Professional Documents
Culture Documents
PORTO
Jornadas
JornadasTNELES
TNELES YY EXCAVACIONES
EXCAVACIONES EN
EN GRANITO
GRANITO Abril
Abril 2010
2010
1
Metro do Porto
Project and
construction
Metro do Porto
INDEX
The Project
Geological Conditions
Tunnels:
Underground stations:
pp
- Cut and Cover: active support or unsupported
pp shafts ((arch effects))
2
Metro do Porto
Metro do Porto
The Project
3
Metro do Porto. Routes
Frentes L eg en d a:
ren tes de
Frentes
F d eObra
de O b raactiv as
obra
ound Stations
activas
activasememJan/20
em OFEV 01
u t/2001
2002 1 - Tnel (Tuneladora)
2 - E st. Herosm o
3 - E st. 24 de A gosto
4 - Trindade (D . Redes p/ Trincheira)
5 - M atosinhos - P .I. V ia Rpida
9
6 - M atosinhos - D esvios Redes p p/ V ia
Main Undergro
7 - P M O Guifes
8 - Ram al acesso P M O Guifes
9 - M aia (D esvios Redes e P lataform a)
7 8
14
6
13
6 6
5 12
Line S
11 15
Line C
4 1
3
10 2
4
Metro do Porto
Geological Conditions
Iberian Granites
5
Metro do Porto. Geological Conditions
CIZ
OMZ (5) Ermesinde granite (hybrid
sin-tectonic);
(6) Porto granite (peraluminous
1 2 3 4 5 6
sin-tectonic)
6
Metro do Porto. Geological Conditions
G2 30-90 25-27 32
3.2 7 5E-3
7.5E-3 10 7
10.7
RO
7
Metro do Porto. Geotechnical Characterisation
Drilled Boreholes
Work Conventional rotary Parameters recording (DPR)
N Comp.(m) N Comp.(m)
LINE C 122 3522 18 592
LINE S 75 2068 11 288
LINE J 10 560 - -
Stations Line 'C' 74 1164 - -
Stations Line 'S' 117 3004 - -
TOTAL 398 10318 29 880
26,4 m
17,0 m
10,5 m
8
Metro do Porto. Campanh Station - Assessment of Geology
Line S
(underground) g7 g6 g5 g4 g3 g2
Line C
(underground) g7 g6 g5 g4 g3 g2
9
Metro do Porto. Geological Conditions
10
Metro do Porto. Geological Conditions
fresh
granite
weathered
granite
11
Metro do Porto. Geological Conditions
Diverse
weathering
Multiple
solutions
Multiple solutions
12
Metro do Porto. Geological Conditions
Mixed solutions
13
Metro do Porto. Geological Conditions
North Side: Preparing the breakthrough of TBM
Jet-Grouting
Type II
Preparing
South Side
the
intrusion of
the TBM -
nails of
fibreglass
Tunnels
TUNNELING BORING
MACHINE
Earth Pressure Balance
14
Metro do Porto. Geological Conditions for TUNNELING
15
Metro do Porto. Tunnel geometry
Geometry
D
D
D
A A
A D
C
C
C
A
F+T
LV
MV
Project conditions
16
Tunnels. TBM (EPB) - Ring Support
17
Tunnels. TBM Earth Pressure Balance (EPB)
Project conditions
Weathered Granite
Porto
Weathered Granite
18
Metro do Porto. TBM - Geological Conditions
Porto
Weathered Granite
The water table is located 10-25m above the tunnel, rarely following the
shape of the surface topography.
Porto
Weathered Granite
Weathered Granito
Granito do Porto
Porto exhibits a METASTABLE structure, which
can accentuate a potential for collapse, depending on the high porosity
and reduced cohesive strength of the loosed/leached residual soil.
The water table is located 10-25m above the tunnel, rarely following the
shape of the surface topography.
ADITIONALLY: a large number of old wells and minas (old and small
handmade water tunnels),
tunnels) with no register...).
register ) The vast number of these
elements have modified the hydro-geological characteristics of the
ground; so, the water MOVES NOT ONLY IN THE POROUS MEDIUM
AND FRACTURES, but ALSO ALONG THESE CHANNELS (MINAS...).
19
Tunnels. TBM
Selection Criteria
20
Metro do Porto. TBM - Design
Geology
Weathered Granite Different Cohesion Different Permeability !...
