- On January 28th 2017 at 12:00, Turbin Generator #1 tripped at the power plant due to under frequency of 45.19 Hertz.
- The incident was caused by an operator accidentally closing the motorized steam inlet valve for Turbin Generator #1 when trying to restart it after an IPCC trip.
- Short term remedies included opening a circuit breaker to reduce TG#1's load, rolling the turbine back, and resynchronizing with the diesel generators. Long term remedies involve ensuring proper unit operation to avoid operator errors.
- On January 28th 2017 at 12:00, Turbin Generator #1 tripped at the power plant due to under frequency of 45.19 Hertz.
- The incident was caused by an operator accidentally closing the motorized steam inlet valve for Turbin Generator #1 when trying to restart it after an IPCC trip.
- Short term remedies included opening a circuit breaker to reduce TG#1's load, rolling the turbine back, and resynchronizing with the diesel generators. Long term remedies involve ensuring proper unit operation to avoid operator errors.
- On January 28th 2017 at 12:00, Turbin Generator #1 tripped at the power plant due to under frequency of 45.19 Hertz.
- The incident was caused by an operator accidentally closing the motorized steam inlet valve for Turbin Generator #1 when trying to restart it after an IPCC trip.
- Short term remedies included opening a circuit breaker to reduce TG#1's load, rolling the turbine back, and resynchronizing with the diesel generators. Long term remedies involve ensuring proper unit operation to avoid operator errors.
Condition prior to disturbance : ( Kondisi sebelum gangguan )
13:55 All D/G IMM Port Stop All Load system from T/G Power plant Total Load 1763 Kw !4:16 Request for start Conveyor C.44 14:24 Request for start Conveyor C26
Chronology incident : ( Kronologi kejadian )
14:26 Start Conveyor C.26 and T/G trip while start 2nd motor. Causing The system Black out
Cause of incident : ( Penyebab kejadian )
- T/G not able to follow the voltage changes
Remedial Action Short term (Perbaikan jangka pendek )
Turbine rolling and prepare for synchronizing 18:06 unit synchronize
Remedial Action Long term ( Perbaikan jangka panjang )
Unit will be check for respone of voltage changes due start Conveyor C 26
REPORTED BY : Sukarijono Date : 5 Juli 2010
APPROVED BY : Zhang Aimin Date : 5 Juli 2010 INCIDENT REPORT IR NO :
Date : January 28th .2017 Time: 12.00
EQUIPMENT / WORK ACTIVITY : Turbin Generator # 1
LOCATION OF EQUIPMENT : T/G unit 1
Condition prior to disturbance : ( Kondisi sebelum gangguan ) at . 11.59 WITA
DG Port Load : 5 X 450 kW & 1200 kW TG#1 Normal condition, Load = 5.338 kW Boiler #1 Normal condition. Steam flow 13.4 t/h. Press 3.5 Mpa. Temp. 435 C Boiler #2 Normal condition. Steam flow 13.0 t/h. Press 3.51 Mpa. Temp. 450 C
Chronology incident : ( Kronologi kejadian )
At 11.59.36 WITA Trip T/G # 1. Indication Under Frequency 45.19 Hertz .
Cause of incident : ( Penyebab kejadian )
when the IPCC trip and would want to start again, going under frequency due motorized steam inlet valve T / G # 1 is closed because ketidaksengajaan operator closing the motorized valve steam inlet T / G # 1.
Remedial Action Short term (Perbaikan jangka pendek )
CB open 505 to reduce load T / G #1 . Rolling back turbin again. At 12.18 Wita T/G synchron with D/G. 12.23 Energize to 70 KV At 12.26 Energize to CPP1,CPP3,IPCC,KM10 At 12.27 Unit powerplant back to normal again
Remedial Action Long term ( Perbaikan jangka panjang )
Ensuring units were operating and that are not operating to avoid mistakes that are running equipment