N de veces
11.00 5.00 7.20 396.00
8.00 7.20 57.60
1.00 7.20 7.20

21.00 6.00 126.00

2.00 6.00 12.00

13.00 5.00 6.00 390.00


3.00 6.00 18.00

4.00 5.00 6.00 120.00


1.00 6.00 6.00
8.00 5.00 6.00 240.00

m 1.00 1.00 919.69

Repeciticiones N de veces

1.00 85.77 85.77


1.00 91.73 91.73
1.00 85.08 85.08
1.00 7.05 7.05

1.00 85.79 85.79


1.00 5.60 5.60

1.00 6.13 6.13


1.00 5.50 5.50
0.00
1.00 104.11 104.11
1.00 182.90 182.90

1.00 84.60 84.60


1.00 5.96 5.96

1.00 86.60 86.60


1.00 82.87 82.87
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
m2 441.20

9.00 3.00 0.10 2.70 29.7


10.00 3.00 0.10 3.00
9.00 3.00 0.10 2.70
10.00 3.00 0.10 3.00
11.00 3.00 0.10 3.30
10.00 3.00 0.10 3.00
10.00 3.00 0.10 3.00
10.00 3.00 0.10 3.00
10.00 3.00 0.10 3.00
10.00 3.00 0.10 3.00

18.00 4.00 0.50 36.00 332


18.00 4.00 0.50 36.00
18.00 4.00 0.50 36.00
16.00 4.00 0.50 32.00
16.00 4.00 0.50 32.00
16.00 4.00 0.50 32.00
16.00 4.00 0.50 32.00
16.00 4.00 0.50 32.00
16.00 4.00 0.50 32.00
16.00 4.00 0.50 32.00

2.00 0.50 3.75 3.75 43.9


4.00 0.10 4.20 1.68
2.00 0.50 3.75 3.75
2.00 0.10 3.50 0.70
2.00 0.50 3.75 3.75
2.00 0.10 5.10 1.02
2.00 0.50 3.00 3.00
2.00 0.10 6.70 1.34
2.00 0.50 3.15 3.15
2.00 0.10 4.95 0.99
2.00 0.50 3.15 3.15
2.00 0.10 5.00 1.00
2.00 0.50 3.15 3.15
2.00 0.10 3.90 0.78
2.00 0.50 3.15 3.15
2.00 0.10 5.60 1.12
2.00 0.50 3.15 3.15
2.00 0.10 5.60 1.12
2.00 0.50 3.15 3.15
2.00 0.10 5.00 1.00

2.00 1.78 3.56 35.60


2.00 1.78 3.56
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
2.00 1.78 3.56
2.00 1.78 3.56
2.00 1.78 3.56
2.00 1.78 3.56
2.00 1.78 3.56
2.00 1.78 3.56
2.00 1.78 3.56
2.00 1.78 3.56

und 16.00

3.00 3.00
2.00 2.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
2.00 2.00
2.00 2.00
2.00 2.00
1.00 1.00

m3 1.00 1.00 9102.68

factor de esponjamiento 1.25 7282.14 9102.68

m2 1.00 1.00 2741.67


2741.67
133.99
131.10
140.83
119.30
120.14
124.02
109.34
132.63
118.70
170.15
152.76
149.56
138.50
151.49
117.03
122.51
110.56
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
117.60
93.74
97.87

1.00 2.36 1.20 2.83 2.83


1.00 1.90 1.20 2.28 2.28
1.00 2.02 1.20 2.42 2.42
1.00 2.55 1.20 3.06 3.06
1.00 2.26 1.20 2.71 2.71
1.00 2.13 1.20 2.56 2.56
1.00 2.24 1.20 2.69 2.69
1.00 2.21 1.20 2.65 2.65
1.00 2.76 1.20 3.31 3.31
1.00 2.09 1.20 2.51 2.51
1.00 1.80 1.20 2.16 2.16
1.00 1.54 1.20 1.85 1.85
1.00 1.70 1.20 2.04 2.04
1.00 1.47 1.20 1.76 1.76
1.00 2.48 1.20 2.98 2.98
1.00 2.20 1.20 2.64 2.64
1.00 1.10 1.20 1.32 1.32
1.00 1.80 1.20 2.16 2.16
1.00 1.50 1.20 1.80 1.80
1.00 2.00 1.20 2.40 2.40
1.00 1.85 1.20 2.22 2.22
1.00 1.81 1.20 2.17 2.17
1.00 1.73 1.20 2.08 2.08
1.00 2.93 1.20 3.52 3.52
1.00 2.56 1.20 3.07 3.07
1.00 2.66 1.20 3.19 3.19
1.00 4.13 1.20 4.96 4.96
1.00 3.53 1.20 4.24 4.24
1.00 2.84 1.20 3.41 3.41
1.00 2.68 1.20 3.22 3.22
1.00 2.58 1.20 3.10 3.10
1.00 2.46 1.20 2.95 2.95
1.00 2.64 1.20 3.17 3.17
1.00 2.83 1.20 3.40 3.40
1.00 3.02 1.20 3.62 3.62
1.00 2.55 1.20 3.06 3.06
1.00 2.64 1.20 3.17 3.17
1.00 2.84 1.20 3.41 3.41
1.00 2.92 1.20 3.50 3.50
1.00 2.31 1.20 2.77 2.77
1.00 AREA 20.76 20.76 20.76
1.00 2.61 1.20 3.13 3.13
1.00 2.52 1.20 3.02 3.02
1.00 2.42 1.20 2.90 2.90
1.00 2.61 1.20 3.13 3.13
1.00 2.51 1.20 3.01 3.01
1.00 2.41 1.20 2.89 2.89
1.00 2.38 1.20 2.86 2.86
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
1.00 2.59 1.20 3.11 3.11
1.00 2.76 1.20 3.31 3.31
1.00 2.80 1.20 3.36 3.36
1.00 2.79 1.20 3.35 3.35
1.00 2.77 1.20 3.32 3.32
1.00 2.63 1.20 3.16 3.16
1.00 2.68 1.20 3.22 3.22
1.00 2.71 1.20 3.25 3.25
1.00 2.66 1.20 3.19 3.19
1.00 2.45 1.20 2.94 2.94
1.00 2.99 1.20 3.59 3.59

m2 1.00 1.00 2741.67


2551.82
133.99
131.10
140.83
119.30
120.14
124.02
109.34
132.63
118.70
170.15
152.76
149.56
138.50
151.49
117.03
122.51
110.56
117.60
93.74
97.87

