total length (2way) 88036 44018

cut length 34844


fill length 33056

LAWAS SECTION
Phase 2 (Mainline + Slip Road) 44.018 mainline = 42.731km, Slip road = 1.287 km
% length on Existing Road 80.686 8.5km
% length on Cut Area 39.579
% length on Fill Area 37.548
% length on Flat Terain 22.872
% Green Area/ Detour 19.314 35.5 km
ch 20.200

40400
mainline slip road
cut fill cut fill
160 100 150 200
160 180 878 80
240 20 878
280 160 50
170 160 1028 1208
90 400
40 400
170 578
170 378
200 300
522 300
522 100
100 200
740 200
540 100
50 400
110 105
330 140
130 300
490 300
490 290
140 160
140 140
480 115
480 120
95 410
100 115
360 250
360 120
480 120
480 140
210 30
120 30
270 70
270 170
330 200
330 170
120 200
230 530
230 530
130 490
500 490
500 200
230 200
230 50
650 350
650 160
70 60
140 180
140 90
100 570
300 570
300 730
500 230
800 700
800 200
340 460
220 540
290 80
140 300
140 260
70 200
320
320
130
300
300
280
280
60
410
20569 15841