PROJECT : PAGE :

CLIENT : DESIGN BY :
JOB NO. : DATE : REVIEW BY :
Concrete Floodway Design Based on ACI 350-06 & ACI 318-08
INPUT DATA & DESIGN SUMMARY
CONCRETE STRENGTH fc' = 3 ksi
REBAR YIELD STRESS fy = 60 ksi
LATERAL SOIL PRESSURE Pa = 45 pcf
(equivalent fluid pressure)
BACKFILL WEIGHT gb = 110 pcf
SURCHARGE WEIGHT ws = 50 psf
SEISMIC GROUND SHAKING PE = 0 psf /ft, ASD
(soil pressure, if no report 35SDS suggested. )
CHANNEL DEPTH H = 6 ft
THICKNESS OF WALL tw = 6 in
THICKNESS OF SLAB ts = 6 in
SLAB TRANS REBARS # 3 @ 10 in o.c. at mid
WALL VERTICAL REBARS # 3 @ 10 in o.c.
WALL BAR LOCATION (1=at middle, 2=at each face) 1 at middle
LAP LENGTH Ls = 36 in
SLAB THICKER DISTANCE D = 4 ft [THE CHANNEL DESIGN IS ADEQUATE.]

ANALYSIS
DESIGN CRITERIA
1. THE CRITERICAL DESIGN, FOR REBAR AT MIDDLE OR EQUAL OF EACH FACE, IS CHANNEL WALL AT INWARD
SOIL PRESSURE BEFORE RESTRAINED AT TOP AND CHANNEL FILLED.
2. SINCE THE WALL AXIAL LOAD SMALL AND SECTIONS UNDER TENSION-CONTROLLED (ACI 318-08, 10.3.4), ONLY
CHECK WALL FLEXURAL CAPACITIES ARE ADEQUATE.
3. SINCE THE SLAB AT FLEXURAL & AXIAL LOADS, THE COMBINED CAPACITY OF FLEXURAL & AXIAL MUST BE CHECKED.

SERVICE LOADS
Hb = 0.5 Pa (H + ts)2 = 0.95 kips / ft
Hs = ws Pa (H + ts) / gb = 0.13 kips / ft
HE = 0.5 PE (H + ts) 2
= 0.42 kips / ft

FACTORED LOADS
gHb = 1.6 Hb = 1.52 kips / ft
gHs = 1.6 Hs = 0.21 kips / ft
gHE = 1.6 HE = 0.68 kips / ft

CHECK WALL FLEXURE CAPACITY (ACI 318-08, 15.4.2, 10.2, 10.5.4, 7.12.2, 12.2, & 12.5)
Mu = (0.5 g Hs + 0.33 g Hb + 0.67 g HE) H = 6.38 ft-kips / ft, (entire lateral loads used conservatively)
Pu = 0.43 kips / ft, (concrete wall self weight)
d = 6.00 in, b = 12 in, As = 0.465 in2 / ft

AS f y P u
M n AS f y d = 7.46 ft-kips / ft > Mu [Satisfactory]
1.7bf 'c
rProvD = 0.010 < rMAX = 0.015
> rMIN = 0.004 [Satisfactory]

CHECK WALL SHEAR CAPACITY (ACI 318-08, 15.5.2, 11.1.3.1, & 11.2)
Vu = g Hs + g Hb + g HE = 2.41 kips / ft, (entire lateral loads used conservatively)

V n 2 bd f
'
c
V n 2 bd f
'
c = 3.94 kips / ft > Vu [Satisfactory]
(cont'd)
CHECK SLAB COMBINED CAPACITY OF FLEXURE & AXIAL (ACI 318-08, 10)
rProvD = 0.01033 < rMAX = 0.08 (for compression, ACI 318-08, 10.9.1)
> rMIN = 0.00333 (for flexural, ACI 318-08, 10.5.1)
[Satisfactory]

120.00 Pn Mn
AT AXIAL LOAD ONLY 106.6 0.0
100.00 AT MAXIMUM LOAD 106.6 3.9
AT MIDDLE 60.9 7.2
80.00 AT e t = 0.002 15.3 5.5
AT BALANCED 14.4 5.4
Pn (k) 60.00 AT e t = 0.005 5.3 5.3
AT FLEXURE ONLY 0.0 4.4
40.00 (Note: For middle reforming the max Mn is at c
equal to 0.5 t / b1, not at balanced condition.)

20.00
Pu = 2.41 kips / ft
0.00 Mu = 1.25 ft-kips / ft
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00

Mn (ft-k) [Satisfactory]

CHECK REBAR DEVELOPMENT


r
requird 0.075y ty ey s b f
d
L d MAX , 12 in 26 db
y = 16 in, (ACI 318-08, 12.2.3)
r provided ' c K tr
l fc
db
< Ls [Satisfactory]

where Bar size # 5 , (governing size)


db = 0.625 in
r required / r provided = 1 ( As,reqd / As,provd, ACI 318-08, 12.2.5)
yt = 1.0 (1.3 for bottom cover more than 12", ACI 318-08, 12.2.4)
ye = 1.0 (1.2 for epoxy-coated, ACI 318-08, 12.2.4)
ys = 0.8 (0.8 for # 6 or smaller, 1.0 for other)
l = 1.0 (0.7 for light weight)
c = 3.3 in, min(d' , 0.5s), (ACI 318-08, 12.2.4)
Ktr = (Atr fyt / 1500 s n) = 0 (ACI 318-08, 12.2.4)
(c + Ktr ) / db = 2.5 < 2.5 , (ACI 318-08, 12.2.3)