Professional Documents
Culture Documents
2
:
4
1.
(1)
(2)
(3)
2.
(1)
(2)
(3)
3.
(1)
(2)
(3)
6
1.
7
1.
:
(1)
(2)
(3)
(4)
8
1.
(1):
9
1.
(2):
a.
b.
c.
10
2.
11
1.
12
2.
13
1.
2.
(1)(2)
(3)(Sill)(Buffer pier)
(1)
14
3.
(3)
15
16
17
18
19
20
21
22
23
24
-
25
26
115m
(1)
(2)
a.
b.
(3)
a.
b.
c.
(4)
a.
b.
c.
27
28
29
30
31
32
33
34
35
()
(
)
(1)
10-15(2)
36
37
38
3.
1
(m^3/s) (m)
200 0.6
200~500 0.8
500~2000 1.0
2000 1.2
39
1.
40
2.
1m
3.
(5-10%)
41
(5m)
(1)
(2)
(3)
42
43
1/4020m
44