189.85
1.00 2.36 1.20 2.83
1.00 1.90 1.20 2.28
1.00 2.02 1.20 2.42
1.00 2.55 1.20 3.06
1.00 2.26 1.20 2.71
1.00 2.13 1.20 2.56
1.00 2.24 1.20 2.69
1.00 2.21 1.20 2.65
1.00 2.76 1.20 3.31
1.00 2.09 1.20 2.51
1.00 1.80 1.20 2.16
1.00 1.54 1.20 1.85
1.00 1.70 1.20 2.04
1.00 1.47 1.20 1.76
1.00 2.48 1.20 2.98
1.00 2.20 1.20 2.64
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
1.00 1.10 1.20 1.32
1.00 1.80 1.20 2.16
1.00 1.50 1.20 1.80
1.00 2.00 1.20 2.40
1.00 1.85 1.20 2.22
1.00 1.81 1.20 2.17
1.00 1.73 1.20 2.08
1.00 2.93 1.20 3.52
1.00 2.56 1.20 3.07
1.00 2.66 1.20 3.19
1.00 4.13 1.20 4.96
1.00 3.53 1.20 4.24
1.00 2.84 1.20 3.41
1.00 2.68 1.20 3.22
1.00 2.58 1.20 3.10
1.00 2.46 1.20 2.95
1.00 2.64 1.20 3.17
1.00 2.83 1.20 3.40
1.00 3.02 1.20 3.62
1.00 2.55 1.20 3.06
1.00 2.64 1.20 3.17
1.00 2.84 1.20 3.41
1.00 2.92 1.20 3.50
1.00 2.31 1.20 2.77
1.00 AREA 20.76 20.76
1.00 2.61 1.20 3.13
1.00 2.52 1.20 3.02
1.00 2.42 1.20 2.90
1.00 2.61 1.20 3.13
1.00 2.51 1.20 3.01
1.00 2.41 1.20 2.89
1.00 2.38 1.20 2.86
1.00 2.59 1.20 3.11
1.00 2.76 1.20 3.31
1.00 2.80 1.20 3.36
1.00 2.79 1.20 3.35
1.00 2.77 1.20 3.32
1.00 2.63 1.20 3.16
1.00 2.68 1.20 3.22
1.00 2.71 1.20 3.25
1.00 2.66 1.20 3.19
1.00 2.45 1.20 2.94
1.00 2.99 1.20 3.59

m2 1.00 1.00 945.16

945.16

10.13 10.13

4.13
18.23 34.99
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
12.63

46.71 67.68
20.97

27.99 38.87
10.88

11.92 35.32
23.40

7.25
10.21 28.34
10.88

33.19
6.00 50.30
5.07
6.04

50.12 89.19
39.07

54.17 54.17

67.79 67.79

44.70 53.65
8.95

7.97 30.71
5.26
17.48
3.90 3.90
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO

47.45 51.45
4.00
75.84 75.84

85.82 85.82

66.75 71.71
4.96

33.99 33.99

36.60 61.31
24.71

m2 1.00 1.00 62.90

62.90
10.02 10.02

26.44 52.88
13.50
12.94

m3 1.00 1.00 1100.78


0.40 2751.95 1100.78
133.99
131.10
140.83
119.30
120.14
124.02
109.34
132.63
118.70
180.43
152.76
149.56
138.50
151.49
117.03
122.51
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
110.56
117.60
93.74
97.87

rampas 189.85

m2 2751.95
2751.95 2751.95
133.99
131.10
140.83
119.30
120.14
124.02
109.34
132.63
118.70
180.43
152.76
149.56
138.50
151.49
117.03
122.51
110.56
117.60
93.74
97.87

rampas 189.85

m2 2751.95
2751.95
133.99
131.1
140.83
119.3
120.14
124.02
109.34
132.63
118.7
180.43
152.76
149.56
138.5
151.49
117.03
122.51
110.56
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
117.6
93.74
97.87

rampas 189.85

m2 2562.10

133.99 2562.10
131.1
140.83
119.3
120.14
124.02
109.34
132.63
118.7
180.43
152.76
149.56
138.5
151.49
117.03
122.51
110.56
117.6
93.74
97.87

m2 189.85

189.85
1.00 2.36 1.20 2.83
1.00 1.90 1.20 2.28
1.00 2.02 1.20 2.42
1.00 2.55 1.20 3.06
1.00 2.26 1.20 2.71
1.00 2.13 1.20 2.56
1.00 2.24 1.20 2.69
1.00 2.21 1.20 2.65
1.00 2.76 1.20 3.31
1.00 2.09 1.20 2.51
1.00 1.80 1.20 2.16
1.00 1.54 1.20 1.85
1.00 1.70 1.20 2.04
1.00 1.47 1.20 1.76
1.00 2.48 1.20 2.98
1.00 2.20 1.20 2.64
1.00 1.10 1.20 1.32
1.00 1.80 1.20 2.16
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
1.00 1.50 1.20 1.80
1.00 2.00 1.20 2.40
1.00 1.85 1.20 2.22
1.00 1.81 1.20 2.17
1.00 1.73 1.20 2.08
1.00 2.93 1.20 3.52
1.00 2.56 1.20 3.07
1.00 2.66 1.20 3.19
1.00 4.13 1.20 4.96
1.00 3.53 1.20 4.24
1.00 2.84 1.20 3.41
1.00 2.68 1.20 3.22
1.00 2.58 1.20 3.10
1.00 2.46 1.20 2.95
1.00 2.64 1.20 3.17
1.00 2.83 1.20 3.40
1.00 3.02 1.20 3.62
1.00 2.55 1.20 3.06
1.00 2.64 1.20 3.17
1.00 2.84 1.20 3.41
1.00 2.92 1.20 3.50
1.00 2.31 1.20 2.77
1.00 AREA 20.76 20.76
1.00 2.61 1.20 3.13
1.00 2.52 1.20 3.02
1.00 2.42 1.20 2.90
1.00 2.61 1.20 3.13
1.00 2.51 1.20 3.01
1.00 2.41 1.20 2.89
1.00 2.38 1.20 2.86
1.00 2.59 1.20 3.11
1.00 2.76 1.20 3.31
1.00 2.80 1.20 3.36
1.00 2.79 1.20 3.35
1.00 2.77 1.20 3.32
1.00 2.63 1.20 3.16
1.00 2.68 1.20 3.22
1.00 2.71 1.20 3.25
1.00 2.66 1.20 3.19
1.00 2.45 1.20 2.94
1.00 2.99 1.20 3.59

m2 1970.10

lado n01
72.27 0.30 21.681
71.72 0.30 21.516
75.23 0.30 22.569
74.05 0.30 22.215
73.7 0.30 22.11
71.48 0.30 21.444
75.24 0.30 22.572
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
75.28 0.30 22.584
78.55 0.30 23.565
78.23 0.30 23.469
74.54 0.30 22.362
75.39 0.30 22.617
74.82 0.30 22.446
75.36 0.30 22.608
72.94 0.30 21.882
73.59 0.30 22.077
76.07 0.30 22.821
76.12 0.30 22.836
77.02 0.30 23.106
76.66 0.30 22.998
1498.26 0.30 449.478

