You are on page 1of 35

MTU Onsite Energy Gas Power

Systems

Economic and sustainable


power, heat & cold generation
for Buildings in Bulgaria

Cneyt Kaymak
Manager Sales

Sofia, 21.06.16
AGENDA
1. Introduction

2. Company profile

3. Product portfolio and solutions for


combined power, heat & cold in buildings

4. Local service and engineering

5. References

6. Outlook

Seite 2 / MTU Onsite Energy / 18.06.2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten
Why are we interested in energy efficient
Buildings?
Decoupling economic growth
from electricity demand and energy consumption

Change consumer behavior

Demand for
Energy efficiency products &
technology
Renewable energy
Intelligent controls

in the building sector

Sustainable decentralized onsite


power and heat generation

Demand for
Fuel switch to natural gas and
renewable sources
Developing market in South Eastern
Europe

Seite 3 / MTU Onsite Energy / 18.06.2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten
02
MTU ONSITE ENERGY Augsburg GmbH
GAS POWER SYSTEMS
COMPANY PROFILE

Seite 4 / MTU Onsite Energy / 18.06.2016


MTU
SeiteOnsite Energy
4 / MTU GmbH
Onsite / Alle
Energy Rechte vorbehalten
/ 18.06.2016
MTU Onsite Energy GmbH / Alle Rechte vorbehalten
Our Vision

We are the preferred


partner for sustainable
energy solutions in power
generation, cogeneration
and service with
WORLDWIDE >4.000
INSTALLED Combined
Heat & Power GAS
SYSTEMS

Germanys Market Leader in power range of 100 kW to 2.5 MW

Page 5 / MTU Onsite Energy Gas Power Systems / 6/18/2016


Our company history

1909

More than 100 years history


Gottlieb Daimler Wilhelm Maybach Karl Maybach Graf Ferdinand von Zeppelin

1918

On-Highway-Motoren Off-Highway-Motoren
1966

Rudolf Diesel 1969

Spin-off from MAN, creation of MDE GmbH 1998

Acquisition of MTU Friedrichshafen GmbH and MDE by 2006

Launch of Brand MTU Onsite Energy GmbH 2008

acquires 2014

TODAY

Seite 6 / MTU Onsite Energy / 18.06.2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten
6
MTU Onsite Energy Gas Augsburg GmbH
Key Facts

Founded in 1998

390 employees

Revenue ~ 100 Mio.


121

105 105
100
94

67
62
57 56

2007 2008 2009 2010 2011 2012 2013 2014 2015

Worldwide Engineering Development Center & Assembly factory


for high-speed non-stop Gas Power Systems of Rolls-Royce
Seite 7 / MTU Onsite Energy / 18.06.2016
MTU Onsite Energy GmbH / Alle Rechte vorbehalten
High production Standards
Assembly hall and test benches

Highly modern production halls for


series 400 & 4000
Production capacity: 500 units per
year
Research & development 1 test bench
for R&D

Seite 8 / MTU Onsite Energy / 18.06.2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten
Our Global Presence

Status: Dec. 2014

Seite 9 / MTU Onsite Energy / 18.06.2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten
03
PRODUCT PORTFOLIO & SOLUTIONS
FOR CHP/CCHP in BUILDINGS

Seite 10 / MTU Onsite Energy / 18.06.2016


MTU
SeiteOnsite Energy
10 / MTU GmbH
Onsite / Alle/ Rechte
Energy vorbehalten
18.06.2016
MTU Onsite Energy GmbH / Alle Rechte vorbehalten
When power, heat or cold is needed
we provide an energy solution
Distributed Gas Energy Systems for Buildings
Natural gas Cogeneration Natural gas Trigeneration
Natural Gas CCHP and
Combined Heat & Power Combined Heat, Power, Cold steam
Plants CHP CCHP
Using low temperature levels of motor cooling Using higher temperature levels of motor Using higher temperature levels of
water for space heating in buildings cooling water, intercooler and exhaust gas for exhaust gas to generate steam
space cooling in buildings
Technology: CHP Plants with heat
exchangers Technology: CHP Plants with/o heat Technology: CHP Plants + steam
exchangers + absorption chiller generator

Benefits: Additional Benefits: Additional Benefits:


Heat source close to the consumer, > 80% of the thermal output of the CHP ..
independency from district heating converted to chilled water
High utilization ratio per year of heat Absorption system as alternative
source technology to conventional electrical
Simple system integration refrigeration systems
Temperature increase possible to higher Low Maintenance and larger running
level hours of the complete plant CCHP
Overall low emissions
Increased overall plant profitability
Reliable solution
Achieve high level of efficiency
Commercial/shopping malls, office & public buildings, industry halls, hospitals, hotels, Universities

Seite 11 / MTU Onsite Energy / 18.06.2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten
Heat Exchange from our CHP
For a wide range of applications
Sources of Heat Converted energy Customer Benefits
Hot
Exhaust gas Steam Steam Production
@ 450C
Absorption Chiller
Mixture HT
@ 200C Drying Processes
Lube Oil High temperature Water
Building Heating
@ 95C
Jacket Water Industrial Processes
@ 90C
Mixture LT
@ 90C
Drying Processes
Condensing Heat
@50C Medium/low temp. Water Underfloor heating

Radiant Heat Return temp. rising


down to 35C.
cool
= up to 96% overall Efficiency!