21
Metro do Porto. TBM - Design
22
Metro do Porto. TBM - Design
23
Metro do Porto. TBM - Design
24
Metro do Porto. TBM - Design
EPB Characteristics
25
Tunnels. Criteria for selection of TBM
Selection of TBM
Type of Face Support: (1) Pressurized Slurry
Selection of TBM
Type of Face Support: (2) Pressurized Earth Paste (EPB)
Fill
Additives Screw
Conveyer
26
Tunnels. Criteria for selection of TBM
8 2 1 90
3 80 Slurry-TBM drives
4 5 70 1. Lyon
2. Hamburg
6 60 3. Grauholztunnel
4. Wesertunnel
50
5. Zrich, Hermetschloo-Werdhlzli
40 6. Zrich, Thalwil
7. Portland, Gravel Alluvium
30 8. Wittenberg (polymer suspension)
7 20
10
0
0,002 0,006 0,02 0,06 0,2 0,63 2 6,3 20 63 100 200 1000
100
90
80
70
60
EPB-TBM drives
9. Essen, U-Bahn Los 32/33
9 50
10. Milano, Passante Ferroviario
10 40 11. Metro Porto
11
30
20
10
0
0,002 0,006 0,02 0,06 0,2 0,63 2 6,3 20 63 100 200 1000
Grain-size [mm]
Slurry limitation
EPB limitation
27
Tunnels. TBM Earth Pressure Balance (EPB)
Reaction procedure :
28
Tunnels. TBM (EPB) - Emergency
In an emergency situation
29
Tunnels. TBM (EPB) Failure!
30
Tunnels. TBM (EPB) Solution
From the
F th problem
bl to
t
the solution !
Panel Specialists
A. Cardoso (FEUP)
S. Babendererde
E. Hoek
P. Marinos (NTUA)
Geological Risks
31
Tunnels. TBM (EPB) - Classical
32
Tunnels. TBM (EPBm) - Face Support
and (9+2)
sures Sensors: (7+2) a
Earth Press
33
Tunnels. TBM (EPBm) - Modified
34
Tunnels. TBM (EPBm) - Modified
35
Tunnels. TBM (EPBm) - Modified
36
Tunnels. TBM (EPBm) - Modified
37
Tunnels. TBM (EPBm) - Modified
38
Tunnels. TBM (EPBm) - Face Support
Suspension
S spension
Container
Pressure Control
Scheme from
Babendererde,
Cardoso, Hoek,
Marinos, report
to Metro do Porto,
2001
39
Tunnels. TBM Earth Pressure Balance (EPBm)
Porto EPBM
40
Tunnels. TBM Earth Pressure Balance (EPBm)
Combined Tool
Arrangement
Disks and
Shave Bits
P
Proved
d an accuracy off 3
3-4%;
4%
41
Tunnels. TBM (EPBm) - Face Support
P
Proved
d an accuracy off 3
3-4%;
4%
P
Proved
d an accuracy off 3
3-4%;
4%
42
Tunnels. TBM (EPBm) - Face Support
P
Proved
d an accuracy off 3
3-4%;
4%
injection
43
Tunnels. TBM (EPBm) - Face Support
Assured by
y IMPOSING A
MINIMUM EFFECTIVE
PRESSURE;
ie, the support pressure
SHOULD BE TRANSMITTED
from the bulkhead to the face
VIA SOLID PARTICLE and NOT
ONLY through the pore
pressure or compressed air.
CONSEQUENCE:
CHAMBER MUST ALWAYS BE FULL OF SOLID MIXTURE with
adequate density (around 14kN/m3)
As additional safety measure,
THE REFERENCE SUPPORT PRESSURE WAS DEFINED AND
MEASURED AT THE TOP OF THE BULKHEAD (1m below the tunnel
crown), so that the other pressures were higher
44
Tunnels. TBM (EPBm) - Face Support
Elements of Face
Pressure
45
Tunnels. TBM (EPBm) - Face Support
d (9+2)
es Sensors: (7+2) and
Advance Force
Conditioning agents
Both polymer and foam have proved to work successfully!
POLYMERS couldnt help to reduce the very high tool-wear rate
FOAM greatly reduced the wear rate, BUT required more complex
and smoother operation of the screw conveyor.
