1) The Tigasin Concrete Company has three different locations and is

presently working on three construction projects, each located at a


different site. Weekly capacities and project requirements are as follows:

Plant A B C
Capacity 400 500 600

Project 1 2 3
Requirement 700 500 300

The shipping costs from the plants to the projects are given in the following table

Project Project Project


1 2 3
Plant A 12 6 13
Plant B 11 7 10
Plant C 10 9 8

Find a routing plan that minimizes total transportation cost.

2) The table indicates per unit profit at the upper right hand corner of each
cell. Find the right decision for maximum profit using the MODI method.
Find the maximum profit.
Dealers

A B C D Supply
70 20 10 40
1 x11 x12 x13 x14 25
20 60 30 20
Factories 2 x21 x22 x23 X24 15
30 40 50 20
3 x31 x32 x33 X34 45
50 40 30 50
4 X41 X42 X43 X44 25
Demand 20 10 40 40
3) Determine the assignment of the management teams to the four projects:

Projects

A B C D
1 11,000 8,000 10,000 7,000
Engineers 2 6,000 5,000 3,000 8,000
3 4,000 8,000 10,000 9,000
4 11,000 10,000 5,000 7,000

4) The Mabuhay Company wants to assign four newly hired management


graduates to Regions I, II, III and IV. Based on their course performance
on the company sales course which they have just completed, product
knowledge, and potential customers, management has rated each ones
expected success in each region. The ratings, on a scale from 1 to 10
(with 10 as the highest)

Person Region I Region II Region III Region IV


Jules 8 9 10 7
Aldwin 9 7 8 8
Justin 7 10 9 6
Kloyd 5 8 7 6

Find the best assignments.