Cost as a Business Driver ACostE EMC Learning Event
Terry Griggs Ford Motor Company
5
Finance
Manufacturing Engineering Purchasing
PD-Finance
TVM-Finance
Cost
Estimating
Estimating Methodologies
Estimating Methodologies
Estimating Methodologies
Estimating Methodologies
and ...
Experience
CAPE
CAPE Assumptions
Assumes raw materials are purchased at high volumes, net
of rebates and incentives
Direct labour is graded appropriately to match the skill level
required for individual cost elements performed
Capital equipment is chosen to exactly satisfy part
requirements without exceeding them
Capital is funded directly from the supplier company profits
and not from a commercial bank loan
Cycle times use state-of-the-art technology
100% equipment up-time except for normal maintenance
Zero excess capacity
Scrap costs are not cumulative
Floor space is fully capacitised
Cost as a Business Driver ACostE EMC Learning Event
Terry Griggs Ford Motor Company
16
GRIMM Database
GRIMM Database
Direct and Indirect Labour and Fringe
Benefits
Multiple Industry Types and Skill Levels
Over 1300 different machines and supporting
data
Nearly 3000 Materials
Over 7000 Standard Bought Out Parts
GRIMM Database
Britain Czech Republic
Germany Poland
Spain Hungary
France Turkey
Portugal Slovakia
Italy Slovenia
Romania
North America
Mexico India Korea
Maquiladoras Sweden South Africa
China Australia
Cost as a Business Driver ACostE EMC Learning Event
Terry Griggs Ford Motor Company
19
SG&A Depreciation
Interest
Profit Clean & Special
Floorspace Handling
Insurance
Utilities
Component Costing
1. How an Estimator
Creates Manufacturing 2. GRIMM Applies Cost 3. Calculate Manuf.
Detail to Manuf. Detail Cost Subtotals:
+ Raw Materials
Raw Materials: Usage ABS Resin: $1.90/Kg
+ Purchased Parts
Purchased Parts: Usage Fastener: $.03/ea
+ Labor & Burden
Operation 1: Mold 500 Ton Inj. Molding Press: $0.89/min.
Labor minutes (number of
Direct Labor $0.17 Depreciation: $0.15
direct laborers, cavities, &
cycle time) Indirect Labor 0.13 Utilities: 0.04
Machine minutes (cavities & Fringe 0.15 Floor Space: 0.03
cycle time)
MRO Labor 0.08 Other Burden: 0.14 4. Apply Markups
Total Labor $0.53 Total Burden: $0.36 to Manuf. Cost:
Operation 2: Assembly Assembly: $0.42/min. + Purch. Parts
Labor minutes (number of Direct Labor $0.00 Depreciation: $0.08 + Scrap
direct laborers, cavities, & Total
Indirect Labor 0.13 Utilities: 0.01
cycle time) + SG&A = Estimate
Machine minutes (cavities & Fringe 0.06 Floor Space: 0.01
cycle time)
+ Profit
MRO Labor 0.04 Other Burden: 0.09
Total Labor $0.23 Total Burden: $0.19
Component Costing
Component Costing
Component Costing
Focus C-Max
Wire Material 1,7 Km
Tape / Tube Material 329 m
Connectors 317
Terminals 1680
Seals 440
Eyelets 42
Fuses / Relays 32
Clips / Retainer 220
Cost as a Business Driver ACostE EMC Learning Event
Terry Griggs Ford Motor Company
24
Component Costing
1 2
Terminal & Wiring
Connector Machine Loom Data Wiring Loom
Yearly Update
Price (Supplier/ Data
Data
Ford) (Supplier)
Benchmarking
Continuous Update Data (e.g.
Materials, Clips,
Tape, Tube, etc) GRIMM EDGS/C3P Wiring
Loom Data
Final Wiring
Estimate
(local
condition)
Component Costing
Global Rates
Machines and
Materials Database
Includes all machine,
materials and
standard
components (i.e.
Connectors,
Terminals) including
cost information
Component Costing
AA 3M5T-14K733-JF M ##
CC 1 A/RSM3G-4603A- TapeTape (9mmx25m)
CC 2 A/RSKM3-G9513-A TapePaper tape
EDGS / C3P Data CC
CC
3 A/RSKM3-G9513-A
4 A/RS95G-G14K02-4AA
TapePaper tape
TapeTape
imported CC
CC
5 A/RSM3G-4616A-
6613598AG-14A199-AA
TapeTape
TubeID5 Conv tube 130C
CC 7238098AG-14A199-GA TubeID12.9 Conv tube 130C
CC 14 69098AG-14A199-EA TubeID10.1 Conv tube 130C
CC 15 92098AG-14A199-KA TubeID16.8 Conv tube 130C
All components and CC 16 105* RE-SIN R-IBBON Other80X45 RIBBON/OUT
CC 17 13M5T-14A076-AB OtherUpper Cover
materials are captured in CC 18 13M5T-14A142-AB OtherLower Cover
CC 19 13M5T-14A076-BB OtherCover Midi Fuses
the import file for CC
CC
20 13M5T-14A034-AB
21 33M5T-14474-GAA
OtherABS Fuseholder
TerminalTerminal f 2.8
downloading to CAPE CC
CC
22 143M5T-14474-GBA
134 13M5T-14489-TAA
Terminal2.8 cbt 0.75-1.00 SN
ConnectorCF 1Pos NWP LSK 8.0
CC 183 101L3T-14A094-FA OtherFuse Mini 10A RD
CC 184 21L3T-14A094-GA OtherFuse Mini 15A BU
CC 185 13M5T-14A067-BB ConnectorBJB Frame (high assem
DD 4-EC2GY-RD 0,5 WK 1345 -- --
DD 4-PB9GY-VT 0,5 WK 2180 -- --
DD 15S-RD15DGN-OG 2,5 WK 960 -- --
DD 49S-LG11ABU-OG 0,75 WK 1520 -- --
DD 49S-LG18ABU 0,75 WK 480 -- --
DD 50-BB16_AGY-BK 1,5 WK 2130 -- --
EE CRCR DATE 03/01/24 EE00-E-1 1449615 -000-
Component Costing
Component Costing
Component Costing
Component Costing
Application of Mark-Ups
Scrap
SG&A
Profit
ED&T
Component Costing
Scrap: 3.85
SG&A: 35.96
Profit: 25.93
R&D: 12.95
Content
Component Costing
Questions
Questions ?