Excessive wear
46
Tunnels. TBM (EPBm) - Face Support
Foam
High filtration Forces
of air and transferred 91% air
water grain to grain 8,8% water
0,2% foaming agent
(300-600 l air/m3 soil)
47
Tunnels. TBM (EPBm) - Modified
Combination of
CUTTER HEAD THRUST, ADVANCE SPEED and DISC WEAR
2 Units
working
simulta-
neously
48
Tunnels. TBM (EPBm) - Modified
TBM operated 24-24h in six-day week, one of which was used to execute
cutterhead maintenance under hyperbaric conditions, leading to:
3
3. B t week
Best k (7
(7-13
13 October
O t b 2002)
2002): 56 rings
i = 78
78.4m;
4
49
Tunneling (TBM - EPBm)
2 TBM
Working in
Working out
Tunnels NATM
TUNNELS NATM
50
Tunnels NATM
Tunnel J
300 m long
C
Cross-section
ti 30 m2
Average Cover 18 m
Relatively competent materials
0.00
0.00 0.00
Tunnels NATM
Tunnel J
51
Tunnels NATM
Tunnel J
Final Lining - Shotcrete
Tunnels NATM
Lapa Tunnel
Rehabilitation of na existent tunnel
52
Tunnels NATM
Lapa Tunnel
Tunnels NATM
Lapa Tunnel
53
Cut & Cover Excavations
Underground stations
54
Cut & Cover Stations
24 Agosto Station
Diaphagm walls
Universal solution for
the tender phase
Enormous difficulties
for the construction
24 Agosto Station
55
Cut & Cover Stations
56
Cut & Cover Stations
57
Cut & Cover Stations
Trindade Station
Aliados Station
58
Cut & Cover Stations
Lima Station
S. Bento Station
59
Cut & Cover Stations
60
Cut & Cover Stations
Marqus
Station
Salgueiros
Station
61
Cut & Cover Stations
Bolho
Station
62
Cut & Cover Stations
2,0m
2,0m
Phase 0
Surface preparation, water
table lowering and cap beam
construction
NF
Phase 1
Partial or total excavation of
the first ring
Phase 2
Phase 3 Phase 4
Shotcrete of the first ring
2,0m
63
Cut & Cover Stations
Salgueiros Station
Salgueiros Station
79.95
WP 15 WP 16 WP 2 WP 3
WP 14
WP 1
WP 4
0.60
R1
.65
WP 5
1.60
38.27
25.40
WP 7
WP 12
WP 11 WP 10 WP 9 WP 8
0.30
6.60
2.00
0.45
3.60
28.09
0.60 0.60
12.02
2.45
64
Cut & Cover stations
65
Cut & Cover stations
66
Mining stations
MINING STATIONS
Mining stations
67
Mining stations
Mining stations
Bolho station
68
Mining stations
Mining stations
69
Mining stations
Herosmo Station
Jornadas TNELES Y EXCAVACIONES EN GRANITO Abril 2010
Mining stations
70
Mining stations
Mining stations
71
Mining stations
Herosmo station
Mining stations
Herosmo station
Jornadas TNELES Y EXCAVACIONES EN GRANITO Abril 2010
72
Mining stations
Mining stations
Lima station
Jornadas TNELES Y EXCAVACIONES EN GRANITO Abril 2010
73
Mining stations
Lima station
Jornadas TNELES Y EXCAVACIONES EN GRANITO Abril 2010
Mining stations
Lima station
Jornadas TNELES Y EXCAVACIONES EN GRANITO Abril 2010
74
Mining stations
Marqus station
Jornadas TNELES Y EXCAVACIONES EN GRANITO Abril 2010
Mining stations
Bolho station
Jornadas TNELES Y EXCAVACIONES EN GRANITO Abril 2010
75
Mining stations
Bolho station
Jornadas TNELES Y EXCAVACIONES EN GRANITO Abril 2010
Mining stations
Bolho station
Jornadas TNELES Y EXCAVACIONES EN GRANITO Abril 2010
76
Mining stations
Bolho station
Jornadas TNELES Y EXCAVACIONES EN GRANITO Abril 2010
Mining stations
Bolho station
Jornadas TNELES Y EXCAVACIONES EN GRANITO Abril 2010
77
Mining stations
Mining stations
78
Mining stations
Mining stations
79
Mining stations
Mining stations
10 mm
20 mm
30 mm
40 mm
Faria Guimares station
Jornadas TNELES Y EXCAVACIONES EN GRANITO Abril 2010
80
Mining stations
TBM information
Mining stations
NATM excavations
81
Mining stations
NATM excavations
Ajuste de Gauss - Marqus
Distncia ao eixo tnel (m)
-50
50 -40
40 -30
30 -20
20 -10
10 0 10 20 30 40 50
0
Asssentamento (mm)
5 5 5
10 10 10
15 15 15
20 20 20
Medies Ajuste
Mining stations
NATM excavations
Rua de Faria Guimares/Rua de Fonseca Cardoso - Lado Este
Perfil longitudinal de assentamentos (alvos automticos)
1596 1597 15981599 1599 1601 1601 1603 1602 1602 1623 1624 1625 1625 1626 1628 1629 1629 1681
A2.1 A2.1 A2.1 A1.1 A2.1 A1.1 A2.1 A1.1 A1.1 A2.1 A3.1 A1.1 A1.1 A2.1 A1.1 A1.1 A1.1 A2.1 A1.1
5,0
G l i C
Galeria Cais
i
-5,0
Poo
Faria
Guimares
-15,0
Poo
Fonseca
Assentamento (mm)
Cardoso
-25,0
-35,0
-45,0
-55,0
-65,0
04/02/04 16/02/04 01/03/04 16/03/04 29/03/04 12/04/04 29/04/04 17/05/04
26/05/04 31/05/04 07/06/04 14/06/04 21/06/04 28/06/04 05/07/04 12/07/04
19/07/04 26/07/04 02/08/04
82
Acknowledgments:
Metro
M t do d Porto
P t and d Normetro;
N t
Prof. Lus Ribeiro e Sousa;
Prof. Paul Marinos;
Dr. Siegmund Babendererde.
83