Professional Documents
Culture Documents
LAMINAS
PLEGADAS
TP N 3
LAMINA TIPO V
1
Estructuras 4 TALLER VERTICAL DNC
45.20
16.80
2
Estructuras 4 TALLER VERTICAL DNC
45.20
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
16.80
45.20 / 17 = 2.6588 = 2.66 m
3
Estructuras 4 TALLER VERTICAL DNC
4
Estructuras 4 TALLER VERTICAL DNC
t= t
t=6 cm 6 Cos =
H1= cm H1
Cos
H1
t=6 cm =40
H1= = 7.8 cm
0.766
L2 / 2
B1= 1.74 m
m
74
1.
H2
=
1
B
=40
5
A= 1.74 m x 0.06 x 2 = 0.208 m2
Estructuras 4 TALLER VERTICAL DNC
Qpp=
L2
t=
6 t
cm Sen =
t1
t1
t=6 cm
t1= = 9.33 cm 6
H1 0.643
=40
Estructuras 4 TALLER VERTICAL DNC
7
Estructuras 4 TALLER VERTICAL DNC
8
Estructuras 4 TALLER VERTICAL DNC
He= 1.09 m
2 x t1= 0.187 m
b X h3
Jx=
12
0.187 x 1.093
Jx=
12
Jx= 0.020 m4
b X h2 0.187 x 1.092
Wx= Wx= Wx= 0.037 m3
6 6
9
Estructuras 4 TALLER VERTICAL DNC
Anlisis de cargas
10
Estructuras 4 TALLER VERTICAL DNC
q x L2
Map= -
8
11
Estructuras 4 TALLER VERTICAL DNC
q x L2 254.5 x 1.332
Map= - =- = - 56.3 kgm
8 8
q= 254.5 kg/ m
56 / 1.33 =42
127 Kg 212 Kg
12
Estructuras 4 TALLER VERTICAL DNC
q x L2
Mt=
14.2
-56
254.5 x 1.332
Mt=
14.2
127 212
Mt= 32 kgm
13
212 127
Estructuras 4 TALLER VERTICAL DNC
Clculo de armaduras
M
A=
z x adm
0,5 M (tm)
A=
h (m)
14
Estructuras 4 TALLER VERTICAL DNC
15
Estructuras 4 TALLER VERTICAL DNC
16
Estructuras 4 TALLER VERTICAL DNC
17
Estructuras 4 TALLER VERTICAL DNC
18
Estructuras 4 TALLER VERTICAL DNC
fin
19