Seite 12 / MTU Onsite Energy / 6/18/2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten
Standardized products
Wide range of power supply and scope delivery

Benefits

Efficiency
Utilization of
MTU engines
From proven motors to gensets
and complex CHP units
up to 44,3%
Fuel flexible (Natural Gas,
Gas Systems Biogas, Landfill, Coal bed L32/L33/L64 with 8/12/16/20V
methane, etc.)
4000 Series
up to 39,5%
50/60 Hz versions D/L/Z with 6R/12V
(4000 with Gearbox)
S 400
Electric Power
Interface with wide scope of 50 100 450 750 1,000 2,000 3,000 kW el
balance of plant available

Enclosure / Container

Page 13 / MTU Onsite Energy Company Presentation/ 6/18/2016


MTU Onsite Energy GmbH / All rights reserved
04 LOCAL SERVICE AND
ENGINEERING CAPABILITIES

Seite 14 / MTU Onsite Energy / 18.06.2016


MTU
SeiteOnsite Energy
14 / MTU GmbH
Onsite / Alle/ Rechte
Energy vorbehalten
18.06.2016
MTU Onsite Energy GmbH / Alle Rechte vorbehalten
Service orientation is our value
client satisfaction is our target

Highest possible
efficiency

Emissions
mg/m3 High availability

Electrical & Long Intervalls &


Natural thermal life
Gas energy
m3/h kWel/kWth
Low Emission
product & customer requirements
Time Intervalls
3 6

2
5
Seite 15 / MTU Onsite Energy / 18.06.2016
MTU Onsite Energy GmbH / Alle Rechte vorbehalten
Service products
Adding value to service capability

Spare Parts Commissioning Training

Remanufactured Maintenance contracts incl. Remote control/service,


components corrective actions messaging &hotline 24/7

Exchange engines Inspections upon warranty Modernization

Seite 16 / MTU Onsite Energy / 6/18/2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten
04 REFERENCES

Seite 17 / MTU Onsite Energy / 18.06.2016


MTU
SeiteOnsite Energy
17 / MTU GmbH
Onsite / Alle/ Rechte
Energy vorbehalten
18.06.2016
MTU Onsite Energy GmbH / Alle Rechte vorbehalten
References
MEETING THE CUSTOMER NEEDS

Page 18
2015 Rolls-Royce Power Systems AG
Shanghai Center
CHP- Office Building| China

Customer Shanghai Center


Place Shanghai, China
Delivery 2x AB 12V4000L62ER, 11kV
Total output 2360 kWe
Fuel Natural gas

Picture

super tall tower sited in the heart of Shanghais


Finance and trade Zone Picture or Country Location
Height 632 meters; Stories 128 floors

Commissioning: 2014 (Construction Phase)

Emissions NOx= 250 mg/Nm3; CO=300 mg/Nm3


Luxury Hotels in Belek
CHP- Steam generation| Turkey

Customer Kaya Palazzo Golf Resort Hotel


Cornelia Diamond Gold Resort & SPA
Maxx Royal Belek Golf & SPA Resort
delivery 1x 12V4000
1x 8V4000 & 1x 20V4000
1x 8V4000 & 1x 20V4000
Fuel Natural gas
Picture

In summer season, energy is used for hotel cooling.


In winter season, Chiller are taken off line as heat is
Picture or Country Location
required
Heat: Swimming Pools / Sauna / Spa
Cooling: Hotel Air conditioning
Steam: cleaning ~40 tones laundry daily
Casino in Baltimore
CHP- Industrial Maryland

Customer Baltimore
delivery 1x 12V4000L62, 60Hz
Total output 1149kWe; 4500 kBTU/h
Fuel Natural gas

Picture

Containerized package
Picture or Country Location
supplies hot water for heating demand of casino.
Expansion to trigeneration for cooling demand planed in
future
Dublin Ohio
CHP- Swimming Center USA

Customer Dublin Ohio


delivery 1x GC 248, 60Hz
Total output 248kWe; 2496kBTU/h
Fuel Natural gas

Picture

Supplies thermal output to heat the recreation Center


and swimming pool; back-up power during utility Picture or Country Location
outages.
Mexico City
CCHP Shopping Mall Mexico

Customer
delivery 13x GR400012VNG
Total output 1000kWe; 4000kBTU/h
Fuel Natural gas

Picture

Trigeneration application with absorption chilling.