71.41 0.30 21.423


73.01 0.30 21.903
74.43 0.30 22.329
74.84 0.30 22.452
75.78 0.30 22.734
72.68 0.30 21.804
74.31 0.30 22.293
73.23 0.30 21.969
79.09 0.30 23.727
79.73 0.30 23.919
74.24 0.30 22.272
75.71 0.30 22.713
76.24 0.30 22.872
74.02 0.30 22.206
72.87 0.30 21.861
72.79 0.30 21.837
74.99 0.30 22.497
76.42 0.30 22.926
76.35 0.30 22.905
79.32 0.30 23.796
1501.46 0.30 450.438

perimetro 19.34 0.30 5.802


19.19 0.30 5.757
19.24 0.30 5.772
18.39 0.30 5.517
17.86 0.30 5.358
22.23 0.30 6.669
18.45 0.30 5.535
19.94 0.30 5.982
20.38 0.30 6.114
19.35 0.30 5.805
16.13 0.30 4.839
20.04 0.30 6.012
29.67 0.30 8.901
21.74 0.30 6.522
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
20.31 0.30 6.093
21.85 0.30 6.555
20.04 0.30 6.012
20.04 0.30 6.012
19.38 0.30 5.814
19.57 0.30 5.871
20.79 0.30 6.237
23.81 0.30 7.143
17.74 0.30 5.322
21.05 0.30 6.315
21.14 0.30 6.342
20.45 0.30 6.135
16.9 0.30 5.07
22.54 0.30 6.762

m 625.20

25.00 1.20 30.00


25.00 1.20 30.00
26.00 1.20 31.20
26.00 1.20 31.20
27.00 1.20 32.40
25.00 1.20 30.00
26.00 1.20 31.20
25.00 1.20 30.00
27.00 1.20 32.40
27.00 1.20 32.40
26.00 1.20 31.20
26.00 1.20 31.20
27.00 1.20 32.40
26.00 1.20 31.20
26.00 1.20 31.20
26.00 1.20 31.20
26.00 1.20 31.20
26.00 1.20 31.20
27.00 1.20 32.40
26.00 1.20 31.20

m 5503.00

23.00 9.60 220.80


1.00 7.42 7.42
24.00 9.60 230.40
25.00 9.60 240.00
25.00 9.60 240.00
23.00 9.60 220.80
23.00 9.60 220.80
24.00 9.60 230.40
2.00 3.95 7.90
21.00 9.50 199.50
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
2.00 9.70 19.40
1.00 14.00 14.00
1.00 8.40 8.40
25.00 9.60 240.00
1.00 10.72 10.72
1.00 5.90 5.90
26.00 9.60 249.60
24.00 9.60 230.40
1.00 7.00 7.00
25.00 9.60 240.00
24.00 9.60 230.40
1.00 4.76 4.76
24.00 9.60 230.40
1.00 6.72 6.72
23.00 9.60 220.80
1.00 12.16 12.16
19.00 9.60 182.40
1.00 12.35 12.35
2.00 11.10 22.20
2.00 12.05 24.10
25.00 9.60 240.00
1.00 4.32 4.32
25.00 9.60 240.00
25.00 9.60 240.00

25.00 9.60 240.00


1.00 4.32 4.32

2.00 26.94 53.88

4.00 29.70 118.80

4.00 30.95 123.80

1.00 20.00 20.00


1.00 27.35 27.35
2.00 6.80 13.60

4.00 28.56 114.24

4.00 28.90 115.60

2.00 26.50 53.00

2.00 23.63 47.26

2.00 28.55 57.10


LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
m 890.40

11.00 1.20 13.20


9.00 1.20 10.80
9.00 1.20 10.80
12.00 1.20 14.40
11.00 1.20 13.20
10.00 1.20 12.00
10.00 1.20 12.00
11.00 1.20 13.20
13.00 1.20 15.60
10.00 1.20 12.00
9.00 1.20 10.80
7.00 1.20 8.40
8.00 1.20 9.60
7.00 1.20 8.40
12.00 1.20 14.40
11.00 1.20 13.20
5.00 1.20 6.00
8.00 1.20 9.60
7.00 1.20 8.40
9.00 1.20 10.80
8.00 1.20 9.60
9.00 1.20 10.80
8.00 1.20 9.60
14.00 1.20 16.80
12.00 1.20 14.40
12.00 1.20 14.40
20.00 1.20 24.00
18.00 1.20 21.60
13.00 1.20 15.60
13.00 1.20 15.60
13.00 1.20 15.60
11.00 1.20 13.20
12.00 1.20 14.40
14.00 1.20 16.80
12.00 1.20 14.40
12.00 1.20 14.40
13.00 1.20 15.60
13.00 1.20 15.60
14.00 1.20 16.80
11.00 1.20 13.20
12.00 7.20 86.40
12.00 1.20 14.40
13.00 1.20 15.60
11.00 1.20 13.20
12.00 1.20 14.40
12.00 1.20 14.40
11.00 1.20 13.20
11.00 1.20 13.20
13.00 1.20 15.60
13.00 1.20 15.60
14.00 1.20 16.80
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
14.00 1.20 16.80
14.00 1.20 16.80
12.00 1.20 14.40
12.00 1.20 14.40
13.00 1.20 15.60
14.00 1.20 16.80
14.00 1.20 16.80
14.00 1.20 16.80

m2 2751.95

area 2562.10 2562.10


area 189.85 189.85

und 149.00
149.00 149.00

und 149.00
149.00 149.00

m3 1031.98

1.25 2751.95 0.30 1031.98

m2 389.50

75.39 0.25 18.85


76.73 0.25 19.18
79.63 0.25 19.91
77.08 0.25 19.27
44.51 0.25 11.13
74.19 0.25 18.55
76.92 0.25 19.23
76.25 0.25 19.06
85.6 0.25 21.40
87.93 0.25 21.98
80.29 0.25 20.07
82.53 0.25 20.63
81.29 0.25 20.32
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
72.47 0.25 18.12
78.76 0.25 19.69
78.63 0.25 19.66
81.12 0.25 20.28
83.08 0.25 20.77
82.71 0.25 20.68
82.87 0.25 20.72

