You are on page 1of 3

PROPOSED SITE DEVELOPMENT WORKS FOR TEMPORARY TRUCK PARKING AREA

A. General Requirements Qty Unit Unit Cost


1 Mobilization and Demobilization 1 lot
2 Permits, Bonds, Insurance & etc. 1 lot
3 Temporary Facilities & Project Management 1 lot
4 Material testings, Quality Control & Misc. Services 1 lot
5 Overheads, Contingencies & Profits 1 lot
6 Others: General site expenses (Specify) 1 lot

B. List of Equipments Qty No. of Hours Rate/hr


1
2
3
4
5
6

C. List of Manpower Qty No. of days Rate/day


1
2
3
4
5
6

PAYMENT TERMS TOTAL A + B + C


DURATION 45 DAYS VAT 12%
OVERALL TOTAL

D. Scope of Works Qty Unit


1 Site survey and layout 1 LOT

Site stripping, clearing and grubbing including removal


2 of trees, shrubs, de-rooting and removal of unsuitable 30000 CUM
topsoil subject to Owners approval, and disposal of
unwanted materials. It is the Contractors responsibility
to look for appropriate disposal site outside JGSPG
Properties

3 Cutting, leveling and banking of low lying areas to final 30000 CUM
grade level to proctor density of 95% MMD ASTM D-698
compaction in layers with a maximum lift of 250mm
Banking, filling and leveling of low lying areas using cut
soil to Final Grade Level +61.00M to proctor density of
4 95% MDD ASTM D-698 compaction in layers with a 45000 CUM
maximum lift of 250mm

Disposal of spoil and unwanted earth materials. It is the


Contractors responsibility to look for appropriate
5 disposal site outside JGSPG Properties 9000 CUM

Provision for 8.00 meter wide truck access dirt


road/ramp located along the new paved road (existing
6 open canal to be fill with layers of stone/boulder) 3.85 CUM

7 Other related works necessary to complete site CUM


development works (specify)
ING AREA

Total Cost

Total Cost

Total Cost