Picture or Country Location
40ft ISO container
REFERENCES
ASIA
Application: Hospital Commissioning: 2011

Module-Type: MTU 12V400 GS


Series: 400
Fuel Type: Natural Gas

Output
Electrical : 357 kW
Thermal: 529 kW

Shanghai Feng Xian Hospital, Shanghai / China

Seite 24 / MTU Onsite Energy / 18.06.2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten
REFERENCES
ASIA
Application: Hospital Commissioning: 2006

Module-Type: 2 x MTU 12V4000 GS


Series: 4000
Fuel Type: Natural Gas

Output
Electrical : each 1.166 kW
Thermal: each 608 kW

United Hospital, Dhaka / Bangladesh

Seite 25 / MTU Onsite Energy / 18.06.2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten
REFERENCES
AUSTRALIA & PACIFIC
Application: Airport Commissioning: 2011

Module-Type: MTU 12V4000 GS


Series: 4000
Fuel Type: Natural Gas

Output
Electrical : 1.166 kW
Thermal: 687 kW

Canberra Airport Terminal, Canberra / Australia

Seite 26 / MTU Onsite Energy / 18.06.2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten
REFERENCES
AUSTRALIA & PACIFIC
Application: Hospital Commissioning: 2011

Module-Type: MTU 20V4000 GS


Series: 4000
Fuel Type: Natural Gas

Output
Electrical : 2.138 kW
Thermal: 1.237 kW

Queen Elizabeth II Hospital, Perth / Australia

Seite 27 / MTU Onsite Energy / 18.06.2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten
REFERENCES
NORTH & CENTRAL AMERICA
Application: School Commissioning: 2013

Module-Type: MTU 12V400 GS


Series: 400
Fuel Type: Natural Gas

Output
Electrical : 125 kW
Thermal: 217 kW

Medina High School, Medina, Ohio / USA

Seite 28 / MTU Onsite Energy / 18.06.2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten
REFERENCES
NORTH & CENTRAL AMERICA
Application: Rest Home Commissioning: 2012

Module-Type: MTU 12V400 GS


Series: 400
Fuel Type: Natural Gas

Output
Electrical : 354 kW
Thermal: 593 kW

Spring Hill Residences, King City, Canada

Seite 29 / MTU Onsite Energy / 18.06.2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten
REFERENCES
EUROPE
Application: University Commissioning: 2010

Module-Type: MTU 12V400 GS


Series: 400
Fuel Type: Natural Gas

Output
Electrical : 362 kW
Thermal: 508 kW

Universidad Rey Juan Carlos, Madrid / Spain

Seite 30 / MTU Onsite Energy / 18.06.2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten
REFERENCES
GERMANY
Application: Public Pool Commissioning: 2011

Module-Type: MTU 12V400 GS


Series: 400
Fuel Type: Natural Gas

Output
Electrical : 232 kW
Thermal: 358 kW

Hockermhlbad Amberg / Germany

Seite 31 / MTU Onsite Energy / 18.06.2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten
REFERENCES
GERMANY
Application: Hotel Commissioning: 2009

Module-Type: 2 x MTU 12V400 GS


Series: 400
Fuel Type: Natural Gas

Output
Electrical : 232 kW
Thermal: 358 kW

Hotel Traube-Tonbach, Baiersbronn / Germany

Seite 32 / MTU Onsite Energy / 18.06.2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten
KEY MESSAGE & OUTLOOK

MTU Onsite Energy is ready to support project


developers and energy providers and building owners
to:
Identifiying together the most promising
energy projects in the building sector

Install Biogas and Natural gas CHPs into the


energy systems of the buildings in Bulgaria

Providing reliable, best performing


equipment, local service and jointly project
development
Seite 33 / MTU Onsite Energy / 18.06.2016
MTU Onsite Energy GmbH / Alle Rechte vorbehalten
Contacts

Local support Bulgaria Headquarters Germany

Balkan Star Rtil OOD Cneyt Kaymak


ID Nr. BG200518817 Manager Sales MTU
5 Resbarska Street
1510 Sofia, Bulgaria Maybachplatz 1
Phone: + 359 2 4082 726 88045 Friedrichshafen Germany
Fax: + 359 2 945 43 97 Phone: +497541905613
Email: Email:
jivko.djissov@balkanstar.com cuneyt.kaymak@mtu-online.com

Page 34 / MTU Onsite Energy / 18.06.2016


MTU Onsite Energy GmbH / All rights reserved
For more information

http://www.mtuonsiteenergy.com/home/
http://www.mtuonsiteenergy.com/products/gas-generator-sets/continuous-power/

http://www.mtuonsiteenergy.com/find-a-dealer/

Thank you! !

Seite 35 / MTU Onsite Energy / 18.06.2016


MTU Onsite Energy GmbH / Alle Rechte vorbehalten

You might also like