m2 389.50

75.39 0.25 18.85


76.73 0.25 19.18
79.63 0.25 19.91
77.08 0.25 19.27
44.51 0.25 11.13
74.19 0.25 18.55
76.92 0.25 19.23
76.25 0.25 19.06
85.6 0.25 21.40
87.93 0.25 21.98
80.29 0.25 20.07
82.53 0.25 20.63
81.29 0.25 20.32
72.47 0.25 18.12
78.76 0.25 19.69
78.63 0.25 19.66
81.12 0.25 20.28
83.08 0.25 20.77
82.71 0.25 20.68
82.87 0.25 20.72

m3 233.70

75.39 0.25 0.60 11.31


76.73 0.25 0.60 11.51
79.63 0.25 0.60 11.94
77.08 0.25 0.60 11.56
44.51 0.25 0.60 6.68
74.19 0.25 0.60 11.13
76.92 0.25 0.60 11.54
76.25 0.25 0.60 11.44
85.6 0.25 0.60 12.84
87.93 0.25 0.60 13.19
80.29 0.25 0.60 12.04
82.53 0.25 0.60 12.38
81.29 0.25 0.60 12.19
72.47 0.25 0.60 10.87
78.76 0.25 0.60 11.81
78.63 0.25 0.60 11.79
81.12 0.25 0.60 12.17
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
83.08 0.25 0.60 12.46
82.71 0.25 0.60 12.41
82.87 0.25 0.60 12.43

m3 194.75

75.39 0.125 9.42


76.73 0.125 9.59
79.63 0.125 9.95
77.08 0.125 9.64
44.51 0.125 5.56
74.19 0.125 9.27
76.92 0.125 9.62
76.25 0.125 9.53
85.6 0.125 10.70
87.93 0.125 10.99
80.29 0.125 10.04
82.53 0.125 10.32
81.29 0.125 10.16
72.47 0.125 9.06
78.76 0.125 9.85
78.63 0.125 9.83
81.12 0.125 10.14
83.08 0.125 10.39
82.71 0.125 10.34
82.87 0.125 10.36

m2 2025.37

75.39 1.30 98.01


76.73 1.30 99.75
79.63 1.30 103.52
77.08 1.30 100.20
44.51 1.30 57.86
74.19 1.30 96.45
76.92 1.30 100.00
76.25 1.30 99.13
85.6 1.30 111.28
87.93 1.30 114.31
80.29 1.30 104.38
82.53 1.30 107.29
81.29 1.30 105.68
72.47 1.30 94.21
78.76 1.30 102.39
78.63 1.30 102.22
81.12 1.30 105.46
83.08 1.30 108.00
82.71 1.30 107.52
82.87 1.30 107.73
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO

kg 6006.3872 6006.39

m 130.25

25.00 0.25 6.25


25.00 0.25 6.25
26.00 0.25 6.50
26.00 0.25 6.50
27.00 0.25 6.75
25.00 0.25 6.25
26.00 0.25 6.50
25.00 0.25 6.25
27.00 0.25 6.75
27.00 0.25 6.75
26.00 0.25 6.50
26.00 0.25 6.50
27.00 0.25 6.75
26.00 0.25 6.50
26.00 0.25 6.50
26.00 0.25 6.50
26.00 0.25 6.50
26.00 0.25 6.50
27.00 0.25 6.75
26.00 0.25 6.50

m2 467.39

75.39 0.30 22.62


76.73 0.30 23.02
79.63 0.30 23.89
77.08 0.30 23.12
44.51 0.30 13.35
74.19 0.30 22.26
76.92 0.30 23.08
76.25 0.30 22.88
85.6 0.30 25.68
87.93 0.30 26.38
80.29 0.30 24.09
82.53 0.30 24.76
81.29 0.30 24.39
72.47 0.30 21.74
78.76 0.30 23.63
78.63 0.30 23.59
81.12 0.30 24.34
83.08 0.30 24.92
82.71 0.30 24.81
82.87 0.30 24.86
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
m2 623.19

75.39 0.40 30.16


76.73 0.40 30.69
79.63 0.40 31.85
77.08 0.40 30.83
44.51 0.40 17.80
74.19 0.40 29.68
76.92 0.40 30.77
76.25 0.40 30.50
85.6 0.40 34.24
87.93 0.40 35.17
80.29 0.40 32.12
82.53 0.40 33.01
81.29 0.40 32.52
72.47 0.40 28.99
78.76 0.40 31.50
78.63 0.40 31.45
81.12 0.40 32.45
83.08 0.40 33.23
82.71 0.40 33.08
82.87 0.40 33.15

m3 292.12

esponjamiento 1.25 233.70 292.12

m2 1019.15

70.06 0.60 42.04


71.72 0.60 43.03
21.22 0.60 12.73
71.88 0.60 43.13
72.7 0.60 43.62
22.93 0.60 13.76
69.2 0.60 41.52
70.15 0.60 42.09
22.96 0.60 13.78
72.96 0.60 43.78
71.88 0.60 43.13
19.92 0.60 11.95
77.74 0.60 46.64
76.73 0.60 46.04
17.43 0.60 10.46
18.24 0.60 10.94
74.24 0.60 44.54
74.04 0.60 44.42
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
79.54 0.60 47.72
78.46 0.60 47.08
18.31 0.60 10.99
18.69 0.60 11.21
71.52 0.60 42.91
71.44 0.60 42.86
22.03 0.60 13.22
84.09 0.60 50.45
86.72 0.60 52.03
75.01 0.60 45.01
75.31 0.60 45.19
21.46 0.60 12.88

m2 1019.15

70.06 0.60 42.04


71.72 0.60 43.03
21.22 0.60 12.73
71.88 0.60 43.13
72.7 0.60 43.62
22.93 0.60 13.76
69.2 0.60 41.52
70.15 0.60 42.09
22.96 0.60 13.78
72.96 0.60 43.78
71.88 0.60 43.13
19.92 0.60 11.95
77.74 0.60 46.64
76.73 0.60 46.04
17.43 0.60 10.46
18.24 0.60 10.94
74.24 0.60 44.54
74.04 0.60 44.42
79.54 0.60 47.72
78.46 0.60 47.08
18.31 0.60 10.99
18.69 0.60 11.21
71.52 0.60 42.91
71.44 0.60 42.86
22.03 0.60 13.22
84.09 0.60 50.45
86.72 0.60 52.03
75.01 0.60 45.01
75.31 0.60 45.19
21.46 0.60 12.88

m3 509.57

70.06 0.60 0.50 21.02


71.72 0.60 0.50 21.52
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
21.22 0.60 0.50 6.37
71.88 0.60 0.50 21.56
72.7 0.60 0.50 21.81
22.93 0.60 0.50 6.88
69.2 0.60 0.50 20.76
70.15 0.60 0.50 21.05
22.96 0.60 0.50 6.89
72.96 0.60 0.50 21.89
71.88 0.60 0.50 21.56
19.92 0.60 0.50 5.98
77.74 0.60 0.50 23.32
76.73 0.60 0.50 23.02
17.43 0.60 0.50 5.23
18.24 0.60 0.50 5.47
74.24 0.60 0.50 22.27
74.04 0.60 0.50 22.21
79.54 0.60 0.50 23.86
78.46 0.60 0.50 23.54
18.31 0.60 0.50 5.49
18.69 0.60 0.50 5.61
71.52 0.60 0.50 21.46
71.44 0.60 0.50 21.43
22.03 0.60 0.50 6.61
84.09 0.60 0.50 25.23
86.72 0.60 0.50 26.02
75.01 0.60 0.50 22.50
75.31 0.60 0.50 22.59
21.46 0.60 0.50 6.44

m3 212.32

70.06 0.125 8.76


71.72 0.125 8.97
21.22 0.125 2.65
71.88 0.125 8.99
72.7 0.125 9.09
22.93 0.125 2.87
69.2 0.125 8.65
70.15 0.125 8.77
22.96 0.125 2.87
72.96 0.125 9.12
71.88 0.125 8.99
19.92 0.125 2.49
77.74 0.125 9.72
76.73 0.125 9.59
17.43 0.125 2.18
18.24 0.125 2.28
74.24 0.125 9.28
74.04 0.125 9.26
79.54 0.125 9.94
78.46 0.125 9.81
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
18.31 0.125 2.29
18.69 0.125 2.34
71.52 0.125 8.94
71.44 0.125 8.93
22.03 0.125 2.75
84.09 0.125 10.51
86.72 0.125 10.84
75.01 0.125 9.38
75.31 0.125 9.41
21.46 0.125 2.68

kg 4871.438 4871.44

M2 2038.30 2038.30

70.06 PERIMETRO= 1.2 84.07


71.72 PERIMETRO= 1.2 86.06
21.22 PERIMETRO= 1.2 25.46
71.88 PERIMETRO= 1.2 86.26
72.7 PERIMETRO= 1.2 87.24
22.93 PERIMETRO= 1.2 27.52
69.2 PERIMETRO= 1.2 83.04
70.15 PERIMETRO= 1.2 84.18
22.96 PERIMETRO= 1.2 27.55
72.96 PERIMETRO= 1.2 87.55
71.88 PERIMETRO= 1.2 86.26
19.92 PERIMETRO= 1.2 23.90
77.74 PERIMETRO= 1.2 93.29
76.73 PERIMETRO= 1.2 92.08
17.43 PERIMETRO= 1.2 20.92
18.24 PERIMETRO= 1.2 21.89
74.24 PERIMETRO= 1.2 89.09
74.04 PERIMETRO= 1.2 88.85
79.54 PERIMETRO= 1.2 95.45
78.46 PERIMETRO= 1.2 94.15
18.31 PERIMETRO= 1.2 21.97
18.69 PERIMETRO= 1.2 22.43
71.52 PERIMETRO= 1.2 85.82
71.44 PERIMETRO= 1.2 85.73
22.03 PERIMETRO= 1.2 26.44
84.09 PERIMETRO= 1.2 100.91
86.72 PERIMETRO= 1.2 104.06
75.01 PERIMETRO= 1.2 90.01
75.31 PERIMETRO= 1.2 90.37
21.46 PERIMETRO= 1.2 25.75

m2 2123.23

70.06 1.25 87.58


71.72 1.25 89.65
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
21.22 1.25 26.53
71.88 1.25 89.85
72.7 1.25 90.88
22.93 1.25 28.66
69.2 1.25 86.50
70.15 1.25 87.69
22.96 1.25 28.70
72.96 1.25 91.20
71.88 1.25 89.85
19.92 1.25 24.90
77.74 1.25 97.18
76.73 1.25 95.91
17.43 1.25 21.79
18.24 1.25 22.80
74.24 1.25 92.80
74.04 1.25 92.55
79.54 1.25 99.43
78.46 1.25 98.08
18.31 1.25 22.89
18.69 1.25 23.36
71.52 1.25 89.40
71.44 1.25 89.30
22.03 1.25 27.54
84.09 1.25 105.11
86.72 1.25 108.40
75.01 1.25 93.76
75.31 1.25 94.14
21.46 1.25 26.83

m2 2972.52

70.06 1.75 122.61


71.72 1.75 125.51
21.22 1.75 37.14
71.88 1.75 125.79
72.7 1.75 127.23
22.93 1.75 40.13
69.2 1.75 121.10
70.15 1.75 122.76
22.96 1.75 40.18
72.96 1.75 127.68
71.88 1.75 125.79
19.92 1.75 34.86
77.74 1.75 136.05
76.73 1.75 134.28
17.43 1.75 30.50
18.24 1.75 31.92
74.24 1.75 129.92
74.04 1.75 129.57
79.54 1.75 139.20
78.46 1.75 137.31
18.31 1.75 32.04
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
18.69 1.75 32.71
71.52 1.75 125.16
71.44 1.75 125.02
22.03 1.75 38.55
84.09 1.75 147.16
86.72 1.75 151.76
75.01 1.75 131.27
75.31 1.75 131.79
21.46 1.75 37.56

m3 41.62

70.06 0.35 0.07 1.72


71.72 0.35 0.07 1.76
21.22 0.35 0.07 0.52
71.88 0.35 0.07 1.76
72.7 0.35 0.07 1.78
22.93 0.35 0.07 0.56
69.2 0.35 0.07 1.70
70.15 0.35 0.07 1.72
22.96 0.35 0.07 0.56
72.96 0.35 0.07 1.79
71.88 0.35 0.07 1.76
19.92 0.35 0.07 0.49
77.74 0.35 0.07 1.90
76.73 0.35 0.07 1.88
17.43 0.35 0.07 0.43
18.24 0.35 0.07 0.45
74.24 0.35 0.07 1.82
74.04 0.35 0.07 1.81
79.54 0.35 0.07 1.95
78.46 0.35 0.07 1.92
18.31 0.35 0.07 0.45
18.69 0.35 0.07 0.46
71.52 0.35 0.07 1.75
71.44 0.35 0.07 1.75
22.03 0.35 0.07 0.54
84.09 0.35 0.07 2.06
86.72 0.35 0.07 2.12
75.01 0.35 0.07 1.84
75.31 0.35 0.07 1.85
21.46 0.35 0.07 0.53

m3 636.97

esponjamiento 1.25 509.57 636.9675


LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
m2 90.48

35.24 2.00 70.48

10.00 2.00 20.00

m2 90.48

35.24 2.00 70.48

10.00 2.00 20.00

m3 25.44

1.00 35.24 0.58 20.44

1.00 10.00 0.50 5.00

m3 9.05

1.00 35.24 0.20 7.05

1.00 10.00 0.20 2.00

m2 45.24

1.00 35.24 1.00 35.24

1.00 10.00 1.00 10.00

m2 56.55

1.00 35.24 1.25 44.05

1.00 10.00 1.25 12.50


LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
kg 1097.9136 1097.91

m3 20.36

1.00 35.24 0.20 1.00 7.05


1.00 35.24 1.00 0.25 8.81

1.00 10.00 0.20 1.00 2.00


1.00 10.00 1.00 0.25 2.50

m 5 1 5 5.00

m3 21.80 21.80

m2 2504.15
AREA 2504.15

m3 500.83
AREA 2504.15 0.20 500.83 500.83

m2 2504.15
AREA 2504.15 2504.15

m2 2504.15

AREA 54.31 54.31


AREA 40.81 40.81
AREA 63.85 63.85
AREA 50.87 50.87

AREA 63.59 63.59


AREA 53.57 53.57
AREA 51.03 51.03
AREA 34.42 34.42

AREA 27.56 27.56


AREA 39.87 39.87
AREA 40.8 40.8
AREA 38.3 38.3
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO

AREA 31.2 31.2


AREA 43.82 43.82
AREA 34.09 34.09
AREA 48.41 48.41

AREA 66.47 66.47


AREA 83.28 83.28
AREA 113.31 113.31
AREA 100.76 100.76

AREA 74.59 74.59


AREA 63.66 63.66
AREA 74.93 74.93
AREA 84.53 84.53

AREA 59.87 59.87


AREA 75.5 75.5
AREA 62.62 62.62
AREA 64.31 64.31

AREA 64.07 64.07


AREA 67.56 67.56
AREA 60.02 60.02
AREA 71.31 71.31

AREA 67.23 67.23


AREA 72.52 72.52
AREA 69.54 69.54
AREA 87.89 87.89

AREA 85.38 85.38


AREA 72.52 72.52
AREA 77.07 77.07
AREA 68.71 68.71

und 227.00

11.00 11.00
11.00 11.00
12.00 12.00
11.00 11.00
7.00 7.00
11.00 11.00
12.00 12.00
12.00 12.00
13.00 13.00
LA DE METRADOS

DE UTCUBAMBA - AMAZONAS

MEDIDAS
UND CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
12.00 12.00
11.00 11.00
12.00 12.00
12.00 12.00
11.00 11.00
12.00 12.00
11.00 11.00
11.00 11.00
12.00 12.00
12.00 12.00
11.00 11.00

m3 626.04
500.83 1.25 626.04

m2 12226.44
area 12,226.44 12,226.44
RESUMEN DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALT
OBRA
PROVINCIA DE UTCUBAMBA - AMAZONAS

Item Descripcin

01.00.00 OBRAS PROVISIONALES


01.01.00 Cartel de indentificacin de Obra de 3.60 x 8.50 m.
01.02.00 Alquiler de Almacn y Oficina

02.00.00 PAVIMENTOS
02.01.00 TRABAJOS PRELIMINARES
02.01.01 Limpieza de Terreno Manual
02.01.02 Trazo, Nivel y Replanteo
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 Corte con Maquinaria en terreno natural hasta H=1.00 m
02.02.02 Perfilado, Nivelacin y compactacin de la subrasante en zonas de corte
02.02.03 Mejoramiento de subrasante con over menor a 6" e=20cm
02.02.04 Base Granular e=20cm
02.03.00 CONCRETO SIMPLE
02.03.01 Losa de Rodadura, Concreto f'c = 210 Kg/cm2, e=0.20 m.
02.03.02 Concreto en Uas para Pavimento Rgido, Concreto f'c = 210 Kg/cm2
02.03.03 Encofrado y Desencofrado de Losa de Rodadura
02.03.04 Levantamiento de Buzones Existentes a nivel de rasante
02.04.00 CURADO
02.04.01 Curado de Losa de Rodadura, durante 7 dias - 4 veces x dia
02.05.00 JUNTAS
02.05.01 Juntas de contraccin e=6mm
02.05.02 Juntas de contruccin de 3/4" c/ pasajuntas
02.05.03 Juntas de contruccin de 3/4" sin pasajuntas en la interseccin de calles
02.05.04 Juntas asflticas en pavimentos h=20 cm, e=1"
02.06.00 ACERO LISO
02.06.01 Dowels transversales con acero liso de 3/4"
02.06.02 Barras de amarre longitudinal con acero corrugado de 3/4"
02.07.00 SEALIZACION
02.07.01 SEALIZACION HORIZONTAL
02.07.01.01 Pintado de Franjas en Pavimento - Sealizacion
02.07.02 SEALIZACION VERTICAL
02.07.02.01 Sealizacin Preventiva de lado 0.60 x 0.60
02.08.00 ELIMINACION DE MATERIAL EXCEDENTE
Item Descripcin

02.08.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete

03.00.00 VEREDAS
03.01.00 TRABAJOS PRELIMINARES
03.01.01 Limpieza de Terreno Manual
03.01.02 Trazo, Nivel y Replanteo
03.01.03 Demolicin de Vereda existente de concreto simple
03.01.04 Demolicin de Vereda existente de concreto simple con una H= 1.00 m
03.02.00 MOVIMIENTO DE TIERRAS
03.02.01 Corte manual de terreno
03.02.02 Nivelacion y Apisonado en Veredas
03.02.03 Relleno Compactado C/ Material de prestamo (Afirmado) para base de vereda
03.03.00 CONCRETO SIMPLE
03.03.01 Concreto f'c=175 Kg/cm2 en veredas, acabado frot., inc. brua.
03.03.02 Concreto f 'c=175 kg/cm2 en Rampas
03.03.03 Encofrado, descencofrado de Vereda.
03.04.00 JUNTAS Y BRUADO
03.04.01 Junta de dilatacin 1" x 4" de concreto asfltico a 3.0 m
03.04.02 Bruado de veredas
03.04.03 Bruado de rampas
03.05.00 CURADO
03.05.01 Curado de vereda con arena fina , durante 7 dias - 4 veces x da
03.06.00 SUMINISTRO Y COLOCACION DE CAJAS PARA AGUA Y DESAGUE
03.06.01 Suministro y colocacin de encimado de cajas para agua
03.06.02 Suministro y colocacin de encimado de cajas para desague
03.07.00 ELIMINACION DE MATERIAL EXCEDENTE
03.07.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete

04.00.00 SARDINEL
04.01.00 TRABAJOS PRELIMINARES
04.01.01 Limpieza de Terreno Manual
04.01.02 Trazo, Nivel y Replanteo
04.02.00 MOVIMIENTO DE TIERRAS
04.02.01 Excavacion de sardineles hasta h=60 cm
04.03.00 CONCRETO SIMPLE
04.03.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora
04.03.02 Encofrado y Desencofrado
04.03.03 Acero Corrugado 3/8", fy=4200 kg/cm2
04.03.04 Relleno de Juntas de Dilatacin con concreto asfaltico 1"x2" m en sardinel
04.03.05 Tarrajeo pulido en sardineles
04.03.06 Curado de sardinel con arena fina, durante 7 dias - 4 veces x da
04.04.00 ELIMINACION DE MATERIAL EXCEDENTE

04.04.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete


Item Descripcin

05.00.00 CUNETAS RECTANGULARES


05.01.00 TRABAJOS PRELIMINARES
05.01.00 Limpieza de Terreno Manual
05.02.00 Trazo, Nivel y Replanteo
05.02.00 MOVIMIENTO DE TIERRAS
05.02.01 Excavacion de cunetas rectangulares hasta h=60 cm
05.03.00 CONCRETO SIMPLE
05.03.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora
05.03.02 Acero Corrugado 3/8", fy=4200 kg/cm2
05.03.03 Encofrado y Desencofrado
05.03.04 Tarrajeo pulido en Cunetas rectangulares
05.03.05 Curado de sardinel y canaletas, durante 7 dias - 4 veces x da
05.03.06 Tapas de concreto para Cunetas Rectangulares
05.04.00 ELIMINACION DE MATERIAL EXCEDENTE

05.04.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete

06.00.00 MURO DE CONTENCION


06.01.00 TRABAJOS PRELIMINARES
06.01.01 Limpieza de Terreno Manual
06.01.02 Trazo, Nivel y Replanteo
06.02.00 MOVIMIENTO DE TIERRAS
06.02.01 Corte de Terreno Manual para Muro de Contencin
06.02.02 Relleno con material de prstamo en Muro de Contencin
06.03.00 CONCRETO SIMPLE
06.03.01 Solado 1:10; C:A e = 4"
06.04.00 CONCRETO ARMADO
06.04.01 Encofrado y Desencofrado de Muro de contencin
06.04.02 ACERO CORRUGADO, fy = 4200 Kg/cm2 -Muro de Contencion
06.04.03 Concreto f'c = 210 Kg/cm2 en muro de contencin
06.05.00 JUNTAS
06.05.01 Juntas de Dilatacin en Muro y Losa Inferior con water stop 6" cada 9.00 m.
06.06.00 ELIMINACION DE MATERIAL EXCEDENTE

06.06.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete

07.00.00 AREAS VERDES


07.01.00 Corte superficial para jardineras hasta 0.20 m
07.02.00 Acarreo de material excedente dp <=50 m
07.03.00 Suministro y colocacin de tierra agricola h=0.20 m
07.04.00 Sembrado de grass
07.05.00 Arborizacion con plantones

07.06.00 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete


Item Descripcin

08.00.00 VARIOS
08.01.00 Limpieza final de obra
SUMEN DE METRADOS
E PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO -
ROVINCIA DE UTCUBAMBA - AMAZONAS

Und. Metrado

und 1.00
mes 4.00

m2 6,007.37
m2 6,007.37

m3 7,282.14
m2 6,007.37
m2 6,007.37
m2 6,007.37

m2 6,007.37
m3 263.26
m2 3,504.61
und 14.00

m2 6,007.37

m 2,292.49
m 254.40
m 418.62
m 1,902.45

m 1,372.80
m 919.69

m2 441.20

und 16.00
Und. Metrado

m3 9,102.68

m2 2,741.67
m2 2,741.67
m2 945.16
m2 62.90

m3 1,100.78
m2 2,751.95
m2 2,751.95

m2 2,562.10
m2 189.85
m2 1,970.10

m 625.20
m 5503.00
m 890.40

m2 2,751.95

und 149.00
und 149.00

m3 1,031.98

m2 389.50
m2 389.50

m3 233.70

m3 194.75
m2 2,025.37
kg 6,006.39
m 130.25
m2 467.39
m2 623.19

m3 292.12
Und. Metrado

m2 1,019.15
m2 1,019.15

m3 509.57

m3 212.32
kg 4871.44
M2 2,038.30
m2 2,123.23
m2 2972.52
m3 41.62

m3 636.97

m2 90.48
m2 90.48

m3 25.44
m3 9.05

m2 45.24

m2 56.55
kg 1,097.91
m3 20.36

m 5.00

m3 21.80

m2 2504.15
m3 500.83
m2 2504.15
m2 2504.15
und 227.00

m3 626.04
Und. Metrado

m2 12226.44
METRADO DE A
N de Descripcin del Diseo de Acero
Partida Elemento Estructural en el elemento estructural
MURO DE CONTENCION
ACERO FY=4200 KG/CM2
3/8" @ 0.3
L= 40.00 39.92

0.10 0.10

0.1

1.50

0.2

MURO DE CONTENCION
ACERO FY=4200 KG/CM2
3/8" @ 0.3 3/8" @ 0.25
L= 40.00 39.92

0.10 0.10

0.1

1.50

0.2

MURO DE CONTENCION
ACERO FY=4200 KG/CM2
3/8" @ 0.25
L= 40.00 39.92

0.10 0.10

0.2

1.00

0.2

MURO DE CONTENCION
ACERO FY=4200 KG/CM2
3/8" @ 0.2
L= 40.00 39.92
0.10 0.10

0.2

1.00

0.2
METRADO DE ACERO -MURO DE CONTENCION
Dimetro Longitud porRepeticionesCantidad de Elementos LONGITUD POR DIAMETRO DE VARILLA
varilla diseo del diseo Estructurales 1/4 3/8 1/2

3/8 40.12 6.00 1.00 240.72

3/8 1.80 134.00 1.00 241.20

3/8 40.12 6.00 1.00 240.72

3/8 1.80 161.00 1.00 289.80

3/8 40.12 5.00 1.00 200.60

3/8 1.40 161.00 1.00 225.40

3/8 40.12 6.00 1.00 240.72


3/8 1.40 201.00 1.00 281.40

Peso en kilogramos por metro lineal 0.22 0.56 0.99


Longitud total por dimetro, en metros lineales - 1,960.56 -
Total en kilogramos por dimetro - 1,097.91 -
OR DIAMETRO DE VARILLA EN ML.
5/8 3/4 1
1.55 2.24 3.97 Total en kg
- - -
- - - 1,097.91
METRADO D
N de Descripcin del Diseo de Acero
Partida Elemento Estructural en el elemento estructural
AV.MARIANO MELGAR
ACERO FY=4200 KG/CM2
1/4" @ 0.15
L= 426.13 426.05

0.10 0.10

0.50 0.5

0.45

JR.JOSE GALVEZ
1/4" @ 0.15
L= 145.00 144.92

0.10 0.10

0.50 0.5

0.45

JR.RICARDO PALMA
1/4" @ 0.15
L= 343.00 342.92

0.10 0.10

0.50 0.5

0.45

JR.PEDRO RUIZ
1/4" @ 0.15
L= 496.00 495.92

0.10 0.10
0.50 0.5

0.45

JR.ABRAHAM
1/4" @ 0.15
L= 142.94 142.86

0.10 0.10

0.50 0.5

0.45

OTROS AV
1/4" @ 0.15
L= 66.21 66.13

0.10 0.10

0.50 0.5

0.45
METRADO DE ACERO - CUNETAS RECTANGULARES
Dimetro Longitud porRepeticionesCantidad de Elementos LONGITUD POR DIAMETRO DE V
varilla diseo del diseo Estructurales 1/4 3/8

1/4 426.25 4 1 1,705.00

0.10

1/4 1.45 2842 1 4,120.90

1/4 145.12 4 1 580.48

0.10

1/4 1.45 968 1 1,403.60

1/4 343.12 4 1 1,372.48

0.10

1/4 1.45 2288 1 3,317.60

1/4 496.12 4 1 1,984.48

0.10
1/4 1.45 3308 1 4,796.60

1/4 143.06 4 1 572.24

0.10

1/4 1.45 954 1 1,383.30

1/4 66.33 4 1 265.32

0.10

1/4 1.45 442 1 640.90

Peso en kilogramos por metro lineal 0.22 0.56


Longitud total por dimetro, en metros lineales 22,142.90 -
Total en kilogramos por dimetro 4,871.44 -
ONGITUD POR DIAMETRO DE VARILLA EN ML.
1/2 5/8 3/4 1
0.99 1.55 2.24 3.97 Total en kg
- - - -
- - - - 4,871.44
METRADO DE ACERO - SARDINELES

N de Descripcin del Diseo de Acero Dimetro Longitud porRepeticionesCantidad de Elementos


Partida Elemento Estructural en el elemento estructural varilla diseo del diseo Estructurales
SARDINEL
AV.MARIANO MELGAR
1/4" @ 0.15
L= 430.00 429.92 1/4 430.12 11.00 1.00

0.10 0.10

1/4 1.70 2,868.00 1.00

1.50

0.2

JR.JOSE GALVEZ
ACERO FY=4200 KG/CM2
1/4" @ 0.15
L= 154.00 153.92 1/4 154.12 11.00 1.00

0.10 0.10

1/4 1.70 1,028.00 1.00

1.50

0.2

JR.PEDRO RUIZ
ACERO FY=4200 KG/CM2
Pgina 93
METRADO DE ACERO - SARDINELES

N de Descripcin del Diseo de Acero Dimetro Longitud porRepeticionesCantidad de Elementos


Partida Elemento Estructural en el elemento estructural varilla diseo del diseo Estructurales
1/4" @ 0.15
L= 404.50 404.42 1/4 404.62 8.00 1.00

0.10 0.10

1/4 1.20 2,698.00 1.00

1.00

0.2

JR.ABRAHAM VALDELOMAR
ACERO FY=4200 KG/CM2
1/4" @ 0.15
L= 156.00 155.92 1/4 156.12 8.00 1.00

0.10 0.10

1/4 1.20 1,041.00 1.00

1.00

0.2

JR.RICARDO PALMA
ACERO FY=4200 KG/CM2
1/4" @ 0.15
L= 329.78 329.70 1/4 329.90 8.00 1.00
Pgina 94
METRADO DE ACERO - SARDINELES

N de Descripcin del Diseo de Acero Dimetro Longitud porRepeticionesCantidad de Elementos


Partida Elemento Estructural en el elemento estructural varilla diseo del diseo Estructurales

0.10 0.10

1/4 1.20 2,200.00 1.00

1.00

0.2

Peso en kilogramos por metro lineal


Longitud total por dimetro, en metros lineales
Total en kilogramos por dimetro

Pgina 95
DE ACERO - SARDINELES

LONGITUD POR DIAMETRO DE VARILLA EN ML.


1/4 3/8 1/2 5/8 3/4 1

4,731.32

4,875.60

1,695.32

1,747.60

Pgina 96
DE ACERO - SARDINELES

LONGITUD POR DIAMETRO DE VARILLA EN ML.


1/4 3/8 1/2 5/8 3/4 1

3,236.96

3,237.60

1,248.96

1,249.20

2,639.20
Pgina 97
DE ACERO - SARDINELES

LONGITUD POR DIAMETRO DE VARILLA EN ML.


1/4 3/8 1/2 5/8 3/4 1

2,640.00

0.22 0.56 0.99 1.55 2.24 3.97 Total en kg


27,301.76 - - - - -
6,006.39 - - - - - 6,006.39

Pgina 98
METRADO DE ACERO - TAPAS DE CANALETAS

N de Descripcin del Diseo de Acero Dimetro Longitud porRepeticionesCantidad de Elementos


Partida Elemento Estructural en el elemento estructural varilla diseo del diseo Estructurales
TAPAS DE CUNETAS
AV.MARIANO MELGAR
1/4" @ 0.15
L= 1698.58 1698.50 1/4 1,698.50 3.00 1.00

1/4 0.35 11325.00 1.00

0.35

Peso en kilogramos por metro lineal


Longitud total por dimetro, en metros lineales
Total en kilogramos por dimetro

Pgina 99
CERO - TAPAS DE CANALETAS

LONGITUD POR DIAMETRO DE VARILLA EN ML.


1/4 3/8 1/2 5/8 3/4 1

5,095.50

3,963.75

0.22 0.56 0.99 1.55 2.24 3.97 Total en kg


9,059.25 - - - - -
1,993.04 - - - - - 1,993.04

Pgina 100

You might also like